2688-Polivka - 1
NAJPTC ProgramNAJPTC Program
Alan PolivkaAssistant Vice President
Communications and Train Control TechnologiesGeneral Manager – NAJPTC Program
Transportation Technology Center, Inc.Pueblo, Colorado - USA
© Transportation Technology Center, Inc., a subsidiary of the Association of American Railroads, 2003
© TTCI/AAR, 20032688-Polivka - 2
TMTM
PTC Program Management PTC Program Management
FRA IDOT AAR
NAJPTC Program Management Committee
OtherContractors
SystemsIntegrator
SystemsEngineer
ProgramManagerARINC
Team
Lockheed Martin Team Eastern PTC Project, Simulation Tools, etc.
NAJPTC is the Only Train Control Project sponsoredjointly by the Class 1 Railroads, Amtrak and FRA
© TTCI/AAR, 20032688-Polivka - 3
TMTM
NAJPTC Project ObjectivesNAJPTC Project ObjectivesDemonstrate PTC Demonstrate PTC Safety FunctionalitySafety Functionality
Prevent Train to Train CollisionsPrevent Train to Train CollisionsEnforce Speed Restrictions Enforce Speed Restrictions Protect Roadway Workers Operating Under Protect Roadway Workers Operating Under Specific AuthoritiesSpecific Authorities
Develop Develop InteroperabilityInteroperability StandardsStandards
Produce Produce CostCost--EffectiveEffective designdesign
Demonstrate Demonstrate RevenueRevenue--ReadyReady System for System for 110 110 mphmph Passenger Trains Intermixed with Passenger Trains Intermixed with Freight TrainsFreight Trains
© TTCI/AAR, 20032688-Polivka - 4
TMTM
System FeaturesSystem Features
Warnings / Enforcement of Authorities and SpeedsWarnings / Enforcement of Authorities and Speeds
Warnings provided in advance (except emergencies)Warnings provided in advance (except emergencies)
Enforcement is last resortEnforcement is last resort
Locomotive Activation of Crossing Warning SystemsLocomotive Activation of Crossing Warning Systems
Eliminates need to extend crossing track circuits for high speedEliminates need to extend crossing track circuits for high speed operationoperation
Modular Design Modular Design –– for evolutionary tailored deploymentfor evolutionary tailored deployment
Pacing & Fine Resolution Train TrackingPacing & Fine Resolution Train Tracking
Potential to improve velocity / capacity / service reliabilityPotential to improve velocity / capacity / service reliability
Potential to reduce congestion & fuel consumptionPotential to reduce congestion & fuel consumption
Flexible BlockFlexible Block
Permits closing up of trains Permits closing up of trains -- reduces freight train delay during overtakesreduces freight train delay during overtakes
Potential to alleviate need for wayside signalsPotential to alleviate need for wayside signals
Increases capacity without adding trackIncreases capacity without adding track
Less Opportunity
for Human Error
© TTCI/AAR, 20032688-Polivka - 5
TMTM
PTC is CommunicationsPTC is Communications--Based Train ControlBased Train Control
Computer-AidedDispatching
RoadwayWorker Terminal
Data Link
Onboard Equipment
PTC Server
- Displays Authorities and Speed Restrictions- Enforces Authorities and Restrictions- Warns Crew when Approaching Limits- Warns of Roadway Workers performing
Authorized Work on Track- Reports Location to Server
- Tracks Trains closely- Monitors Field Conditions
• Track Circuits• Switches• Defects Detectors
- Computes Authority Limits
- Transmits Movement Authorities & Speed Restrictions to Trains
AuthoritiesLocation Reports
PTC-ActivatedGrade Crossing
- Constant Warning Time- Responds to Radio
Messages from Trains- Does not rely on Track
Circuits
GPS
- Requests, Acks & Displays RW Authorities
- Sends Pacing commands to Trains
PTC uses Mobile Data Radios and Onboard Location DeterminationPTC uses Mobile Data Radios and Onboard Location Determination
© TTCI/AAR, 20032688-Polivka - 6
TMTM
PTC uses Moving Block Concept
Direction of Movement
≥ Braking Distanceof Worst Case Train
Excess TrainSeparation
4-aspectsignaling
Standalone Territory
Integrated Territory
Illinois Dept. of Transportation(IDOT) PTC Corridor
Integrated Territory(Fixed Block)
Standalone Territory(Moving Block)
Precise Train Location enables Moving Block operation which
Reduces Headway toIncrease Line Capacity.
© TTCI/AAR, 20032688-Polivka - 7
TMTM
PTC System Design BaselinePTC System Design Baseline
CommunicationsSegment
Office Segment
Remote TerminalsRemote Terminals• Amtrak• IDOT
≈
Dispatch(CAD)
Dispatch(CAD)
(ATCS Spec 200)
Sun UltraRemote Terminal
WEB Server
Sun UltraRemote Terminal
WEB Server
PTC Office RemoteTerminal Server Program
CSCI
Application Administration
Console
RWT
MCP(ATCS Spec 200)
Work Vehicle Segment
WIU
MCP
Crossings, Signals, Switches, Defect Detectors, Track Circuits
TRACKS
(ATCS Spec 200)
Field Devices External Interfaces
Field Segment
WIUSoftware
RWTSoftware
Modems
1010
← Spare
← PTCWEB →
3COM Ethernet Hubs
FEP/CC(Tandem)FEP/CC(Tandem)
PTC Office Server Program (POSP) CSCI
System Administration
Console
STRATUS Fault Tolerant
PTC Office Server
Base Towers
Ethernet / TCP/IP(ATCS Spec 200) *
FEP/CC(Tandem)FEP/CC(Tandem)
Modems
99
Locomotive Segment
MCP
. ..GPS/DGPS
InertialPackage
Train Interface (e.g., Brake, Wheel Tach, Throttle, etc.)
(ATCS Spec 200)
LocoPTC
Software
Locomotive CIs
LocoLDS
Software
LocoPTC Display
Software
© TTCI/AAR, 20032688-Polivka - 8
TMTM
Location Determination System (LDS)Location Determination System (LDS)
CBTC uses Onboard Location DeterminationCBTC uses Onboard Location Determination
PTC uses a MultiPTC uses a Multi--Sensor LDS which handles Track Sensor LDS which handles Track Discrimination, GPS Outages, and Fault DetectionDiscrimination, GPS Outages, and Fault Detection
No track tags requiredNo track tags required
PTCLDS
TrackDiscrim.
Location Determination
GPSNDGPSBeacon
© TTCI/AAR, 20032688-Polivka - 9
TMTM
IDOT PTC BuildsIDOT PTC BuildsBuild 1Build 1
Infrastructure (Infrastructure (commcomm, server, onboard hardware), server, onboard hardware)Location Determination, Reporting, and Tracking functionalityLocation Determination, Reporting, and Tracking functionality
Build 2 is adding:Build 2 is adding:Basic PTC Functionality to enter Revenue Service with Emphasis oBasic PTC Functionality to enter Revenue Service with Emphasis on n High Speed Passenger OperationHigh Speed Passenger Operation
Management & Enforcement of AuthoritiesManagement & Enforcement of AuthoritiesManagement & Enforcement of Speed Restrictions (civil & temp.)Management & Enforcement of Speed Restrictions (civil & temp.)Advance Activation of Highway CrossingsAdvance Activation of Highway CrossingsRoute Integrity MonitoringRoute Integrity MonitoringRoadway Worker ProtectionRoadway Worker Protection
Build 3 (if fully funded) will add:Build 3 (if fully funded) will add:Confirmed ConsistConfirmed ConsistPredictorsPredictorsHigh Speed Defect DetectorsHigh Speed Defect DetectorsOnline Database ChangesOnline Database ChangesRoadway Worker TerminalRoadway Worker TerminalTrain PacingTrain PacingCab Signal Interoperability DemoCab Signal Interoperability DemoFunctional NegotiationFunctional Negotiation
© TTCI/AAR, 20032688-Polivka - 10
TMTM
PTC Build 1 PTC Build 1 -- Field Tested October 2002Field Tested October 2002
LDS met requirements up to 110 mphLDS met requirements up to 110 mph
© TTCI/AAR, 20032688-Polivka - 11
TMTM
Primary PTC Building BlocksPrimary PTC Building Blocks& their Benefits& their Benefits
More Precise & Timely Info, Supports Better More Precise & Timely Info, Supports Better Meet/Pass Scheduling, Supports other PTC Meet/Pass Scheduling, Supports other PTC Modules, Leads to Better MoW ProductivityModules, Leads to Better MoW Productivity
LocationLocationTrackingTracking
Supports other PTC ModulesSupports other PTC ModulesData CommData CommNetworkNetwork
More Capacity for Track & Asset Utilization More Capacity for Track & Asset Utilization (moving block), Track Forces Protection, (moving block), Track Forces Protection, Less Human Error, Less Voice Comm TimeLess Human Error, Less Voice Comm Time
AuthorityAuthorityManagementManagement
Less Human Error, Less Voice Comm Time, Less Human Error, Less Voice Comm Time, Less Track MaintenanceLess Track Maintenance
SpeedSpeedManagementManagement
BenefitsBenefitsModuleModule
© TTCI/AAR, 20032688-Polivka - 12
TMTM
Secondary PTC Building BlocksSecondary PTC Building Blocks& their Benefits& their Benefits
Increased Safety/Less Human ErrorIncreased Safety/Less Human ErrorRoute IntegrityRoute IntegrityMonitoringMonitoring
Increased Safety/Less Human ErrorIncreased Safety/Less Human ErrorWarnings &Warnings &EnforcementEnforcement
1010--30 minutes Savings per Switch30 minutes Savings per SwitchPower SwitchPower SwitchControlControl
Less Interference with/from Voice Traffic, Less Interference with/from Voice Traffic, Car Number Identification (w/AEI)Car Number Identification (w/AEI)
Train Defect Train Defect Detector InterfaceDetector Interface
Constant Warn Time for Fast Trains Without Constant Warn Time for Fast Trains Without Extending Circuits, Additional Warning to Extending Circuits, Additional Warning to equipped Highequipped High--Risk VehiclesRisk Vehicles
Highway CrossingHighway CrossingActivationActivation
Service Reliability, Less Congestion, 3Service Reliability, Less Congestion, 3--7% Fuel 7% Fuel Savings, Reduced Delays, Higher Network Savings, Reduced Delays, Higher Network VelocityVelocity
PacingPacing
BenefitsBenefitsModuleModule
© TTCI/AAR, 20032688-Polivka - 13
TMTM
60
Civil 079 mph; MP: 102.50 to 105.25TEMPORARY 040 mph; MP: 105.25 to 107.70; Effective: 08:25 11/18/2002 until 17:30 11/18/2002RESTRICTED 020 mph; MP: 107.70 to 110.00; Effective: 10:00 11/18/2002 until 17:30 11/18/2002
7979
4040
20R20R
Restricted Speed
Onboard DisplayOnboard Display
© TTCI/AAR, 20032688-Polivka - 14
TMTM
Summary of PTC Project StatusSummary of PTC Project StatusBuild 1 Complete Build 1 Complete –– Successful Field Test/Demo Oct Successful Field Test/Demo Oct ‘‘02 02
New ATCS Data Radio System in Territory New ATCS Data Radio System in Territory
Upgrades to UPRR Dispatch System Complete Upgrades to UPRR Dispatch System Complete
13 Locomotives Fitted w/PTC Hardware 13 Locomotives Fitted w/PTC Hardware
Track Upgrades (Class 6) in Territory nearly Complete Track Upgrades (Class 6) in Territory nearly Complete
Build 2 Build 2 -- High Speed Train ControlHigh Speed Train Control
Lab System Integration UnderwayLab System Integration Underway
Demonstrated Key Functions in Lab in Nov Demonstrated Key Functions in Lab in Nov ‘‘03 03
All All WIUsWIUs Delivered Delivered –– Cutovers about to start Cutovers about to start
Field Trials & Tests in Q2 & Q3 2004Field Trials & Tests in Q2 & Q3 2004
Begin Revenue Service around end of 2004Begin Revenue Service around end of 2004
Build 3 Build 3 –– Features to be Added in 2005Features to be Added in 2005