    Estimated Cost Rs. 1500000.00

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part

    1 Km 0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

    G O V E R N M E N T O F M A H A R A S H T R A

    P.W. CIRCLE , GADCHIROLI

    P.W. DIVISION NO. 1, GADCHIROLI

    UNDER I.A.P. BUDGET 12 -13

  • 7/31/2019 Nagari to Mohazari Road 1

    2/52

    ESTIMATE

    DIVISION : PUBLIC WORKS DIVISION NO.I ,

    GADCHIROLI

    SUB-DIVISION : PUBLIC WORKS SUB-DIVISION NO.1,

    GADCHIROLI

    SANCTIONED ESTIMATE NO:

    FUND HEAD :

    MAJOR HEAD :

    MINOR HEAD :

    SERVICE HEAD :

    DEPARTMENTAL HEAD :

    Estimate is framed in the office of the Executive Engineer, Public Works Division

    No. I , Gadchiroli for the probable expenses that will be incurred on

    AMOUNT: Rs. 1500000.00

    Administrative Approval under No.: Date:

    Technically Sanctioned under No.: Date:

    Estimate Prepared by: S. G. Allewar (A.E.II)

    Estimate checked by:

    General Description

    Attached Seperatly

    Assistant Engineer Gr. 1

    P.W. Sub-Division No. 1,

    Gadchiroli

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in

    Gadchiroli Taluka & Dist. Gadchiroli.

  • 7/31/2019 Nagari to Mohazari Road 1

    3/52

    GENERAL REPORT

    Amount of Estimate:- Rs. 1500000.00

    Authority :- This work is proposed in IAP budget Progrmme 2012-13 for Rs. 15.00 Lakhs.

    vide letter of Shri. Marotrao S. Kowase, M.P. Gadchiroli - Chimur no.

    M.P.L.A.D. / G.D. / 1558/2012/ Dt. 21/04/12

    Introduction & necessity:-

    Nagari village is situated on S.H. - 275 i.e. Bejorpalli Parsewada

    Aheri Chamroshi Gadchiroli Armori Wadsa Balagath Road about 1.20 Km

    away. The existing earthen road is constructed under E.G.S. but no metelling of

    this road in constructed in any programme. Mohazai village is situated on R/S

    of S.H. - 275. Due to existing earthen road the people of Nagari Village found it

    very difficult to go agriculture field & main road during rainy season.

    Also there are agriculture field on both side of road, due to

    construction of this road the farmers also get facility for transporting of

    agriculture goods during rainy season and the road will be all weather.

    Hence this estimate is framed.

    Provisions:-

    In order to gain above objectives following provisions are made in estimate;

    For Road Work

    1 Excavation of Catch water drain with its utilisation.

    2 Providing Eartwork in embankment required as per standard cross section.

    3 Blanketing as an admixture of Soft Murum & Sand 50 % respectively for full width.

    4 80 mm metalling in 1 coat 200 mm loose of 3.30 mt. width.

    5 40 mm metalling in 1 coats 100 mm loose of 3.00 mt. width.

    Construction of Conc. Dhaba Drain at location of crossing. 2 Nos.

    1 Rubble soling below face wall .

    2 C.Conc. 1:4:8, 0.10 m thik below Bottom slab.

    3 C.Conc. In M-15, 0.10 m thick.

    4 Face wall in M-15

    5 RCC slab in M-20 C. Conc.

    Rate & Specifications:-

    The rates are adopted as per current CSR 2012-2013 w.e.f. 01-09-2011. The standard

    specifications of Govt. of Maharashtra will be followed for execution of these items.

    Assistant Engineer Gr. 1

    P.W. Sub-Division No. 1,

    Gadchiroli

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in

    Gadchiroli Taluka & Dist. Gadchiroli.

  • 7/31/2019 Nagari to Mohazari Road 1

    4/52

    GENERAL ABSTARCT

    1 Work Cost Rs. 1499746.00

    Rs. 1499746.00

    Total Rs. 1499746.00

    Say Rs. 1500000.00

    Assistant Engineer Gr. 1

    P.W. Sub-Division No. 1,

    Gadchiroli

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1

    Km 0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

  • 7/31/2019 Nagari to Mohazari Road 1

    5/52

    Sr. Quantity Rate Unit Amount

    No. in Rs. in Rs.

    a) Road Work

    1

    (C.S.R. It No 13 / Page No. 224 ) 356.00 105.50 Cum. 37558.00

    2

    (C.S.R. It No ( 27 - 28 ) /Page No. 227 ) 356.00 12.00 Cum. 4272.00

    3

    (C.S.R. It No 27 Page No. 227 ) 1280.44 155.85 Cum. 199557.00

    4

    For 80mm Metal 385.04 695.75 Cum. 267892.00

    For 40mm Metal 175.02 723.35 Cum. 126601.00

    5

    738.73 456.85 Cum. 337489.00

    6

    694.98 455.95 Cum. 316876.00

    Excavation for catch / side water gutter in all sort of soils, soft

    murum etc. to the specified section including stacking the

    excavated stuff in regular bund and disposing off unsuitable or

    excess stuff upto a lead of 50 m and spreading as directed

    Engineer-in-charge.

    Laying, watering and compacting the embankment formed of

    materials obtained from the road cutting, breaking clods,

    dressing to 3% camber design superelevation curve &prescribed section for embankment within a lead of 50 m, after

    laying them in layers of 20cm to 30cm. with static roller etc.

    complete.

    Providing earthwork in embankment with approved materials

    obtained from departmental land or other sources including all

    lifts, laying in layers of 20 cm. to 30 cm. thickness breaking

    clods, dressing to the required lines, curves, grade and

    section, watering and compacting with power roller complete. (

    Including Royalty Charges )

    CSR Item No. 33/229

    Supplying sand at the road side, including conveying and

    stacking complete.

    CSR Item No. 34/229

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in

    Gadchiroli Taluka & Dist. Gadchiroli.

    Item of Work

    Supplying trap /granite /quartzite / gneiss stone metal of

    required size by bringing the boulders at the road side

    breaking them to required gradation including conveying the

    boulders and stacking the broken metal etc. complete. (Prior

    approval of sample stack of broken metal by the Ex.Engineer

    is necessary, the date of approval will form part of the

    measurements)

    ABSTRACT SHEET

    b) By Breaking boulder (Hand broken)

    Supplying soft murum at the road side, including conveying

    and stacking complete.

    CSR Item No. 31(bi)/228

  • 7/31/2019 Nagari to Mohazari Road 1

    6/52

    Sr. Quantity Rate Unit Amount

    No. in Rs. in Rs.

    Item of Work

    7

    1433.71 16.80 Cum. 24086.00

    8385.04 27.60 Cum. 10627.00

    9

    175.02 24.00 Cum. 4200.00

    10

    1925.22 8.40 Sqm. 16172.00

    11

    1925.22 13.80 Sqm. 26568.00

    12

    1750.20 14.40 Sqm. 25203.00

    13

    5250.60 3.60 Sqm. 18902.00

    (b) DHABA DRAINS

    14

    11.09 149.85 Cum. 1662.00

    15

    1.96 672.40 Cum. 1318.00

    16

    1.31 3213.25 Cum. 4209.00

    Providing and laying in situ cement concrete of 1:4:8

    proportion with trap / granite / quartzite / gneiss metal in

    foundation including necessary compacting and curing

    complete. (Including plywood/ steel formwork) The C.M. 1:3

    plaster is considered for rendering uneven and honeycombed

    surface only. Newly laid concrete shall be covered by gunny

    bag, plastic, tarpaulin etc. (Wooden centering/formwork will

    not be allowed).

    CSR Item No. 2/216

    CSR Item No. 1/216

    CSR Item No. 42/230

    Compacting the hard murum side widths layerwise on each

    side with static roller including necessary artificial watering

    complete .

    Providing rubble filling of trap / granite / quartzite / gneiss

    stones in foundation including hand packing filling gravel /

    sand in the voids etc. complete.

    CSR Item No. 44/230

    Lift upto 1.5 meter

    CSR Item No. 1/184

    Excavation for foundation in earth, soils of all types, sand,

    gravel soft murum etc. including shoring and strutting as

    necessary and disposing off excavated stuff within lead of 100

    m as directed etc. complete

    CSR Item No. 39/229

    Compacting the hard murum / kankar of all width (200 mm.

    loose) with Static roller including necessary artificial watering

    complete.

    CSR Item No. 43/230

    Compacting the sub grade/gravel/ oversize metal (200 mm

    loose) layers of all width with static roller including necessary,labour, materials and artificial watering complete.

    CSR Item No. 40/230

    Compacting the sub grade/gravel/ size metal (100 mm loose)

    layers of all width with static roller including necessary, labour,

    materials and artificial watering complete.

    Spreading 40 mm metal including sectioning complete.

    Spreading 80 mm metal including sectioning complete.CSR Item No. 38/229

    Spreading gravel/sand/soft murum/ available murum over

    rubble soling/ W.B.M. surface blanketing berms etc. complete.

    CSR Item No. 37/229

  • 7/31/2019 Nagari to Mohazari Road 1

    7/52

    Sr. Quantity Rate Unit Amount

    No. in Rs. in Rs.

    Item of Work

    17

    4.54 5325.55 Cum. 24178.00

    18

    1.17 4922.45 Cum. 5759.00

    19

    2.23 135.50 Rmt 302.00

    20

    2.93 6774.85 Cum 19850.00

    21

    0.411 63834.20 MT 26236.00

    Providing and casting in situ cement concrete of M-20 grade

    of trap / granite /quartzite /gneiss metal for R.C.C slabs and

    landings as per detailed design and drawings including steel

    centering, plywood /steel formwork, steel props, compaction,

    finishing uneven and honeycombed surface with C.M. 1:3 of

    sufficient minimum thickness to give a smooth and even

    surface or roughening the surface if special finish is to be

    provided with fan hook box of 2 mm thick M.S.Sheet

    rectangular size 180 mm x 100 mm with required depth, with

    holes or notches, as required, bottom and top lids of 1.6 mm

    thick M.S.Sheet

    CSR Item No. 43/203

    Providing and cutting, bending, hooking, laying, in position and

    tying bar reinforcement as per detailed drawing for R.C.C.

    works etc. complete.

    CSR Item No. 35/200

    CSR Item No. 16/191

    Providing and laying in situ cement concrete of M-15 / 1:2:4

    with trap / granite / quartzite / gneiss metal in face wall

    including plywood/ steel formwork and steel centering,

    compaction by vibrator, finishing uneven and honeycombed

    surface with C.M.1:3 of sufficient minimum thickness to give

    smooth and even surface, filling joints with bitumen, curing

    etc. complete. (Excluding cost of reinforcement.) The C.M. 1:3

    plaster is considered for rendering uneven and honeycombed

    surface only. Newly laid concrete shall be covered by gunny

    bag, plastic, tarpaulin etc. (Wooden centering/formwork will

    not be allowed).

    CSR Item No. 3/216

    Providing and laying in situ M-15 / 1:2:4 cement concrete of

    trap / granite / quartzite / gneiss metal for levelling coures

    below R.C.C raft and in foundation including necessary

    plywood/steel formwork, steel centering, compaction byvibrating finishing, curing etc. complete. The C.M. 1:3 plaster

    is considered for rendering uneven and honeycombed surface

    only. Newly laid concrete shall be covered by gunny bag,

    plastic, tarpaulin etc. (Wooden centering/formwork will not be

    allowed).

    CSR Item No. 14/190

    Providing and fixing A.C./ UPVC pipes of 100 mm diameter

    and of required length for relieving water pressure, stone filter

    as directed complete.(For vent holes in raft).

  • 7/31/2019 Nagari to Mohazari Road 1

    8/52

    Sr. Quantity Rate Unit Amount

    No. in Rs. in Rs.

    Item of Work

    22

    0.65 353.05 Cum. 229.00

    Total Rs. 1499746.00

    Assistant Engineer Gr. 1

    P.W. Sub-Division No. 1,

    Gadchiroli

    Providing selected murum (having PI < 6 ) filling including

    laying in layers of 15 cm to 20 cm watering and compacting

    etc. complete.

    CSR Item No. 10/219

  • 7/31/2019 Nagari to Mohazari Road 1

    9/52

    Sr. Nos. L. B. D. Quantity Unit

    No.

    a) Road Work

    1

    (C.S.R. It No 13 / Page No. 224 )

    75% of Total Length 2 439.50 0.90 0.45 356.00

    356.00 Cum.

    2

    (C.S.R. It No ( 27 - 28 ) /Page No. 227 ) As per Quantity of item no. 3 356.00

    356.00 Cum.

    3

    (C.S.R. It No 27 Page No. 227 )

    As per Std X- Section 1 583.40 (9.0+10.80)/2 0.45 2599.05 Cum.Deduct As per existing X- Section 1 583.40 (5.0+6.00)/2 0.30 -962.61

    Less Qty obtained from Drain -356.00

    Nett Qty. 1280.44 Cum.

    4

    b) By Breaking boulder (Hand broken)

    CSR Item No. 31(bi)/228 80mm Metal583.40 1 583.40 3.30 0.20 385.04 Cum.

    Total 385.04 Cum.

    CSR Item No. 31(bii)/228

    40mm Metal 1 583.40 3.00 0.10 175.02 Cum.

    Total 175.02 Cum.

    Providing earthwork in embankment with approved materials obtained from departmental land or other

    sources including all lifts, laying in layers of 20 cm. to 30 cm. thickness breaking clods, dressing to the

    required lines, curves, grade and section, watering and compacting with power roller complete. (

    Including Royalty Charges )

    Laying, watering and compacting the embankment formed of materials obtained from the road cutting,

    breaking clods, dressing to 3% camber design superelevation curve & prescribed section forembankment within a lead of 50 m, after laying them in layers of 20cm to 30cm. with static roller etc.

    complete.

    Excavation for catch / side water gutter in all sort of soils, soft murum etc. to the specified section

    including stacking the excavated stuff in regular bund and disposing off unsuitable or excess stuff upto

    a lead of 50 m and spreading as directed Engineer-in-charge.

    Supplying trap /granite /quartzite / gneiss stone metal of required size by bringing the boulders at the

    road side breaking them to required gradation including conveying the boulders and stacking the

    broken metal etc. complete. (Prior approval of sample stack of broken metal by the Ex.Engineer is

    necessary, the date of approval will form part of the measurements)

    MEASUREMENT SHEET

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in

    Gadchiroli Taluka & Dist. Gadchiroli.

    Item of Work

  • 7/31/2019 Nagari to Mohazari Road 1

    10/52

    Sr. Nos. L. B. D. Quantity Unit

    No.

    Item of Work

    5

    CSR Item No. 33/229

    Murum Blanketing for Formation of Road

    3.30 3.30

    For Blanketing 3.30 3.30 1X1/2 583.40 3.30 0.20 192.52 Cum.For filling side of 80mm 2.55 2.25 2X1/2 583.40 (2.55+2.25)/2 0.20 280.03 Cum.

    For side berms 2.40 2.25 2X1/2 583.40 (2.40+2.25)/2 0.10 135.64 Cum.

    Murum for 80mm (1/2)X (3/8) 385.04 Cum. 72.200 Cum.

    Murum for 40mm (1/3) 175.02 Cum. 58.340 Cum.

    Total 738.73 Cum.

    6

    CSR Item No. 34/229

    For Blanketing 3.30 3.30 1X1/2 583.40 3.30 0.20 192.52 Cum.

    For filling side of 80mm 2.55 2.25 2X1/2 583.40 (2.55+2.25)/2 0.20 280.03 Cum.

    For side berm 2.40 2.25 2X1/2 583.40 (2.40+2.25)/2 0.10 135.64 Cum.

    Murum for 80 (1/2)X (3/8) 385.04 Cum. 72.200 Cum.

    Murum for 40 (1/12) 175.02 Cum. 14.590 Cum.Total 694.98 Cum.

    7

    CSR Item No. 37/229

    Quantity vide Item No. 3 738.73 Cum.

    Quantity vide Item No. 4 694.98 Cum.

    Total Qty. 1433.71 Cum.

    8

    CSR Item No. 38/229

    Quantity vide Item No. 2 385.04 Cum.

    9

    CSR Item No. 39/229

    Quantity vide Item No. 2 175.02 Cum.

    10

    CSR Item No. 43/230

    Compaction of Murum Formation layer 583.40 1 583.40 3.30 --- 1925.22 Sqm.

    Total 1925.22 Sqm.

    11

    CSR Item No. 40/230

    80mm Metal 583.40 1 583.40 3.30 --- 1925.22 Sqm.

    Total 1925.22 Sqm.

    12

    CSR Item No. 42/230

    40mm Metal 583.40 1 583.40 3.00 --- 1750.20 Sqm.

    Total 1750.20 Sqm.

    Supplying sand at the road side, including conveying and stacking complete.

    Supplying soft murum at the road side, including conveying and stacking complete.

    Compacting the sub grade/gravel/ oversize metal (200 mm loose) layers of all width with static rollerincluding necessary, labour, materials and artificial watering complete.

    Compacting the hard murum / kankar of all width (200 mm. loose) with Static roller including necessary

    artificial watering complete.

    Spreading 40 mm metal including sectioning complete.

    Spreading 80 mm metal including sectioning complete.

    Compacting the sub grade/gravel/ size metal (100 mm loose) layers of all width with static roller

    including necessary, labour, materials and artificial watering complete.

    Spreading gravel/sand/soft murum/ available murum over rubble soling/ W.B.M. surface blanketing

    berms etc. complete.

  • 7/31/2019 Nagari to Mohazari Road 1

    11/52

    Sr. Nos. L. B. D. Quantity Unit

    No.

    Item of Work

    13

    CSR Item No. 44/230

    For filling side of 80mm 2 583.40 2.25 --- 2625.30 Sqm.

    For side berm 2 583.40 2.25 --- 2625.30 Sqm.

    Total 5250.60 Sqm.

    (b) DHABA DRAINS14

    CSR Item No. 1/184

    For Dhaba Drain 1 9.00 1.45 0.85 11.09 Cum.

    Total 11.09 Cum.

    15

    CSR Item No. 1/216

    For Dhaba Drain 1 9.00 1.45 0.15 1.96 Cum.

    Total 1.96 Cum.

    16

    For Dhaba Drain 1 9.00 1.45 0.10 1.31 Cum.

    Total 1.31 Cum.

    17

    For Dhaba Drain (0.20+0.35)/2

    2 1 9.00 0.28 0.90 4.46 Cum.Inscribing Pillars 4 1 0.25 0.25 0.30 0.08

    Total 4.54 Cum.

    Providing and laying in situ cement concrete of 1:4:8 proportion with trap / granite / quartzite / gneiss

    metal in foundation including necessary compacting and curing complete. (Including plywood/ steel

    formwork) The C.M. 1:3 plaster is considered for rendering uneven and honeycombed surface only.

    Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering/formwork

    will not be allowed).

    Providing rubble filling of trap / granite / quartzite / gneiss stones in foundation including hand packing

    filling gravel / sand in the voids etc. complete.

    Excavation for foundation in earth, soils of all types, sand, gravel soft murum etc. including

    shoring and strutting as necessary and disposing off excavated stuff within lead of 100 m as directed

    etc. complete

    Compacting the hard murum side widths layerwise on each side with static roller including necessary

    artificial watering complete .

    Providing and laying in situ cement concrete of M-15 / 1:2:4 with trap / granite / quartzite / gneiss metal

    in face wall including plywood/ steel formwork and steel centering, compaction by vibrator, finishing

    uneven and honeycombed surface with C.M.1:3 of sufficient minimum thickness to give smooth and

    even surface, filling joints with bitumen, curing etc. complete. (Excluding cost of reinforcement.) The

    C.M. 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid

    concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering/formwork will not be

    allowed).

    Lift upto 1.5 meter

    CSR Item No. 3/216

    CSR Item No. 2/216

  • 7/31/2019 Nagari to Mohazari Road 1

    12/52

    Sr. Nos. L. B. D. Quantity Unit

    No.

    Item of Work

    18

    For Dhaba Drain 1 9.00 1.30 0.10 1.17 Cum.

    Total 1.17 Cum.

    19

    2 1 9.00 0.90 0.28 2.23 Rmt

    2

    TOTAL QTY. 2.23 Rmt

    20

    Slab over Drain 1 9.00 1.30 0.25 2.93 Cum

    Total 2.93 Cum

    21

    For Bottom Slab @ 60 Kg/ Cum 1.17 @ 0.060 0.070 MT

    For Pier Sur. Reinf. @ 40 Kg/ Cum 4.54 @ 0.030 0.136

    For Top Slab @ 70 Kg/ Cum 2.93 @ 0.070 0.205

    TOTAL QTY. 0.411 MT

    22

    Side of Excavation 2 1 9.00 0.08 0.90 0.65 Cum.

    Total 0.65 Cum.

    Assistant Engineer Gr. 1

    P.W. Sub-Division No. 1,

    Gadchiroli

    Providing and cutting, bending, hooking, laying, in position and tying bar reinforcement as per detailed

    drawing for R.C.C. works etc. complete.

    CSR Item No. 43/203

    CSR Item No. 16/191

    Providing selected murum (having PI < 6 ) filling including laying in layers of 15 cm to 20 cm watering

    and compacting etc. complete.

    CSR Item No. 10/219

    CSR Item No. 35/200

    Providing and laying in situ M-15 / 1:2:4 cement concrete of trap / granite / quartzite / gneiss metal for

    levelling coures below R.C.C raft and in foundation including necessary plywood/steel formwork, steel

    centering, compaction by vibrating finishing, curing etc. complete. The C.M. 1:3 plaster is considered

    for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny

    bag, plastic, tarpaulin etc. (Wooden centering/formwork will not be allowed).

    Providing and fixing A.C./ UPVC pipes of 100 mm diameter and of required length for relieving water

    pressure, stone filter as directed complete.(For vent holes in raft).

    Providing and casting in situ cement concrete of M-20 grade of trap / granite /quartzite /gneiss metal

    for R.C.C slabs and landings as per detailed design and drawings including steel centering, plywood

    /steel formwork, steel props, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of

    sufficient minimum thickness to give a smooth and even surface or roughening the surface if special

    finish is to be provided with fan hook box of 2 mm thick M.S.Sheet rectangular size 180 mm x 100 mm

    with required depth, with holes or notches, as required, bottom and top lids of 1.6 mm thick M.S.Sheet

    CSR Item No. 14/190

  • 7/31/2019 Nagari to Mohazari Road 1

    13/52

    RATE ANALYSIS

    Sr. Rate/Unit Unito.

    1

    Rs. 88.00

    Deduct 0.50 % for Insurance -0.44

    Total = Rs. 87.56

    Add 20 % for Naxal Special Action Plan 17.51Add 0.50 % for Insurance 0.44

    Total = Rs. 105.51

    Say = Rs. 105.50 /Cum.

    2

    Rs. 10.00

    Deduct 0.50 % for Insurance -0.05

    Total = Rs. 9.95

    Add 20 % for Naxal Special Action Plan 1.99Add 0.50 % for Insurance 0.05

    Total = Rs. 11.99

    Say = Rs. 12.00 /Cum.

    3

    Rs. 130.00

    Deduct 0.50 % for Insurance -0.65

    Total = Rs. 129.35

    Add 20 % for Naxal Special Action Plan 25.87Add 0.50 % for Insurance 0.65

    Total = Rs. 155.87

    Say = Rs. 155.85 /Cum.

    4

    (C.S.R. It No ( 27 - 28 ) /Page No. 227 )

    Providing earthwork in embankment with approved materials

    obtained from departmental land or other sources including all

    l ifts, laying in layers of 20 cm. to 30 cm. thickness breaking clods,

    dressing to the required lines, curves, grade and section, watering

    and compacting with power roller complete. ( Including Royalty

    (C.S.R. It No 27 Page No. 227 )

    CSR Item No. 31(bi)/228

    Excavation for catch / side water gutter in all sort of soils, soft

    murum etc. to the specified section including stacking theexcavated stuff in regular bund and disposing off unsuitable or

    excess stuff upto a lead of 50 m and spreading as directed

    (C.S.R. It No 13 / Page No. 224 )

    Laying, watering and compacting the embankment formed of

    materials obtained from the road cutting, breaking clods, dressing

    to 3% camber design superelevation curve & prescribed section

    for embankment within a lead of 50 m, after laying them in layers

    of 20cm to 30cm. with static roller etc. complete.

    Supplying trap /granite /quartzite / gneiss stone metal of required

    size by bringing the boulders at the road side breaking them to

    required gradation including conveying the boulders and stacking

    the broken metal etc. complete. (Prior approval of sample stack of

    broken metal by the Ex.Engineer is necessary, the date of

    approval will form part of the measurements)

    b) By Breaking boulder (Hand broken)

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in

    Gadchiroli Taluka & Dist. Gadchiroli.

    Item of Work

  • 7/31/2019 Nagari to Mohazari Road 1

    14/52

    Sr. Rate/Unit Unito.

    Item of Work

    Rate as per Lead Statement For 80mm Rs. 592.00 /Cum.

    Deduct for Royalty Charges 1.00 Cum.Rs. -70.60 /Cum. Rs. -70.60

    Total Rs. 521.40

    Deduct Insurance Charges 0.50 % Rs. -2.61

    Total Rs. 518.79

    Add for Naxal affected Area 20% Rs. 103.76

    Add Insurance Charges 0.50 % Rs. 2.61

    Add for Royalty Charges 1.00 Cum. Rs. 70.60 /Cum. Rs. 70.60

    Total Rs. 695.76

    Say Rs. 695.75 /Cum.

    For 40mm

    Rate as per Lead Statement Rs. 615.00 /Cum.

    Deduct for Royalty Charges 1.00 Cum.Rs. -70.60 /Cum. Rs. -70.60

    Total Rs. 544.40

    Deduct Insurance Charges 0.50 % Rs. -2.72

    Total Rs. 541.68

    Add for Naxal affected Area 20% Rs. 108.34

    Add Insurance Charges 0.50 % Rs. 2.72

    Add for Royalty Charges 1.00 Cum. Rs. 70.60 /Cum. Rs. 70.60

    Total Rs. 723.34

    Say Rs. 723.35 /Cum.

    5

    Rate as per Lead Statement Rs. 392.75 /Cum.

    Deduct for Royalty Charges 1.00 Cum.Rs. -70.60 /Cum. Rs. -70.60

    Total Rs. 322.15

    Deduct Insurance Charges 0.50 % Rs. -1.61

    Total Rs. 320.54

    Add for Naxal affected Area 20% Rs. 64.11Add Insurance Charges 0.50 % Rs. 1.61

    Add for Royalty Charges 1.00 Cum. Rs. 70.60 /Cum. Rs. 70.60

    Total Rs. 456.86

    Say Rs. 456.85 /Cum.

    6

    Rate as per Lead Statement Rs. 391.98 /Cum.

    Deduct for Royalty Charges 1.00 Cum.Rs. -70.60 /Cum. Rs. -70.60

    Total Rs. 321.38

    Deduct Insurance Charges 0.50 % Rs. -1.61

    Total Rs. 319.77Add for Naxal affected Area 20% Rs. 63.95

    Add Insurance Charges 0.50 % Rs. 1.61

    Add for Royalty Charges 1.00 Cum. Rs. 70.60 /Cum. Rs. 70.60

    Total Rs. 455.93

    Say Rs. 455.95 /Cum.

    CSR Item No. 33/229

    Supplying sand at the road side, including conveying and stacking

    complete.

    CSR Item No. 34/229

    Supplying soft murum at the road side, including conveying and

    stacking complete.

  • 7/31/2019 Nagari to Mohazari Road 1

    15/52

    Sr. Rate/Unit Unito.

    Item of Work

    7

    Rate as per CSR Item No 37/229 Rs. 14.00 /Cum.

    Deduct 0.50 % for Insurance -0.07

    Total = Rs. 13.93

    Add 20 % for Naxal Special Action Plan 2.79

    Add 0.50 % for Insurance 0.07Rs. 16.79

    Say Rs. 16.80 /Cum.

    8

    Rate as per CSR Item No 38/229 Rs. 23.00 /Cum.

    Deduct 0.50 % for Insurance -0.12

    Total = Rs. 22.88

    Add 20 % for Naxal Special Action Plan 4.58Add 0.50 % for Insurance 0.12

    Rs. 27.58

    Say Rs. 27.60 /Cum.9

    Rate as per CSR Item No 39/229 Rs. 20.00 /Cum.

    Deduct 0.50 % for Insurance -0.10

    Total = Rs. 19.90

    Add 20 % for Naxal Special Action Plan 3.98Add 0.50 % for Insurance 0.10

    Rs. 23.98

    Say Rs. 24.00 /Cum.

    10

    Rate as per CSR Item No 43/230 Rs. 7.00 /Sqm.

    Deduct 0.50 % for Insurance -0.04

    Total = Rs. 6.96

    Add 20 % for Naxal Special Action Plan 1.39Add 0.50 % for Insurance 0.04

    Rs. 8.39

    Say Rs. 8.40 /Cum.

    11

    Rate as per CSR Item No 40/230 Rs. 11.50 /Sqm.Deduct 0.50 % for Insurance -0.06

    Total = Rs. 11.44

    Add 20 % for Naxal Special Action Plan 2.29Add 0.50 % for Insurance 0.06

    Rs. 13.79

    Say Rs. 13.80 /Sqm.

    12

    Spreading gravel/sand/soft murum/ available murum over rubble

    soling/ W.B.M. surface blanketing berms etc. complete.

    Spreading 80 mm metal including sectioning complete.

    CSR Item No. 43/230

    Compacting the sub grade/gravel/ oversize metal (200 mm loose)

    layers of all width with static roller including necessary, labour,

    materials and artificial watering complete.

    CSR Item No. 39/229

    Compacting the hard murum / kankar of all width (200 mm. loose)

    with Static roller including necessary artificial watering complete.

    CSR Item No. 38/229

    CSR Item No. 37/229

    Compacting the sub grade/gravel/ size metal (100 mm loose)

    layers of all width with static roller including necessary, labour,

    materials and artificial watering complete.

    Spreading 40 mm metal including sectioning complete.

    CSR Item No. 40/230

    CSR Item No. 42/230

  • 7/31/2019 Nagari to Mohazari Road 1

    16/52

    Sr. Rate/Unit Unito.

    Item of Work

    Rate as per CSR Item No 42/230 Rs. 12.00 /Sqm.

    Deduct 0.50 % for Insurance -0.06

    Total = Rs. 11.94

    Add 20 % for Naxal Special Action Plan 2.39Add 0.50 % for Insurance 0.06

    Rs. 14.39

    Say Rs. 14.40 /Sqm.

    13

    Rate as per CSR Item No 44/230 Rs. 3.00 /Sqm.

    Deduct 0.50 % for Insurance -0.02

    Total = Rs. 2.98

    Add 20 % for Naxal Special Action Plan 0.60Add 0.50 % for Insurance 0.02

    Rs. 3.60

    Say Rs. 3.60 /Sqm.

    14

    Rate as per CSR Item No 1/184 Rs 125.00 /Cum

    Deduct 0.50 % for Insurance -0.63

    Total = Rs. 124.37

    Add 20 % for Naxal Special Action Plan 24.87Add 0.50 % for Insurance 0.63

    Rs. 149.87

    Say Rs. 149.85 /Cum

    15

    Rate as per CSR Item No 1/216 Rs 395.00 /Cum

    Add Tranptn of Metal 1.00 Cum Rs 162.80 /Cum Rs 162.80

    Sand 0.30 Cum Rs 60.78 /Cum Rs 18.23

    Rs 576.03

    Deduct for Royalty Charges 1.30 Cum.Rs. -70.60 /Cum. Rs. -91.78

    Total Rs. 484.25

    Deduct Insurance Charges 0.50 % Rs. -2.42

    Total Rs. 481.83

    Add for Naxal affected Area 20% Rs. 96.37

    Add Insurance Charges 0.50 % Rs. 2.42

    Add for Royalty Charges 1.30 Cum. Rs. 70.60 /Cum. Rs. 91.78

    Total Rs. 672.40

    Say Rs. 672.40 /Cum

    CSR Item No. 44/230

    CSR Item No. 1/216

    Compacting the hard murum side widths layerwise on each side

    with static roller including necessary artificial watering complete .

    Providing rubble fil ling of trap / granite / quartzite / gneiss stonesin foundation including hand packing filling gravel / sand in the

    voids etc. complete.

    Excavation for foundation in earth, soils of all types, sand, gravel

    soft murum etc. including shoring and strutting as necessary anddisposing off excavated stuff within lead of 100 m as directed etc.

    complete

    Lift upto 1.5 meter

    CSR Item No. 1/184

  • 7/31/2019 Nagari to Mohazari Road 1

    17/52

    Sr. Rate/Unit Unito.

    Item of Work

    16

    Rate as per CSR Item No 2/216 Rs 2520.00 /Cum

    Add Tranptn Charges

    HB Metal 0.90 Cum Rs 148.00 /Cum Rs 133.20

    Sand 0.450 Cum Rs 60.78 /Cum Rs 27.35

    Cement 3.40 Bag Rs 4.48 /Bag Rs 15.23

    Rs 2695.78

    Deduct for Royalty Charges 1.35 Cum.Rs. -70.60 /Cum. Rs. -95.31

    Total Rs. 2600.47

    Deduct Insurance Charges 0.50 % Rs. -13.00

    Total Rs. 2587.47

    Add for Naxal affected Area 20% Rs. 517.49

    Add Insurance Charges 0.50 % Rs. 13.00

    Add for Royalty Charges 1.35 Cum. Rs. 70.60 /Cum. Rs. 95.31

    Total Rs. 3213.27

    Say Rs. 3213.25 /Cum

    17

    Rate as per CSR Item No 3/216 Rs 3615.00 /Cum

    Add Tranptn Charges

    CB Metal 0.85 Cum Rs 926.70 /Cum Rs 787.70

    Sand 0.425 Cum Rs 60.78 /Cum Rs 25.83

    Cement 6.27 Bag Rs 4.48 /Bag Rs 28.09

    Rs 4456.62

    Deduct for Royalty Charges 1.28 Cum.Rs. -70.60 /Cum. Rs. -90.02

    Total Rs. 4366.60

    Deduct Insurance Charges 0.50 % Rs. -21.83

    Total Rs. 4344.77

    Add for Naxal affected Area 20% Rs. 868.95

    Add Insurance Charges 0.50 % Rs. 21.83

    Add for Royalty Charges 1.28 Cum. Rs. 70.60 /Cum. Rs. 90.02

    Total Rs. 5325.57

    Say Rs. 5325.55 /Cum

    CSR Item No. 2/216

    Providing and laying in situ cement concrete of M-15 / 1:2:4 with

    trap / granite / quartzite / gneiss metal in face wall including

    plywood/ steel formwork and steel centering, compaction by

    vibrator, finishing uneven and honeycombed surface with C.M.1:3

    of sufficient minimum thickness to give smooth and even surface,

    filling joints with bitumen, curing etc. complete. (Excluding cost of

    reinforcement.) The C.M. 1:3 plaster is considered for rendering

    uneven and honeycombed surface only. Newly laid concrete shall

    be covered by gunny bag, plastic, tarpaulin etc. (Wooden

    centering/formwork will not be allowed).

    Providing and laying in situ cement concrete of 1:4:8 proportion

    with trap / granite / quartzite / gneiss metal in foundation including

    necessary compacting and curing complete. (Including plywood/

    steel formwork) The C.M. 1:3 plaster is considered for rendering

    uneven and honeycombed surface only. Newly laid concrete shall

    be covered by gunny bag, plastic, tarpaulin etc. (Wooden

    centering/formwork will not be allowed).

    CSR Item No. 3/216

  • 7/31/2019 Nagari to Mohazari Road 1

    18/52

    Sr. Rate/Unit Unito.

    Item of Work

    18

    Rate as per CSR Item No 14/190 Rs 2830.00 /Cum

    Add Diff. in cost of Cement (6.27-4.40)=1.87 240.00 /Bag Rs 448.80

    Add Tranptn Charges

    CB Metal 0.85 Cum Rs 926.70 /Cum Rs 787.70

    Sand 0.425 Cum Rs 60.78 /Cum Rs 25.83

    Cement 6.27 Bag Rs 4.48 /Bag Rs 28.09

    Rs 4120.42

    Deduct for Royalty Charges 1.275 Cum.Rs. -70.60 /Cum. Rs. -90.02

    Total Rs. 4030.40

    Deduct Insurance Charges 0.50 % Rs. -20.15

    Total Rs. 4010.25

    Add for Naxal affected Area 20% Rs. 802.05

    Add Insurance Charges 0.50 % Rs. 20.15

    Add for Royalty Charges 1.275 Cum. Rs. 70.60 /Cum. Rs. 90.02

    Total Rs. 4922.47

    Say Rs. 4922.45 /Cum

    19

    Rate as per CSR Item No 16/191 Rs 113.00 /Rmt

    Deduct 0.50 % for Insurance -0.57

    Total = Rs. 112.43

    Add 20 % for Naxal Special Action Plan 22.49Add 0.50 % for Insurance 0.57

    Rs. 135.49

    Say Rs. 135.50 /Rmt

    20

    Rate as per CSR Item No 43/203 Rs 4820.00 /Cum

    Add Tranptn Charges

    CB Metal 0.85 Cum Rs 926.70 /Cum Rs 787.70

    Sand 0.425 Cum Rs 60.78 /Cum Rs 25.83

    Cement 7.10 Bag Rs 4.48 /Bag Rs 31.81

    Rs 5665.34

    Providing and fixing A.C./ UPVC pipes of 100 mm diameter and of

    required length for relieving water pressure, stone filter as

    directed complete.(For vent holes in raft).CSR Item No. 16/191

    Providing and laying in situ M-15 / 1:2:4 cement concrete of trap /

    granite / quartzite / gneiss metal for levelling coures below R.C.C

    raft and in foundation including necessary plywood/steel

    formwork, steel centering, compaction by vibrating finishing,

    curing etc. complete. The C.M. 1:3 plaster is considered for

    rendering uneven and honeycombed surface only. Newly laid

    concrete shall be covered by gunny bag, plastic, tarpaulin etc.

    (Wooden centering/formwork will not be allowed).

    CSR Item No. 14/190

    Providing and casting in situ cement concrete of M-20 grade of

    trap / granite /quartzite /gneiss metal for R.C.C slabs and landings

    as per detailed design and drawings including steel centering,

    plywood /steel formwork, steel props, compaction, finishing

    uneven and honeycombed surface with C.M. 1:3 of sufficient

    minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided with fan

    hook box of 2 mm thick M.S.Sheet rectangular size 180 mm x 100

    mm with required depth, with holes or notches, as required,

    bottom and top lids of 1.6 mm thick M.S.Sheet

    CSR Item No. 43/203

  • 7/31/2019 Nagari to Mohazari Road 1

    19/52

    Sr. Rate/Unit Unito.

    Item of Work

    Deduct for Royalty Charges 1.275 Cum.Rs. -70.60 /Cum. Rs. -90.02

    Total Rs. 5575.32

    Deduct Insurance Charges 0.50 % Rs. -27.88

    Total Rs. 5547.44

    Add for Naxal affected Area 20% Rs. 1109.49

    Add Insurance Charges 0.50 % Rs. 27.88

    Add for Royalty Charges 1.275 Cum. Rs. 70.60 /Cum. Rs. 90.02

    Total Rs. 6774.83Say Rs. 6774.85 /Cum

    21

    Rate as per CSR Item No 35/200 Rs 53150.00 /MT

    Add Tranptn Charges

    Steel 1.000 MT Rs 89.55 /MT Rs 89.55

    Rs 53239.55

    Deduct 0.50 % for Insurance -266.20

    Total = Rs. 52973.35

    Add 20 % for Naxal Special Action Plan 10594.67Add 0.50 % for Insurance 266.20

    Rs 63834.22

    Say Rs. 63834.20 /MT

    22

    Rate as per CSR Item No 10/219 Rs 225.00 /Cum

    Add Diff. in cost of Murum(140.00-130.00) 1.00 Cum. Rs. 10.00 /Cum. Rs -10.00

    Add Transportation Charges

    Murum 0.50 Cum Rs 121.55 /Cum Rs 60.78

    Sand 0.50 Cum Rs 60.78 /Cum Rs 30.39

    Rs 306.17

    Deduct for Royalty Charges 1.000 Cum.Rs. -70.60 /Cum. Rs. -70.60

    Total Rs. 235.57

    Deduct Insurance Charges 0.50 % Rs. -1.18

    Total Rs. 234.39

    Add for Naxal affected Area 20% Rs. 46.88

    Add Insurance Charges 0.50 % Rs. 1.18

    Add for Royalty Charges 1.000 Cum. Rs. 70.60 /Cum. Rs. 70.60

    Total Rs. 353.05

    Say Rs. 353.05 /Cum

    Assistant Engineer Gr. 1

    P.W. Sub-Division No. 1,

    Gadchiroli

    CSR Item No. 35/200

    Providing selected murum (having PI < 6 ) fill ing including laying

    in layers of 15 cm to 20 cm watering and compacting etc.

    complete.

    CSR Item No. 10/219

    Providing and cutting, bending, hooking, laying, in position and

    tying bar reinforcement as per detailed drawing for R.C.C. works

    etc. complete.

  • 7/31/2019 Nagari to Mohazari Road 1

    20/52

    LEAD STATEMENT (For Road Work)

    Sr. Material Source of supply Lead in Lead Supply Loading/ Net Unit

    No. Km. Charges Chrges Unloadin Charges

    1 H. Br.metal Dongargaon quarry 17.50 280.00 279.00 33.00 592.00 /Cum.

    80 mm

    2 40 mm Dongargaon quarry 17.50 280.00 302.00 33.00 615.00 /Cum.

    3 Sand Kathani River 10.50 172.98 190.00 29.00 391.98 /Cum.

    4 Murum Madia Tukum Quarry 17.00 233.75 130.00 29.00 392.75 /Cum.

    5 C.B. Metal From Nandori Metal 136.00 1058.70 --- --- 1058.70 /Cum.

    crusher quarry

    6 Rubble Dongargaon quarry 17.50 308.00 308.00 /Cum.

    Assistant Engineer Gr. 1

    P.W. Sub-Division No. 1,

    Gadchiroli

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km

    0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

  • 7/31/2019 Nagari to Mohazari Road 1

    21/52

    LEAD STATEMENT (For C.Conc. Work )

    Sr. Material Source of supply Lead in Lead Deduct 5 Net Unit

    No. Km. Charges km Lead Chargescharges

    1 H. Br.metal Dongargaon quarry 17.50 280.00 132.00 148.00 /Cum.

    80 mm &

    40 mm

    2 Rubble Dongargaon quarry 17.50 308.00 145.20 162.80 /Cum.

    3 Sand Kathani River 10.50 172.98 112.20 60.78 /Cum.

    4 Murum Madia Tukum Quarry 17.00 233.75 112.20 121.55 /Cum.

    5 C.B. Metal From Nandori Metal 136.00 1058.70 132.00 926.70 /Cum.

    crusher quarry

    6 Cement Gadchiroli Market 13.00 208.35 118.80 89.55 /MT

    4.48 /Bag

    7 Steel Gadchiroli Market 13.00 208.35 118.80 89.55 /MT

    Assistant Engineer Gr. 1

    P.W. Sub-Division No. 1,Gadchiroli

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km

    0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

  • 7/31/2019 Nagari to Mohazari Road 1

    22/52

    Proposed 80mm metaling layer

    40mm metaling 1 coat of 0.075m compacted

    Side Berm 0.075 m compacted

    7.50 Murum Sand blanketing

    2.25 3.00 2.250

    3.30

    9

    Av Banking Ht. in M 0.45

    10.8

    Assistant Engineer Gr. 1

    P.W. Sub-Division No. 1,

    Gadchiroli

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km

    0/000 to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

    TYPE CROSS SECTION OF ROAD (VR Std.)

  • 7/31/2019 Nagari to Mohazari Road 1

    23/52

    Type Cross Section of RCC DHABA DRAIN

    1.30

    0.20 0.90 0.20

    0.25

    Surface Reinforcement 10 mm Dia

    1: 6 30 Cm C/C. form of Closed Stirrups.

    0.90

    Weep Hole 100 mm Dia UPVC Pipe

    1.25

    0.60

    0.35

    0.10

    0.10

    0.15

    Assistant Engineer Gr. 1

    P.W. Sub-Division No. 1,

    Gadchiroli

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000

    to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

    1.45

    RCC Slab in M-20

    C. Conc.

    1:4:8 C. Conc.

    Rubble Filling

  • 7/31/2019 Nagari to Mohazari Road 1

    24/52

    LEAD STATEMENT

    LEAD Metal Rubble Murum Sand Cement Steel Bricks Bit.Mix

    0.50 68.00 74.80 57.80 57.80 61.20 61.20 68.00 61.20

    1.00 75.00 82.50 63.75 63.75 67.50 67.50 75.00 67.50

    1.50 82.00 90.20 69.70 69.70 73.80 73.80 82.00 73.80

    2.00 89.50 98.45 76.08 76.08 80.55 80.55 89.50 80.552.50 96.50 106.15 82.03 82.03 86.85 86.85 96.50 86.85

    3.00 103.50 113.85 87.98 87.98 93.15 93.15 103.50 93.15

    3.50 110.50 121.55 93.93 93.93 99.45 99.45 110.50 99.45

    4.00 118.00 129.80 100.30 100.30 106.20 106.20 118.00 106.20

    4.50 125.00 137.50 106.25 106.25 112.50 112.50 125.00 112.50

    5.00 132.00 145.20 112.20 112.20 118.80 118.80 132.00 118.80

    5.50 138.50 152.35 117.73 117.73 124.65 124.65 138.50 124.65

    6.00 145.00 159.50 123.25 123.25 130.50 130.50 145.00 130.50

    6.50 152.00 167.20 129.20 129.20 136.80 136.80 152.00 136.80

    7.00 158.50 174.35 134.73 134.73 142.65 142.65 158.50 142.657.50 165.00 181.50 140.25 140.25 148.50 148.50 165.00 148.50

    8.00 171.50 188.65 145.78 145.78 154.35 154.35 171.50 154.35

    8.50 178.00 195.80 151.30 151.30 160.20 160.20 178.00 160.20

    9.00 185.00 203.50 157.25 157.25 166.50 166.50 185.00 166.50

    9.50 191.50 210.65 162.78 162.78 172.35 172.35 191.50 172.35

    10.00 198.00 217.80 168.30 168.30 178.20 178.20 198.00 178.20

    10.50 203.50 223.85 172.98 172.98 183.15 183.15 203.50 183.15

    11.00 209.00 229.90 177.65 177.65 188.10 188.10 209.00 188.10

    11.50 215.00 236.50 182.75 182.75 193.50 193.50 215.00 193.50

    12.00 220.50 242.55 187.43 187.43 198.45 198.45 220.50 198.4512.50 226.00 248.60 192.10 192.10 203.40 203.40 226.00 203.40

    13.00 231.50 254.65 196.78 196.78 208.35 208.35 231.50 208.35

    13.50 237.00 260.70 201.45 201.45 213.30 213.30 237.00 213.30

    14.00 243.00 267.30 206.55 206.55 218.70 218.70 243.00 218.70

    14.50 248.50 273.35 211.23 211.23 223.65 223.65 248.50 223.65

    15.00 254.00 279.40 215.90 215.90 228.60 228.60 254.00 228.60

    15.50 259.00 284.90 220.15 220.15 233.10 233.10 259.00 233.10

    16.00 264.50 290.95 224.83 224.83 238.05 238.05 264.50 238.05

    16.50 269.50 296.45 229.08 229.08 242.55 242.55 269.50 242.55

    17.00 275.00 302.50 233.75 233.75 247.50 247.50 275.00 247.5017.50 280.00 308.00 238.00 238.00 252.00 252.00 280.00 252.00

    18.00 285.00 313.50 242.25 242.25 256.50 256.50 285.00 256.50

    18.50 290.50 319.55 246.93 246.93 261.45 261.45 290.50 261.45

    19.00 295.50 325.05 251.18 251.18 265.95 265.95 295.50 265.95

    19.50 301.00 331.10 255.85 255.85 270.90 270.90 301.00 270.90

    20.00 306.00 336.60 260.10 260.10 275.40 275.40 306.00 275.40

  • 7/31/2019 Nagari to Mohazari Road 1

    25/52

    20.50 311.00 342.10 264.35 264.35 279.90 279.90 311.00 279.90

    21.00 315.50 347.05 268.18 268.18 283.95 283.95 315.50 283.95

    21.50 320.50 352.55 272.43 272.43 288.45 288.45 320.50 288.45

    22.00 325.00 357.50 276.25 276.25 292.50 292.50 325.00 292.50

    22.50 330.00 363.00 280.50 280.50 297.00 297.00 330.00 297.00

    23.00 335.00 368.50 284.75 284.75 301.50 301.50 335.00 301.50

    23.50 339.50 373.45 288.58 288.58 305.55 305.55 339.50 305.55

    24.00 344.50 378.95 292.83 292.83 310.05 310.05 344.50 310.05

    24.50 349.00 383.90 296.65 296.65 314.10 314.10 349.00 314.10

    25.00 354.00 389.40 300.90 300.90 318.60 318.60 354.00 318.60

    25.50 358.50 394.35 304.73 304.73 322.65 322.65 358.50 322.65

    26.00 363.00 399.30 308.55 308.55 326.70 326.70 363.00 326.70

    26.50 367.00 403.70 311.95 311.95 330.30 330.30 367.00 330.30

    27.00 371.50 408.65 315.78 315.78 334.35 334.35 371.50 334.35

    27.50 376.00 413.60 319.60 319.60 338.40 338.40 376.00 338.40

    28.00 380.50 418.55 323.43 323.43 342.45 342.45 380.50 342.45

    28.50 385.00 423.50 327.25 327.25 346.50 346.50 385.00 346.50

    29.00 389.00 427.90 330.65 330.65 350.10 350.10 389.00 350.10

    29.50 393.50 432.85 334.48 334.48 354.15 354.15 393.50 354.15

    30.00 398.00 437.80 338.30 338.30 358.20 358.20 398.00 358.2030.50 401.78 441.96 341.51 341.51 361.60 361.60 401.78 361.60

    31.00 405.55 446.11 344.72 344.72 365.00 365.00 405.55 365.00

    31.50 409.33 450.26 347.93 347.93 368.40 368.40 409.33 368.40

    32.00 413.10 454.41 351.14 351.14 371.79 371.79 413.10 371.79

    32.50 416.88 458.57 354.35 354.35 375.19 375.19 416.88 375.19

    33.00 420.65 462.72 357.55 357.55 378.59 378.59 420.65 378.59

    33.50 424.43 466.87 360.77 360.77 381.99 381.99 424.43 381.9934.00 428.20 471.02 363.97 363.97 385.38 385.38 428.20 385.38

    34.50 431.98 475.18 367.18 367.18 388.78 388.78 431.98 388.78

    35.00 435.75 479.33 370.39 370.39 392.18 392.18 435.75 392.18

    35.50 439.53 483.48 373.60 373.60 395.58 395.58 439.53 395.58

    36.00 443.30 487.63 376.81 376.81 398.97 398.97 443.30 398.97

    36.50 447.08 491.79 380.02 380.02 402.37 402.37 447.08 402.37

    37.00 450.85 495.94 383.22 383.22 405.77 405.77 450.85 405.77

    37.50 454.63 500.09 386.44 386.44 409.17 409.17 454.63 409.17

    38.00 458.40 504.24 389.64 389.64 412.56 412.56 458.40 412.56

    38.50 462.18 508.40 392.85 392.85 415.96 415.96 462.18 415.96

    39.00 465.95 512.55 396.06 396.06 419.36 419.36 465.95 419.36

    39.50 469.73 516.70 399.27 399.27 422.76 422.76 469.73 422.7640.00 473.50 520.85 402.48 402.48 426.15 426.15 473.50 426.15

    40.50 477.28 525.01 405.69 405.69 429.55 429.55 477.28 429.55

    41.00 481.05 529.16 408.89 408.89 432.95 432.95 481.05 432.95

    41.50 484.83 533.31 412.11 412.11 436.35 436.35 484.83 436.35

    42.00 488.60 537.46 415.31 415.31 439.74 439.74 488.60 439.74

    42.50 492.38 541.62 418.52 418.52 443.14 443.14 492.38 443.14

    43.00 496.15 545.77 421.73 421.73 446.54 446.54 496.15 446.54

    43.50 499.93 549.92 424.94 424.94 449.94 449.94 499.93 449.94

  • 7/31/2019 Nagari to Mohazari Road 1

    26/52

    44.00 503.70 554.07 428.15 428.15 453.33 453.33 503.70 453.33

    44.50 507.48 558.23 431.36 431.36 456.73 456.73 507.48 456.73

    45.00 511.25 562.38 434.56 434.56 460.13 460.13 511.25 460.13

    45.50 515.03 566.53 437.78 437.78 463.53 463.53 515.03 463.53

    46.00 518.80 570.68 440.98 440.98 466.92 466.92 518.80 466.92

    46.50 522.58 574.84 444.19 444.19 470.32 470.32 522.58 470.32

    47.00 526.35 578.99 447.40 447.40 473.72 473.72 526.35 473.7247.50 530.13 583.14 450.61 450.61 477.12 477.12 530.13 477.12

    48.00 533.90 587.29 453.82 453.82 480.51 480.51 533.90 480.51

    48.50 537.68 591.45 457.03 457.03 483.91 483.91 537.68 483.91

    49.00 541.45 595.60 460.23 460.23 487.31 487.31 541.45 487.31

    49.50 545.23 599.75 463.45 463.45 490.71 490.71 545.23 490.71

    50.00 549.00 603.90 466.65 466.65 494.10 494.10 549.00 494.10

    50.50 552.78 608.06 469.86 469.86 497.50 497.50 552.78 497.50

    51.00 556.55 612.21 473.07 473.07 500.90 500.90 556.55 500.90

    51.50 560.33 616.36 476.28 476.28 504.30 504.30 560.33 504.30

    52.00 564.10 620.51 479.49 479.49 507.69 507.69 564.10 507.69

    52.50 567.88 624.67 482.70 482.70 511.09 511.09 567.88 511.09

    53.00 571.65 628.82 485.90 485.90 514.49 514.49 571.65 514.4953.50 575.43 632.97 489.12 489.12 517.89 517.89 575.43 517.89

    54.00 579.20 637.12 492.32 492.32 521.28 521.28 579.20 521.28

    54.50 582.98 641.28 495.53 495.53 524.68 524.68 582.98 524.68

    55.00 586.75 645.43 498.74 498.74 528.08 528.08 586.75 528.08

    55.50 590.53 649.58 501.95 501.95 531.48 531.48 590.53 531.48

    56.00 594.30 653.73 505.16 505.16 534.87 534.87 594.30 534.87

    56.50 598.08 657.89 508.37 508.37 538.27 538.27 598.08 538.27

    57.00 601.85 662.04 511.57 511.57 541.67 541.67 601.85 541.67

    57.50 605.63 666.19 514.79 514.79 545.07 545.07 605.63 545.07

    58.00 609.40 670.34 517.99 517.99 548.46 548.46 609.40 548.46

    58.50 613.18 674.50 521.20 521.20 551.86 551.86 613.18 551.86

    59.00 616.95 678.65 524.41 524.41 555.26 555.26 616.95 555.26

    59.50 620.73 682.80 527.62 527.62 558.66 558.66 620.73 558.66

    60.00 624.50 686.95 530.83 530.83 562.05 562.05 624.50 562.05

    60.50 627.48 690.23 533.36 533.36 564.73 564.73 627.48 564.73

    61.00 630.45 693.50 535.88 535.88 567.41 567.41 630.45 567.41

    61.50 633.43 696.77 538.42 538.42 570.09 570.09 633.43 570.09

    62.00 636.40 700.04 540.94 540.94 572.76 572.76 636.40 572.76

    62.50 639.38 703.32 543.47 543.47 575.44 575.44 639.38 575.44

    63.00 642.35 706.59 546.00 546.00 578.12 578.12 642.35 578.12

    63.50 645.33 709.86 548.53 548.53 580.80 580.80 645.33 580.80

    64.00 648.30 713.13 551.06 551.06 583.47 583.47 648.30 583.47

    64.50 651.28 716.41 553.59 553.59 586.15 586.15 651.28 586.15

    65.00 654.25 719.68 556.11 556.11 588.83 588.83 654.25 588.83

    65.50 657.23 722.95 558.65 558.65 591.51 591.51 657.23 591.5166.00 660.20 726.22 561.17 561.17 594.18 594.18 660.20 594.18

    66.50 663.18 729.50 563.70 563.70 596.86 596.86 663.18 596.86

    67.00 666.15 732.77 566.23 566.23 599.54 599.54 666.15 599.54

    67.50 669.13 736.04 568.76 568.76 602.22 602.22 669.13 602.22

    68.00 672.10 739.31 571.29 571.29 604.89 604.89 672.10 604.89

    68.50 675.08 742.59 573.82 573.82 607.57 607.57 675.08 607.57

    69.00 678.05 745.86 576.34 576.34 610.25 610.25 678.05 610.25

    69.50 681.03 749.13 578.88 578.88 612.93 612.93 681.03 612.93

  • 7/31/2019 Nagari to Mohazari Road 1

    27/52

    70.00 684.00 752.40 581.40 581.40 615.60 615.60 684.00 615.60

    70.50 686.98 755.68 583.93 583.93 618.28 618.28 686.98 618.28

    71.00 689.95 758.95 586.46 586.46 620.96 620.96 689.95 620.96

    71.50 692.93 762.22 588.99 588.99 623.64 623.64 692.93 623.64

    72.00 695.90 765.49 591.52 591.52 626.31 626.31 695.90 626.31

    72.50 698.88 768.77 594.05 594.05 628.99 628.99 698.88 628.99

    73.00 701.85 772.04 596.57 596.57 631.67 631.67 701.85 631.6773.50 704.83 775.31 599.11 599.11 634.35 634.35 704.83 634.35

    74.00 707.80 778.58 601.63 601.63 637.02 637.02 707.80 637.02

    74.50 710.78 781.86 604.16 604.16 639.70 639.70 710.78 639.70

    75.00 713.75 785.13 606.69 606.69 642.38 642.38 713.75 642.38

    75.50 716.73 788.40 609.22 609.22 645.06 645.06 716.73 645.06

    76.00 719.70 791.67 611.75 611.75 647.73 647.73 719.70 647.73

    76.50 722.68 794.95 614.28 614.28 650.41 650.41 722.68 650.41

    77.00 725.65 798.22 616.80 616.80 653.09 653.09 725.65 653.09

    77.50 728.63 801.49 619.34 619.34 655.77 655.77 728.63 655.77

    78.00 731.60 804.76 621.86 621.86 658.44 658.44 731.60 658.44

    78.50 734.58 808.04 624.39 624.39 661.12 661.12 734.58 661.12

    79.00 737.55 811.31 626.92 626.92 663.80 663.80 737.55 663.8079.50 740.53 814.58 629.45 629.45 666.48 666.48 740.53 666.48

    80.00 743.50 817.85 631.98 631.98 669.15 669.15 743.50 669.15

    80.50 746.48 821.13 634.51 634.51 671.83 671.83 746.48 671.83

    81.00 749.45 824.40 637.03 637.03 674.51 674.51 749.45 674.51

    81.50 752.43 827.67 639.57 639.57 677.19 677.19 752.43 677.19

    82.00 755.40 830.94 642.09 642.09 679.86 679.86 755.40 679.86

    82.50 758.38 834.22 644.62 644.62 682.54 682.54 758.38 682.54

    83.00 761.35 837.49 647.15 647.15 685.22 685.22 761.35 685.22

    83.50 764.33 840.76 649.68 649.68 687.90 687.90 764.33 687.90

    84.00 767.30 844.03 652.21 652.21 690.57 690.57 767.30 690.57

    84.50 770.28 847.31 654.74 654.74 693.25 693.25 770.28 693.25

    85.00 773.25 850.58 657.26 657.26 695.93 695.93 773.25 695.93

    85.50 776.23 853.85 659.80 659.80 698.61 698.61 776.23 698.61

    86.00 779.20 857.12 662.32 662.32 701.28 701.28 779.20 701.28

    86.50 782.18 860.40 664.85 664.85 703.96 703.96 782.18 703.96

    87.00 785.15 863.67 667.38 667.38 706.64 706.64 785.15 706.64

    87.50 788.13 866.94 669.91 669.91 709.32 709.32 788.13 709.32

    88.00 791.10 870.21 672.44 672.44 711.99 711.99 791.10 711.99

    88.50 794.08 873.49 674.97 674.97 714.67 714.67 794.08 714.67

    89.00 797.05 876.76 677.49 677.49 717.35 717.35 797.05 717.35

    89.50 800.03 880.03 680.03 680.03 720.03 720.03 800.03 720.03

    90.00 803.00 883.30 682.55 682.55 722.70 722.70 803.00 722.70

    90.50 805.98 886.58 685.08 685.08 725.38 725.38 805.98 725.38

    91.00 808.95 889.85 687.61 687.61 728.06 728.06 808.95 728.06

    91.50 811.93 893.12 690.14 690.14 730.74 730.74 811.93 730.7492.00 814.90 896.39 692.67 692.67 733.41 733.41 814.90 733.41

    92.50 817.88 899.67 695.20 695.20 736.09 736.09 817.88 736.09

    93.00 820.85 902.94 697.72 697.72 738.77 738.77 820.85 738.77

    93.50 823.83 906.21 700.26 700.26 741.45 741.45 823.83 741.45

    94.00 826.80 909.48 702.78 702.78 744.12 744.12 826.80 744.12

    94.50 829.78 912.76 705.31 705.31 746.80 746.80 829.78 746.80

    95.00 832.75 916.03 707.84 707.84 749.48 749.48 832.75 749.48

    95.50 835.73 919.30 710.37 710.37 752.16 752.16 835.73 752.16

  • 7/31/2019 Nagari to Mohazari Road 1

    28/52

    96.00 838.70 922.57 712.90 712.90 754.83 754.83 838.70 754.83

    96.50 841.68 925.85 715.43 715.43 757.51 757.51 841.68 757.51

    97.00 844.65 929.12 717.95 717.95 760.19 760.19 844.65 760.19

    97.50 847.63 932.39 720.49 720.49 762.87 762.87 847.63 762.87

    98.00 850.60 935.66 723.01 723.01 765.54 765.54 850.60 765.54

    98.50 853.58 938.94 725.54 725.54 768.22 768.22 853.58 768.22

    99.00 856.55 942.21 728.07 728.07 770.90 770.90 856.55 770.9099.50 859.53 945.48 730.60 730.60 773.58 773.58 859.53 773.58

    100.00 862.50 948.75 733.13 733.13 776.25 776.25 862.50 776.25

    100.50 865.23 951.75 735.45 735.45 778.71 778.71 865.23 778.71

    101.00 867.95 954.75 737.76 737.76 781.16 781.16 867.95 781.16

    101.50 870.68 957.75 740.08 740.08 783.61 783.61 870.68 783.61

    102.00 873.40 960.74 742.39 742.39 786.06 786.06 873.40 786.06

    102.50 876.13 963.74 744.71 744.71 788.52 788.52 876.13 788.52

    103.00 878.85 966.74 747.02 747.02 790.97 790.97 878.85 790.97

    103.50 881.58 969.74 749.34 749.34 793.42 793.42 881.58 793.42

    104.00 884.30 972.73 751.66 751.66 795.87 795.87 884.30 795.87

    104.50 887.03 975.73 753.98 753.98 798.33 798.33 887.03 798.33

    105.00 889.75 978.73 756.29 756.29 800.78 800.78 889.75 800.78105.50 892.48 981.73 758.61 758.61 803.23 803.23 892.48 803.23

    106.00 895.20 984.72 760.92 760.92 805.68 805.68 895.20 805.68

    106.50 897.93 987.72 763.24 763.24 808.14 808.14 897.93 808.14

    107.00 900.65 990.72 765.55 765.55 810.59 810.59 900.65 810.59

    107.50 903.38 993.72 767.87 767.87 813.04 813.04 903.38 813.04

    108.00 906.10 996.71 770.19 770.19 815.49 815.49 906.10 815.49

    108.50 908.83 999.71 772.51 772.51 817.95 817.95 908.83 817.95

    109.00 911.55 1002.71 774.82 774.82 820.40 820.40 911.55 820.40

    109.50 914.28 1005.71 777.14 777.14 822.85 822.85 914.28 822.85

    110.00 917.00 1008.70 779.45 779.45 825.30 825.30 917.00 825.30

    110.50 919.73 1011.70 781.77 781.77 827.76 827.76 919.73 827.76

    111.00 922.45 1014.70 784.08 784.08 830.21 830.21 922.45 830.21

    111.50 925.18 1017.70 786.40 786.40 832.66 832.66 925.18 832.66

    112.00 927.90 1020.69 788.72 788.72 835.11 835.11 927.90 835.11

    112.50 930.63 1023.69 791.04 791.04 837.57 837.57 930.63 837.57

    113.00 933.35 1026.69 793.35 793.35 840.02 840.02 933.35 840.02

    113.50 936.08 1029.69 795.67 795.67 842.47 842.47 936.08 842.47

    114.00 938.80 1032.68 797.98 797.98 844.92 844.92 938.80 844.92

    114.50 941.53 1035.68 800.30 800.30 847.38 847.38 941.53 847.38

    115.00 944.25 1038.68 802.61 802.61 849.83 849.83 944.25 849.83

    115.50 946.98 1041.68 804.93 804.93 852.28 852.28 946.98 852.28

    116.00 949.70 1044.67 807.25 807.25 854.73 854.73 949.70 854.73

    116.50 952.43 1047.67 809.57 809.57 857.19 857.19 952.43 857.19

    117.00 955.15 1050.67 811.88 811.88 859.64 859.64 955.15 859.64

    117.50 957.88 1053.67 814.20 814.20 862.09 862.09 957.88 862.09118.00 960.60 1056.66 816.51 816.51 864.54 864.54 960.60 864.54

    118.50 963.33 1059.66 818.83 818.83 867.00 867.00 963.33 867.00

    119.00 966.05 1062.66 821.14 821.14 869.45 869.45 966.05 869.45

    119.50 968.78 1065.66 823.46 823.46 871.90 871.90 968.78 871.90

    120.00 971.50 1068.65 825.78 825.78 874.35 874.35 971.50 874.35

    120.50 974.23 1071.65 828.10 828.10 876.81 876.81 974.23 876.81

    121.00 976.95 1074.65 830.41 830.41 879.26 879.26 976.95 879.26

    121.50 979.68 1077.65 832.73 832.73 881.71 881.71 979.68 881.71

  • 7/31/2019 Nagari to Mohazari Road 1

    29/52

    122.00 982.40 1080.64 835.04 835.04 884.16 884.16 982.40 884.16

    122.50 985.13 1083.64 837.36 837.36 886.62 886.62 985.13 886.62

    123.00 987.85 1086.64 839.67 839.67 889.07 889.07 987.85 889.07

    123.50 990.58 1089.64 841.99 841.99 891.52 891.52 990.58 891.52

    124.00 993.30 1092.63 844.31 844.31 893.97 893.97 993.30 893.97

    124.50 996.03 1095.63 846.63 846.63 896.43 896.43 996.03 896.43

    125.00 998.75 1098.63 848.94 848.94 898.88 898.88 998.75 898.88125.50 1001.48 1101.63 851.26 851.26 901.33 901.33 1001.48 901.33

    126.00 1004.20 1104.62 853.57 853.57 903.78 903.78 1004.20 903.78

    126.50 1006.93 1107.62 855.89 855.89 906.24 906.24 1006.93 906.24

    127.00 1009.65 1110.62 858.20 858.20 908.69 908.69 1009.65 908.69

    127.50 1012.38 1113.62 860.52 860.52 911.14 911.14 1012.38 911.14

    128.00 1015.10 1116.61 862.84 862.84 913.59 913.59 1015.10 913.59

    128.50 1017.83 1119.61 865.16 865.16 916.05 916.05 1017.83 916.05

    129.00 1020.55 1122.61 867.47 867.47 918.50 918.50 1020.55 918.50

    129.50 1023.28 1125.61 869.79 869.79 920.95 920.95 1023.28 920.95

    130.00 1026.00 1128.60 872.10 872.10 923.40 923.40 1026.00 923.40

    130.50 1028.73 1131.60 874.42 874.42 925.86 925.86 1028.73 925.86

    131.00 1031.45 1134.60 876.73 876.73 928.31 928.31 1031.45 928.31131.50 1034.18 1137.60 879.05 879.05 930.76 930.76 1034.18 930.76

    132.00 1036.90 1140.59 881.37 881.37 933.21 933.21 1036.90 933.21

    132.50 1039.63 1143.59 883.69 883.69 935.67 935.67 1039.63 935.67

    133.00 1042.35 1146.59 886.00 886.00 938.12 938.12 1042.35 938.12

    133.50 1045.08 1149.59 888.32 888.32 940.57 940.57 1045.08 940.57

    134.00 1047.80 1152.58 890.63 890.63 943.02 943.02 1047.80 943.02

    134.50 1050.53 1155.58 892.95 892.95 945.48 945.48 1050.53 945.48

    135.00 1053.25 1158.58 895.26 895.26 947.93 947.93 1053.25 947.93

    135.50 1055.98 1161.58 897.58 897.58 950.38 950.38 1055.98 950.38

    136.00 1058.70 1164.57 899.90 899.90 952.83 952.83 1058.70 952.83

    136.50 1061.43 1167.57 902.22 902.22 955.29 955.29 1061.43 955.29

    137.00 1064.15 1170.57 904.53 904.53 957.74 957.74 1064.15 957.74

    137.50 1066.88 1173.57 906.85 906.85 960.19 960.19 1066.88 960.19

    138.00 1069.60 1176.56 909.16 909.16 962.64 962.64 1069.60 962.64

    138.50 1072.33 1179.56 911.48 911.48 965.10 965.10 1072.33 965.10

    139.00 1075.05 1182.56 913.79 913.79 967.55 967.55 1075.05 967.55

    139.50 1077.78 1185.56 916.11 916.11 970.00 970.00 1077.78 970.00

    140.00 1080.50 1188.55 918.43 918.43 972.45 972.45 1080.50 972.45

    140.50 1083.23 1191.55 920.75 920.75 974.91 974.91 1083.23 974.91

    141.00 1085.95 1194.55 923.06 923.06 977.36 977.36 1085.95 977.36

    141.50 1088.68 1197.55 925.38 925.38 979.81 979.81 1088.68 979.81

    142.00 1091.40 1200.54 927.69 927.69 982.26 982.26 1091.40 982.26

    142.50 1094.13 1203.54 930.01 930.01 984.72 984.72 1094.13 984.72

    143.00 1096.85 1206.54 932.32 932.32 987.17 987.17 1096.85 987.17

    143.50 1099.58 1209.54 934.64 934.64 989.62 989.62 1099.58 989.62144.00 1102.30 1212.53 936.96 936.96 992.07 992.07 1102.30 992.07

    144.50 1105.03 1215.53 939.28 939.28 994.53 994.53 1105.03 994.53

    145.00 1107.75 1218.53 941.59 941.59 996.98 996.98 1107.75 996.98

    145.50 1110.48 1221.53 943.91 943.91 999.43 999.43 1110.48 999.43

    146.00 1113.20 1224.52 946.22 946.22 1001.88 1001.88 1113.20 1001.88

    146.50 1115.93 1227.52 948.54 948.54 1004.34 1004.34 1115.93 1004.34

    147.00 1118.65 1230.52 950.85 950.85 1006.79 1006.79 1118.65 1006.79

    147.50 1121.38 1233.52 953.17 953.17 1009.24 1009.24 1121.38 1009.24

  • 7/31/2019 Nagari to Mohazari Road 1

    30/52

    148.00 1124.10 1236.51 955.49 955.49 1011.69 1011.69 1124.10 1011.69

    148.50 1126.83 1239.51 957.81 957.81 1014.15 1014.15 1126.83 1014.15

    149.00 1129.55 1242.51 960.12 960.12 1016.60 1016.60 1129.55 1016.60

    149.50 1132.28 1245.51 962.44 962.44 1019.05 1019.05 1132.28 1019.05

    150.00 1135.00 1248.50 964.75 964.75 1021.50 1021.50 1135.00 1021.50

    150.50 1137.73 1251.50 967.07 967.07 1023.96 1023.96 1137.73 1023.96

    151.00 1140.45 1254.50 969.38 969.38 1026.41 1026.41 1140.45 1026.41151.50 1143.18 1257.50 971.70 971.70 1028.86 1028.86 1143.18 1028.86

    152.00 1145.90 1260.49 974.02 974.02 1031.31 1031.31 1145.90 1031.31

    152.50 1148.63 1263.49 976.34 976.34 1033.77 1033.77 1148.63 1033.77

    153.00 1151.35 1266.49 978.65 978.65 1036.22 1036.22 1151.35 1036.22

  • 7/31/2019 Nagari to Mohazari Road 1

    31/52

    Timber Tiles(Floor) Mang. Tiles AC/GI Sheet RCC Pipe bulk Bitn Pack Bitun

    47.60 54.40 61.20 51.00 9.08 3.13 1.60

    52.50 60.00 67.50 56.25 18.15 6.25 3.20

    57.40 65.60 73.80 61.50 27.23 9.38 4.80

    62.65 71.60 80.55 67.13 36.30 12.50 6.4067.55 77.20 86.85 72.38 45.38 15.63 8.00

    72.45 82.80 93.15 77.63 54.45 18.75 9.60

    77.35 88.40 99.45 82.88 63.53 21.88 11.20

    82.60 94.40 106.20 88.50 72.60 25.00 12.80

    87.50 100.00 112.50 93.75 81.68 28.13 14.40

    92.40 105.60 118.80 99.00 90.75 31.25 16.00

    96.95 110.80 124.65 103.88 99.83 34.38 17.60

    101.50 116.00 130.50 108.75 108.90 37.50 19.20

    106.40 121.60 136.80 114.00 117.98 40.63 20.80

    110.95 126.80 142.65 118.88 127.05 43.75 22.40115.50 132.00 148.50 123.75 136.13 46.88 24.00

    120.05 137.20 154.35 128.63 145.20 50.00 25.60

    124.60 142.40 160.20 133.50 154.28 53.13 27.20

    129.50 148.00 166.50 138.75 163.35 56.25 28.80

    134.05 153.20 172.35 143.63 172.43 59.38 30.40

    138.60 158.40 178.20 148.50 181.50 62.50 32.00

    142.45 162.80 183.15 152.63 190.58 65.63 33.60

    146.30 167.20 188.10 156.75 199.65 68.75 35.20

    150.50 172.00 193.50 161.25 208.73 71.88 36.80

    154.35 176.40 198.45 165.38 217.80 75.00 38.40158.20 180.80 203.40 169.50 226.88 78.13 40.00

    162.05 185.20 208.35 173.63 235.95 81.25 41.60

    165.90 189.60 213.30 177.75 245.03 84.38 43.20

    170.10 194.40 218.70 182.25 254.10 87.50 44.80

    173.95 198.80 223.65 186.38 263.18 90.63 46.40

    177.80 203.20 228.60 190.50 272.25 93.75 48.00

    181.30 207.20 233.10 194.25 278.63 96.88 49.60

    185.15 211.60 238.05 198.38 285.00 100.00 51.20

    188.65 215.60 242.55 202.13 291.38 103.13 52.80

    192.50 220.00 247.50 206.25 297.75 106.25 54.40196.00 224.00 252.00 210.00 304.13 109.38 56.00

    199.50 228.00 256.50 213.75 310.50 112.50 57.60

    203.35 232.40 261.45 217.88 316.88 115.63 59.20

    206.85 236.40 265.95 221.63 323.25 118.75 60.80

    210.70 240.80 270.90 225.75 329.63 121.88 62.40

    214.20 244.80 275.40 229.50 336.00 125.00 64.00

  • 7/31/2019 Nagari to Mohazari Road 1

    32/52

    217.70 248.80 279.90 233.25 342.38 128.13 65.60

    220.85 252.40 283.95 236.63 348.75 131.25 67.20

    224.35 256.40 288.45 240.38 355.13 134.38 68.80

    227.50 260.00 292.50 243.75 361.50 137.50 70.40

    231.00 264.00 297.00 247.50 367.88 140.63 72.00

    234.50 268.00 301.50 251.25 374.25 143.75 73.60

    237.65 271.60 305.55 254.63 380.63 146.88 75.20

    241.15 275.60 310.05 258.38 387.00 150.00 76.80

    244.30 279.20 314.10 261.75 393.38 153.13 78.40

    247.80 283.20 318.60 265.50 399.75 156.25 80.00

    250.95 286.80 322.65 268.88 406.13 159.38 81.60

    254.10 290.40 326.70 272.25 412.50 162.50 83.20

    256.90 293.60 330.30 275.25 418.88 165.63 84.80

    260.05 297.20 334.35 278.63 425.25 168.75 86.40

    263.20 300.80 338.40 282.00 431.63 171.88 88.00

    266.35 304.40 342.45 285.38 438.00 175.00 89.60

    269.50 308.00 346.50 288.75 444.38 178.13 91.20

    272.30 311.20 350.10 291.75 450.75 181.25 92.80

    275.45 314.80 354.15 295.13 457.13 184.38 94.40

    278.60 318.40 358.20 298.50 463.50 187.50 96.00

    281.25 321.42 361.60 301.34 469.88 190.63 97.60

    283.89 324.44 365.00 304.16 476.25 193.75 99.20

    286.53 327.46 368.40 307.00 482.63 196.88 100.80

    289.17 330.48 371.79 309.83 489.00 200.00 102.40

    291.82 333.50 375.19 312.66 495.38 203.13 104.00

    294.46 336.52 378.59 315.49 501.75 206.25 105.60

    297.10 339.54 381.99 318.32 508.13 209.38 107.20299.74 342.56 385.38 321.15 514.50 212.50 108.80

    302.39 345.58 388.78 323.99 520.88 215.63 110.40

    305.03 348.60 392.18 326.81 527.25 218.75 112.00

    307.67 351.62 395.58 329.65 533.63 221.88 113.60

    310.31 354.64 398.97 332.48 540.00 225.00 115.20

    312.96 357.66 402.37 335.31 546.38 228.13 116.80

    315.60 360.68 405.77 338.14 552.75 231.25 118.40

    318.24 363.70 409.17 340.97 559.13 234.38 120.00

    320.88 366.72 412.56 343.80 565.50 237.50 121.60

    323.53 369.74 415.96 346.64 571.88 240.63 123.20

    326.17 372.76 419.36 349.46 578.25 243.75 124.80

    328.81 375.78 422.76 352.30 584.63 246.88 126.40331.45 378.80 426.15 355.13 591.00 250.00 128.00

    334.10 381.82 429.55 357.96 597.38 253.13 129.60

    336.74 384.84 432.95 360.79 603.75 256.25 131.20

    339.38 387.86 436.35 363.62 610.13 259.38 132.80

    342.02 390.88 439.74 366.45 616.50 262.50 134.40

    344.67 393.90 443.14 369.29 622.88 265.63 136.00

    347.31 396.92 446.54 372.11 629.25 268.75 137.60

    349.95 399.94 449.94 374.95 635.63 271.88 139.20

  • 7/31/2019 Nagari to Mohazari Road 1

    33/52

    352.59 402.96 453.33 377.78 642.00 275.00 140.80

    355.24 405.98 456.73 380.61 648.38 278.13 142.40

    357.88 409.00 460.13 383.44 654.75 281.25 144.00

    360.52 412.02 463.53 386.27 661.13 284.38 145.60

    363.16 415.04 466.92 389.10 667.50 287.50 147.20

    365.81 418.06 470.32 391.94 673.88 290.63 148.80

    368.45 421.08 473.72 394.76 680.25 293.75 150.40371.09 424.10 477.12 397.60 686.63 296.88 152.00

    373.73 427.12 480.51 400.43 693.00 300.00 153.60

    376.38 430.14 483.91 403.26 699.38 303.13 155.20

    379.02 433.16 487.31 406.09 705.75 306.25 156.80

    381.66 436.18 490.71 408.92 712.13 309.38 158.40

    384.30 439.20 494.10 411.75 718.50 312.50 160.00

    386.95 442.22 497.50 414.59 723.90 315.63 161.60

    389.59 445.24 500.90 417.41 729.30 318.75 163.20

    392.23 448.26 504.30 420.25 734.70 321.88 164.80

    394.87 451.28 507.69 423.08 740.10 325.00 166.40

    397.52 454.30 511.09 425.91 745.50 328.13 168.00

    400.16 457.32 514.49 428.74 750.90 331.25 169.60402.80 460.34 517.89 431.57 756.30 334.38 171.20

    405.44 463.36 521.28 434.40 761.70 337.50 172.80

    408.09 466.38 524.68 437.24 767.10 340.63 174.40

    410.73 469.40 528.08 440.06 772.50 343.75 176.00

    413.37 472.42 531.48 442.90 777.90 346.88 177.60

    416.01 475.44 534.87 445.73 783.30 350.00 179.20

    418.66 478.46 538.27 448.56 788.70 353.13 180.80

    421.30 481.48 541.67 451.39 794.10 356.25 182.40

    423.94 484.50 545.07 454.22 799.50 359.38 184.00

    426.58 487.52 548.46 457.05 804.90 362.50 185.60

    429.23 490.54 551.86 459.89 810.30 365.63 187.20

    431.87 493.56 555.26 462.71 815.70 368.75 188.80

    434.51 496.58 558.66 465.55 821.10 371.88 190.40

    437.15 499.60 562.05 468.38 826.50 375.00 192.00

    439.24 501.98 564.73 470.61 831.90 378.13 193.60

    441.32 504.36 567.41 472.84 837.30 381.25 195.20

    443.40 506.74 570.09 475.07 842.70 384.38 196.80

    445.48 509.12 572.76 477.30 848.10 387.50 198.40

    447.57 511.50 575.44 479.54 853.50 390.63 200.00

    449.65 513.88 578.12 481.76 858.90 393.75 201.60

    451.73 516.26 580.80 484.00 864.30 396.88 203.20

    453.81 518.64 583.47 486.23 869.70 400.00 204.80

    455.90 521.02 586.15 488.46 875.10 403.13 206.40

    457.98 523.40 588.83 490.69 880.50 406.25 208.00

    460.06 525.78 591.51 492.92 885.90 409.38 209.60462.14 528.16 594.18 495.15 891.30 412.50 211.20

    464.23 530.54 596.86 497.39 896.70 415.63 212.80

    466.31 532.92 599.54 499.61 902.10 418.75 214.40

    468.39 535.30 602.22 501.85 907.50 421.88 216.00

    470.47 537.68 604.89 504.08 912.90 425.00 217.60

    472.56 540.06 607.57 506.31 918.30 428.13 219.20

    474.64 542.44 610.25 508.54 923.70 431.25 220.80

    476.72 544.82 612.93 510.77 929.10 434.38 222.40

  • 7/31/2019 Nagari to Mohazari Road 1

    34/52

    478.80 547.20 615.60 513.00 934.50 437.50 224.00

    480.89 549.58 618.28 515.24 939.90 440.63 225.60

    482.97 551.96 620.96 517.46 945.30 443.75 227.20

    485.05 554.34 623.64 519.70 950.70 446.88 228.80

    487.13 556.72 626.31 521.93 956.10 450.00 230.40

    489.22 559.10 628.99 524.16 961.50 453.13 232.00

    491.30 561.48 631.67 526.39 966.90 456.25 233.60493.38 563.86 634.35 528.62 972.30 459.38 235.20

    495.46 566.24 637.02 530.85 977.70 462.50 236.80

    497.55 568.62 639.70 533.09 983.10 465.63 238.40

    499.63 571.00 642.38 535.31 988.50 468.75 240.00

    501.71 573.38 645.06 537.55 993.90 471.88 241.60

    503.79 575.76 647.73 539.78 999.30 475.00 243.20

    505.88 578.14 650.41 542.01 1004.70 478.13 244.80

    507.96 580.52 653.09 544.24 1010.10 481.25 246.40

    510.04 582.90 655.77 546.47 1015.50 484.38 248.00

    512.12 585.28 658.44 548.70 1020.90 487.50 249.60

    514.21 587.66 661.12 550.94 1026.30 490.63 251.20

    516.29 590.04 663.80 553.16 1031.70 493.75 252.80518.37 592.42 666.48 555.40 1037.10 496.88 254.40

    520.45 594.80 669.15 557.63 1042.50 500.00 256.00

    522.54 597.18 671.83 559.86 1047.90 503.13 257.60

    524.62 599.56 674.51 562.09 1053.30 506.25 259.20

    526.70 601.94 677.19 564.32 1058.70 509.38 260.80

    528.78 604.32 679.86 566.55 1064.10 512.50 262.40

    530.87 606.70 682.54 568.79 1069.50 515.63 264.00

    532.95 609.08 685.22 571.01 1074.90 518.75 265.60

    535.03 611.46 687.90 573.25 1080.30 521.88 267.20

    537.11 613.84 690.57 575.48 1085.70 525.00 268.80

    539.20 616.22 693.25 577.71 1091.10 528.13 270.40

    541.28 618.60 695.93 579.94 1096.50 531.25 272.00

    543.36 620.98 698.61 582.17 1101.90 534.38 273.60

    545.44 623.36 701.28 584.40 1107.30 537.50 275.20

    547.53 625.74 703.96 586.64 1112.70 540.63 276.80

    549.61 628.12 706.64 588.86 1118.10 543.75 278.40

    551.69 630.50 709.32 591.10 1123.50 546.88 280.00

    553.77 632.88 711.99 593.33 1128.90 550.00 281.60

    555.86 635.26 714.67 595.56 1134.30 553.13 283.20

    557.94 637.64 717.35 597.79 1139.70 556.25 284.80

    560.02 640.02 720.03 600.02 1145.10 559.38 286.40

    562.10 642.40 722.70 602.25 1150.50 562.50 288.00

    564.19 644.78 725.38 604.49 1155.90 565.63 289.60

    566.27 647.16 728.06 606.71 1161.30 568.75 291.20

    568.35 649.54 730.74 608.95 1166.70 571.88 292.80570.43 651.92 733.41 611.18 1172.10 575.00 294.40

    572.52 654.30 736.09 613.41 1177.50 578.13 296.00

    574.60 656.68 738.77 615.64 1182.90 581.25 297.60

    576.68 659.06 741.45 617.87 1188.30 584.38 299.20

    578.76 661.44 744.12 620.10 1193.70 587.50 300.80

    580.85 663.82 746.80 622.34 1199.10 590.63 302.40

    582.93 666.20 749.48 624.56 1204.50 593.75 304.00

    585.01 668.58 752.16 626.80 1209.90 596.88 305.60

  • 7/31/2019 Nagari to Mohazari Road 1

    35/52

    587.09 670.96 754.83 629.03 1215.30 600.00 307.20

    589.18 673.34 757.51 631.26 1220.70 603.13 308.80

    591.26 675.72 760.19 633.49 1226.10 606.25 310.40

    593.34 678.10 762.87 635.72 1231.50 609.38 312.00

    595.42 680.48 765.54 637.95 1236.90 612.50 313.60

    597.51 682.86 768.22 640.19 1242.30 615.63 315.20

    599.59 685.24 770.90 642.41 1247.70 618.75 316.80601.67 687.62 773.58 644.65 1253.10 621.88 318.40

    603.75 690.00 776.25 646.88 1258.50 625.00 320.00

    605.66 692.18 778.71 648.92 1263.90 628.13 321.60

    607.57 694.36 781.16 650.96 1269.30 631.25 323.20

    609.48 696.54 783.61 653.01 1274.70 634.38 324.80

    611.38 698.72 786.06 655.05 1280.10 637.50 326.40

    613.29 700.90 788.52 657.10 1285.50 640.63 328.00

    615.20 703.08 790.97 659.14 1290.90 643.75 329.60

    617.11 705.26 793.42 661.19 1296.30 646.88 331.20

    619.01 707.44 795.87 663.23 1301.70 650.00 332.80

    620.92 709.62 798.33 665.27 1307.10 653.13 334.40

    622.83 711.80 800.78 667.31 1312.50 656.25 336.00624.74 713.98 803.23 669.36 1317.90 659.38 337.60

    626.64 716.16 805.68 671.40 1323.30 662.50 339.20

    628.55 718.34 808.14 673.45 1328.70 665.63 340.80

    630.46 720.52 810.59 675.49 1334.10 668.75 342.40

    632.37 722.70 813.04 677.54 1339.50 671.88 344.00

    634.27 724.88 815.49 679.58 1344.90 675.00 345.60

    636.18 727.06 817.95 681.62 1350.30 678.13 347.20

    638.09 729.24 820.40 683.66 1355.70 681.25 348.80

    640.00 731.42 822.85 685.71 1361.10 684.38 350.40

    641.90 733.60 825.30 687.75 1366.50 687.50 352.00

    643.81 735.78 827.76 689.80 1371.90 690.63 353.60

    645.72 737.96 830.21 691.84 1377.30 693.75 355.20

    647.63 740.14 832.66 693.89 1382.70 696.88 356.80

    649.53 742.32 835.11 695.93 1388.10 700.00 358.40

    651.44 744.50 837.57 697.97 1393.50 703.13 360.00

    653.35 746.68 840.02 700.01 1398.90 706.25 361.60

    655.26 748.86 842.47 702.06 1404.30 709.38 363.20

    657.16 751.04 844.92 704.10 1409.70 712.50 364.80

    659.07 753.22 847.38 706.15 1415.10 715.63 366.40

    660.98 755.40 849.83 708.19 1420.50 718.75 368.00

    662.89 757.58 852.28 710.24 1425.90 721.88 369.60

    664.79 759.76 854.73 712.28 1431.30 725.00 371.20

    666.70 761.94 857.19 714.32 1436.70 728.13 372.80

    668.61 764.12 859.64 716.36 1442.10 731.25 374.40

    670.52 766.30 862.09 718.41 1447.50 734.38 376.00672.42 768.48 864.54 720.45 1452.90 737.50 377.60

    674.33 770.66 867.00 722.50 1458.30 740.63 379.20

    676.24 772.84 869.45 724.54 1463.70 743.75 380.80

    678.15 775.02 871.90 726.59 1469.10 746.88 382.40

    680.05 777.20 874.35 728.63 1474.50 750.00 384.00

    681.96 779.38 876.81 730.67 1479.90 753.13 385.60

    683.87 781.56 879.26 732.71 1485.30 756.25 387.20

    685.78 783.74 881.71 734.76 1490.70 759.38 388.80

  • 7/31/2019 Nagari to Mohazari Road 1

    36/52

    687.68 785.92 884.16 736.80 1496.10 762.50 390.40

    689.59 788.10 886.62 738.85 1501.50 765.63 392.00

    691.50 790.28 889.07 740.89 1506.90 768.75 393.60

    693.41 792.46 891.52 742.94 1512.30 771.88 395.20

    695.31 794.64 893.97 744.98 1517.70 775.00 396.80

    697.22 796.82 896.43 747.02 1523.10 778.13 398.40

    699.13 799.00 898.88 749.06 1528.50 781.25 400.00701.04 801.18 901.33 751.11 1533.90 784.38 401.60

    702.94 803.36 903.78 753.15 1539.30 787.50 403.20

    704.85 805.54 906.24 755.20 1544.70 790.63 404.80

    706.76 807.72 908.69 757.24 1550.10 793.75 406.40

    708.67 809.90 911.14 759.29 1555.50 796.88 408.00

    710.57 812.08 913.59 761.33 1560.90 800.00 409.60

    712.48 814.26 916.05 763.37 1566.30 803.13 411.20

    714.39 816.44 918.50 765.41 1571.70 806.25 412.80

    716.30 818.62 920.95 767.46 1577.10 809.38 414.40

    718.20 820.80 923.40 769.50 1582.50 812.50 416.00

    720.11 822.98 925.86 771.55 1587.90 815.63 417.60

    722.02 825.16 928.31 773.59 1593.30 818.75 419.20723.93 827.34 930.76 775.64 1598.70 821.88 420.80

    725.83 829.52 933.21 777.68 1604.10 825.00 422.40

    727.74 831.70 935.67 779.72 1609.50 828.13 424.00

    729.65 833.88 938.12 781.76 1614.90 831.25 425.60

    731.56 836.06 940.57 783.81 1620.30 834.38 427.20

    733.46 838.24 943.02 785.85 1625.70 837.50 428.80

    735.37 840.42 945.48 787.90 1631.10 840.63 430.40

    737.28 842.60 947.93 789.94 1636.50 843.75 432.00

    739.19 844.78 950.38 791.99 1641.90 846.88 433.60

    741.09 846.96 952.83 794.03 1647.30 850.00 435.20

    743.00 849.14 955.29 796.07 1652.70 853.13 436.80

    744.91 851.32 957.74 798.11 1658.10 856.25 438.40

    746.82 853.50 960.19 800.16 1663.50 859.38 440.00

    748.72 855.68 962.64 802.20 1668.90 862.50 441.60

    750.63 857.86 965.10 804.25 1674.30 865.63 443.20

    752.54 860.04 967.55 806.29 1679.70 868.75 444.80

    754.45 862.22 970.00 808.34 1685.10 871.88 446.40

    756.35 864.40 972.45 810.38 1690.50 875.00 448.00

    758.26 866.58 974.91 812.42 1695.90 878.13 449.60

    760.17 868.76 977.36 814.46 1701.30 881.25 451.20

    762.08 870.94 979.81 816.51 1706.70 884.38 452.80

    763.98 873.12 982.26 818.55 1712.10 887.50 454.40

    765.89 875.30 984.72 820.60 1717.50 890.63 456.00

    767.80 877.48 987.17 822.64 1722.90 893.75 457.60

    769.71 879.66 989.62 824.69 1728.30 896.88 459.20771.61 881.84 992.07 826.73 1733.70 900.00 460.80

    773.52 884.02 994.53 828.77 1739.10 903.13 462.40

    775.43 886.20 996.98 830.81 1744.50 906.25 464.00

    777.34 888.38 999.43 832.86 1749.90 909.38 465.60

    779.24 890.56 1001.88 834.90 1755.30 912.50 467.20

    781.15 892.74 1004.34 836.95 1760.70 915.63 468.80

    783.06 894.92 1006.79 838.99 1766.10 918.75 470.40

    784.97 897.10 1009.24 841.04 1771.50 921.88 472.00

  • 7/31/2019 Nagari to Mohazari Road 1

    37/52

    786.87 899.28 1011.69 843.08 1776.90 925.00 473.60

    788.78 901.46 1014.15 845.12 1782.30 928.13 475.20

    790.69 903.64 1016.60 847.16 1787.70 931.25 476.80

    792.60 905.82 1019.05 849.21 1793.10 934.38 478.40

    794.50 908.00 1021.50 851.25 1798.50 937.50 480.00

    796.41 910.18 1023.96 853.30 1803.90 940.63 481.60

    798.32 912.36 1026.41 855.34 1809.30 943.75 483.20800.23 914.54 1028.86 857.39 1814.70 946.88 484.80

    802.13 916.72 1031.31 859.43 1820.10 950.00 486.40

    804.04 918.90 1033.77 861.47 1825.50 953.13 488.00

    805.95 921.08 1036.22 863.51 1830.90 956.25 489.60

  • 7/31/2019 Nagari to Mohazari Road 1

    38/52

    Sr.No. Name of Material Approximately Quantity Unit Place of Delivery

    to be supplied

    In Figures In Words

    1 2 3 4 5 6 7

    All the materials mentioned are to

    1 H.Y.S.D. Steel 4.742 Per Metric ----- ----- procured by contractor at his own

    MT Tonne cost and risk from open market &

    proof of purchase of materials sho

    be submitted. All materials should

    tested from P.W. Distt. Laboratory

    2 Cement 43 Grade 349 Per Bag ----- ----- his own cost. RCC Pipes should

    Bags purchase from MSSIDC only & bi

    along with test result should be

    submitted.

    Assistant Engineer Gr. 1 Executive Engineer

    P.W. Sub-Division No. 1, P.W. Division No. 1

    Gadchiroli Gadchiroli

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in Gadchiroli Taluka

    Gadchiroli.

    APPENDIX "A"

    Rate of which the materials

    will be charged to the Contractor

  • 7/31/2019 Nagari to Mohazari Road 1

    39/52

    1 km off 220.000

    Nagari Village Mohazari Village

    204/400

    Proposed

    Road

    Kathani River 195.200

    Sand

    madiya

    Tukum

    Murum &

    Brick

    Quarry 0.50 Km off

    192.300

    98/800 MSH - 7 Gadchiroli 108/600 112/400 126/000

    To Dhanora

    CB Metal upto plant Site -128.50 Km

    CB Metal upto Indira Chowk -123.20 Km

    Chamorshi 170.600

    1) Certified that the quarries shown have good and sufficeint quantity of material available in it.

    A E II Assistant Engineer Gr. 1

    P.W. Sub-Division No. 1,

    Gadchiroli

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000

    to 0/600 in Gadchiroli Taluka & Dist. Gadchiroli.

    Quarry Chart

    Dongargao

    n

    Crusher1.0

    Km off

    2) Certified that the route shown is shortes one.

  • 7/31/2019 Nagari to Mohazari Road 1

    40/52

    Sr. Item of Work Quantity Unit Amount SpeNo. In Figures In Words in Rs.

    1 Excavation for catch / side water gutter in

    all sort of soils, soft murum etc. to the

    specified section including stacking the

    excavated stuff in regular bund and disposing

    off unsuitable or excess stuff upto a lead of 50

    m and spreading as directed Engineer-in-

    charge.

    356.00 105.50 Rs. Eigthy Nine & Paise Eigthy

    Five Only.

    One Cubic

    Meter

    37558.00 Rd.9/Pag

    2 Laying, watering and compacting the

    embankment formed of materials obtained

    from the road cutting, breaking clods, dressing

    to 3% camber design superelevation curve &

    prescribed section for embankment within a

    lead of 50 m, after laying them in layers of20cm to 30cm. with static roller etc. complete.

    356.000 12.00 Rs. Thirteen & Paise Twenty

    Only.

    One Cubic

    Meter

    4272.00 Rd.13/Pa

    Rd.16/Pa

    3 Providing earthwork in embankment with

    approved materials obtained from

    departmental land or other sources including

    all lifts, laying in layers of 20 cm. to 30 cm.

    thickness breaking clods, dressing to the

    required lines, curves, grade and section,

    watering and compacting with power roller

    complete.

    1280.440 155.85 Rs. One Hundred Forty Two &

    Paise Fifty Only.

    One Cubic

    Meter

    199557.00 Rd.13/Pa

    Name of Work:- Construction of Nagari to Mohazari road ( V.R. - 9 ) Part 1 Km 0/000 to 0/600 in Gadchiroli Taluka & D

    Gadchiroli.

    SCHEDULE "B" & "C"

    Rate

  • 7/31/2019 Nagari to Mohazari Road 1

    41/52

    Sr. Item of Work Quantity Unit Amount S

    No. In Figures In Words in Rs.

    Rate

    4 Supplying trap/granite/quartzite/ gneiss

    stone metal of required size by bringing

    the boulders at the road side breaking them

    to required gradation including conveying the

    boulders and stacking the broken metal etc.

    complete. (Prior approval of sample stack ofbroken metal by the Ex.Engineer is necessary,

    the date of approval will form part of the

    measurements

    b) By Breaking boulder (Hand broken)

    80 mm Metal385.040 695.75 Rs. Eigth Hundred Twenty Nine

    & Paise Eigthy Only.

    One Cubic

    Meter

    267892.00 Rd.19

    No. 19

    40 mm Metal175.020 723.35 Rs. Eigth Hundred Fifty Four &

    Paise Ninty Five Only.

    One Cubic

    Meter

    126601.00 Rd.19

    No. 19

    5 Supplying soft murum at the road side,

    including conveying and stacking complete.

    738.730 456.85 Rs. Three Hundred Eigthy Five

    & Paise Eigthy Only.

    One Cubic

    Meter

    337489.00 Rd.24

    6 Supplying sand at the road side, includingconveying and stacking complete.

    694.980 455.95 Rs. Four Hundred Forty One &Paise Ninty Five Only.

    One CubicMeter

    316876.00 Rd.25

    7 Spreading gravel/sand/soft murum/

    available murum over rubble soling/ W.B.M.

    surface blanketing berms etc. complete.

    1433.710 16.80 Rs. Thirteen & Paise Twenty

    Only.

    One Cubic

    Meter

    24086.00 Rd.28

    8 Spreading 80 mm metal including sectioning

    complete.

    385.040 27.60 Rs. Twenty Two & Paise

    Seventy Five Only.

    One Cubic

    Meter

    10627.00 Rd.29

    9 Spreading 40 mm metal including sectioning

    complete.

    175.020 24.00 Rs. Ninteen & Paise Seventy

    Five Only.

    One Cubic

    Meter

    4200.00 Rd.29

  • 7/31/2019 Nagari to Mohazari Road 1

    42/52

    Sr. Item of Work Quantity Unit Amount S

    No. In Figures In Words in Rs.

    Rate

    10 Compacting the hard murum / kankar of all

    width (200 mm. loose) with Static roller

    including necessary artificial watering

    complete.

    1925.220 8.40 Rs. Six & Paise Sixty Only. One Square

    Meter

    16172.00 Rd.38

    11 Compacting the sub grade/gravel/ oversizemetal (200 mm loose) layers of all width

    with static roller including necessary, labour,

    materials and artificial watering complete.

    1925.220 13.80 Rs. Eleven & Paise Forty Only. One SquareMeter

    26568.00 Rd.32

    12 Compacting the sub grade/gravel/ size

    metal (100 mm loose) layers of all width

    with static roller including necessary, labour,

    materials and artificial watering complete.

    1750.200 14.40 Rs. Eleven & Paise Forty Only. One Square

    Meter

    25203.00 Rd.35

    13 Compacting the hard murum side widths

    layerwise on each side with static roller

    including necessary artificial wateringcomplete .

    5250.600 3.60 Rs. Three & Paise Sixty Only. One Square

    Meter

    18902.00 Rd.40

    14 Excavation for foundation in earth, soils of

    all types, sand, gravel soft murum etc.

    including shoring and strutting as necessary

    and disposing off excavated stuff within lead

    of 100 m as directed etc. complete

    11.090 149.85 Rs. One Hundred Twenty Eigth

    & Paise Twenty Only.

    One Cubic

    Meter

    1663.00 BR.3/

    15 Providing rubble filling of trap / granite /

    quartzite / gneiss stones in foundation

    including hand packing filling gravel / sand in

    the voids etc. complete.

    1.960 672.40 Rs. Eigth Hundred Seventy &

    Paise Ninty Only.

    One Cubic

    Meter

    1318.00 CD.1/

  • 7/31/2019 Nagari to Mohazari Road 1

    43/52

    Sr. Item of Work Quantity Unit Amount S

    No. In Figures In Words in Rs.

    Rate

    16 Providing and laying in situ cement concrete

    of 1:4:8 proportion with trap / granite /

    quartzite / gneiss metal in foundation

    including necessary compacting and curing

    complete. (Including plywood/ steel formwork)

    The C.M. 1:3 plaster is considered forrendering uneven and honeycombed surface

    only. Newly laid concrete shall be covered by

    gunny bag, plastic, tarpaulin etc. (Wooden

    centering/formwork will not be allowed).

    1.310 3213.25 Rs. Three Thousand One

    Hundred Fifty Nine & Paise Nil

    Only.

    One Cubic

    Meter

    4209.00 CD.3/

    17 Providing and laying in situ cement concrete

    of M-15 / 1:2:4 with trap / granite / quartzite

    / gneiss metal in face wall including

    plywood/ steel formwork and steel centering,

    compaction by vibrator, finishing uneven and

    honeycombed surface with C.M.1:3 of

    sufficient minimum thickness to give smooth

    and even surface, filling joints with bitumen,

    curing etc. complete. (Excluding cost ofreinforcement.) The C.M. 1:3 plaster is

    considered for rendering uneven and

    honeycombed surface only. Newly laid

    concrete shall be covered by gunny bag,

    plastic, tarpaulin etc. (Wooden

    centering/formwork will not be allowed).

    4.540 5325.55 Rs. Four Thousand Seven

    Hundred Eigthy Nine & Paise