National Board Update
Presentation to the Valve Repair Council
June 2, 2016
Prepared by: Joseph F. Ball, P.E.
National Board Update
• National Board activities
Who we are and what we do
• National Board Inspection Code (NBIC) Updates
• National Board Test Lab updates
• New Certified Testing Organization (TO) program
National Board Activities
3
COMMISSIONING
boiler and pressure vessel inspectors
through its Commission Examination
CERTIFICATION
Pressure relief device
capacity cert. program
EDUCATING
the general public and
government representatives
on the need for safety
Standards, and tracking
violations
REGISTERING
all manufactured boilers
and pressure vessels
TRAINING
boiler and pressure
vessel inspectors
ASSISTING
in the establishment of
manufacturing,
maintenance and repair
standards for boiler and
pressure vessels
INVESTIGATING
accidents involving boilers
and pressure vessels
The National boardis comprised of
Chief Boiler Inspectorsrepresenting government
Agencies from acrossthe United States & Canada.
National BoardActivities include:
National Board Inspection Code (NBIC) Updates
New format for all Administrative requirementsVR program rules to NB-514R stamp program to NB-415NR program to NB-417
2015 AdditionsPart 1: Installation requirements for Biomass boilers and thermal fluid heaters added
Part 2: Added supplement on Change of ServiceAdded supplement on Inspection of high pressure vessels –
includes AE testing procedures
NBIC Updates (cont.)
2015 Additions
Part 3
NR program updated – repairs broken into three categories
1. Repairs prior to fuel loading
2. Systems under ASME Section XI (after fuel loading)
3. Items constructed to standards other than ASME
Updated NBIC repair welding procedures
Added Welding Method 6 for Grade 91 material
NBIC Ongoing Activities
Preparation of NBIC Part 4 for Pressure Relief Devices
Merges installation, inspection and repair requirements
NBIC pressure relief initiatives
• Repair of tank vents
• Repair of pin devices
• Shelf life concerns for PRV’s
Testing Laboratory Updates
Gas Supply Changed
6000 gallon
liquid N2 storage
vessel with
pumps and
vaporizer
Additional Gas storage with 6 new 4000 psig storage bottles
approx. 70,000 SCFM
additional capacity
1350 psig test system added (N2)in 3000 sq. ft. addition
High pressure air test system revised, rated at 2500 psi
Steam System rebuilt
220 HP
natural gas
steam
generators,
900 psi,
6,000 PPH,
plus
preheater
New feedwatersystem Feed water storage and D/A tank
Updated controls and DAQ system
NATIONAL BOARD TEST ORGANIZATION PROGRAM
Test Organization Program
Authorized in Feb. 2016 by National Board Board of Trustees
Implements certification program for organizations that only perform In-Service testing of pressure relief valves
Structure similar to VR program
Test Organization Program
Formal program for “Test Only” process
Development Goals
• Act as aid to Jurisdictions (Ref. Part 3 Supplement S7.10)
• Elevate standards and improve practices for the PRV testing process
Scope
Program scope: certifies testing organizations who perform testing of in-service PRV’s
Provides specific qualification to make adjustments per NBIC Part 2, paragraph 2.5.7(g)
NBIC Part 2, par. 2.5.7 g)
“If a pressure test indicates the valve does not open within the requirements of the original code of construction, but otherwise is in acceptable condition, minor adjustments (defined as no more than twice the permitted set pressure tolerance) shall be made by an organization accredited by the National Board to reset the valve to the correct opening pressure.
All adjustments shall be resealed with a seal identifying the responsible organization and a tag shall be installed identifying the organization and the date of the adjustment.”
Program Details
Quality program manual for testing process required
Quality program needs to address in-service inspection
•Valve in good condition
•No broken or damaged parts
•Not leaking
• Seal(s) intact
Test equipment must meet NBIC requirements –Test vessel REQUIRED
Program Details
• Inspection and test to be documented on test report
• Test report to have unique identifier (test no.)
• TO symbol marked nameplate to be applied to valve that passes test
Nameplate includes:
• Company name
• Test date
• Test number
• TO symbol
• Set Pressure
Program Details
Valves that fail inspection or test (including leakage, outside of adjustment tolerance, or broken or missing seal) shall be repaired by a VR holder or be replaced.
TO sample test report
ABC Test Company Inspection and Test Checklist for Pressure Relief Valves
1. Test Number ________________________ 2. Customer Name _____________________ 3. Address ____________________________ 4. Valve Type _____________________ 5. Manufacturer_________________ 6. Set pressure ____________________ 7. Size/ connection_______x_______ 8. Serial Number ___________________ 9.Capacity/ units ________________ 10. ASME/ NB/ VR Stamps: V UV NB VR 11. Last repair/ Date _________by__________ Job. No.__________ 12. Last test/ Date _________by__________ Test No.__________ Received by: _______________Date _______ Inspection Acceptable/ Action Req’d 1. Set pressure seal intact Yes No 2. Adjusting ring(s) seal intact Yes N/A No 3. Seals match mfg. /repair/ test nameplate Yes No 4. Inspection and test done with valve: Removed Installed 5. Valve Condition: Clean Dirty Missing or damaged parts 6. Evidence valve is leaking No Yes 7. Evidence of rust or corrosion No Yes 8. Body drain open Yes No 9. Test gag found No Yes 10. Bonnet vented for bellows Yes N/A No 11. Drain pipe open Yes No 12. Binding of inlet or outlet piping No Yes 13. Discharge pipe support OK Yes No Inspected by: __________________ Date ________ Test Data 1. Set Pressure Definition: Pop Aud. Disch. Bubble 1st Steady Str. 2. Test method: Pop test Lift assist device 3. Test Fluid: Steam Air Water 4. Test Stand ID No._____ 5. Measured set press.: 1_______2_______3________ Tolerance:+/-______ Set pressure: Acceptable: Requires Adjustment Not acceptable 6. Final set press. after adjustment ____________ Tested by: _____________ 7. Seat leakage test method: API-527 Audible Visual Other 8. Seat Leakage result: Acceptable: Not acceptable 9. Seal applied/ identification: Yes ID ______ No adj. made By________ 10: M&TE Serial Nos. _______________________________ 11: TO Nameplate applied: Yes No By: __________ Date _______ Remarks: ________________________________________________ ________________________________________________________
TO Sample Nameplate
TO symbol is registered certification trademark – TO organization can pre-apply mark to test plate
Tested By:
ABC Test Co.
Test Date 7-15-16
Test No. A12345-1
Set Pressure 500 psig
Application process
Application form submitted
NB Representative conducts shop review• Evaluates written description of Quality System (QC Manual)
• Verifies implementation of Quality System
• Observes tests of demonstration valves
Demonstration valves submitted for verification testing of set pressure at NBBI-accepted lab
Comparison of TO to VR program
VR program
• Can test and adjust valves
• Can change set pressure
• VR symbol applied only to valves that meet all repair requirements
• Can perform repair processes: machining, welding, NDE
• Can perform fluid changes or conversion
TO program
• Can test and adjust valves
• Can restore original set pressure only
• TO symbol applied only to valves that pass test
• Cannot perform repairs
• Cannot perform fluid changes or conversion
Affect on VR Holders
VR holder can get TO certification with application and QC manual update only (no application charge or additional test required)
When needed, repairs must be done by VR holder –Repairs cannot be performed under the TOprogram
Value of TO Certification?
Benefits for test company
User are confident of test organization’s quality due to independent audit and comparison tests
Differentiate company from non-certified organizations – reduce user’s need to perform audits
Help with liability concerns by complying with National Standard
Value of TO Certification?
Benefit to User organizations
Provides confidence in the suppliers test data, lessens need for vendor audit
Help document safety equipment in uniform fashion
Help in meeting Jurisdictional/ Inspection Agency / Insurance carrier requirements
More Information
NB-528 program document and application form to be added to National Board web page
VR Course material being updated
Thank You for Having the National Board Here!
Recognizing our shared objective:
To promote safety through proper repair and rebuild
Contact Info:Ph: 614-888-8320
E-mail: [email protected] page: www.nationalboard.org