BRIGHTSTAR SHOTBLASTING AND COATINGS LTD NON CONFORMANCE REPORT
INSPECTOR:
NON CONFORMITY OBSERVEDSHOTBLAST STANDARD NOT UP TO SPECIFICATION - SA2.5
ALSO PAINT RESIDUE STILL ON ITEMS
CORRECTIVE ACTIONS REQUIREDRE-BLAST PARTS UP TO SPECIFICATION - SA2.5, ALSO REMOVING PAINT NOMINATED OPERATIVERESIDUE
NIEL PARKER
TARGET DATE OF COMPLETION
11/20/2014
ROOT CAUSE(S)OPERATIVE TECHNIQUE ERROR
CONTAMINATED BLAST MEDIA
CORRECTIVE ACTIONS CARRIED OUTRE-BLASTED UP TO SPEC - SA2.5 ACTUAL OPERATIVEPAINT RESIDUE ALSO REMOVED
NIEL PARKER
ACTUAL DATE OF COMPLETION
11/20/2014
VERIFICATION OF WORKS COMPLETED
VISUAL INSPECTION BY A.HANDLEY
N.C.R FORM COMPLETE CORRECTIVE ACTIONS ACCEPTANCE
INSPECTOR SIGNATURE INSPECTOR SIGNATUREDATE:
11/20/2014
N.C.R STATUS
[ X ] CLOSING NOTES
X' WHEN CLOSEDOPERATOR CHECKS TO BE MORE THOROUGH
N.C.R CLOSE ACCEPTANCE MANAGEMENT SIGNATURE + POSITION (IF APPLICABLE)
INSPECTOR SIGNATURE
POSITION DATE:
QA 11/20/2014
JOB NUMBER.: 11486
CUSTOMER: TINSLEY BRIDGE SERVICESDATE: 20/11/14 NCR NO: 2014/001
DEPARTMENT: QACOMMENTS: 3 OFF STORAGE TANKS - PART OF FRAME
INSPECTOR: ASHLEY HANDLEY
OPERATIVE: KEVIN WOLSTENHOME
DATE: 20/11/14
Form no. QF / 5.2 / A