NARTS Annual List of Obligated Projects (ALOP) Federal Fiscal Year 2015
NARTS – Northwest Arkansas Transportation Study
Prepared by the Northwest Arkansas Regional Planning Commission (NWARPC)
1311 Clayton St. , Springdale, AR, 72762| http://nwarpc.org
December 22, 2015
NARTS Annual List of Obligated Projects (ALOP) Federal Fiscal Year 2015
Page 1
Northwest Arkansas Regional Transportation Study (NARTS) Notice
Annual Listing of Obligated Projects
The Annual Listing of Obligated Projects (ALOP) for which Federal funds were obligated during Federal Fiscal Year
(FFY) 2015 has been published. This document was made available on December 30, 2015 on the Northwest
Arkansas Regional Planning Commission web site, www.nwarpc.org, under Departments and Programs;
Transportation; Annual Listing of Obligated Projects. The document can also be obtained by calling the NWA
Regional Planning Commission at 479-751-7125.
This publication presents a list of projects in the Northwest Arkansas Regional Transportation Study (NARTS) area for
which Federal funds were obligated during FFY 2015, October 1, 2014 through September 31, 2015, on projects in
the FFY 2013 –2016 Transportation Improvement Program (TIP). The TIP contains an estimate of the Federal funds
that will be needed for project phases to progress during a given fiscal year.
The publication of this list is in response to 23 U.S.C. 134(j)(7)(B), 23 U.S.C. 135(g)(4)(B), 49 U.S.C. 5303(j)(7)(B), and 49
U.S.C. 5304(g)(4)(B) as revised by the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users
(SAFETEA-LU)and the Moving Ahead for Progress in the 21st Century Act (MAP-21), that requires "...an Annual Listing of
projects, including investments in pedestrian walkways and bicycle transportation facilities, for which Federal funds have
been obligated in the preceding year shall be published or otherwise made available by the cooperative effort of the State,
transit operator, and metropolitan planning organization for public review. The listing shall be consistent with the funding
categories identified in each metropolitan transportation improvement program (TIP)."
The public participation procedures outlined in the NWARPC Public Participation Plan (PPP) serve as the public participation
process required for the development of transit projects as per FTA Circular 9030. Specifically, the public participation
procedures outlined in the PPP will serve to satisfy the Program of Projects (POP) requirements of the Section 5307,
Urbanized Area Formula Grant Program for the University of Arkansas/Razorback Transit and Ozark Regional Transit.
The NARTS and any and all public transit operators will address the POP requirements as per FTA Circular 9030.
Additionally, any and all public transit operator’s capital projects and operational costs are included in the NARTS TIP which
is developed through a cooperative and collaborative process with interested parties and other private and public
transportation providers.
This notice is in accordance with the 2035 Northwest Arkansas Regional Transportation Plan, the Federal
Transportation Act, and MAP-21, in cooperation with local agencies, the Arkansas Highway and Transportation
Department, the Missouri Department of Transportation, the Federal Highway Administration, and the Federal
Transit Administration. The Annual Listing of Obligated Projects report was funded in part through grant(s) from
the FHWA, FTA, and/or the U.S. Department of Transportation. The views and opinions of the NARTS expressed herein
do not necessarily state or reflect those of the U.S. Department of Transportation.
NARTS Annual List of Obligated Projects (ALOP) Federal Fiscal Year 2015
Page 2
NORTHWEST ARKANSAS REGIONAL PLANNING COMMISSION
NOTICE O F NONDIS C RIMINATION
The Northwest Arkansas Regional Planning Commission (NWARPC) complies with all civil rights provisions of federal
statues and related authorities that prohibit discrimination in programs and activities receiving federal
financial assistance. Therefore, the NWARPC does not discriminate on the basis of race, sex, color, age, national
origin, religion or disability, in the admission, access to and treatment in NWARPC’s programs a n d activities, as well
as the NWARPC’s hiring or employment practices. Complaints of alleged discrimination and inquiries regarding
the NWARPC’s nondiscrimination policies may be directed to Celia Scott-Silkwood, AICP, Regional Planner – EEO/DBE
(ADA/504/Title VI Coordinator), 1311 Clayton, Springdale, AR 72762, (479) 751-7125, (Voice/TTY 7-1-1 or 1-800-285-
1131) or the following email address: [email protected]. This notice is available from the ADA/504/Title
VI Coordinator in large print, on audiotape and in Braille. If information is needed in another language, contact Celia
Scott-Silkwood. Se necesita informacion en otro idioma, comuniquese Celia Scott-Silkwood, cscott-
NARTS Annual List of Obligated Projects (ALOP) Federal Fiscal Year 2015
Page 3
NARTS ANNUAL LIST OF OBLIGATED PROJECTS (ALOP) FEDERAL FISCAL YEAR 2015
JOB
NUMBERROUTE
LENGTH
(MILES)STIP NUMBER COUNTY TERMINI
FUNDING
CATEGORY
FEDERAL
FUNDS
PREVIOUSLY
OBLIGATED
FEDERAL
FUNDS
OBLIGATED
IN FFY 2015
TOTAL
FEDERAL
FUNDS
OBLIGATED
FEDERAL
FUNDS
AVAILABLE
IN TIP
REMAINING
AVAILABLE
FEDERAL
FUNDS
WORKPHASE URBANAREA MATCHDESC FYSUBMIT
TRANSFER 012---BENTON &
WASHINGTON
FHWA TRANSFER
REQUEST -
STP URBANIZED
AREA > 200K - 696,000 696,000 696,000
0
CAPITAL
ROLLING NARTS 2015
090065 HWY. 62 6.43 090065 BENTONAVOCA-NORTH
GARFIELD
NATIONAL
HIGHWAY 4,112,186 53,188 4,165,374 23,440,000 19,274,626 ROW NARTS STATE 2015
090148 HWY. 59 3 090148 BENTONHWY. 412-
NORTH (HWY. STP ANY AREA 1,814,829 47,505 1,862,334 5,600,000 3,737,666 UTILITIES NARTS STATE 2015
090218I-540, HWYS.
62/102, & 090218 BENTON
HWY. 62/102
INTCHNG. & 8TH
STP URBANIZED
AREA > 200K, - 4,060,686 4,060,686 36,240,000 32,179,314
ROW &
UTIL.NARTS CITY 2015
090282 HWY. 16 090282 BENTONILLINOIS RIVER
STR. & APPRS. STP FLEX - 5,720,916 5,720,916 4,000,000 0 CONST NARTS STATE 2015
090284 HWY. 264 1.4 090284 BENTONHWY. 71B-HWY.
265
STP CITY STREETS
AREAS < 200K 5,957,481 728,016 6,685,497 6,480,000 0
UTILITIES &
CONSTNARTS STATE 2015
090347 HWY. 264 XX2014-13 BENTONOSAGE CREEK
STR & APPRS
BRIDGE
REPLACEMENT - 153,600 3,137,450 3,291,050 67,090,000 63,798,950
ROW &
CONSTNARTS STATE 2015
090373 NEW ROUTE 4.2 XX2012-13 BENTONHWY. 264-
PLEASANT
TIFIA
REDISTRIBUTION - 21,618,578 21,618,578 70,680,000 49,061,422
P.E., ROW
& CONSTNARTS STATE 2015
090406 HWY. 43 XX2014-13 BENTONHWY. 43 KCS
RAILROAD
HIGHWAY
SAFETY 47,673 88,300 135,973 67,090,000 66,954,027 P.E. NARTS STATE 2015
090425 HWY. 71 6.7 90425 BENTONI-49 - MISSOURI
STATE LINE
NATIONAL
HIGHWAY - 88,391 88,391 0 0
PE
CONSULTNARTS STATE 2015
090436 CITY STREET 90436 BENTONMERCY WAY
CORRIDOR
STP URBANIZED
AREA > 200K - 4,000 4,000 256,000 252,000 P.E. NARTS CITY 2015
090439 90439 BENTONNEW HOPE
BICYCLE/PEDEST
TAP URBANIZED
AREA WITH - 220,199 220,199 225,000 4,801 CONST NARTS CITY 2015
090440HWYS. 62,
94 & 1290440 BENTON
ROGERS HWYS.
62/94 & HWYS.
STP URBANIZED
AREA > 200K - 40,000 40,000 0 0
P.E. & PE
CONSULTNARTS CITY 2015
090446HWY. 94 &
CITY STREET
Added as 090--
-BENTON
ROGERS HWY.
94/EASY ST. A&M
STP URBANIZED
AREA > 200K - 4,000 4,000 P.E. NARTS CITY 2015
090448HWY. 94 &
CITY STREET
BROKEN OUT
OF 090446BENTON
HWY. 94/EASY
ST. TRAFFIC
STP URBANIZED
AREA > 200K - 60,751 60,751
PE
CONSULTNARTS CITY 2015
090449HWY. 94 &
CITY STREET
BROKEN OUT
OF 090446BENTON
HWY. 94/EASY
ST. A&M RR
STP URBANIZED
AREA > 200K - 531,600 531,600 CONST NARTS CITY 2015
090---
TOTAL - 596,351 596,351 700,000 103,649
090447 90447 BENTONDIXIELAND RD.
A&M RR
STP URBANIZED
AREA > 200K - 420,000 420,000 0 0
P.E. &
CONSTNARTS CITY 2015
BB0902I-49 &
HWY. 264
XX2012-13 &
BB0902BENTON
HWY. 264
INTCHNG.
INTERSTATE
MAINTENANCE, 2,491,973 48,456 2,540,829 74,680,000 72,139,171
PE
CONSULT, NARTS STATE 2015
BB0903I-49 &
HWY. 71BXX2012-13 BENTON
HWY. 71B
INCHNG.
INTERSTATE
MAINTENANCE 677,530 179,568 857,098 70,680,000 69,822,902
P.E., PE
CONSULT & NARTS STATE 2015
CA0904 HWY. 71 5.7 CA0904 BENTONHWY. 71B-HWY.
72 SOUTH (BELLA
NATIONAL
HIGHWAY - 1,360,000 1,360,000 0 0 P.E. NARTS STATE 2015
CA0907 &
001966HWY. 412 4 CA0907 BENTON
HWY. 112 - I-49
(HWY. 412)
TRANSPORTATIO
N 19,184,213 1,036,423 20,220,636 9,767,000 0
PE
CONSULT, NARTS STATE 2015
012007 HWY. 265 2.06 012007BENTON &
WASHINGTON
RANDALL
WOBBE LANE-
STP CITY STREETS
AREAS < 200K 287,492 350,400 637,892 2,500,000 1,862,108 ROW NARTS STATE 2015
012192 12192BENTON &
WASHINGTON
CAVE SPRINGS
AREA KARST
STP CERTAIN
AUTHORIZED 499,512 32,882 532,394 500,000 0 STUDY NARTS STATE 2015
040024 HWY. 74 040024 WASHINGTONWHITE RIVER
STR. & APPRS.
BRIDGE
REPLACEMENT - 3,471,923 79,457 3,551,380 2,000,000 0 ROW NARTS STATE 2015
040581 HWY. 112 0.35 040581 WASHINGTONHWY. 180-LEROY
POND DR. (HWY.
STP CITY STREETS
AREAS < 200K 177,023 190,549 367,572 1,000,000 632,428 UTILITIES NARTS CITY 2015
040618CITY
STREETS
040618 &
XX2012-03WASHINGTON
MAPLE ST. &
LAFAYETTE ST.
BRIDGE
REPLACEMENT - 227,237 772,763 1,000,000 2,400,000 1,400,000
ROW &
CONSTNARTS CITY 2015
040619 CITY STREET 3.24BROKEN OUT
OF 040272WASHINGTON
I-540-CHAPMAN
AVE. (JOHNSON
HIGH PRIORITY
PROJECTS (TEA- 4,413,484 688,155 5,101,639 7,327,000 2,225,361 CONST NARTS CITY 2015
040641 HWY. 16 040641 WASHINGTONMIDDLE FORK
WHITE RIVER
NATIONAL
HIGHWAY - 84,480 84,480 3,680,000 3,595,520
PE
CONSULTNARTS STATE 2015
040646I-540 &
HWY. 71XX2014-13 WASHINGTON
CRAWFORD CO.
LN.-
HIGHWAY
SAFETY 879,366 48,242 927,608 67,090,000 66,162,392 P.E. NARTS STATE 2015
040661 XX2014-08 WASHINGTONWESTWOOD
ELEMENTARY
SAFE ROUTES TO
SCHOOL 28,117 8,362 36,479 1,400,000 1,363,521
PE
CONSULTNARTS CITY 2015
040662 XX2014-08 WASHINGTONELMDALE
ELEMENTARY
SAFE ROUTES TO
SCHOOL 22,101 3,877 25,978 1,400,000 1,374,022
PE
CONSULTNARTS CITY 2015
040663 XX2015-08 WASHINGTONFAYETTEVILLE
SRTS I (2012)
SAFE ROUTES TO
SCHOOL - 39,080 39,080 1,400,000 1,360,920
PE
CONSULTNARTS CITY 2015
040673 40673 WASHINGTONGORDON LONG
PARK TRAILHEAD
TAP URBANIZED
AREA WITH - 260,000 260,000 260,000 0 CONST NARTS CITY 2015
040683 HWY. 170 1.9 040683 WASHINGTONHWY. 62-CLYDE
CARNES RD.
STP URBANIZED
AREA > 200K - 520,000 520,000 520,000 0
P.E. & PE
CONSULTNARTS CITY 2015
040688 CITY STREET 0.4 040688 WASHINGTONSAIN STREET
EXTENSION
STP URBANIZED
AREA > 200K - 320,000 320,000 320,000 0
P.E. & PE
CONSULTNARTS CITY 2015
BB0410I-49 &
HWY. 62XX2012-13 WASHINGTON
HWY. 62
INTCHNG.
INTERSTATE
MAINTENANCE 214,902 159,363 374,265 70,680,000 70,305,735
P.E. & PE
CONSULTNARTS STATE 2015
BB0411I-49 &
HWY. 16/112XX2012-13 WASHINGTON
HWY. 16/112
SPUR INTCHNG.
INTERSTATE
MAINTENANCE 90,249 1,176,791 1,267,040 70,680,000 69,412,960
PE
CONSULTNARTS STATE 2015
BB0413I-49 & CITY
STREETBB0413 WASHINGTON
ELM SPRINGS RD.
INTCHNG.
INTERSTATE
MAINTENANCE 447,752 344,488 792,240
P.E., ROW
& PE NARTS STATE 2015
BB0416I-49 & CITY
STREET
Broken out of
BB0413WASHINGTON
ELM SPRINGS RD.
INTCHNG. TEMP.
NATIONAL
HIGHWAY - 86,046 86,046 CONST NARTS STATE 2015
TOTAL FOR
BB0413 & 447,752 430,534 878,286 3,600,000 2,721,714
BB0414I-49 & HWY.
112/71B2.5 XX2013-13 WASHINGTON
PORTER RD.-
HWY. 112/71B
NATIONAL
HIGHWAY 544,281 5,633,589 6,177,870 68,700,000 62,522,130
P.E., ROW
& PE NARTS STATE 2015
012193 012---WASHINGTON &
BENTON
NARTS
PLANNING
STP URBANIZED
AREA > 200K - 200,000 200,000 200,000 0 PLANNING NARTS LOCAL 2015
Page 4
NARTS ANNUAL LIST OF OBLIGATED PROJECTS (ALOP) FEDERAL FISCAL YEAR 2015
TRANSIT
Page 5
Fayetteville-Springdale-Rogers Urbanized Area
Urbanized Area Formula Program – Section 5307
Final Fiscal Year 2015 Program of Projects (1)
Provider: Ozark Regional Transit Authority
Project Description Project Type Total Cost Federal Share Local Share
Operating Assistance Operating $1,291,772 $645,886 $645,886
Preventative Maintenance Capital 562,660 450,128 112,532
ADA Paratransit Service Capital 155,855 124,684 31,171
Enhancements/Shelter Capital 29,531 23,625 5,906
TOTAL $2,039,818 $1,244,323 $795,495
Provider: University of Arkansas – Razorback Transit
Project Description Project Type Total Cost Federal Share Local Share
Operating Assistance Operating $806,266 $403,133 $403,133
Preventative Maintenance Capital 100,000 80,000 20,000
Bus Procurement Capital 509,578 433,141 76,437
ADA Paratransit Service Capital 127,260 101,808 25,452
TOTAL $1,543,104 $1,018,082 $525,022
Provider: Northwest Arkansas Regional Planning Commission
Project Description Project Type Total Cost Federal Share Local Share Comprehensive Planning Capital $125,000.00 $100,000.00 $25,000.00
Summary –All Providers: Total Cost Federal Share Local Share
TOTAL $3,707,922 $2,362,405 $1,345,517
FTA Section 5339 Program of Projects (FY 2013, FY 2014, & FY 2015)
Provider: Ozark Regional Transit Authority
Project Description FY Funding Project Type Total Cost Federal Share Local Share Bus Rehabilitation 2013 Capital $147,102 $117,681 $29,421
Bus Rehabilitation 2014 Capital $150,954 $120,763 $30,191
Bus Procurement 2015 Capital $151,189 $120,951 $30,238
Provider: University of Arkansas – Razorback Transit
Project Description FY Funding Project Type Total Cost Federal Share Local Share
Bus Procurement 2013 Capital $138,450 $117,682 $20,768
Bus Procurement 2014 Capital $142,075 $120,764 $21,311
Bus Procurement 2015 Capital $142,296 $120,952 $21,344
Summary – FY Totals Project Type Total Cost Federal Share Local Share
FTA Section 5339 – FY 2013 Capital $285,552 $235,363 $50,189
FTA Section 5339 – FY 2014 Capital $293,029 $241,527 $51,502
FTA Section 5339 – FY 2015 Capital $293,485 $241,903 $51,582