Nervia Industrial Park
Cluj-Napoca (ROMANIA)
March 2018
Location:
March 2018
Points of interests in Cluj:
2nd university
campus in the country
good transport and communication services linking people to jobs, health, recreation, schools and other facilities
one of the
most dynamic
cities in
Romania
well connected
March 2018
Where is Nervia Industrial Park located:
We can find the Nervia Industrial Park in Cluj Napoca,
located in the central part of Transylvania. The city lies in
the middle of one of the most dynamic regions in
Romania.
Transylvania is known as the main access to the country
from Europe. This geographic situation gives Cluj
Napoca the characteristic of being an ideal city for
logistics and production activities.
The Industrial Park is located in Apahida, near the European
National Road E576 at:
• 2 Km far from the customs.
• 13 Km far from the center of Cluj-Napoca city
• 3 Km far from the international airport from Cluj.
• 2 km far from the railway station in Sannicoara
Within the country, Cluj is located at:
• 40 km far from Gherla
• 58 km far from Dej
• 30 km far from Turda
• 498 km far from Bucarest
• 168 km far from Bors customs
• 150 km far from Hungary border
March 2018
Where is Nervia Industrial Park located:
CLUJ - NAPOCA
Parc Industrial
Nervia
GPS coordinates:
46°47'37.94"N
23°44'15.62"E
March 2018
The Nervia Industrial Park in numbers:
COEFICIENTS
Sqm Availability From 5.000 m² to 20.000m²
POT 70%
CUT 1,5
Maximum height Ground floor + 2 floors, 12 meters max.
SURFACES
PARK TOTAL SURFACE 244.508 m²
COMMON SURFACES 26.537 m²
GREEN AREA 12.052 m²
INNER ROADS 12.632 m²
UTILITIES 1.853 m²
OWNERS AREA OCCUPIED
PRODUCTION 73.000 m²
LOGISTIC 44.800 m²
March 2018
2
4
6
8 9
10 11
12 13
14
20
19 17
15 m ² m²
ULMA 10.245 SNS LOG. 15.860
ZAROM 15.134 GUEHRING 9.480
HONEST 9.305 SNS LOG. 16.436
TELE D. 9.721 NERVIA 9.329
SAMMILS 9.530 Plot 15 5.043
TAMO KO 9.770 NERVIA 12.534
MIDICONS 9.531 Plot 17 7.761
SARMATEC 9.892 NERVIA 14.946
SNS LOG. 9.894 Plot 19 9.867
SARMATEC 9.636 SESE 14.021
Nervia Industrial Park:
Legend: Colour plots are available
March 2018
Technical Infrastructure
Water supply system approximated minimal flow of 1,5 mc/h/plot at a mean pressure of 4 bar.
Utility into a manhole
Sewage water collecting system final inner spilling pipe of a Ø 200 mm: Utility into a manhole, linked to the
main collecting evacuation piping network with an approximated flow
capacity of 4,5 mc/h/plot
Telecommunication system: underground network piping by means of Ø 110 mm pipes into a manhole,
now been equipped with a last generation system of wiring and distribution
hardware
Rain water collecting system final inner spilling pipe linked to the main telescopic piping network from Ø
400 mm up to Ø 1000 mm. Utility into a mainhold. Full rain water of the park
is cleaned of contaminants before to be spilled in the Somes river by means
of suitable separators with a maximum spilling flow capacity of 8.230 mc/h .
Gas supply system Guaranteed delivery flow of gas of 200 mc/h/plot in low pressure at the
connection point (on surface as per the ANRE regulations); 0,7 bar in
normal conditions of atmospheric pressure and temperature (15ºC and
1,01325 bar abs atm p)
Electrical supply system Medium voltage AC current available in each plot; 2x10 (20) kV -360
A/phase; buried wire utility; for a minimum mean value of 0,125 kW/mp/
built- in plant (installed power) and mean simultaneous absorbed power of
0,04 kWh/mp/ built- in plant
Utilities:
March 2018
Nervia Industrial Park:
Estimative costs
Electricity 291.33 RON/MWh
Water and sewage 5.42 RON/m³
Gas
0 – 23,25MW 170,25 RON / MWh
23,26MW – 116.28MW 167,59 RON / MWh
116,29MW – 1162,78MW 162,16 RON / MWh
1162,79MW – 11627,78MW 158,99 RON / MWh
March 2018
Nervia Industrial Park in images:
March 2018
www.nervia.ro