C al son, PC Doc. Cpr7ittee & anager, EMD-PES 5 s qbji Date Prepared by JO I Y ICARDO RO VES Vice '7!'-nt, PES ED DA ELIO C. CO Vice Pres' ent, M LORN Vice Pre A ga;NO C. MENDIOLA, JR. wzzilikyr A fr lf MEL• • - • R Vice President, OL ME NATIONAL POWER CORPORATION CORPORATE PROCEDURE NPC-007 Document Code CONTROL OF EXTERNALLY PROVIDED PROCESSES AND SERVICES Document Title Revision No.: 0 Effectivity Date: OCT 1 7 2017 Reviewed by : 1( lailUEL A. UMALI C QM & Manager, WMD-CAG Date MA EL LUIS B.AOFINO Sr. Dept. anager, RMS Date Date 3? 0- 0te ctks { 4 - 3- a e Date 4L-ta- Date Approved by NPC-001.F03 Rev. No. 0

NATIONAL POWER CORPORATION CORPORATE PROCEDURE

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NATIONAL POWER CORPORATION CORPORATE PROCEDURE

C al son, PC Doc. Cpr7ittee & anager, EMD-PES 5

sqbji Date

Prepared by JO I Y ICARDO

RO VES Vice '7!'-nt, PES

ED

DA ELIO C. CO Vice Pres' ent, M

LORN Vice Pre

Aga;NO C. MENDIOLA, JR. wzzilikyr A

fr lf

MEL• • - • R Vice President, OL

ME

NATIONAL POWER CORPORATION

CORPORATE PROCEDURE NPC-007

Document Code

CONTROL OF EXTERNALLY PROVIDED PROCESSES AND SERVICES

Document Title

Revision No.:

0

Effectivity Date: OCT 1 7 2017

Reviewed by : 1(lailUEL A. UMALI

C QM & Manager, WMD-CAG Date

MA EL LUIS B.AOFINO Sr. Dept. anager, RMS Date

Date

3? 0-0te

ctks{4-3-a e

Date

4L-ta-Date

Approved by

NPC-001.F03 Rev. No. 0

The official copy of this document is available on NPC-DCC's shared drive. Before using a printed copy, verify the version by checking the electronic version. This document becomes uncontrolled once printed.

Page 2: NATIONAL POWER CORPORATION CORPORATE PROCEDURE

National Power Corporation

ISO 9001:2015 Quality Management System

Document Code: NPC-007

Revision No.: 0 Page 1 of 6

Effectivity Date:

Document Title: CONTROL OF EXTERNALLY PROVIDED PROCESSES AND SERVICES

___________________________________________________________________

1.0 PURPOSE

To control externally provided processes and services to ensure that these conform to the NPC requirements.

2.0 SCOPE

This procedure covers the establishment and application of criteria for the evaluation, selection, monitoring of performance, and re-evaluation of external providers in their ability to satisfy NPC requirements for the following:

a. processes and services intended for incorporation into the NPC’s productsand services;

b. processes and services provided directly to the customers on behalf of theNPC; and

c. a process or part of a process provided, as a result of a decision by theNPC.

3.0 DEFINITIONS/ACRONYMS

3.1 Definitions

3.1.1 Bidding Documents - documents issued by the procuring entity as the basis for bids, furnishing all information necessary for a prospective bidder to prepare a bid for the infrastructure projects, goods and/or consulting services.

3.1.2 Competitive Bidding or Public Bidding - a method of procurement which is open to participation by any interested party and which consists of the following processes: advertisement, pre-bid conference, eligibility screening of prospective bidders, receipt and opening of bids, evaluation of bids, post-qualification, and award of contract.

NPC-001.F03 Rev. No. 0-A-001.F03v. No. 2

OCT 17 2017

Page 3: NATIONAL POWER CORPORATION CORPORATE PROCEDURE

NPC-007

CONTROL OF EXTERNALLY PROVIDED PROCESSES AND SERVICES

Rev. No.: 0

Page 2 of 6

Chart

3.1.3 Contract - is an agreement having a lawful object entered into voluntarily by two or more parties, each of whom intends to create one or more legal obligations between them.

3.1.4 End-user - requisitioning Cost Center/Monitoring Center.

3.1.5 Interim PPMP/APP - transitional/temporary Project Procurement Management Plan/Annual Procurement Plan pending approval of the GAA budget. Interim PPMP/APP is based on budget approved by the Board and submitted to DBM.

3.1.6 Procurement - Refers to the acquisition of goods, consulting

services, and the contracting for infrastructure projects by the procuring entity.

3.1.7 Purchase Order - a written sales contract between buyer and

seller detailing the exact goods, merchandise or services to be rendered.

3.1.8 Purchase Requisition/Contract Request Form - form used in the

processing of requirements. Contains all the necessary details, specifications, measurement, quantity, approved budget of the contract, etc.

3.2 Acronyms

3.2.1 APP - Annual Procurement Plan 3.2.2 DBM - Department of Budget and Management 3.2.3 GAA - General Appropriations Act 3.2.4 NPC - National Power Corporation 3.2.5 PO - Purchase Order 3.2.6 PPMP - Project Procurement Management Plan 3.2.7 PR - Purchase Requisition

3.2.8 RO - Records Officer 3.2.9 TOR - Terms of Reference

NPC-001.F03 Rev. No. 0-ES-A-0Page 2 of 6Rev. No. 2Pa

Page 4: NATIONAL POWER CORPORATION CORPORATE PROCEDURE

NPC-007

CONTROL OF EXTERNALLY PROVIDED PROCESSES AND SERVICES

Rev. No.: 0

Page 3 of 6

Chart 4.0 REFERENCES

4.1 Philippine National Standard - ISO 9000:2015 Quality Management

Systems, Fundamentals and Vocabulary 4.2 Philippine National Standard - ISO 9001:2015 Quality Management

Systems, Requirements

4.3 Republic Act No. 9184 - Government Procurement Reform Act and its Revised Implementing Rules and Regulations and Government Procurement Policy Board (GPPB) Resolutions and Issuances.

5.0 APPENDICES 5.1 NPC-007.F01, Monitoring Sheet for Externally Provided Processes/

Services

NPC-001.F03 Rev. No. 0-ES-A-0Page 3 of 6Rev. No. 2Pa

Page 5: NATIONAL POWER CORPORATION CORPORATE PROCEDURE

NPC-007

CONTROL OF EXTERNALLY PROVIDED PROCESSES AND SERVICES

Rev. No.: 0

Page 4 of 6

Chart

Approve TOR

6.0 PROCEDURES

6.1 Establishment of Criteria for the Evaluation of Externally Provided Processes, Products and Services

Flowchart Responsibility Details

End-user

1.1

Prepare TOR detailing specifications of processes, products and services to be procured in accordance with the approved PPMP. Note: For services procured through Public Bidding, use Bid Documents, otherwise, use TOR.

Cost Center Head 2.1

Review and approve TOR.

End User 3.1 Submit PR with the approved TOR or Bid Docs, as applicable, to the Logistics as input to the procurement process.

RO 4.1 File copy of generated documents in accordance with NPC-001, Control of Documents and Records.

Prepare TOR 1

Start

2

3

Submit PR

File Documents 4

End

NPC-001.F03 Rev. No. 0-ES-A-0Page 4 of 6Rev. No. 2Pa

Page 6: NATIONAL POWER CORPORATION CORPORATE PROCEDURE

NPC-007

CONTROL OF EXTERNALLY PROVIDED PROCESSES AND SERVICES

Rev. No.: 0

Page 5 of 6

Chart

6.2 Establishment and Application of Monitoring Criteria for Externally Provided Processes and Services

Flowchart Responsibility Details

End-user

1.1

Define Performance Criteria, Relative Weight and Service Requirements by filling out NPC-007.F01, Monitoring Sheet for Externally Provided Processes/Services based on the PO/Contract requirements.

End-user

2.1

Evaluate actual performance and provide rating of process/service provided by filling out NPC-007.F01, Monitoring Sheet for Externally Provided Processes/ Services. Note: Re-evaluation is conducted every quarter using the same form.

Cost Center Head

3.1 Review and approve the Monitoring Sheet.

Establish criteria for monitoring

Approve Monitoring Sheet

1

3

Start

Evaluate Service Provided

2

A

NPC-001.F03 Rev. No. 0-ES-A-0Page 5 of 6Rev. No. 2Pa

Page 7: NATIONAL POWER CORPORATION CORPORATE PROCEDURE

NPC-007

CONTROL OF EXTERNALLY PROVIDED PROCESSES AND SERVICES

Rev. No.: 0

Page 6 of 6

Chart

Flowchart Responsibility Details

End-user 4.1

Transmit approved Performance Evaluation to Logistics for appropriate action.

RO 5.1 File copy of approved Monitoring Sheet in accordance with NPC-001, Control of Documents and Records.

Transmit Monitoring Sheet

4

A

End

5 File

Monitoring Sheet

NPC-001.F03 Rev. No. 0-ES-A-0Page 6 of 6Rev. No. 2Pa