NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

Embed Size (px)

Citation preview

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    1/14

    ESA UNCLASSIFIED for official use

    ESA UNCLASSIFIED For Official Use

    "HERACLESPreparing Human Exploration by Integrated Certification ofCrew and Hardware for Lunar Surface Operations

    Markus Landgraf

    ESA/ESTECFuture In-Space Operations Telecon 06/04/2016

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    2/14

    Slide 2ESA UNCLASSIFIED for official use

    HERACLES

    CONTEXT

    EXPLORING TOGETHER

    ESA Space Exploration Strategy

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    3/14

    Slide 3ESA UNCLASSIFIED for official use

    RussianPilotedSystem

    Orion&

    SLS

    EvolvableDeep Space

    Habitat

    InitialCargo

    Delivery

    SmallCargoLander

    HumanSurfaceMobility

    CrewedLunarLander

    Orion& SLS

    (Upgrade)

    2020 2030

    Multi-Destination

    Transportation

    Capabilities(Planned and Conceptual)

    Test Missions

    LADEE Luna 25 Luna 26

    Chandrayaan-2

    Luna 27 SELENE-2

    Rosetta Hayabusa2

    (Sample Return)

    OSIRIS-REx

    (Sample Return)

    Orion& SLS

    (Upgrade)

    Commercial or Government-Owned Platforms

    Luna 28/29

    (Sample Return)

    Human-Assisted

    Sample ReturnPotential Commercial Opportunities

    Staging Post for Crew

    to Lunar Surface

    MAVEN ISRO MarsOrbiter Mission

    ExoMars2016

    ExoMars2018

    Mars2020

    JAXAMars

    Precursor

    InSight

    Icon indicates rst use opportunity.

    Commercial/institutional launchers not shown.

    Human Scale EDL Test Mission Opportunities

    ExtendedDurationCrewMissions

    Moon

    Mars

    Asteroid Redirection

    AdvancedElectric

    Propulsion

    SELENE-3

    Near-Earth ObjectsApophis

    Potential Commercial Opportunities

    Explore Near-Earth Asteroid

    Humans to Lunar Surface

    International Space Station

    Low-Earth Orbit

    Beyond Low-Earth Orbit

    Lunar Vicinity

    RESOLVE

    Mars Sample Return MissionOpportunities

    Sustainable Human

    Missions to theMars System

    Robotic Mission

    Human Mission

    Cargo Mission

    Human-Assisted Sample Return

    ISECG Mission Scenario

    CONTEXT

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    4/14

    Slide 4ESA UNCLASSIFIED for official use

    The Human-Enhanced Robotic Architecture

    and Capability for Lunar Exploration and

    Science (HERACLES) is to establish the

    elements and capabilities for sustainablehuman exploration of the Moon and human-

    robotic exploration of Mars while maximising

    opportunities for unprecedented scientificknowledge gain

    MISSION STATEMENT

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    5/14

    Slide 5ESA UNCLASSIFIED for official use

    Achieve human rating of critical subsystems of a lunar lander by flight test:

    ascent and descent engine

    autonomous GNC for descent, landing, ascent, and rendezvous

    Provide opportunities for crew certification

    surface mobility operations

    surface landing operations

    Advance understanding of ISRU by

    sample return

    deployment of a pilot plant

    Provide opportunities for scientific research

    sample return

    in situ investigation

    Prepare international partnership for roles in lunar surface exploration

    MISSION OBJECTIVES

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    6/14

    Slide 6ESA UNCLASSIFIED for official use

    BASIC ARCHITECTURE ELEMENTS

    Lunar Ascent ElementDry mass: 600 kg

    Wet mass: 1,300 kgThrust: 6kN

    Lunar Descent ElementDry mass: 1,800 kg

    Wet mass: 8,700 kgThrust: 30 kN

    Sample ContainerMass: 25 kg

    Samples: up to 15kgCryo-Samples: 1kgCryo temperature: -140 C

    RoverMass: 500 kg

    Speed: 5 km/hLifetime: 2y

    Communication: 10 MbpsRobotics: 2 armsNight survival

    Eclipse operationsGround and orbit crew control

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    7/14

    Slide 7ESA UNCLASSIFIED for official use

    REFERENCE SCENARIO HERACLES (1/3)

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    8/14

    Slide 8ESA UNCLASSIFIED for official use

    REFERENCE SCENARIO HERACLES (2/3)

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    9/14

    Slide 9ESA UNCLASSIFIED for official use

    REFERENCE SCENARIO HERACLES (3/3REUSE)

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    10/14

    Slide 10ESA UNCLASSIFIED for official use

    REFERENCE SCENARIO HERACLES (3/3 NON-REUSE)

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    11/14

    Slide 11ESA UNCLASSIFIED for official use

    Detailed coordinated (ESA & international partners) ConOps available

    Coordinated Surface Campaign Description Document available

    (performance wrt. exploration and science objectives in agenda point 3)

    Based on exploitation of cis-lunar infrastructure: eDSH and Orion

    Crew role in sample return and vehicle control is essential element

    Flexibility in operational authority: autonomous systems, ground crew,orbital crew !optimum tele-ops approach as per METERON test plan

    (agenda point 2)

    Extended duration operations for reusable elements: ascent stage and

    rover

    Multiple surface missions mimicking human architecture N x 70d for lunar module (= DNDND = 5x14)

    2 y for rover

    TOP-LEVEL HERACLES OPERATIONAL CONCEPT

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    12/14

    Slide 12ESA UNCLASSIFIED for official use

    EXAMPLE LANDING SITE: SCHRDINGER

    Basin diameter ~320 km

    Pyroclastic Inter-peak

    ring

    Secondary

    craters

    Peak ring

    Smooth

    inner-peak

    ring

    Basin wall

    Slump

    Smooth

    outer-peak

    ring

    Smooth

    hummocky

    floor

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    13/14

    Slide 13ESA UNCLASSIFIED for official use

    1.

    First soft landing south of 41S2. First soft landing Pole-ward of 45 latitude

    3. First return of samples outside the KREEP region

    4. First landing on the far side

    5. First equipment surviving lunar night

    6. First rover tele-operated by orbital crew

    7.

    First sample delivery to orbital station

    8. First assembly of lunar lander in orbit

    9. First return of SPA samples

    10.First return of PSR samples

    11.First cryogenic sample return

    12.

    First reuse of lunar ascent stage13.First rover to visit more than one landing sites

    14.First production of oxygen from lunar regolith

    15.First climb of lunar mountain by rover

    16.First lander tele-operated by orbital crew

    INSPIRATIONAL FIRSTS

  • 7/26/2019 NASA FISO Presentation: HERACLES: Preparing Human Exploration by Integrated Certification of Crew and Hardware for Lunar Surface Operations

    14/14

    ESA UNCLASSIFIED for official use

    THANK YOU !