    NEDO-MEA Meeting

    11 December 2012

  • 7/30/2019 nedo 11 dec.pdf

    2/20

    MEA Background Bangkok,Bangkok, NonthaburiNonthaburi andand SamutprakanSamutprakan

    Service areaService area :: 33,,192192 kmkm22

    Maximum DemandMaximum Demand:: 88,,383383 MWMW

    Substation no.Substation no.:: 149149

    Number of customerNumber of customer :: 33,,115115,,695695

    April , 2012Load

    Time

    2

  • 7/30/2019 nedo 11 dec.pdf

    3/20

    Distribution facilities

    Transformers

    Terminal station 230/69-115 kV ( 17 stations) 18,205.88 MVA Substation 69-115/12-24 kV ( 149 stations ) 18,405.00 MVA

    Distribution 12-24 kV/230-380 V 14,148.68 MVA

    TRANSMISSION LINES . cc - m

    115 kV ( 38 LINES ) 722.75 cct-km 69 kV ( 77 LINES ) 897.88 cct-km

    DISTRIBUTION LINES

    24 kV ( 1,156 LINES ) 12,829.52 cct-km

    12 kV ( 464 LINES ) 4,279.18 cct-km

    Low voltage 27,211.83 cct-km

    OPTICAL FIBER

    ADSS Structure Cable 10,000.00 cct-km

  • 7/30/2019 nedo 11 dec.pdf

    4/20

    Operation and maintenance

    No subsidiary company

    24 kV line maintenance by district office

    69 and 115 kV maintenance by Maintenance

    epartment Substation equipment maintenance by

    Maintenance department

  • 7/30/2019 nedo 11 dec.pdf

    5/20

    Quality of supply

  • 7/30/2019 nedo 11 dec.pdf

    6/20

  • 7/30/2019 nedo 11 dec.pdf

    7/20

  • 7/30/2019 nedo 11 dec.pdf

    8/20

  • 7/30/2019 nedo 11 dec.pdf

    9/20

    Adder

  • 7/30/2019 nedo 11 dec.pdf

    10/20

    Energy Regulatory Commission policy framework as to ensure the equality and

    fairness nested between consumers, producers,and other relevant interest groups.

    The primary functions and duties

    systems of generation, transmission, distribution, andtheir system operator.

    monitoring energy market conditions by tariff review,licensing, approval of power purchase, disputesettlement and fulfilling its mandate, in order tocounterbalance each other, to ensure maximuminterests of the people and the country

  • 7/30/2019 nedo 11 dec.pdf

    11/20

    Challenge1. Power System

    Power Quality, Reliability, Security

    Loss Reduction, Economic

    2. Service

    New Service3. Renewable Energy

    Manage and Support

    New Technology (EV, Energy Storage)4. IT Interoperability and Standard

    11

  • 7/30/2019 nedo 11 dec.pdf

    12/20

    Smart Grid Roadmap

    Stage 12012 2016

    Laying the Foundations

    Stage 12012 2016

    Laying the Foundations

    Stage 22017 2021

    Large Scale Implementation

    Stage 22017 2021

    Large Scale Implementation

    40 automation substationsAutomation substation in all service area(170 stations)

    12

    Power system

    Manage and Control LBS in distributionnetwork cover 30% of service area. Manage and Control LBS in distributionnetwork cover all of service area

    Outage area monitoring and managementsystem for HV and MV network

    Outage monitoring and managementsystem all network

    Automatic service restoration (Self-

    healing) in some area.

    Automatic service restoration (Self-

    healing) in all area

    Asset management

  • 7/30/2019 nedo 11 dec.pdf

    13/20

    Stage 1

    2012 2016

    Laying the Foundations

    Stage 1

    2012 2016

    Laying the Foundations

    Stage 2

    2017 2021

    Large Scale Implementation

    Stage 2

    2017 2021

    Large Scale Implementation

    Automatic meter reading (AMR) for commercial and industrial customer

    Smart Grid Roadmap

    13

    Service Daily load profile and power consumption monitoring for customer via internet andmobile phone

    Street light control

  • 7/30/2019 nedo 11 dec.pdf

    14/20

    Stage 12012 2016

    Laying the Foundations

    Stage 12012 2016

    Laying the Foundations

    Stage 22017 2021

    Large Scale Implementation

    Stage 22017 2021

    Large Scale Implementation

    Support integration of SPP/VSPP and

    renewable energy

    Monitoring and control SPP/VSPP andrenewable energy in widely area

    Smart Grid Roadmap

    14

    Energyconservation

    &

    Alternativeenergy

    Pilot project of 20 EV and 10 chargingstations to study the effect to power

    system

    Support widely used of EV and chargingstation and electric vehicle to grid (V2G)

    Pilot project of energy storage Energy Storage for powersecurity

    Building Energy Management System(BEMS)

    Integration of BEMS and home energymanagement system

  • 7/30/2019 nedo 11 dec.pdf

    15/20

    MEAs Smart Grid Projectsobjective

    Project

    EMS DMS SA BEMS EV ESS AMR

    Substation Automation

    According toIEC 61850 pRemote control of distribution

    switch with Distribution

    Management System

    p

    Outage monitor in high

    voltage and medium voltage p p p p

    system

    self-healing in some area p p p

    AMR for Commercial and

    industrial customerp

    Ready for SPP/VSPP andRenewable Energy connection

    p p p p

    Pilot use of EV and charging

    stationp

    Pilot use of Energy Storage p

    Building Energy ManagementSystem p

  • 7/30/2019 nedo 11 dec.pdf

    16/20

  • 7/30/2019 nedo 11 dec.pdf

    17/20

  • 7/30/2019 nedo 11 dec.pdf

    18/20

  • 7/30/2019 nedo 11 dec.pdf

    19/20

    Condition or regulations to be

    authorized as VSPP

    Power Generation Using Renewable Energy (

    attached 1 ) Power Generation Using Cogeneration Energy

  • 7/30/2019 nedo 11 dec.pdf

    20/20

    The procedure to be authorized as VSPP

    1. Procedures and criteria for consideration of

    power purchase from VSPPs.

    2. Conditions for purchasing electrical power

    from VSPPs.3. Power purchasing point and connection point.

    4. Costs incurred for VSPPs.