NESC Subcommittee 5Changes to the 2017 NESC

Joseph Rempe

18 October 2016

Re-format Rule 241.C. At Crossings

2

241. Application of grades of construction to different situations

2012version

Re-format Rule 241.C. At Crossings

3

241. Application of grades of construction to different situations

2012version

2017version

Re-format Rule 241.C. At Crossings

4

241. Application of grades of construction to different situations

2012version

2017version

SameWords

EasiertoComprehend

Grade N

5

CPIntention:

ChangeGradeNEmergency&Temp

EliminateGradeNfromTable242-1

Grade N

6

CPIntention:

ChangeGradeNEmergency&Temp

EliminateGradeNfromTable242-1

FinalModification:

KeepGradeN

AddNOTE toRule240.A.General:NOTE: For emergency or temporary installations,

see Rule 014.

Grade Cx

7

CPIntention:MakeGrade“Catcrossings”anofficialGrade:Callit“Cx”

ListinSection24-GradesofConstruction

Grade Cx

8

CPIntention:MakeGrade“Catcrossings”anofficialGrade:Callit“Cx”

ListinSection24-GradesofConstruction

PotentialModification:EliminateGrade“Catcrossings”

Grade Cx

9

CPIntention:MakeGrade“Catcrossings”anofficialGrade:Callit“Cx”

ListinSection24-GradesofConstruction

PotentialModification:EliminateGrade“Catcrossings”

FinalAction:Rejectanychange

Revise Table 242-1Grades of Construction Applications

10

Revise Table 242-1Grades of Construction Applications

11

CPIntention:Improvelogicallayoutandformat

Columnssequencefromlowtohighvoltage

Rowssequencefromlowtohighvoltage

12

2012Table242-1

13

2012Table242-1

14

2017 Table242-1

15

2017 Table242-1

Revise Table 242-1Grades of Construction Applications

16

CPIntention:Improvelogicallayoutandformat

Columnssequencefromlowtohighvoltage

Rowssequencefromlowtohighvoltage

FN3reversed;highergradeinthetable

3 Grade B C construction shall may be used if the supply circuits will not be promptly de-energized, both initially and following subsequent breaker operations, in the event of a contact with lower supply conductors or other grounded objects.

Revise Table 242-1Grades of Construction Applications

17

CPIntention:Improvelogicallayoutandformat

Columnssequencefromlowtohighvoltage

Rowssequencefromlowtohighvoltage

FN3reversed;highergradeinthetable

AddFN11– GradeNfordielectricfiber-opticsupplycables

Revise Table 242-1Grades of Construction Applications

18

CPIntention:Improvelogicallayoutandformat

Columnssequencefromlowtohighvoltage

Rowssequencefromlowtohighvoltage

FN3reversed;highergradeinthetable

AddFN11– GradeNfordielectricfiber-opticsupplycables

Meet Rule 230F1b – Insulated Comm Cables in Supply Space

andSupported by effectively grounded messenger

orBonded at intervals specified in Rule 092C to Supply messengers supporting cable meeting Rule 230C1

Revise Table 242-1Grades of Construction Applications

19

CPIntention:Improvelogicallayoutandformat

Columnssequencefromlowtohighvoltage

Rowssequencefromlowtohighvoltage

FN3reversed;highergradeinthetable

AddFN11– GradeNfordielectricfiber-opticsupplycables

FinalAction:Accept

k-factor

20

Introducedin1941§DistrictLoadswerereduced

Clearancesbasedonprevioushigherloads

K-factorapproximatedthesameresultantloadingonthewiretocreatethesamesags§Clearancesbasedonsags,nottension

Resultingincreaseintensionnotintendedforstructuraldesign

2007NESCaddedDistrictLoadMaptoSec23

k-factor

21

CPIntention: Setk=0insection25

Onlyaffectsguyedstructures

Iftensionssetat%limit,designtensionsincrease -everydaytensionsincrease

Affectonstructuresconsideredsmall

k-factor

22

CPIntention: Setk=0insection25

Onlyaffectsguyedstructures

Iftensionssetat%limit,designtensionsincrease -everydaytensionsincrease

Affectonstructuresconsideredsmall

FinalAction:Reject

WillcoordinateeffortwithSC4innextcycle

Delete Rule 243.C.4

23

Delete Rule 243.C.4

24

When communication conductors are required tomeet Grade B or C, only the requirements formechanical strength for these grades are required.

Delete Rule 243.C.4

25

Delete Rule 243.C.4

26

Two new grades of construction:Undefined Loads + Grade B StrengthUndefined Loads + Grade C Strength

Delete Rule 243.C.4

27

FinalAction:Accept

Rule 250C: Add Wind Return Period

28

Rule 250C: Add Wind Return Period

29

NOTE: The commentary to ASCE 7-2005 indicates thatthese wind speeds represent a 50-to-90 year meanrecurrence interval.

Rule 250C: Add Wind Return Period

30

NOTE: The commentary to ASCE 7-2005 indicates thatthese wind speeds represent a 50-to-90 year meanrecurrence interval.

FinalAction:Accept

Rule 250C: Eliminate 60 ft Exclusion

31

Rule 250C: Eliminate 60 ft Exclusion

32

Forgeeht aboutit!!!!

Non-linear analysis

33

CPIntention:

Rule250BGradeB IncreaseStrengthFactorwhenusenon-linear

Rule250BGradeC DecreaseStrengthFactorwhenuselinear

Rule250C&D .75to.79

Non-linear analysis

34

Non-linear analysis

35

Intention:Rule250BGradeB IncreaseStrengthFactor

whenusenon-linear

Rule250BGradeC DecreaseStrengthFactorwhenuselinear

Rule250C&D .75to.79

AsModifiedin2013:Rule250B ReduceLFfornon-linear

Rule250C&D IncreaseLFforlinear

Non-linear analysis

36

Non-linear analysis

37

Non-linear analysis

38

Furtheranalysisshowedinconsistenciesintheresultsofapplyingthesevalues.

-SomeofGradeCrequirementshigherthanGradeB

-Reducedrequirementsexceedincreased loadduetonon-linear

Non-linear analysis

39

Furtheranalysisshowedinconsistenciesintheresultsofapplyingthesevalues.

-SomeofGradeCrequirementshigherthanGradeB

-Reducedrequirementsexceedincreased loadduetonon-linear

FinalAction:Reject

“Clarification”Determining Gust Response Factor

40

“Clarification”Determining Gust Response Factor

41

Clarifiesusing“spanlength”todetermineGRF

Previouslystatedas“designwindspan”

FinalAction:Accept

Clarify when ice is appliedRule 250D

42

…………

Clarify when ice is appliedRule 250D

43

…………

Addiceto:WiresConductorsCablesMessengers

Donotaddiceto:StructureOthersupportedfacilities

Clarify when ice is appliedRule 250D

44

…………

Addiceto:WiresConductorsCablesMessengers

Donotaddiceto:StructureOthersupportedfacilities

FinalAction:Accept

New ASCE ReferenceExtreme Wind Map Figures 250-2

45

New ASCE ReferenceExtreme Wind Map Figures 250-2

46

2012NESC

2017NESC

ASCE7-05MinimumDesignLoadsforBuildingsandOtherStructures

ASCE74-10GuidelinesforElectricalTransmissionLineStructuralLoading

New ASCE ReferenceExtreme Wind Map Figures 250-2

47

SameMap

NewlyrevisedASCEstandard

2012NESC

2017NESC

ASCE7-05MinimumDesignLoadsforBuildingsandOtherStructures

ASCE74-10GuidelinesforElectricalTransmissionLineStructuralLoading

FinalAction:Accept

New ASCE ReferenceExtreme Ice Map Figures 250-3

48

New ASCE ReferenceExtreme Ice Map Figures 250-3

49

2012NESC

2017NESC

ASCE7-05MinimumDesignLoadsforBuildingsandOtherStructures

ASCE7-10MinimumDesignLoadsforBuildingsandOtherStructures

New ASCE ReferenceExtreme Ice Map Figures 250-3

50

2012NESC

2017NESC

ASCE7-05MinimumDesignLoadsforBuildingsandOtherStructures

ASCE7-10MinimumDesignLoadsforBuildingsandOtherStructures

SameMap

NewEditionofASCE7

FinalAction:Accept

Longitudinal Capability Rule 252.C.6

51

Longitudinal Capability Rule 252.C.6

52

It is recommended that structures having a longitudinal strength capability be provided at reasonable intervals along the line.

Longitudinal Capability Rule 252.C.6

53

LongitudinalcapabilityrecommendationmovedtheissuetoaRECOMMENDATION

FinalAction:Accept

Aeolian Vibration – Rule 261H.1.b

54

Aeolian Vibration – Rule 261H.1.b

55

Aeolian Vibration – Rule 261H.1.b

56

FinalAction:Accept

Aeolian Vibration – Rule 261H.1.b

57

FinalAction:Accept

Insulators – New Rating System

58

OldLinePostratings:

Ratingequaltoaverage

Lowestnolessthan85%ofaverage

NewLinePostratings:

Rating=Minimumofallinsulators

Insulators – New Rating System

59

OldTransmissionSuspensionratings:

1.2standarddeviations

NewTransmissionSuspensionratings:

3.0standarddeviations

Exception AddedInsulator Factory Tests Rule 274

60

Exception AddedInsulator Factory Tests Rule 274

61

EXCEPTION:

Guyinsulatorsmanufacturedperdesigns

forwhichvalidationtestshavebeenperformed

and

avalidqualityassuranceprogramisfollowed,

thisruledoesnotrequirethat

dryandwetflashovertestsbeperformed

oneachguyinsulatorunit.

Insulators

62

CPIntention:

IntroduceLoadfactors(LRFD)

Adjustallowablestresses

Mostlyequivalentinsulatorapplications

IntroduceClasses:Distribution&Trans

Differentallowables forRule250Bvs250C,D

Insulators: Table 253-1 Load Factors

63

Insulators: Table 253-1 Load Factors

64

Insulators Table 277-1

65

Insulators Table 277-1

66

Insulators Table 277-1

67

Insulators Table 277-1

68

Nonceramic Table 277-1 cont’d

69

Table 277-1 cont’d

70

Table 277-1 cont’d

71

Table 277-1 cont’d

72

Table 277-1 cont’d

73

FN 3: This percentage shall be supplied by the manufacturer.

FinalAction:Accept

Subcommittee 5 Works in Progress

74

Subcommittee 5 Works in Progress

75

StandardizeTerminology

ImproveClarityandConsistency

K-factor

60ftexclusion

Non-linearAnalysis

GradeN

GradeCx

Subcommittee 5 Works in Progress

76

StartWorkingGroupMeetingsin2016

IEEE WG-7Changes to the 2017 NESC

presented by

Nelson Bingel

Add Temperature Map Figures 250-4For Rule 250D

78

Add Temperature Map Figures 250-4For Rule 250D

79

ToBeUsed

With250D

ExtremeIce&

ConcurrentWind

FinalAction:Accept