1 May 03Environmental Quality Control Committee3 NEPA Requirements 1.Consider environmental impacts of proposed actions 2.Evaluate alternative actions 3.Disclose actions/impacts to the public 4.Integrate public participation into the decision making process
Citation preview
National Environmental Policy Act
Environmental EngineerUS Army Garrison
1 May 03 Environmental Quality Control Committee 2
NEPA
• National Environmental Policy Act of 1969
• US Army implementing regulation is AR 200-2
1 May 03 Environmental Quality Control Committee 3
NEPA Requirements
1. Consider environmental impacts of proposed actions
2. Evaluate alternative actions
3. Disclose actions/impacts to the public
4. Integrate public participation into the decision making process
1 May 03 Environmental Quality Control Committee 4
NEPA ProcessDocumentation
• Record of Environmental Consideration (REC) – 1 page, cost minimal
• Environmental Assessment (EA) – 3-6 month process, cost $20K to $60K– FONSI– NOI
• Environmental Impact Statement (EIS) – 1-5 year process, $200K to $Ms– ROD
1 May 03 Environmental Quality Control Committee 5
Public Notification?
• REC – no
• EA – yes
• EIS – yes
1 May 03 Environmental Quality Control Committee 6
Project Proponents
• Early integration of NEPA required
• Responsible for funding NEPA documentation
• Fully involved in NEPA process
1 May 03 Environmental Quality Control Committee 7
Allegheny Power Substation EA
Fluoridation of the Drinking Water EA
Commissary/PX/Fire Station EA
NIAID EIS
Installation EA
Recent NEPA Projects
1 May 03 Environmental Quality Control Committee 8
Conclusion
1. NEPA is a legal and a US Army requirement
2. Project proponents must be fully involved
3. Call x3152 if you have any questions