  • Neighbourhood Forum

    01 August 2018

  • • Feedback from the last meeting

    • What’s been happening in the last 2 weeks

    • Vibration impact

    • Surveys done to date

    • Highways work

    • Amendments to the scheme

    • Questions

    • Opportunity to question experts 1:1

    Agenda for this evening

  • Feedback from the last meeting

    • Visit to Westaway Court

    • Speak to Parish about parking for Metro Apartments

    residents – meeting 15 August

    • Speak to Jersey Employment Trust about disabled

    access concerns – meeting next week

    • Confirm the extent of surveys on surrounding properties

  • What’s been happening in the last two

    weeks

  • • Meetings with neighbours

    • Amendments to planning application (coming up later)

    • Lessons learned from St Peter

    • Scoping condition surveys (coming up next)

    • Phasing of early works

    • Main scheme design

    • Westaway Court engineering designs

    • Basement design discussion

  • Vibration impact

  • Neighbourhood Vibration Phase 1

  • Comparison of Vibration

  • Potential vibration effect without mitigation• Identify risks to each specific department• Develop specific control and mitigation strategy• Communication & scheduling• Physical measures (primary & Secondary)

    Air quality, noise & vibration – control and mitigation

  • Where we’ve done this before

    Royal Albert Hall London

    Bristol Royal Infirmary

    Bexley Wing St James’s Leeds

    Combined University Hospital ManchesterPrincesshay Exeter

    Milton Court London

  • Existing hospital and Kensington Place properties

  • Environmental protection barrier

  • Demolition traffic routes

    Existing

    Changed

    Construction

    Traffic Flow

  • Construction/EmergencyTraffic only

    Open to traffic outside of

    Working hours

    Traffic management during works

  • Surveys and Highways

  • Surveys

    Survey Type Complete/Anticipated Completion Date

    Lidar survey Complete

    Below ground services (GPR) Complete except for remote highways and junctions

    Topographical Survey Complete except for remote highways and junctions

    Drainage CCTV Final phase of jetting and survey to be completed and services drawing updated. Anticipate one week of site works. To be completed ASAP

    Acoustics A number of surveys completed. New scheme will be assessed to inform further surveys required

    Vibration A number of surveys completed. New scheme will be assessed to inform further surveys required

    Ground Investigation

    BH101 Borehole complete. Monitoring July and August

    BH102 Borehole complete. Monitoring July and August

    BH103 Borehole complete. Monitoring July and August

    BH104 Borehole complete. Monitoring July and August

    BH105 Borehole complete. Monitoring July and August

    BH106 Borehole complete. Monitoring July and August

    BH107 Borehole complete. Target date for monitoring August/September

    BH108 Borehole complete. Monitoring July and August

    BH109 Incomplete. Target date post-demolition

    BH110 Incomplete. Target date post-demolition

    BH111 Incomplete. Target date post-demolition

    BH112 Incomplete, target date end of May 2018

    Water Monitoring As noted above

    Gas Monitoring As noted above

    Electrical Surveys To be defined during Stage 2 design

    Mechanical surveys To be defined during Stage 2 design

    Asbestos Survey On vacation of buildings to be demolished

    Condition Surveys Prior to any works commencing

    Structural surveys MSCP in August 2018

    Traffic Surveys Complete

  • Westaway Court

    N

    People’s Park junction

    Signalise junction to enable construction

    traffic

    Key

    Location of highway/ junction works

    Kensington Place

    Acquisition of properties, surveys and soft strip

    Removal of traffic calming measures prior to

    demolition

    Westaway Court

    Asbestos survey

    Soft strip

    Patriotic Street MSCP

    Modifications for additional staff car and

    motorcycle parking

    Service road, Westaway Court, Sutherland Court,

    Kensington Place Properties

    Ground Investigation

    St Elmo

    Soft strip and temporary propping

    Demolition, including footway closure

    All properties on construction route (dock to site and

    back) - condition surveys All highway works to be agreed with DfI Streetworks and Highway Maintenance

    Relevant highways and junctions - Topographical and

    services survey

    Esplanade/Kensington Place

    Amend junction to enable construction

    traffic

    First physical works

    Gloucester/Newgate

    Street

    Drainage connection

    Gloucester Street Car Park

    Staff car parking to be relocated to PSMSCP and

    car park cleared and plant etc. installed

  • Amendments to the scheme

  • Amendments to the scheme

  • Amendments to the scheme

  • Questions and answers