37
US Army Corps of Engineers BUILDING US Army Corps of Engineers BUILDING STRONG ® Navigation Lock Foundation Design in Complex Karst Geology At Chickamauga Dam Mark S. Elson, P.G. USACE Juan Payne, P.G. USACE Dewayne Ponds, P.G. Arcadis

Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

US Army Corps of Engineers

BUILDINGUS Army Corps of EngineersBUILDING STRONG®

Navigation Lock Foundation Design in Complex Karst Geology At Chickamauga

DamMark S. Elson, P.G. USACEJuan Payne, P.G. USACE

Dewayne Ponds, P.G. Arcadis

Page 2: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Acknowledgements

Arcadis Ben C. Gerwick, Inc. Bergmann Assoc. Black & Veatch Inca Engineers, Inc. MWH

Page 3: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Cofferdam construction for the new Chickamauga Lock.

Page 4: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Chickamauga Dam lies within the Valley and Ridge Physiographic Province

Chattanooga

Chickamauga DamChickamauga Dam

Page 5: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Site Stratigraphy

Compressive Strength

•Cannon, upper – 10,000 psi

•Cannon, lower – 18,000 psi

•Hermitage – 11,000 psi

•Tyrone – 10,000 psi

•Carters – 14,400 psi

Page 6: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Carters Fm

Page 7: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Tyrone Fm

Page 8: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

T-4 Bentonite in Tyrone Fm

Page 9: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Hermitage Fm

Page 10: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Geologic Map

Rocks strike 020 dipping to the southeast at2-5 degrees at the surface, 40 degrees to vertical in some locations.

Page 11: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

L-12 through L-14 geologic profile.

Page 12: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Sites of further field investigations upstream of Chickamauga LockSites 1-5 bentonite, folding and faulting

Chickamauga Lock

Page 13: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Site 3 off of Lake Resort Drive upstream of the existing lock.

Drag Fold in Carters LimestoneBentonite Sample Site

Page 14: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Site 4 upstream of existing lock.

Hwy 153

Drag fold

T-3 Bentonite

T-3 Bentonite

T-3 Bentonite

Page 15: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Original lock excavation cross cutting bentonitebed exposing fault and slickensided surface

Slickensided surface

Bentonite bed

Fault

Page 16: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Highly weathered joints and solutioned cavities, looking east

Page 17: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Joint spacing as close as 2 feet is indicated by arrows Two joint sets: 258-353 and 018-050Vertical to near vertical dips with spacing from 2 to 9 feet

Joints

Page 18: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Design Solutions

•Design of Lock Monolith Foundations include:

Exploratory Drilling for Construction

Drilled Shaft Installation

Secant Wall Installation

Blasting, and Excavation

Foundation Drilling and Grouting

Excavation Stabilization

Page 19: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Drilled Shaft Location Plan

Page 20: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Integrated lock monolith, Riverside lock monolith.

landside.

Page 21: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Exploratory Drilling for Drilled Shaft Construction

• One boring in center of structure to verify founding elevation conditions

• One boring at center of each drilled shaft to a depth of 10 feet below tip elevation

•HQ diameter vertical borings

Page 22: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Floating plant for cofferdam drilled shaft installation.

Page 23: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Structural steel for cofferdam drilled shafts.

Page 24: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

L-12 through L-14 geologic profile.

Page 25: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

L-13 Secant wall, plan view.

Page 26: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Secant wall construction at L-13.

Page 27: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Blasting

• Blasting extremely important at this project

• Most major rock excavation will be accomplished by drilling and blasting

•Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting

• Preblast survey conducted end of September of 2007

• Structures examined; TVA Power Management Facility, Chickamauga Lock, Dam and Powerhouse, the other facilities

Page 28: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Lock Foundation Excavation, Looking Southwest

Outlet structure

Crossover trench

Downstream miter sill

Bentonite beds

Page 29: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Lock Foundation Excavation, Looking Southeast

Page 30: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Pre-Split (18” -24” spacing)

Pre-split at monolith joints (12” spacing)

Line drill (6” spacing)

Blasting Plan

Monolith L13

Page 31: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Foundation Drilling and Grouting

• Grouting needed to minimize leakage

• Operational condition

• Maintenance condition

• Seepage analysis performed to evaluate grout curtain effectiveness

• Single line grout curtain placed with holes drilled on 10 foot centers, 30 degrees from vertical.

• Contingency in quantities for split spacing to be applied as needed.

Page 32: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Foundation Grouting Plan

Page 33: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Excavation Stabilization

Rock Bolts And Shotcrete

• Closely spaced joints, bedding planes dipping into excavation and bentonite beds make slope failures possible.

• Rock bolts, shotcrete, drains and limits on excavation employed to maintain excavation stability.

• Rock bolts consist of 15’, 20’ 25’ and 30’ vertical and angled mechanical bolts for the excavation.

• Large stranded anchors are to be installed at the toe of the cellular coffercells to maintain stability of cofferdam during excavation.

Page 34: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Shotcrete Application and Drain installation

Page 35: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Rock Bolts at D/S Miter Sill, Plan

Page 36: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Rock Bolts at D/S Miter Sill, Section

Sill Foundation

Page 37: Navigation Lock Foundation Design in Complex Karst Geology ... · •Types of blasting; Pre-splitting, Pre-splitting at monolith joints, line drilling, production blasting • Preblast

BUILDING STRONG®

Questions?