3/16/2012
1
NECC – Delaware Progress
Karl V. Steiner 2012 Annual NECC Meeting,
Newark, Delaware – March 16, 2012
Delaware INBRE/EPSCoR Partners
3/16/2012
2
Delaware’s Cyberinfrastructure Expansion
Five related Grants
• NSF EPSCoR RII‐2 Track‐1 (2008‐2013)
• NSF EPSCoR RII‐2 Track‐2 (2009‐2012)
• NSF EPSCoR RII‐2 Track‐2 C2 (2010‐2012)
• NIH INBRE–2 (2009‐2014)
• NIH INBRE IDeA CyberIT Supplement (2009‐2012)
Delaware EPSCoR Cyberinfrastructure Strategy
Cyberinfrastructure Goals
• Strengthen capacity and capability of cyber‐
knowledgeable faculty and staff
• Develop a high‐throughput genomics
research capability
• Key Focus Theme: “Environmental
Observation and Sensing“
• Establish Delaware Environmental
Monitoring and Analysis Center (DEMAC)
3/16/2012
3
Delaware INBRE Bioinformatics Goals
• Creation of a new Center for Bioinformatics and Computational Biology
• Increase in Cyber‐savvy Faculty and Students
• New Graduate Courses in Bioinformatics and Computational Biology
• Integration with Biostatistics Resources at Christiana Care Center for Outcomes Research
• Integrated Cyberinfrastructure with Delaware IDeA Partner Institutions; i.e. NECC
NECC Cyberinfrastructure Upgrades in Delaware
Prior to NECC:
– UD is linked to Internet‐2 via MAGPI in Philadelphia
– INBRE‐funded Extension of Internet‐2 to DSU – 2006
NECC Enhancements:
– UD: Bandwidth Expansion to Lewes Campus (100 Mbps to 1,000 Mbps)Regional Datacenter at DBI & Environmental Monitoring in Lewes
– UD: Campus Backbone Upgrade & Distributed Data Center in Newark
– DSU: Redundancy loop across Dover Campus
– Wesley: Wireless access across Dover Campus
– DelTech: Campus‐wide cyber‐infrastructure upgrades at Georgetown Campus
3/16/2012
4
Increased Use of Bandwidth
• Upgraded Connection from UD Campus in Newark to Lewes Campus from 100 Mbps to 1,000 Mbps in October 2010
• Significant increase in bandwidth usage over the past year
UD Network Infrastructure Upgrades
Major Improvements in Capabilities – Leveraged Programs
• Wide‐area Network (connecting UD with Internet/Internet2)
• Fiber ring (50 Gbps upgrade from 10 Gbps)
• I2/ION: on‐demand 10Gbps optical waves
• Campus Backbone
• Upgrade from 1 Gbps to 10 Gbps
• Reliability and Resilience
• Adding a second connectivity point
• Wireless Connectivity
• 802.11n capability added to 100 buildings
• IP Address Range increased
3/16/2012
5
UD Cyberinfrastructure Upgrades
Research Support Initiatives
• Community Cluster Program (Mills Cluster)
• 5,136‐core HPC cluster, Infiniband network fabric, Lustre filesystem
• 14 Terabyte of RAM, 200 Terabytes of Disk Space
• Partners include DEMAC, Environmental Sciences faculty, DBI scientists
• Physical and Virtual Server Hosting
• Including major replacements of power generator, HVAC, UPS
• InCommon federated Authentication
• For multi‐institutional shared resources
• Provide a redundant 10 Gbps data network to academic buildings for NSF and NIH faculty and students
– Install new 10 Gbps fiber
– Create new Data Closets in several locations
• Install new Cisco Data Network Equipment to support 10 GbpsNetwork & UPS’s to protect the equipment
• Upgrade Internal Copper Wiring to support higher bandwidth
• Packet shape data traffic going into and out of DSU to speed up and control the type of data traffic
Delaware State University Cyberinfrastructure Upgrades
3/16/2012
6
3/16/2012
7
DTCC Cyberinfrastructure Plan
• Installation of 15 new network infrastructure switches to provide connectivity among all buildings on campus
• Installation of single mode 72‐pair fiber optic cable
that existing multi‐mode cable would not support
• Increased speed from 100 Mbps to 10 Gbpsto allow significantly enhanced connectivity on Campus as well as with UD and DSU.
100 Mbps
10 Gbps
3/16/2012
8
Delaware Tech Owens Campus
Wesley CollegeCyberinfrastructure Upgrades
• Original Bandwidth Utilization to Campus was at 85% to 95% of capacity.
• Upgrade Campus Connection from 40 Mbps to 100 Mbps
– Completed in May 2011
• This bandwidth enhancement has had a significant impact on the graduate and undergraduate research capability at Wesley College.
3/16/2012
9
Wesley – Cyber Upgrades
Before: June 2010 ‐ June 2011 Network Bandwidth Utilization
Wesley – Cyber Upgrades
After: October 2011 ‐ November 2011 Network Bandwidth Utilization
3/16/2012
10
Wesley – Cyber Upgrades
June 2011 Download/Upload Speeds November 2011 Download/Upload Speeds
NECC – Delaware Progress
Thank you