Updated Infrastructure Development Plan (IDP) For (FY 2017/18 - FY 2021/22 Narayanganj City Corporation

Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

Updated Infrastructure Development Plan (IDP)

For (FY 2017/18 - FY 2021/22

Narayanganj City Corporation

Page 2: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

2

Annexure-I

List of Priority Sub-Projects (FY 2017/18 - FY 2021/22) of IDP

Narayanganj City Corporation

Sector: Transport

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o.

(Fro

m In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

1

a) Re-construction of Road and X-Drain by RCC starting from AEPZ Road to Sumilpara Road in ward No-06 at ch ( 0+00 to 0+681m).

m 3377 1065

JIC

A

2017

2018

(b) Re-construction of Char Sumilpara road by CC with RCC drain starting in ward No:06 ( Ch0+00 to 0+366.00m)

c) Construction of CC road with RCC drain from Kaium’s house to Noarda bara maszid in ward no-24 (Ch 0+00 to 0+680m).

d) Construction of RCC road with side RCC drain in Shitolankha housing under Ward no. 11 (Ch 0+00 to 0+650m)

e)Re-Construction of drain & road by RCC from 100’-0” road to Baitul Mamur Madrasha via Roman house beside Kadamrasul College in ward no-23 (at Ch 0+00 to 0+550m)

f)Re-Construction of CC road with RCC drain from Bugbari Bus road to Bhandary bari in ward no-23 (at Ch 0+00 to 0+ 445m).

2

Re-Construction of RCC road with RCC Drain form Mouchak road to canalpar Ohid house in ward no-2 (Ch 0+00-0+415m).

√ m 415 124 √ 2017 2018 √ √

Page 3: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

3

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

3

Construction of RCC Road with RCC drain from Jalkuri Wapda Canal near Mr. Mojibur pradan to south side Jalkuri Maijpara Mosque via Eidgha & Graveyard in ward no-9 (Ch 0+00-0+700m).

√ m 700 219 √ 2017 2018 √ √

4

Re-Construction of RCC Road with RCC drain from Jalkuri T C road to south west side Narayanganj link road via play ground in ward no-9 (Ch 0+00-0+350m).

√ m 350 109 √ 2017 2018 √ √

5

a)Re-Construction of RCC Road with RCC drain from Jalkuri Jubo Unnyaon office Madrasha in ward no-9 (Ch 0+00-0+400m). b)Re-Construction Road and drain by RCC from Rajmohol cinema hall to ghuramara Nur mosjid with links (L=750m).

√ m 1150 328 √ 2017 2018 √ √

6

Re-Construction of Road & drain by RCC drain from DND road near Nasir house to 2no. rail line via moon light cinema hall road in ward no-6 (Ch 0+00-0+855m). .

√ m 855 228 √ 2017 2018 √ √

7

Re-Construction of south Laxmankhola Road & Drain by RCC from RHD road to Laxamkhola bridge in ward no-25 (Ch 0+00-0+950m).

√ m 950 302 √ 2017 2018 √ √

8

Re-Construction of Road & by RCC Drain from AEPZ road (Moonlight Cinema hall and the house of Mr. Haque) to canal via rail line in ward no-06 in ward-06 (Ch 0+00-0+950m)

√ m 950 266 √ 2017 2018 √ √

9 Re-Construction of road by RCC with Drain from Mizmizi Taltola to north side Painadi via Alamgir Bhuiyan house in ward no-1 (Ch 0+00 to 1+200m)

√ m 1200 359 √

2017 2018 √ √

10

Re-Construction of road & drain by RCC from siddhirgonj pool to Abdul Ali pool in ward no-01 & 02 (Ch 0+00 to 1+400m)

√ m 1400 499 √ 2017 2018 √ √

Page 4: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

4

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

11

Re-Construction of road by RCC with Drain from Mouchak Bus Stand to Nimaikasari bazar in ward no-3 (Ch 0+00-350m)

√ m 350 123 √ 2017 2018 √ √

12

Re-Construction of road & drain by RCC a) from batenpara Mr. Taher house to Graveyard mosjid via Eidgah math & Ideal school (Ch 0+00 to 400m) b) from shahi mosjid to Mr. Chan Badshah house (Ch 0+00 to 300m) c) from Hirahjeel main road to Giasuddi Islamic model school(Goli no:02) (Ch 0.00 to190m ) in ward no-01

√ m 890 250 √ 2017 2018 √ √

13

Re-Construction of drain & road by RCC a)from Abdul Ali house to Matin Hujur house (Ch 0+00 to 400m ) b) from Rowshan Chairman house to (South direction) Batenpara (Ch 0+00 to 0+600m) c) from Batenpara Wapda canal par chowrasta to south direction Namarchar Bil raoa (Ch 0+00 to 700m) in ward no:-01.

√ m 1700 574 √ 2017 2018 √ √

14

Re-Construction of RCC Road with RCC drain from Salu Haji steel mill to TC Road via Motaleb Haji house in ward no-02 (Ch 0+00-1+000m).

√ m 1000 281 √ 2017 2018 √ √

15

Construction of RCC Road along with RCC drain at Muktarjheel different connecting road in ward no-02 (L=780m).

√ m 750 210 √ 2017 2018 √ √

16

Construction of drain & road by RCC a) from Nurul Islam house to Siddik mia house via Kadir Fakir (Ch 0+00 to 0+600m) b) from Shahebpara wapda canal to south line Mr. Arif house (Ch 0+00 to 0+ 200m) in ward no-02.

√ m 800 212 √ 2017 2018 √ √

17

Construction of drain & road by RCC a) from Madrasha road Sumya villa to Haji Ali house (Ch 0+00 to 0+320m) b) from Kandapara kordova school to Rahim member house via Majid house

√ m 880 218 √ 2017 2018 √ √

Page 5: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

5

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

(Ch 0+00 to 0+560m) in ward no.-02

18

Re-Construction of drain & road by RCC a)from Muktinagar haque super market to Abu sayed patowary house via Darul arkam mosque (Ch 0+00 to 0=900m) b)from Mukti nagar Mr. Atil house to Dhaka-Chitaganj high way via capital school (Ch 0+00 to 0+700m) in ward no.-03.

√ m 1600 449 √ 2017 2018 √ √

19

Re-Construction of road & drain by RCC a)from Rahim house to Baitul mamur jame masjid road (Ch 0+00 to 0+120m) b)from Rail line to Chapakhana via Konapara, kasaipara (Ch 0+00 to 0+305m) c)from Siddhirganj housing to Awlabon road (Ch 0=00 to 0+120m) in ward no.-04.

√ m 545 129 √ 2017 2018 √ √

20

Re-Construction of Road & Drain by RCC from Kadamtoly Uttorpara DND Canal to west-south side Kadamtoly Collage road in ward no-07 (Ch 0+00 to 0+940m)

√ m 940 299 √ 2017 2018 √ √

21

Re-Construction of road & drain from Pathantoli main road to graveyard by RCC in ward no-8 (Ch.0+00-0+650m)

√ m 650 175 √ 2017 2018 √ √

22

Re-Construction of RCC road & RCC drain from Khanpur road to Don Chamber road and Footpath-cum RCC Drain from Chashara Raifal Club to Chanmari Railway Khal (both side of Road) in Ward no-12 (Ch 0+00 to 0+205m, L=900m).

√ m 1105 228 √ 2017 2018 √ √

23

Construction of road & drain by RCC from Anayet Nagar to Sonakanda graveyard road with connecting roads in ward no-21(Ch 0+00 to 0+370m)

m 370 98 √ 2017 2018 √ √

Page 6: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

6

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

24 Construction of all Links road & drain of R-Sim residential area by RCC in ward no-23 (L=1350m) √ m 1350 379 √ 2017 2018 √ √

25

Re-Construction of road & drain by RCC from wilson road to RHD road (Hospital) with link in ward no-23(Ch 0+00 to 0+400m, Link=250m )

√ m 650 173 √ 2017 2018 √ √

26 Construction of road & drain by RCC from Kaitakhali to Noadda connecting road in ward no-24 (Ch 0+00 to 0+635m)

√ m 635 179 √ 2017 2018 √ √

27

a) Re-construction of Road and X-Drain by RCC starting from AEPZ Road to Sumilpara Road in ward No-06 at ch ( 0+00 to 0+681m). (b) Re-construction of Char Sumilpara road by CC with rcc drain starting in ward No:06 ( Ch0+00 to 0+366.00m)

√ m 1047 350 JICA 2017 2018 √ √

28

a)Re-Construction of drain & road by RCC from 100’-0” road to Baitul Mamur Madrasha via Roman house beside Kadamrasul College in ward no-23 (at Ch 0+00 to 0+550m). b)Re-Construction of CC road with RCC drain from Bugbari Bus road to Bhandary bari in ward no-23 (at Ch 0+00 to 0+ 445m).

√ m 1000 340 JICA 2017 2018 √ √

Sub-Total(Lac Tk) 8166.00

29

Construction of 18m long RCC bride over WAPDA canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m long RCC Culvert near Rahim market at ward-02

√ m

18+15+

10=43

650 JICA 2018 2020 √ √

30 Construction of City Protection Embankment with Plantation & Beautification on the both sides of Shitalakhya River

√ m 2x7000

70000 JICA 2018 2020 √ √

31 Re-construction of Kahnpur Hospital road by Asphalt. √ m 200 50 √ 2018 2020 √ √

Page 7: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

7

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

32 Re-Construction of road with drain by RCC from Freedom fighter road Rail line to Godnail Bugpara Moszid road in ward no-10(Ch 0+00-0+430m).

√ m 430 131 √ 2018 2020 √ √

33

Re-Construction of Nirapod school and Raj timber road with drain by RCC from Dhaka-Chittagong highway to Sahebpara canal in ward no-02 (L=1480m).

√ m 1480 614 √ 2018 2020 √ √

34 Re-Construction of Institute Road partial Drain by RCC in Ward no-15 (L=250m) √ m 250 45 √ 2018 2020 √ √

35

Construction of road & drain by RCC from TC Road to North Direction Up to Hirajheel Main Road via 3 & 4 no-goli in ward no.-01 (Ch0+00 to1+450m)

√ m 1450 462 √ 2018 2020 √ √

36

Re-Construction of RCC road & RCC drain from Mojib bagh Canalpar to WAPDA canal via Batenpara Alamin Nagar with connectiviting road in ward no.-01.(Ch 0+00 to 0+750m, L1=120, L2=120, L3=350m, L4=300m, L5=240m, L6=150m, L7=300m ,L8=120m, L9=420m,

√ m 2750 681 √ 2018 2020 √ √

37

Re-Construction of Road & drain by RCC from Hirajheel road to Wapda Canal par Road via central jame Mosjid in ward-01 (Ch 0+00 to 1+700m)

√ m 1700 655 √ 2018 2020 √ √

38

Re-Construction of Road and Drain by RCC from Rail line Mosque to Nurbag Mosque in ward no-4 (Ch 0+00 to 0+400m).

√ m 400 109 √ 2018 2020 √ √

39

Construction of drain & road by RCC from Dhaka-Chittaganj highway Tiger rolling mills to Shimrail Danish more in ward no:-04 (Ch 0+00 to 1+150m)

√ m 1150 336 √ 2018 2020 √ √

Page 8: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

8

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

40

Re-Construction of RCC Road with Drain starting from Ramnagor Mosque(river bank) to RHD road via North side Link road in ward No-26 (Ch 0+00-0+500m).

√ m 500 162 √ 2018 2020 √ √

41

Re-Construction of RCC Road & RCC drain from Siddhirganj SO road (Ali Akkass house ) to shumilpara (Jaynal house) in ward no-6 (Ch.0+00-0+475m)

√ m 475 142 √ 2018 2020 √ √

42

Construction of RCC Road & Drain from Kadamtoly Uttarpara DND Canal to WAPDA Canal in ward no-7 (Ch 0+00 to 700)

√ m 700 196 √ 2018 2020 √ √

43

Re-Construction of Road & Drain by RCC from Kadamtoly Nayapara Mr.Hajrat Ali house to Baropukur Aminul house via Mr. Oaseq house in ward no-07 (Ch 0+00 to 1+015m)

√ m 1015 285 √ 2018 2020 √ √

44

Re-Construction of RCC Road with RCC Drain starting from Chowdhury Bari adrsho bazar to Dakeshare Baroipara beside Rail Line in ward no-08 (Ch.0+00-1+380m).

√ m 1380 387 √ 2018 2020 √ √

45

Construction of RCC Road with Drain from Santinagar near Uttara Febricks to Wapda Canal near Titu miah via Abdul Mannan house in ward No-08 (Ch 0+00 to 0+430m)

√ m 430 120 √ 2018 2020 √ √

46

Re-Construction of RCC Road with RCC drain staring from Jalkuri Wapda Canal near Shikderbari poll to south side Jalkuri TC road near Young socity jame Mosque & Transmiter in ward no-9 (Ch.0+00 to 1+ 100m)

√ m 1100 426 √ 2018 2020 √ √

47

Re-Construction of RCC drain and CC road with Branch Road from Khanpur Lal Mosque to Khanpur Bowbazar in Ward no-12 (Ch 0+00 to 0+400m).

√ m 400 109 √ 2018 2020 √ √

Page 9: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

9

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

48 Construction of RCC road with RCC drain from North chashara mosque to Isdair bazar beside rail line in ward No-12 (Ch 0+00 to 0+600m)

√ m 600 201 √ 2018 2020 √ √

49 Re-Construction of Khagendranath road & drain by RCC (Partly) in Ward no-13 (L=285m). √ m 285 57 √ 2018 2020 √ √

50

Re-Construction of Bowalia Khal Road by RCC with footpath and partial RCC drain in Ward no-14 (Ch 0+00 to 0+760m).

√ m 760 147 √ 2018 2020 √ √

51

Construction of connecting road with drain by RCC from Paikpara end point to Buyanpara end point via Al-Baraka & big grave yard in Ward no-17 (L=1120m, L=300)

√ m 1420 367 √ 2018 2020 √ √

52

Re-Construction of road & drain by RCC from Sayedpur Bottala to Shahid Nagar Sukum Potti Mosque in Ward no-18 (Ch 0+00 to 0+600m).

√ m 600 220 √ 2018 2020 √ √

53

Re-Construction of Hazrat Shah Jalal road with drain by RCC starting from RHD road to Shale Nagar (Biddut office) Khalpar road in ward No.-21 (Ch 0+00 to 0+500m).

√ m 500 166 √ 2018 2020 √ √

54

Construction of road & drain by RCC at Rupali-Amin-Raily-Lezaras residential area road by RCC in ward no-21 & 22 (Length=4610m)

m 4610 1026 √ 2018 2020 √ √

55

Re-Construction of RCC Road with RCC Drain starting from Bandar Ghat road to Reli Residential area and its connectivity road at ward no-22.

√ m 950 320 √ 2018 2020 √ √

56

Re-Construction of RCC Road with RCC side drain starting Nawaddah Road to Luhiyer bridge including Link Road in ward no-24 (Ch0.00-0+520m).

√ m 520 175 √ 2018 2020 √ √

Page 10: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

10

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

57

Construction of CLK Road and Link Road(Chapatoli+Lalkharbug+Kuripara) with Drain By RCC from RHD road to Kuripara High School via Lalkharbug in ward No-27 (Ch 0+00-1+225m, link 250m)

√ m 1475 497 √ 2018 2020 √ √

58

a) Construction of Shantinagar Osmanea madrasha road and drain by RCC in ward no-8(Ch.0+00-0+550m, Link-500m) b)Construction of road and drain by RCC from Gudnail TC road to WAPDA canal via Modina bug(L=600m) in ward no-8

√ m 1650 506 √ 2018 2020 √ √

59

Construction of Bongshason road by RCC with Drain starting from PDB road to Borobari in ward No-27 (Ch 0+00-0+620m).

√ m 620 197 √ 2018 2020 √ √

60

Re-Construction of KB Shaha and SK Banarjy Road and Partial RCC drain in ward no-13 (L=270m, L=150m).

√ m 450 61 √ 2018 2020 √ √

61 Reparing of Bangabundhu road by BC (Plant method) Chashara morh to Shadhinatha chattar (Ch 0+00 to 2+600m) in ward no-13, 14, 15, 16, & 18

√ m 2650 533 √ 2018 2020 √ √

62 Reparing of Solimullah & Ishakhan road by BC (Plant method) Chashara morh to Haziganj rail line (Ch 0+00 to 2+600m) in ward no-11 &12

√ m 2600 328 √ 2018 2020 √ √

63

Reparing of Sorowardi , Shirajudowla & Shayestha khan road by BC (Plant method) 2 no rail gate to metro hall(Ch 0+00 to 1+250m &310m) in ward no-13 & 15

√ m 1560 182 √ 2018 2020 √ √

64

Reparing of Ali ahammed chunka road & Sher-e-Bangla road by BC (Plant method) 2 no rail gate to Govt. girls school(Ch 0+00 to 2+450m) in ward no-14 & 13

√ m 2450 145 √ 2018 2020 √ √

Page 11: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

11

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

65 Construction of Embankment cum ring road on West Bank of Shitallakhya river from Koilaghat to kanchpur bridge

√ m 1350 10000 MGSP 2018 2020 √ √

66 Construction of Embankment cum ring road on East Bank of Shitalakhya river from ward No-19 to kanchpur bridge

√ m 1700 12000 MGSP 2018 2020 √ √

67 Construction of road from Jalkuri Bus stand to Pagla bari DND canal. √ m 4200 4000 MGSP 2018 2020 √ √

68 Construction of Foot over bridge at different intersection in NCC

√ m 10 1000 MGSP 2018 2020 √ √

69 Construction of RCC Road at RK Gupta road from Azmeri Monzil to Sirajuddoula road.

√ m 120 8 MGSP 2018 2020 √ √

70 Construction of freedom fighter Gulam Mohiuddin Sahijan (Bir Muktizoddha) Sarak by RCC.

√ m 1000 100 MGSP 2018 2020 √ √

71 Rehabilitation of road from Tribini bridge to Italy building. √ m 1500 288 √ 2018 2020 √ √

72 Construction of Ramnagar Bongoon Road by BC with Drain with cover slab

√ m 600 46 √ 2018 2020 √ √

73 Construction of Lakkhankhola road starting from T. Hossain Road to Belal market by BC.

√ m 4750 570 √ 2018 2020 √ √

74 Construction of Ful Hori Primary School Road by BC

√ m 650 57 √ 2018 2020 √ √

75 Construction of Koroipara Road by RCC with drain √ m 1300 120 √ 2018 2020 √ √

76 Construction of RCC road Nayapara to Baburail link road with Bridge.

√ m 350 70 MGSP 2018 2020 √ √

77 Construction of SG road by RCC .

√ m 220 44 MGSP 2018 2020 √ √

78 Construction of Khanka sarak by RCC . √ m 250 38 MGSP 2018 2020 √ √

79 Construction of RCC road from Dhaka-Chittagong highway to Sahebpara cannel.

√ m 700 94 MGSP 2018 2020 √ √

Page 12: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

12

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

80 Construction of road from Stadium DN road to City Corporation last boundary by asphalt. √ m 1500 252 MGSP 2018 2020 √ √

81

Construction of Bituminous Carpeting road from Sahebpara Eng. Latif house to Mitali market via Darul Quran Madrasha by asphalt.

√ m 1135 159 MGSP 2018 2020 √ √

82 Construction of RCC Road from Jalkuri Naintarpar to Karoitola via Firoz Master house √ m 1500 251 MGSP 2018 2020 √ √

83 Construction of Willson Road to Nabiganj Hospital Road by RCC . √ m 600 60 MGSP 2018 2020 √ √

84 Construction of Ispahani Shadur ghat Road by RCC

√ m 450 68 MGSP 2018 2020 √ √

85 Construction of Ramnagar Brance Road by RCC

√ m 850 104 MGSP 2018 2020 √ √

86 Construction of Ramnagar Main road by RCC .

√ m 600 73 MGSP 2018 2020 √ √

87 Construction of Sholperchar to Bagbari Road by RCC . √ m 1220 109 MGSP 2018 2020 √ √

88 Construction of Cobalt Horipur Power Plan Road by RCC with drain √ m 320 42 MGSP 2018 2020 √ √

89 Construction of Bituminous Carpeting Road from Jalkuri Bus Stand to end of NCC via Rajmahal cinema hall by asphalt.

√ m 450 74 MGSP 2018 2020 √ √

90 Construction of Modangonj Islampur road by RCC √ m 600 127 MGSP 2018 2020 √ √

91 Rehabilitation of road by BC/CC/RCC in defaranc wards

√ m 1000

0 6000 NCC 2018 2020 √ √

92 Construction of Neitaiganj road to Hatkhola more by asphalt.

m 2000 750 Donor 2018 2020 √ √

93 Construction of Khanka sarak by RCC with Drain

√ m 250 28 Donor 2018 2020 √ √

Page 13: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

13

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

94 Construction of RCC road form Mouchak road to cannelpara Ohid house. √ m 570 60 Donor 2018 2020 √ √

95

Construction of RCC Road from Mizmizi Batanpara Wapda Canal to north side of Osman house East side of Painade Degree Fazil Madrasha & West side of Abdul Haque Mollha house.

√ m 610 62 Donor 2018 2020 √ √

96 Construction of RCC road from Dhaka-Chittagong highway to Sahebpara cannel. √ m 700 71 Donor 2018 2020 √ √

97 Construction of RCC Road from Cittagong-Narayanganj Road to Baganbari Railline via Aowlaban.

√ m 650 50 Donor 2018 2020 √ √

98 Construction of RCC road from S.O road Ali Akkas house to cannel side via Abdul Latif house. √ m 530 47 Donor 2018 2020 √ √

99 Construction of RCC Road from SO road to Shumilpara Power Station road via Shumilpara primary school.

√ m 600 46 Donor 2018 2020 √ √

100 Construction of RCC Road from side of Godnail UP office to Anayetnagar. √ m 1850 164 Donor 2018 2020 √ √

101 Construction of RCC Road from Bagmara to Nimaikasari bazaar via Matin master saw mills. √ m 450 46 Donor 2018 2020 √ √

102 Construction of RCC Road from sanarpar primary school to Tofajjal house via Ali Ajam patowary house.

√ m 390 40 Donor 2018 2020 √ √

103 Construction of RCC Road from Azibpur Railline to Azibpur Karim house via Mitha khan house. √ m 470 72 Donor 2018 2020 √ √

104 Construction of RCC Road from Sanarpar Sonamia Market to end of NCC Near Mono Mia Market. √ m 400 51 Donor 2018 2020 √ √

105 Construction of RCC road from Dhaka-Chittagong highway (Raj Timbar) to cannel side via Sahebpara Fatema Monjil.

√ m 475 60 Donor 2018 2020 √ √

Page 14: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

14

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

106 Construction of RCC Road from SO road to Shumilpara power station road via Shumilpara primary school.

√ m 750 57 Donor 2018 2020 √ √

107 Construction of RCC Road from side of Bhondhu Cinema Hall to Anayetnagar. √ m 650 58 Donor 2018 2020 √ √

108 Construction of RCC Road from Godenail Nayapara lal Building to west side cannel. √ m 670 85 Donor 2018 2020 √ √

109 Construction of RCC Road from Sanarpar Govt. primary school to Bagmara road via M.A Mannan & Abul Hosen house

√ m 500 51 Donor 2018 2020 √ √

110 Construction of RCC Road from Mojib Bag Mr. Milon house to Kadamtoly westpara Mosque via Marzon Kinder Garten & East side of DND cannel.

√ m 550 56 Donor 2018 2020 √ √

111 Construction of RCC Road from East Mozibag Mosque to Kadamtoly cannel. √ m 425 43 Donor 2018 2020 √ √

112 Construction of Lakhankhola Dalal Bari Road by RCC √ m 800 69 Donor 2018 2020 √ √

113 Construction of Sharongsha Bag Road by RCC

√ m 450 63 Donor 2018 2020 √ √

114 Construction of Etarpol to Horipur Mosque Road by RCC √ m 450 43 Donor 2018 2020 √ √

115 Construction of Rupali Residential area road by RCC . √ m 1350 244 Donor 2018 2020 √ √

116 Construction of Lakhankhola Kazi Bari & South Bari Road by RCC . √ m 1030 92 Donor 2018 2020 √ √

117 Construction of Lakhankhola choto SamajMosque connecting Road by RCC √ m 675 61 Donor 2018 2020 √ √

118 Construction of Horipur Power Plan Road by RCC .

√ m 500 75 Donor 2018 2020 √ √

119 Construction of Ekrampur Road by RCC . √ m 1250 100 Donor 2018 2020 √ √

Page 15: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

15

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

120 Construction of bituminous carpeting road from Muktinagar Bat tala to Mouchak Bus Stand by asphalt.

√ m 1250 574 Donor 2018 2020 √ √

121 Construction of Road by RCC from 2 No Dhakeshwary to Hajiganj Rail line mour √ m 2000 365 Donor 2018 2020 √ √

122 Improvement of Road by RCC Hajiganj Mirbari to west side up to railline. √ m 400 49 Donor 2018 2020 √ √

123 Improvement of Road by RCC from Chanmary to Hajigonj via rail line √ m 1600 250 Donor 2018 2020 √ √

124 Improvement of Road by RCC with sand tiling & palasiding from paikpara Boro Kabar sthan to east sided braneh road up to Riazuddin Mridha house

√ m 400 50 Donor 2018 2020 √ √

125 Improvement of Road by RCC with sand tiling & palasiding at Paik para Bara kabarsthan south east sided br. road

√ m 180 242 Donor 2018 2020 √ √

126 Rehabilitation of road by RCC starting from Painadi Baitol Aman Jami Masque to Danu Hazi road. √ m 325 59 Donor 2018 2020 √ √

127 Rehabilitation of T.C road by carpeting starting from Siddirganj poll to west side Danu Hazi road. √ m 1098 310 Donor 2018 2020 √ √

128 Rehabilitation of Herajell road by RCC starting from Wapda canal par to west side Dhaka Chittagong Highway.

√ m 550 205 Donor 2018 2020 √ √

129 Rehabilitation Mizmizi TC road by BC starting from Kalu hazi more to Chowdhury para more. √ m 815 1607 Donor 2018 2020 √ √

130 Rehabilitation Dhanu Hazi by RCC starting from TC road to Dhaka-Chittagong highway √ m 1144 314 Donor 2018 2020 √ √

131 Rehabilitation Kalu Hazi by RCC starting from TC road to south side Wapda canal.

√ m 860 59 Donor 2018 2020 √ √

132 Rehabilitationof road by RCC starting from Mizmizi west para TC road(Near Bara Mosque) to south side Choto Minar mosque.

√ m 745 160 Donor 2018 2020 √ √

Page 16: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

16

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

133 Rehabilitation road by RCC starting from Chowdhury para more to Kandapara Mosque.

√ m 625 164 Donor 2018 2020 √ √

134 Rehabilitation of road by RCC starting from purba shanarpar Osman gani road near korisal to Bazar.

√ m 405 100 Donor 2018 2020 √ √

135 Rehabilitation of carpeting road starting from Osman gani canal par Bridge to west side shanarpar canal par Bridge.

√ m 672 93 Donor 2018 2020 √ √

136

Rehabilitation of Bituminous Carpeting road starting from Rasulbag D&D cannal near Nickon Packaging to Rasulbag D&D cannal near Garur Firm via Mr. Abul Hossen & Mr.Salauddin Sahen house.

√ m 900 238 Donor 2018 2020 √ √

137 Rehabilitation of road by RCC starting from Wapda canal north side shanarpar Jameya Islamia darul Ulum Madrasha.

√ m 210 38 Donor 2018 2020 √ √

138

Rehabilitation of carpeting road starting from Nemaikashary Bazar to north side Bugmara Mosque.

√ m 370 77 Donor 2018 2020 √ √

139

Rehabilitation of road by RCC starting from Bugmara Masque to Nemaikashary Fazlur Rahman house via Mizan & h/o Hazi Rahman.

√ m 1060 163 Donor 2018 2020 √ √

140 Rehabilitation of road by RCC starting from Nemaikashary Mama Bagnea store to Hazi Rahman Ali house via Principal Nurul Islam house.

√ m 815 148 Donor 2018 2020 √ √

141 Rehabilitation of road by RCC starting from Ademjee road to Atigram east side of Ambar paper mill.

√ m 1420 324 Donor 2018 2020 √ √

142 Rehabilitation of road by RCC starting from Monowara jute Mill to Azibpur railline.

√ m 750 136 Donor 2018 2020 √ √

143 Rehabilitation of road by RCC starting from Chapakhana to Azibpur railline. √ m 480 87 Donor 2018 2020 √ √

144 Rehabilitation of road by RCC starting from house of Abdul Hakim to Shitalakkhya river via Taj Jute mill.

√ m 1260 247 Donor 2018 2020 √ √

Page 17: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

17

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

145 Rehabilitation of road by RCC starting from Kalabug Jame Mosque to Silo road.

√ m 495 90 Donor 2018 2020 √ √

146

Rehabilitation of road by CC starting from Siddirgang Land Office to Shitalakkhya river via Siddirganj Bazar .

√ m 391 64 Donor 2018 2020 √ √

147 Rehabilitation of road by RCC starting from house of Nur Islam to SO road via house of Satri mia. √ m 710 129 Donor 2018 2020 √ √

148 Rehabilitation of road by RCC starting from Meghna dipo gate to Shumilpara primary School √ m 565 105 Donor 2018 2020 √ √

149 Rehabilitation of road by RCC starting from Adamjee south gate to Barma stand road. √ m 1230 336 Donor 2018 2020 √ √

150 Rehabilitation of road by RCC starting from Barma stand road house of Ismail Commander to Bagpara road.

√ m 860 132 Donor 2018 2020 √ √

151 Rehabilitation of road by RCC starting from SO road to Barma stan road via Mondalpara . √ m 790 118 Donor 2018 2020 √ √

152

Rehabilitation of road by RCC starting from south side of Ademjee main gate AEPZ road to Shadur ghat via Shonamiya bazaar.

√ m 1560 240 Donor 2018 2020 √ √

153

Rehabilitation of road by RCC starting from AEPZ road to Ademjee Boundary wall via Shonamiya bazaar.

√ m 650 100 Donor 2018 2020 √ √

154

Rehabilitation of Gass line road by RCC starting from Lakepar road to kadamtali uttar para Jame Masque.

√ m 521 118 Donor 2018 2020 √ √

155

Rehabilitation of road by RCC starting from kadamtali uttar para Jame Masque to west side Shahar Alibag road

√ m 490 111 Donor 2018 2020 √ √

156 Rehabilitation of road by BC starting from kadamtali uttar para Jame Masque to south side kadamtali west para Juramazar more.

√ m 580 80 Donor 2018 2020 √ √

Page 18: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

18

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

157

Rehabilitation of road by CC starting from kadamtali uttar para Khairunnesa Educear School to south side Maker road.

√ m 304 39 Donor 2018 2020 √ √

158 Rehabilitation of road by RCC starting from Pathantoly Bas stand to house of Salam molla. √ m 656 194 Donor 2018 2020 √ √

159 Rehabilitation of road by RCC starting from Goadnail road to WAPDA canal via Modina Jame Mosque .

√ m 620 112 Donor 2018 2020 √ √

160 Rehabilitation of road by RCC starting from Goadnail road house of Soleman to house of Anower.

√ m 600 108 Donor 2018 2020 √ √

161 Rehabilitation of road by RCC starting from AEPZ road house of Mr. Kamal to wapda canal.

√ m 675 1232 Donor 2018 2020 √ √

162

Rehabilitation of road by RCC starting from AEPZ roade house of Tofazzal Hossain to house of Abdur Rahman.

√ m 327 59 Donor 2018 2020 √ √

163 Rehabilitation of road by RCC starting from AEPZ road house of Mahiuddin to railline. √ m 424 76 Donor 2018 2020 √ √

164 Rehabilitation of road by RCC starting from WAPDA Canal road house of Sikder to house of Nur Hazi at Jalkuri.

√ m 465 84 Donor 2018 2020 √ √

165 Rehabilitation of road by RCC starting from cc house of Hasem Bandari to west side of Jalkuri road.

√ m 1247 224 Donor 2018 2020 √ √

166 Rehabilitation of road by RCC starting from WAPDA canal road house of Akbar Hossain to house of Delwar Hossain.

√ m 434 78 Donor 2018 2020 √ √

167 Rehabilitation of carpeting road starting from Siddirgang poll to Jalkuri Bas Stand.

√ m 4250 1607 Donor 2018 2020 √ √

168 Rehabilitation of road by RCC starting from Painadi Wapda Cannal to Mizmize T.C road via painade Baitol Aman Jami Moque & Shapla Chattar.

√ m 1150 314 Donor 2018 2020 √ √

Page 19: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

19

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

169 Rehabilitation of road by RCC starting from Painadi Baitol Aman Jami Masque to Danu Hazi road.

√ m 325 59 Donor 2018 2020 √ √

170 Rehabilitation of T.C road by carpeting starting from Siddirgang poll to west side Danu Hazi road. √ m 1098 311 Donor 2018 2020 √ √

171

Rehabilitation of road by RCC starting from Herajell wapda canal par to west side Dhaka Chittagonj High way.

√ m 550 205 Donor 2018 2020 √ √

172 Rehabilitation of road by RCC starting from Danu Hazi road to painadi Rahim member Works Shop via Painadi Sapla Chattar.

√ m 950 316 Donor 2018 2020 √ √

173 Rehabilitation of Baroiepara Road (Starting from H.M Sen road to Salenagar road )

√ m 450 137 Donor 2018 2020 √ √

174 Rehabilitation of Kadamrasul University College to Modongonj-Modonpur road

√ m 1250 380 Donor 2018 2020 √ √

175 Rehabilitation of road at NCC Kadamrasul office to Shitalakha river via Archime Residential area

√ m 600 182 Donor 2018 2020 √ √

176 Rehabilitation of road at Modonganj-Modonpur road to Ramnagar Cannel √ m 152 Donor 2018 2020 √ √

177 Rehabilitation of Chapatoli Road (Starting from Modonganj-Modonpur road to PDB Bridge) √ m 500 379 Donor 2018 2020 √ √

178 Rehabilitation of road at Dhaka-Chittagong road to PDB(DPDC) office √ m 1250 379 Donor 2018 2020 √ √

179 Rehabilitation of road at Mododonganj-Modonpur road to PDB(DPDC) Road via yater Bridge

√ m 500 334 Donor 2018 2020 √ √

180

Construction of RCC road and drain starting from Paikpara south side of Choto kabarsthan at ward no. 17 up to the Shitalakhya khal via Kumudini welfare trust at ward no. 18 under Narayanganj City Corporation.

√ m 350 WB 2018 2020 √ √

181

Construction of walk way with beautification along Tribeni khal Starting from Madanganj Madanpur road up to the river Shitalakhya via Tribeni bridge at ward no. 21 under Narayanganj City Corporation.

√ m 1497 WB 2018 2020 √ √

Page 20: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

20

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme (Put √ Mark) Unit

(km/m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

182

Construction of walkway with beautification starting from Chyalbari Ghat at ward no. 19 up to the river Shitalakhya via Mahmud Nagar Graveyard at ward no. 20 under Narayanganj City Corporation.

√ m 1193 WB 2018 2020 √ √

183 Construction of pedestrain road in (Ward no 1-27) √ m 5310 √ NCC 2018 2020 √ √

184 Rehabilitation of pedestrain road in (Ward no 1-26)

√ m 5520 √ NCC 2018 2020 √ √

Sub-Total(Lac Tk) 147599.

00

Foot Note:

Construction Responsibility= CC/LGED/DPHE/WASA/RHD/Others (Specify)

O & M Responsibility = CC/WASA/RHD/Others (Specify)

Page 21: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

21

Sector: Drainage

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o.

(Fro

m

Infr

astr

uctu

re In

ven

tory

L

ist)

Description of Project/Scheme

Type of Project/Scheme

(Put √ Mark) Unit (km/ m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

185

(Lot-01) Construction of following Road side drain(RCC/Brick/pipe) with both side earth filling, leveling and dressing

m 6100 1140

JICA 2017 2018 √

a) Construction of RCC dain (RCC/Brick/pipe) starting from Godnail Lal building to Anayetnagar Laky Bazar to (Ch-0.00 to 2+500m )

b) Construction of drain (RCC/Brick/Pipe) starting from Tatkhana more upto WAPDA canal via Sayedpara wooden bridge, Sayedpare Kafil uddin garments & the house of Mr. Shamim at ward no-08. ( L=1050m)

c)Construction of drain (RCC/Brick/Pipe) starting fromTatkhana Government Primary School to Chowdhuribari road via Dr.kuddus house at ward no-08

d) Construction of drain (RCC/Brick/Pipe) starting from Dhanakunda Saudbari to Rail Line & Barepara Aklim miha house at ward no-08

e) Construction of drain (RCC/Brick/Pipe) starting from Modhugar connecting upto WAPDA canal at ward no-08

186

(Lot-02) Construction of following Road side drain(RCC/Brick/pipe) with both side earth filling, leveling and dressing

m 6730 1385

JICA 2017 2018 √

a)Construction of drain(RCC/Brick/Pipe) at Jalkuri starting from Amtala more to Wapda Cannal via east side & Jalkuri Khola Market at ward no-9

b) Construction of drain (RCC/Brick/Pipe) at Jalkuri starting from Jalkuri Naintarpar to Karoitola via Firoz Master house at ward-9.

c)Construction of drain (RCC/Brick/Pipe) at Jalkuri starting from Jalkuri Wapd acanal Culvert to end of NCC & Goramara Mosque-E-Noor via Rajmahal Chinema Hall at ward no-9.

Page 22: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

22

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o.

(Fro

m

Infr

astr

uctu

re In

ven

tory

L

ist)

Description of Project/Scheme

Type of Project/Scheme

(Put √ Mark) Unit (km/ m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

d)Construction of drain (RCC/Brick/Pipe) at Jalkuri starting from Jalkuri Transmeter to Shikderbari pool via Taher Ali house & Jalkuri Graveyared at ward no-9.

e)Construction of drain (RCC/Brick/Pipe) at jalkuri starting from Modogar Mojibor poulty firm to Wapda canal near Ali hossain house

Sub-Total (in Lac Tk) 1385.00

187

(Lot-01) Re-excavation, earth filling in both side with retaining & levelling dressing of the following canals

m 4190 1047.5

2018 2020 √

a) Lucky Bazar to Lal Dalan (L=2050m)

b)Shaheb para to Mouchak khal ( L=1020m)

c) Dogair to Dhonu Hajr khal More ( L= 1120m)

188

(Lot-02) Re-excavation, earth filling in both side with retaining & levelling dressing of the following canals

m 4200 1050

JICA 2018 2020 √

a) Lal Dalan to East side of Rupayan Housing via Bagan Bari and Dosh pipe(L=3500m)

b)Shitalakkhya river to west side of land ministry residensial project (L=700m)

189

(Lot-03) Re-excavation, earth filling in both side with retaining & levelling dressing of the following canals

m 3705 920

JICA 2018 2020 √

a) from Shiddhirganj Pool to Abdul Ali's Pool (L= 1450m)

b) Mizmizi South para WAPDA main canal to Jhalkuri Dosh-pipe (L=2255m)

190

(Lot-04) Re-excavation, earth filling in both side with retaining & levelling dressing of the following canals

m 3960 990

JICA 2018 2020 √

a) Haji Kashem Ali Kindergarden School Road to Mijmij Dakshin para N.D.C Canal with RCC U drain. (L=550+150m)

b) Jalkuri Jutputty to Dosh-pipe Samad Member's Mill Canal, Shikdar Bari pool Canal to Uttarpara pool Canal, (L=3260m)

Page 23: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

23

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o.

(Fro

m

Infr

astr

uctu

re In

ven

tory

L

ist)

Description of Project/Scheme

Type of Project/Scheme

(Put √ Mark) Unit (km/ m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

191

(Lot-05) Re-excavation, earth filling in both side with retaining & levelling dressing of the following canals

m 4150 1037.5

JICA 2018 2020 √

a) Kadamtuli Uttar-pachim para Jame mosque to Baganbari (L= 1490.00m)

b) Battala mhore to Mouchak (L= 1350.00m)

c) Sonamia Bazar to Shitalakkhya river via ssven hourse Cement factory (L= 1310.00m)

192

Construction of 06 (Six) nos decorative Steel Foot over Bridges Over main Main Canal at Ch. 0+280, Ch. 1+200, Ch. 2+130, Ch. 2+630, Ch. 3+550 & Ch. 5+150, including beautification works from Bhangerpool to Shimrail Galakata Bridge.

√ m 1000 3600 JICA 2018 2020 √ √

193

Re-excavation of Main Canal (from Bhanger poll to Shimrail Galakata Bridge) and construction of walkway with retaining wall (from ch. 0+000 to 4+000m) at west side of main Canel of Shiddirgonj along with CC-Block lining at Ch. 0+4000 to 0+5200 at both sides.

√ m 5200 2700 JICA 2018 2020 √ √

194

Re-excavation, slop protection, walkway & Beautification of Canal at Siddhirganj

4860 1450

JICA 2018 2020 √

a) Lucy Bazar to Lal-dalan, (L=2050.00m) with retaining wall,

b) Lal-dalan to Baganbari (L= 660.00m) with retaining wall.

c) Canal par to Baganbari (L= 660.00m) with retaining wall.

d) kadamtuli Uttar-pachim para Jame mosque to Baganbari (L= 1490.00m)

195 Re-excavation & Beautification of Cana in Siddirganj √ m 20000 1200 JICA 2018 2020 √ √

196 Construction of RCC Drain Cum Footpath at Khal Ghat road √ m 220 37 JICA 2018 2020 √ √

197

Construction of Drain by RCC from Nobiganj Bazar to Dakesshay Mill

√ m 2700 1800 JICA 2018 2020 √ √

198

Re-excavation of canal from kadomtola bridge to Shahidnagar bridge

√ m 2000 125 JICA 2018 2020 √ √

199 Cleanning of existing drains in (ward 1-27) √ m 165 250 JICA 2018 2020 √ √

Page 24: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

24

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o.

(Fro

m

Infr

astr

uctu

re In

ven

tory

L

ist)

Description of Project/Scheme

Type of Project/Scheme

(Put √ Mark) Unit (km/ m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

200

Construction of Drain with cover slab from Hirajheel Wapda office to Godnail Bhangar pool .

√ m 4200 625 √ 2018 2020 √ √

201 Construction of Drain with cover slab from Mizmizi Matin Sarak wooden bridge to Dhaka-Chittagong highway.

√ m 946 147 √ 2018 2020 √ √

202 Construction of Drain with cover slab from Muktinagar khanka Mosqu to Golakata Bridge.

√ m 1300 193 √ 2018 2020 √ √

203 Construction of RCC Drain from Bowbwzar to Siddigopal Akhra. √ m 630 94 √ 2018 2020 √ √

204 Construction of Drain with cover slab from Daradir Culvert to Golachipa Masjid.

√ m 450 67 √ 2018 2020 √ √

205 Re -Construction of Sahid Bappi Sarak (RCC) with drain & RCC Footpath from Kumudini more to last boundary of NCC

√ m 900 134 √ 2018 2020 √ √

206 Construction of Drain with cover slab from Neitaiganj more to Shitallaka river beside Khalghat road.

√ m 550 82 √ 2018 2020 √ √

207 Construction of Drain with cover slab at Ramnagar Bongoon Road √ m 600 89 √ 2018 2020 √ √

208 Construction of RCC Drain with cover slab at Lakkhankhula road starting from T hossain road to Billal market √ m 5000 744 √ 2018 2020 √ √

209 Construction of Ful Hori Primary School Drain with cover slab √ m 650 97 √ 2018 2020 √ √

210 Construction of Koroipara Drain with RCC slab. √ m 1300 163 √ 2018 2020 √ √ 211 Construction of RCC Drain at Khanka sarak . √ m 250 35 MGSP 2018 2020 √ √

212 Construction Kurepara Machien Ghor RCC drain √ m 650 95 √ 2018 2020 √ √

213 Construction of RCC drain Nayapara to Baburail link drain.. √ m 350 63 MGSP 2018 2020 √ √

214 Construction of RCC drain at SG road . √ m 250 45 MGSP 2018 2020 √ √

215 Construction of RCC Drain with cover slab from Dhaka-Chittagong highway to Sahebpara cannel.

√ m 700 127 MGSP 2018 2020 √ √

216 Construction of RCC drain in the area of Shitallakha Housing. √ m 800 145 MGSP 2018 2020 √ √

217 Construction of Drain with cover slab from Laksmi pharmacy to Adarsha mistanno bhandar beside Shirajjdoulla raod. √ m 150 4 MGSP 2018 2020 √ √

218 Construction of Drain with cover slab from Sahebpara Eng. Latif house to Mitali market via Darul Quran Madrasha.

√ m 1150 208 MGSP 2018 2020 √ √

219 Construction of RCC Drain with cover slab from Jalkuri Naintarpar to Karoitola via Firoz Master house

√ m 1500 272 MGSP 2018 2020 √ √

220 Construction of RCC drain GA Road to T Hossain road . √ m 2100 380 MGSP 2018 2020 √ √

221 Construction of RCC drain from Willson Road to Nabiganj Hospital √ m 650 118 MGSP 2018 2020 √ √

Page 25: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

25

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o.

(Fro

m

Infr

astr

uctu

re In

ven

tory

L

ist)

Description of Project/Scheme

Type of Project/Scheme

(Put √ Mark) Unit (km/ m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

222 Construction of RCC drain at Ispahani Shadur ghat road. √ m 650 82 MGSP 2018 2020 √ √

223 Construction of RCC drain at Ramnagar Brance road √ m 860 156 MGSP 2018 2020 √ √ 224 Construction of RCC drain at Ramnagar Main road √ m 620 112 MGSP 2018 2020 √ √ 225 Construction of Drain by RCC in the area of Shitalkha Housing √ m 850 140 Donor 2018 2020 √ √

226 Construction of Drain by RCC from Chasara Jila parishad Dak banglo to North directon beside west side of rail line

√ m 600 99 Donor 2018 2020 √ √

227 Construction of Drain with cover slab at Isdair pilkhane road to North Direction via Octo Office

√ m 900 137 Donor 2018 2020 √ √

228 Construction of Drain with cover slab from Paik para Baro kabarsthan to east sided br. Road up to Haji Riazuddin Mridha house

√ m 400 657 Donor 2018 2020 √ √

229 Construction of Drain with cover slab from Paik para Baro kabarsthan south east branch √ m 180 30 Donor 2018 2020 √ √

230

Construction of RCC drain with covered slab starting from Painadi Wapda Canal to Mizmize T.C road via painade Baitol Aman Jami Moque & Shapla Chattar.

√ m 1150 302 Donor 2018 2020 √ √

231 Construction of RCC drain with covered slab starting from Painadi Baitol Aman Jami Masque to Danu Hazi road. √ m 325 77 Donor 2018 2020 √ √

232 Construction of RCC drain with covered slab at Herajell road starting from Wapda canal par to west side Dhaka Chittagonj High way.

√ m 550 145 Donor 2018 2020 √ √

233 Construction of RCC drain with covered slab starting from Danu Hazi road to painadi Rahim member Works Shop via Painadi Sapla Chattar.

√ m 950 250 Donor 2018 2020 √ √

234

Construction of RCC drain with covered slab starting from Mizmize Taltala Club more to Painadi to wapda cannel via P.M Academe & Alamgir Bhuiyan house.

√ m 1000 263 Donor 2018 2020 √ √

235 Construction of RCC drain with covered slab starting from Mizmizi Painadi C.I khola wooden Bridge to west North side T.C road. √ m 910 239 Donor 2018 2020 √ √

236

Construction of RCC drain with covered slab starting from Mizmizi Taltola Mosjid more to south side Mizmizi Chairman Bari Mosjid via Taher Member house.

√ m 470 124 Donor 2018 2020 √ √

Page 26: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

26

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o.

(Fro

m

Infr

astr

uctu

re In

ven

tory

L

ist)

Description of Project/Scheme

Type of Project/Scheme

(Put √ Mark) Unit (km/ m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

237 Construction of RCC drain with covered slab starting from Mizmizi Batenpara Bridge to south side Mr.Abdul Hai Poultry Firm. √ m 580 152 Donor 2018 2020 √ √

238 Construction of RCC drain with covered slab at Mizmizi TC road starting from Kalu hazi more to Chowdhury para more. √ m 815 214 Donor 2018 2020 √ √

239 Construction of RCC drain with covered slab at Dhanu Hazi starting from TC road to Wapda canal near Dhaka-Chittagong highway

√ m 895 235 Donor 2018 2020 √ √

240 Construction of RCC drain with covered slab at Kalu Hazi starting from TC road to south side Wapda canal.

√ m 860 226 Donor 2018 2020 √ √

241 Construction of RCC drain with covered slab starting from Mizmizi west para TC road(Near Bara Mosque) to south side Choto Minar mosque.

√ m 745 196 Donor 2018 2020 √ √

242 Construction of RCC drain with covered slab starting from Muktinagar Bot-tala to west side Mauchak more. √ m 706 1664 Donor 2018 2020 √ √

243 Construction of RCC drain with covered slab (both side) starting from Sanarpar Landon market Bridge to east side Madaninagar Bridge. (2x915)

√ m 1830 385 Donor 2018 2020 √ √

244 Construction of RCC drain with covered slab starting from Muktinagar Bot-tala to Rasulbug Adarsha Nagar via Ali Akber High School.

√ m 220 58 Donor 2018 2020 √ √

245 Rehabilitation of drain by RCC with covered slab starting from Nemaikashary Bazar more to south side wapda canal par masjid. √ m 200 42 Donor 2018 2020 √ √

246 Construction of RCC drain with covered slab starting from Ademjee road to Atigram east side of Ambar paper mill. √ m 1420 448 Donor 2018 2020 √ √

247 Construction of RCC drain with covered slab starting from Monowara jute Mill to Azibpur railline. √ m 750 177 Donor 2018 2020 √ √

248 Construction of RCC drain with covered slab starting from Chapakhana to Azibpur railline.

√ m 480 101 Donor 2018 2020 √ √

249 Construction of RCC drain with covered slab starting from house of Abdul Hakim to Shitalakkhya river via Taj Jute mill.

√ m 1260 331 Donor 2018 2020 √ √

250 Construction of Brick drain with covered slab starting from Kalabug Jame Mosque to Silo road.

√ m 495 58 Donor 2018 2020 √ √

Page 27: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

27

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o.

(Fro

m

Infr

astr

uctu

re In

ven

tory

L

ist)

Description of Project/Scheme

Type of Project/Scheme

(Put √ Mark) Unit (km/ m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

251 Construction of RCC drain starting from house of Nur Islam to SO road via house of Satri mia.

√ m 710 167 Donor 2018 2020 √ √

252 Construction of RCC drain starting from Adamjee south gate to Barma stand road. √ m 1230 290 Donor 2018 2020 √ √

253 Construction of RCC drain starting from Barma stand road house of Ismail Commander to Bagpara road.

√ m 860 203 Donor 2018 2020 √ √

254 Construction of RCC drain starting from SO road to Barma stand road via Mondalpara . √ m 790 186 Donor 2018 2020 √ √

255 Construction of RCC drain with covered slab at Gass line road by RCC starting from Lakepar road to kadamtali uttar para Jame Masque.

√ m 521 137 Donor 2018 2020 √ √

256 Construction of RCC drain with covered slab starting from kadamtali uttar para Jame Masque to west side Shahar Alibag road

√ m 490 129 Donor 2018 2020 √ √

257 Construction of Brick drain with covered slab starting from Goadnail road to WAPDA canal via Modina Jame Mosque .

√ m 620 73 Donor 2018 2020 √ √

258 Construction of Brick drain with covered slab starting from Goadnail road house of Soleman to house of Anower.

√ m 600 70 Donor 2018 2020 √ √

259 Construction of Brick drain with covered slab starting from AEPZ road house of Mr. Kamal to wapda canal.

√ m 675 79 Donor 2018 2020 √ √

260 Construction of Brick drain with covered slab starting from AEPZ roade house of Tofazzal Hossain to house of Abdur Rahman. √ m 327 38 Donor 2018 2020 √ √

261 Construction of Brick drain with covered slab starting from WAPDA Canal road house of Sikder to house of Nur Hazi at Jalkuri.

√ m 465 54 Donor 2018 2020 √ √

262 Constructionof RCC Drain starting from Jalkure Amtala more to east side Khilpara near house of Oli Ullah . √ m 610 120 Donor 2018 2020 √ √

263 Constructionof RCC Drain starting from Jalkure Wapda Canal road to east side Baitul Aksha Jame mosque. √ m 775 152 Donor 2018 2020 √ √

264 Construction of RCC Drain starting from Jalkure northpara khola Bazar to Khilpara Road.

√ m 490 96 Donor 2018 2020 √ √

265 Construction of RCC Drain starting from Jalkuri Nailtarpara more to west side karaitola Bridge.

√ m 715 140 Donor 2018 2020 √ √

Page 28: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

28

Sl N

o.

Co

rresp

on

din

g R

oad

ID

N

o.

(Fro

m

Infr

astr

uctu

re In

ven

tory

L

ist)

Description of Project/Scheme

Type of Project/Scheme

(Put √ Mark) Unit (km/ m/ sq.m/ nos.)

Qty

Cost Estimate (Lac Taka)

Expected Source of Fund (Put √ Mark)

Timeline Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n

Reven

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime

(FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

266 Rehabilitation of drain by RCC at sonabibi Road (Starting from Dockyard to east side sonakanda Primary school) √ m 850 229 Donor 2018 2020 √ √

267 Construction of RCC drain at Amin Residentail area road (Starting from babupara to Shitalakha river) √ m 1525 411 Donor 2018 2020 √ √

268

Construction of RCC drain Kadamrasul University College to Modongonj-Modonpur road √ m 1325 357 Donor 2018 2020 √ √

269

Rehabilitation of drain by RCC at NCC Kadamrasul office to Shitalakha river via Archime Residentail area

√ m 750 202 Donor 2018 2020 √ √

270 Rehabilitation of drain by RCC at Belal Market to Taltola mohor √ m 1200 323 Donor 2018 2020 √ √

271

Construction of RCC drain at Modonganj-Modonpur road to Ramnagar Cannel √ m 500 135 Donor 2018 2020 √ √

272

Construction of RCC drain (Starting from Modonganj-Modonpur road to PDB Bridge) √ m 1275 343 Donor 2018 2020 √ √

273

Construction of RCC drain at Dhaka-Chittagong road to PDB office

√ m 525 141 Donor 2018 2020 √ √

274

Construction of RCC drain at Mododonganj-Modonpur road to PDB Road via yater Bridge

√ m 1125 303 Donor 2018 2020 √ √

275 Construction of drain along pedestrian road √ m 20000 23400 √

2018 2020 √ √

276

Re-excavation of Baburail Khal starting from Jimkhana Bbridge up to Dhaleswari River, with provision of Retaining wall in one side (south side).

√ m 1300 90 UNDP 2018 2020 √ √

277

Re-excavation of earthen cannel from Lakey Bazar up to DND (BWDB) pump house at Shimrail. √ m 4500 65 UNDP 2018 2020 √ √

278

Re-excavation of cannel from Chandmari ABC school to Shitalakhya river via Nalkhali khal. √ m 2100 100 UNDP 2018 2020 √ √

Sub-Total (in Lac Tk) 55267.0

Foot Note:

Construction Responsibility= CC/LGED/DPHE/WASA/RHD/Others (Specify)

O & M Responsibility = CC/WASA/RHD/Others (Specify)

Page 29: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

29

Sector: Waste Water Management

Sl

No

.

ID N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Co

rresp

on

din

g R

oad

ID

No

. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme

(Put √ Mark) Unit

(km/m /sq.m/ acre/ nos.)

Qty Cost

Estimate (Lac Taka)

Expected Source of Fund

(Put √ Mark) Timeline

Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n R

even

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime (

FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

279

i)Construction of Sanitary land fill ii)Purchase of land for sanitary land fill & required development. iii)Construction of Compost plant

√ acre 29 31500 MGSP 2018 2020 √ √

280 Installation of Effluent Treatment Plant (ETP) for purification of household waste water

√ nos 3 10000 MGSP 2018 2020 √ √

281

Procurement of Vehicle and equipment for drain cleaning and road sweeping.(Bulldozer, Excavator, Drum Truck etc.)

√ nos 10 10 MGSP 2018 2020 √ √

282 Excavation, landscaping ,beautification & Lighting of Baburail khal.

√ m 5800 10000 MGSP 2018 2020 √ √

283 Preservation, Excavation, landscaping ,beautification & Lighting of canals & Ponds of NCC.

√ nos 20 5000 MGSP 2018 2020 √ √

284 Construction of RCC pipe drain along the rail way property line from ward no-27 to 19

m 1700 5000 MGSP 2018 2020 √ √

Sub-Total 61510.00

Foot Note:

Construction Responsibility= CC/LGED/DPHE/WASA/RHD/Others (Specify)

O & M Responsibility = CC/WASA/RHD/Others (Specify)

Page 30: Narayanganj City Corporationncc.portal.gov.bd/sites/default/files/files/ncc.portal...canal near Lithi garments at ward no-3, 15m long RCC bridge (Abdul Ali pool) at ward no-2, 10m

30

Sector: Municipal Facilities

Sl

No

.

ID N

o. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Co

rresp

on

din

g R

oad

ID

No

. (F

rom

In

frastr

uctu

re

Inven

tory

Lis

t)

Description of Project/Scheme

Type of Project/Scheme

(Put √ Mark) Unit

(km/m /sq.m/ acre/ nos.)

Qty Cost

Estimate (Lac Taka)

Expected Source of Fund

(Put √ Mark) Timeline

Construction Responsibility

O & M Responsibility

New

C

on

str

ucti

on

Reh

ab

ilit

ati

on

/ P

eri

od

ic

Main

ten

an

ce

Ow

n R

even

ue

AD

P

Do

no

r

Exp

ecte

d

Sta

rt t

ime (

FY

)

Exp

ecte

d

Co

mp

leti

on

ti

me (

FY

)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

Cit

y

Co

rpo

rati

on

Oth

er

Org

an

izati

on

(P

lease

Sp

ecif

y)

285

Construction of 10-Storied office building (NAGAR Bhaban) of Narayanganj City Corporation at 10 Bangabandhu road Narayanganj

sqm 1000 4000 JICA 2018 2020 √ √

286 Development of Sheikh Rasel ECO park in Sonakanda

Acres 6 10000 MGSP 2018 2020 √ √

287 Development of green space & play ground in different places of NCC

Nos 20 2000 MGSP 2018 2020 √ √

288 Construction of Nagar Bhaban (Requested for fund to BMDF) Nos 1 5000 MGSP 2018 2020 √ √

289 Construction of Mayoral Bhaban Nos 1 1000 MGSP 2018 2020 √ √

290 Construction of Bus Terminal in NCC Nos 1 2000 MGSP 2018 2020 √ √

291 Construction of Conservancy Colony in Ward 12,15 and 17

Nos 4 16246 NCC

& GOB

2018 2020 √ √

Sub-Total 40246.00

Total Cost Estimate(In Lac Tk) 314173.00

Foot Note:

Construction Responsibility= CC/LGED/DPHE/WASA/RHD/Others (Specify)

O & M Responsibility = CC/WASA/RHD/Others (Specify)