1 May 03Environmental Quality Control Committee3 NEPA Requirements 1.Consider environmental impacts of proposed actions 2.Evaluate alternative actions 3.Disclose actions/impacts to the public 4.Integrate public participation into the decision making process

Citation preview

Page 1: National Environmental Policy Act Environmental Engineer US Army Garrison

National Environmental Policy Act

Environmental EngineerUS Army Garrison

Page 2: National Environmental Policy Act Environmental Engineer US Army Garrison

1 May 03 Environmental Quality Control Committee 2

NEPA

• National Environmental Policy Act of 1969

• US Army implementing regulation is AR 200-2

Page 3: National Environmental Policy Act Environmental Engineer US Army Garrison

1 May 03 Environmental Quality Control Committee 3

NEPA Requirements

1. Consider environmental impacts of proposed actions

2. Evaluate alternative actions

3. Disclose actions/impacts to the public

4. Integrate public participation into the decision making process

Page 4: National Environmental Policy Act Environmental Engineer US Army Garrison

1 May 03 Environmental Quality Control Committee 4

NEPA ProcessDocumentation

• Record of Environmental Consideration (REC) – 1 page, cost minimal

• Environmental Assessment (EA) – 3-6 month process, cost $20K to $60K– FONSI– NOI

• Environmental Impact Statement (EIS) – 1-5 year process, $200K to $Ms– ROD

Page 5: National Environmental Policy Act Environmental Engineer US Army Garrison

1 May 03 Environmental Quality Control Committee 5

Public Notification?

• REC – no

• EA – yes

• EIS – yes

Page 6: National Environmental Policy Act Environmental Engineer US Army Garrison

1 May 03 Environmental Quality Control Committee 6

Project Proponents

• Early integration of NEPA required

• Responsible for funding NEPA documentation

• Fully involved in NEPA process

Page 7: National Environmental Policy Act Environmental Engineer US Army Garrison

1 May 03 Environmental Quality Control Committee 7

Allegheny Power Substation EA

Fluoridation of the Drinking Water EA

Commissary/PX/Fire Station EA

NIAID EIS

Installation EA

Recent NEPA Projects

Page 8: National Environmental Policy Act Environmental Engineer US Army Garrison

1 May 03 Environmental Quality Control Committee 8

Conclusion

1. NEPA is a legal and a US Army requirement

2. Project proponents must be fully involved

3. Call x3152 if you have any questions