1 NASEB Energy Day Chris Advena Transmission Team Lead March 21 and 22, 2005

NASEB Energy Day

  • Upload
    varsha

  • View
    40

  • Download
    2

Embed Size (px)

DESCRIPTION

NASEB Energy Day. Chris Advena Transmission Team Lead March 21 and 22, 2005. NEASB Energy Day. PJM Data Sources PJM OASIS http://oasis.pjm.com/indexmain.html PJM eData https://esuite.pjm.com PJM home page http://www.pjm.com. OASIS. Operational Data. OASIS Main. OASIS Data. - PowerPoint PPT Presentation

Citation preview

Page 1: NASEB Energy Day

1

NASEB Energy Day

Chris Advena

Transmission Team Lead

March 21 and 22, 2005

Page 2: NASEB Energy Day

2

NEASB Energy Day

• PJM Data Sources– PJM OASIS

http://oasis.pjm.com/indexmain.html

– PJM eDatahttps://esuite.pjm.com

– PJM home pagehttp://www.pjm.com

Page 3: NASEB Energy Day

3

OASIS

Operational Data

Page 4: NASEB Energy Day

4

OASIS Main

Page 5: NASEB Energy Day

5

OASIS Data

• System Information • Transmission Facilities Descriptions• Dispatch Rates • LMP Prices• Pricing Point Calculator• Emergency Procedures• RTOR Information • Additional RTOR Information as of 02/16/2005• Quad Cities West Information • PJM Coordinated Flowgates as of 01/10/2005• Process of Sharing or Transferring Unused Allocations• Allocation Results as of 03/01/2005

Page 6: NASEB Energy Day

6

OASIS Data

• System Information • Transmission Facilities Descriptions• Dispatch Rates • LMP Prices• Pricing Point Calculator• Emergency Procedures• RTOR Information • Additional RTOR Information as of 02/16/2005• Quad Cities West Information • PJM Coordinated Flowgates as of 01/10/2005• Process of Sharing or Transferring Unused Allocations• Allocation Results as of 03/01/2005

•System Conditions Impacting PJM ATC•PJM Transmission Facilities Complete Descriptions•PJM Transmission Facilities Outage List•PJM Transmission Facilities Outage List new•PJM Dispatch Rates (new 15 second interval) •PJM Real-Time Operational Data LMP, Transfer Limits, Instantaneous Load, and Transmission Constraints•Seven Day PJM Load Projections and Constraint Forecast Information

• Fixed Transmission Rights (FTRs)

Page 7: NASEB Energy Day

7

PJM Dispatch Rates

Page 8: NASEB Energy Day

8

PJM LMP Prices and Operational Data

Page 9: NASEB Energy Day

9

OASIS Main

Page 10: NASEB Energy Day

10

PJM Manuals / Reference

• PJM Tariff• CBM Practices - Man. 2: Transmission Service Request• Regional Practices / Business Rules• OASIS User Guide• NERC Tagging - Priority Codes Job Aid• OASIS Timing Requirements Job Aid• PJM Company Transmission Provider Information• Confirmed Reservations as of 03/09/2005

Page 11: NASEB Energy Day

11

OASIS

Transmission Service

Page 12: NASEB Energy Day

12

OASIS Application Login

•Display ATC•Discounts•Transaction Information•Energy Scheduled•Security

• PJM Info• Post/Read Messages• Company Information• User Information

Page 13: NASEB Energy Day

13

OASIS Transaction Information

Page 14: NASEB Energy Day

14

eData

Real-time Data

Page 15: NASEB Energy Day

15

eData

Page 16: NASEB Energy Day

16

eData

Page 17: NASEB Energy Day

17

eData

• Preferred Layout

• My eData• Energy Contracts• eSuite• IRC Report• Constraints• Activity Log• Announcements• Emergency Messages