NABB FORMS Watermark

Embed Size (px)

Citation preview

  • 7/29/2019 NABB FORMS Watermark

    1/35

    TABLE OF CONTENTS

    TAB SAMPLE FORMS

    Report Title ........................................................................................................... 1

    Certification........................................................................................................... 2

    Instrument Calibration Report...............................................................................3

    Air Handling Unit (Central Station)........................................................................ 4

    Air Handling Unit (Packaged/Unitary Belt Drive)................................................... 5

    Air Handling Unit (Packaged/Unitary Direct Drive) ...............................................6

    Fan Test Report (Belt Drive)................................................................................. 7

    Fan Test Report (Direct Drive >1/8 hp).................................................................8

    Fan Test Report (Direct Drive

  • 7/29/2019 NABB FORMS Watermark

    2/35

    Cooling Coil Test Data (Hydronic) ...................................................................... 21

    Cooling Coil Test Data (DX) ............................................................................... 22

    Heating Coil Test Data (Hydronic) ...................................................................... 23

    Heating Coil Test Data (Steam)..........................................................................24

    Heating Coil Test Data (Electric) ........................................................................25

    Chiller Test Report (Water Cooled) .................................................................... 26

    Chiller Test Report (Air Cooled).......................................................................... 27

    Cooling Tower Test Report................................................................................. 28

    Hot Water Boiler Test Report.............................................................................. 29

    Heat Exchanger Test Report (Water to Water)...................................................30

    Heat Exchanger Test Report (Steam to Water).................................................. 31

    Energy Recovery Wheels Test Data................................................................... 32

    Duct Air Leakage Test Data (Optional)............................................................... 33

  • 7/29/2019 NABB FORMS Watermark

    3/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    1

    CERTIFIED TEST, ADJUST, AND

    BALANCE REPORT

    DATE:_____________

    PROJECT:

    NAME ________________________________________________________________

    ADDRESS____________________________________________________________________________________________________________________________

    DESIGN ENGINEER:NAME ________________________________________________________________

    HVAC CONTRACTOR:NAME ________________________________________________________________

    NEBB TAB FIRM:NAME ________________________________________________________________

    ADDRESS___________________________________________________________________________________________________________________________

    TAB CERTIFICATION NUMBER: _______________

  • 7/29/2019 NABB FORMS Watermark

    4/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    2

    SEAL

    PROJECT____________________________________________________________________

    THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS ANFINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURREEDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, ABALANCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM DESIGN QUANTITIE

    WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE TEST- ADJUST- BALANCE REPOPROJECT SUMMARY.

    SUBMITTED & CERTIFIED BY:

    NEBB CERTIFIED TAB FIRM NAME _____________________________________________

    CERTIFICATION NO. ____________ CERTIFICATION EXPIRATION DATE___________

    REPORT DATE __________________________

    NEBB QUALIFIED TAB SUPERVISOR NAME _____________________________________

    NEBB QUALIFIED TAB SUPERVISOR SIGNATURE________________________________

    CERTIFICATION

  • 7/29/2019 NABB FORMS Watermark

    5/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    3

    PROJECT ____________________________________________________________________

    INSTRUMENTTYPE

    MANUFACTURER MODELNUMBER

    SERIALNUMBER

    DATES OF USE INSTRUMENTCALIBRATION

    DATE

    NEBB TAB FIRM

    TAB SUPERVISOR

    INSTRUMENT CALIBRATION REPORT

  • 7/29/2019 NABB FORMS Watermark

    6/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    4

    PROJECT SYSTEM/UNIT

    LOCATION DATE

    UNIT DATA

    Unit Designation

    Manufacturer

    Model Number

    Serial Number

    FAN DATA DESIGN ACTUAL

    Supply Air CFM (L/s)

    Outside Air CFM (L/s)

    Return Air CFM (L/s)

    Total Outlet Air CFM (L/s)

    Fan Discharge S.P. in.(Pa)

    Fan Suction S.P. in. (Pa)

    Fan Total S.P in. (Pa)

    External S.P. in. (Pa)

    Fan RPM

    REMARKS:

    TEST DATE:READINGS BY:

    AIR HANDLING UNIT TEST REPORT

    (Central Station)

    MOTOR DATA DESIGN ACTUAL

    HP (Kw)

    RPM

    Rated Volts

    Rated Amps

    Phase

    Operating Hz

    Service Factor

    Operating Volts

    Operating Amps

    OTHER DATA DESIGN ACTUALMotor Sheave OD

    Motor Sheave Bore

    Fan Sheave OD

    Fan Sheave Bore

    Sheave Center Distance

    Number of BeltsBelt Size

  • 7/29/2019 NABB FORMS Watermark

    7/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    5

    PROJECT SYSTEM/UNIT

    LOCATION DATE

    UNIT DATA

    Unit Designation

    Manufacturer

    Model Number

    Serial Number

    FAN DATA DESIGN ACTUALSupply Air CFM (L/s)

    Outside Air CFM (L/s)

    Return Air CFM (L/s)

    Total Outlet Air CFM (L/s)

    External Discharge S.P.in. (Pa)

    External Suction S.P. in.

    (Pa)External S.P. in. (Pa)

    Fan RPM

    REMARKS:

    TEST DATE:

    READINGS BY:

    AIR HANDLING UNIT TEST REPORT

    (Packaged/Unitary Belt Drive)

    MOTOR DATA DESIGN ACTUAL

    HP (Kw)

    RPM

    Rated Volts

    Rated Amps

    Phase

    Operating Hz

    Service Factor

    Operating Volts

    Operating Amps

    OTHER DATA DESIGN ACTUALMotor Sheave OD

    Motor Sheave Bore

    Fan Sheave OD

    Fan Sheave Bore

    Sheave Center Distance

    Number of BeltsBelt Size

  • 7/29/2019 NABB FORMS Watermark

    8/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    6

    PROJECT SYSTEM/UNIT

    LOCATION DATE

    UNIT DATA

    Unit Designation

    Manufacturer

    Model Number

    Serial Number

    FAN DATA DESIGN ACTUALSupply Air CFM (L/s)

    Outside Air CFM (L/s)

    Return Air CFM (L/s)

    Total Outlet Air CFM (L/s)

    External Discharge S.P.in. (Pa)

    External Suction S.P. in.(Pa)

    Fan RPM

    REMARKS:

    TEST DATE:

    READINGS BY:

    AIR HANDLING UNIT TEST REPORT

    (Packaged/Unitary Direct Drive)

    MOTOR DATA DESIGN ACTUAL

    HP (Kw)

    RPM

    Rated Volts

    Rated Amps

    r Phase

    Operating Hz

    Service Factor

    Operating Volts

    Operating Amps

    OTHER DATA DESIGN ACTUAL

  • 7/29/2019 NABB FORMS Watermark

    9/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    7

    PROJECT __________________________________________________________________

    FAN DATA FAN NO. FAN NO. FAN NO.Unit Designation

    Type of Service

    Manufacturer

    Model Number

    Serial Number

    TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL

    Total Airflow CFM (L/s)

    Total Outlet Airflow CFM(L/s)

    Fan Suction SP in. (Pa)Fan Discharge SP in. (Pa)

    Total SP or ESP in. (Pa)

    Motor HP (Kw)

    Motor RPM

    Motor Rated Volts

    Motor Rated Amps

    Motor Phase

    Motor Operating Hz

    Motor Service Factor

    Motor Sheave OD

    Motor Sheave Bore

    Fan Sheave OD

    Fan Sheave Bore

    Sheave Center Distance

    Number of Belts

    Belt Size

    Fan RPM

    Operating Voltage

    Operating Amps T1/T2/T3

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    FAN TEST REPORT

    (Belt Drive)

  • 7/29/2019 NABB FORMS Watermark

    10/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    8

    PROJECT __________________________________________________________________

    FAN DATA FAN NO. FAN NO. FAN NO.Unit Designation

    Type of Service

    Manufacturer

    Model Number

    Serial Number

    TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUALTotal Airflow CFM (L/s)

    Total Outlet Airflow CFM(L/s)

    Fan Suction SP in. (Pa)

    Fan Discharge SP in. (Pa)Total SP or ESP in. (Pa)

    Motor HP (Kw)

    Motor RPM

    Motor Rated Volts

    Motor Rated Amps

    Motor Phase

    Motor Operating Hz

    Motor Service Factor

    Operating Voltages

    Operating Amperages

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    FAN TEST REPORT

    (Direct Drive) >1/8 hp

  • 7/29/2019 NABB FORMS Watermark

    11/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    9

    PROJECT __________________________________________________________________

    FAN DATA FAN NO. FAN NO. FAN NO.Unit Designation

    Type of Service

    Manufacturer

    Model Number

    TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUALTotal Airflow CFM (L/s)

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    FAN TEST REPORT

    (Direct Drive) < 1/6 hp

  • 7/29/2019 NABB FORMS Watermark

    12/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    10

    PROJECT ______________________________ SYSTEM DESIGNATION_____________

    OUTLET MANUFACTURER __________________ TEST APPARATUS________________

    AREA OUTLET DESIGN FINAL

    SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

    * NOTE: If AK = 1.00, velocity information and measurements are not required.

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    AIR OUTLET TEST REPORT

  • 7/29/2019 NABB FORMS Watermark

    13/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    11

    PROJECT ______________________________ SYSTEM DESIGNATION_____________

    OUTLET MANUFACTURER _________________ OUTLET TEST APPARATUS________

    VAV TERMINAL DATA

    NUMBER DESIGN ACTUAL

    TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)

    SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)

    HEATING AIRFLOW CFM (L/S)

    VAV OUTLET DATA

    AREA OUTLET DESIGN FINAL

    SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

    VAV TERMINAL DATA

    NUMBER DESIGN ACTUAL

    TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)

    SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)

    HEATING AIRFLOW CFM (L/S)

    VAV OUTLET DATA

    AREA OUTLET DESIGN FINALSERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

    * NOTE: If AK = 1.00, velocity information and measurements are not required.

    REMARKS:

    TEST DATE _________________________READINGS BY ______________________

    VAV TERMINAL UNIT TEST REPORT(Pressure Dependent)

  • 7/29/2019 NABB FORMS Watermark

    14/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    12

    VAV TERMINAL UNIT TEST REPORT

    (Pressure Independent)

    PROJECT _______________________________ SYSTEM DESIGNATION____________

    OUTLET MANUFACTURER ______________ OUTLET TEST APPARATUS__________

    VAV TERMINAL DATA

    NUMBER DESIGN ACTUAL

    TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)

    SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)

    DDC CF HEATING AIRFLOW CFM (L/S)

    DDC MAX/MIN AIRFLOWS CFM (L/S) -------- /

    VAV OUTLET DATA

    AREA OUTLET DESIGN FINAL

    SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

    VAV TERMINAL DATA

    NUMBER DESIGN ACTUAL

    TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)

    SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)

    DDC CF HEATING AIRFLOW CFM (L/S)

    DDC MAX/MIN AIRFLOWS CFM (L/S) -------- /

    VAV OUTLET DATA

    AREA OUTLET DESIGN FINAL

    SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

    * NOTE: If AK = 1.00, velocity information and measurements are not required.

    REMARKS:TEST DATE _________________________ READINGS BY ______________________

  • 7/29/2019 NABB FORMS Watermark

    15/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    13

    PROJECT ___________________________________ SYSTEM DESIGNATION_____________

    OUTLET MANUFACTURER ____________________ OUTLET TEST APPARATUS___________

    VAV TERMINAL DATA

    NUMBER DESIGN ACTUAL

    TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)

    SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)

    HEATING AIRFLOW CFM (L/S)

    FAN AIRFLOW CFM (L/S)

    DDC CF FAN SPEED (Hi,med,low,variable,etc) --------

    VAV OUTLET DATA

    AREA OUTLET DESIGN FINAL

    SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

    * NOTE: If AK = 1.00, velocity information and measurements are not required.

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    FAN TERMINAL UNIT TEST REPOR(Pressure Dependen

  • 7/29/2019 NABB FORMS Watermark

    16/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    14

    PROJECT _________________________________________ SYSTEM DESIGNATION_____________OUTLET MANUFACTURER ___________________________ OUTLET TEST APPARATUS___________

    VAV TERMINAL DATA

    NUMBER DESIGN ACTUAL

    TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)

    SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)

    HEATING AIRFLOW CFM (L/S)

    FAN AIRFLOW CFM (L/S)

    DDC ADDR FAN SPEED (Hi,med,low,variable,etc) --------

    DDC CF DDC MAX/MIN AIRFLOWS CFM (L/S) -------- /

    VAV OUTLET DATA

    AREA OUTLET DESIGN FINALSERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

    * NOTE: If AK = 1.00, velocity information and measurements are not required.

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    FAN TERMINAL UNIT TEST REPORT(Pressure Independent

  • 7/29/2019 NABB FORMS Watermark

    17/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    15

    PROJECT_______________________________ SYSTEM DESIGNATION___________________LOCATION ______________________________ TRAVERSE DESIGNATION________________INSTRUMENTATION_______________________

    DUCTSize I.D. ____________

    Area ft (m)____________S.P. in. w.g. (Pa)________

    DESIGN AIRFLOWSCFM (sL/s) _______________CFM (L/s) _________________

    ACTUAL AIRFLOWSCFM (sL/s) _______________FPM (m/s) _________________CFM (L/s) _________________

    POSITION 1 2 3 4 5 6 7 8 9 10 11 12

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    1213

    VELOCITYSUBTOTALS

    .

    REMARKS:

    TEST DATE _________________________

    READINGS BY ________________________

    DUCT TRAVERSE TEST REPORT

    (Rectangular)

  • 7/29/2019 NABB FORMS Watermark

    18/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    16

    PROJECT_______________________________ SYSTEM DESIGNATION____________________

    LOCATION ______________________________ TRAVERSE DESIGNATION_________________INSTRUMENTATION_______________________

    DUCTSize Diameter__________

    Area ft (m)____________S.P. in. w.g. (Pa)________

    DESIGN AIRFLOWSCFM (s/Ls) _______________CFM (L/s) _________________

    ACTUAL AIRFLOWSCFM (s/Ls) _______________FPM (m/s) _________________CFM (L/s) _________________

    REMARKS:TEST DATE _________ READINGS BY _______________________

    DUCT TRAVERSE TEST REPOR

    (Roun

  • 7/29/2019 NABB FORMS Watermark

    19/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    17

    PROJECT _________________________________________________________________________

    UNIT DATA UNIT NO. UNIT NO. UNIT NO.

    Unit Designation

    Type of Service

    Manufacturer

    Model Number

    Design Flow GPM (L/s)

    Design Head Ft (kPa)

    Impeller Size Inches (mm)

    Serial Number

    Motor Manufacturer

    TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL

    Motor Hp (Kw)

    Pump/Motor Speed RPM

    No Flow Suction Pressure ft (kPa)

    No Flow Discharge Pressure ft (kPa)

    No Flow Differential Pressure ft (kPa)

    Actual Impeller Size

    Final Suction Pressure ft (kPa)

    Final Discharge Pressure ft (kPa)

    Total Dynamic Head ft (kPa)

    Final Flow GPM (L/s)

    Motor Rated Amperage

    Final Operating Voltages

    Final Operating Amperages T1/T2/T3

    Final Operating HZ

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    HYDRONIC PUMP TEST REPORT

  • 7/29/2019 NABB FORMS Watermark

    20/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    18

    PROJECT

    UnitDesignation

    Service Manufacturer ModelNumber

    Size Design FlowGPM(L/s)

    ValveSetting/Position

    P Final FlowGPM(L/s)

    REMARKS:

    TEST DATE _________________________

    READINGS BY ________________________

    BALANCING VALVE TEST REPORT

    (Fixed or Adjustable Orifice)

  • 7/29/2019 NABB FORMS Watermark

    21/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    19

    PROJECT

    UnitDesignation

    Service Manufacturer ModelNo.

    Size DesignFlow

    GPM (L/s)

    OperatingPressureRange

    P Final FlowGPM (L/s)

    REMARKS:

    TEST DATE _________________________

    READINGS BY________________________

    BALANCING VALVE TEST REPORT

    (Self Adjusting)

  • 7/29/2019 NABB FORMS Watermark

    22/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    20

    PROJECT

    ReadingNo. ___

    ReadingNo. ___

    ReadingNo. ___

    ReadingNo. ___

    ReadingNo. ___

    ReadingNo. ___

    ReadingNo. ___

    DESIGN

    Reading Designation

    Service

    Location

    Design Flow GPM (L/s)

    ACTUAL

    Pipe Size

    Pipe MaterialPipe Wall Thickness

    Transducer Size

    Spacing Distance

    Application

    Final Flow GPM (L/s)

    REMARKS:

    TEST DATE _________________________

    READINGS BY ________________________

    ULTRASONIC FLOW

    MEASUREMENT TEST DATA

  • 7/29/2019 NABB FORMS Watermark

    23/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    21

    PROJECT _________________________________________________________________________

    CoilDesignation

    SystemServed

    CoilLocation

    Design AirFlow

    CFM (L/s)

    Design WaterFlow GPM (L/s)

    Actual AirflowCFM (L/s)

    Actual WaterFlow GPM (L/s)

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    COOLING COIL TEST DATA

    (Hydronic)

  • 7/29/2019 NABB FORMS Watermark

    24/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    22

    PROJECT _________________________________________________________________________

    CoilDesignation

    SystemServed

    CoilLocation

    Design AirflowCFM (L/s)

    Final ActualAirflow

    CFM (L/s)

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    COOLING COIL TEST DATA

    (DX)

  • 7/29/2019 NABB FORMS Watermark

    25/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    23

    PROJECT _________________________________________________________________________

    CoilDesignation

    SystemServed

    CoilLocation

    Design Air FlowCFM (L/s)

    Design WaterFlow GPM (L/s)

    Actual AirflowCFM (L/s)

    Actual WaterFlow GPM (L/s)

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    HEATING COIL TEST DATA

    (Hydronic

  • 7/29/2019 NABB FORMS Watermark

    26/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    24

    PROJECT ________________________________________________________________

    CoilDesignation

    SystemServed

    CoilLocation

    Design Air FlowCFM (L/s)

    Actual AirflowCFM (L/s)

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    HEATING COIL TEST DATA

    (Steam)

  • 7/29/2019 NABB FORMS Watermark

    27/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    25

    PROJECT _________________________________________________________________________

    CoilDesignation

    SystemServed

    CoilLocation

    DesignAirflow

    CFM (L/s)

    DesignKw

    DesignVoltage

    Phase ActualAirflow

    CFM (L/s)

    ActualVoltage

    ActualAmperage

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    HEATING COIL TEST DATA

    (Electric)

  • 7/29/2019 NABB FORMS Watermark

    28/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    26

    PROJECT

    UNIT DATA DESIGN ACTUALUnit Designation

    Manufacturer

    Model Number

    Serial Number

    EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)

    Pressure Drop

    CONDENSER DATAFlow GPM (L/s)

    Pressure Drop

    UNIT DATA DESIGN ACTUAL

    Unit Designation

    Manufacturer

    Model Number

    Serial Number

    EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)

    Pressure Drop

    CONDENSER DATA

    Flow GPM (L/s)

    Pressure Drop

    REMARKS:

    TEST DATE:

    READINGS BY:

    CHILLER TEST REPORT

    (Water Cooled)

    UNIT DATA DESIGN ACTUALUnit Designation

    Manufacturer

    Model Number

    Serial Number

    EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)

    Pressure Drop

    CONDENSER DATAFlow GPM (L/s)

    Pressure Drop

    UNIT DATA DESIGN ACTUALUnit Designation

    Manufacturer

    Model Number

    Serial Number

    EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)

    Pressure Drop

    CONDENSER DATAFlow GPM (L/s)

    Pressure Drop

  • 7/29/2019 NABB FORMS Watermark

    29/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    27

    PROJECT

    UNIT DATA DESIGN ACTUALUnit Designation

    Manufacturer

    Model Number

    Serial Number

    EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)

    Pressure Drop

    UNIT DATA DESIGN ACTUAL

    Unit Designation

    Manufacturer

    Model Number

    Serial Number

    EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)

    Pressure Drop

    REMARKS:

    TEST DATE:

    READINGS BY:

    CHILLER TEST REPORT

    (Air Cooled)

    UNIT DATA DESIGN ACTUALUnit Designation

    Manufacturer

    Model Number

    Serial Number

    EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)

    Pressure Drop

    UNIT DATA DESIGN ACTUALUnit Designation

    Manufacturer

    Model Number

    Serial Number

    EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)

    Pressure Drop

  • 7/29/2019 NABB FORMS Watermark

    30/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    28

    PROJECT _________________________________________________________________________

    UnitDesignation

    Manufacturer Model No. Serial No. Design WaterFlow GPM (L/s)

    Actual WaterFlow GPM (L/s)

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    COOLING TOWER TEST REPORT

  • 7/29/2019 NABB FORMS Watermark

    31/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    29

    PROJECT _________________________________________________________________________

    UNIT DATA UNIT NO. UNIT NO. UNIT NO.

    Unit Designation

    Manufacturer

    Model Number

    Serial Number

    TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL

    Water Flow GPM (L/s)

    Water Pressure Drop

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    HOT WATER BOILER TEST REPORT

  • 7/29/2019 NABB FORMS Watermark

    32/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    30

    PROJECT ___________________________

    UNIT DATA UNIT NO. UNIT NO. UNIT NO.

    Unit Designation

    Location

    Service

    Manufacturer

    Model No.

    Serial No.

    TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL

    PRIMARY WATER

    Water Flow GPM (L/s)Water Pressure Drop

    SECONDARY WATER

    Water Flow GPM (L/s)

    Water Pressure Drop

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    HEAT EXCHANGER TEST REPORT

    (Water to Water)

  • 7/29/2019 NABB FORMS Watermark

    33/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    31

    PROJECT _________________________________________________________________

    UNIT DATA UNIT NO. UNIT NO. UNIT NO.

    Unit Designation

    Location

    Service

    Manufacturer

    Model No.

    Serial No.

    TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL

    Water Flow GPM (L/s)

    Water Pressure Drop

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    HEAT EXCHANGER TEST REPORT

    (Steam to Water)

  • 7/29/2019 NABB FORMS Watermark

    34/35

    COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____

    32

    PROJECT ___________________________________________________________________

    DESIGN DATAUnit System Designation

    Service

    Location

    Manufacturer

    Model Number

    Serial Number

    Primary Air Flow CFM (L/s)

    Primary AirP

    Secondary Air Flow CFM (L/s)

    Secondary AirP

    ACTUAL DATA

    Primary Air Flow CFM (L/s)

    Primary AirP

    Secondary Air Flow CFM (L/s)Secondary AirP

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    ENERGY RECOVERY WHEELS TEST DATA

  • 7/29/2019 NABB FORMS Watermark

    35/35

    PROJECT ______________________________________________________________________

    DESIGN DATASection

    No.Section

    No.Section

    No.Section

    No.Section

    No.Section

    No.

    System Designation

    Type of Service

    Location

    Zone

    Altitude

    Density

    Leakage Class

    Design Static PressurePressure Class

    Seal Class

    Airflow CFM (L/s)

    Surface Area

    Airflow per Surface Factor

    Percent Allowable Leakage

    ACTUAL DATAActual Static Pressure

    Test Section Air Leakage

    Test Section % Air Leakage

    Test Witness

    REMARKS:

    TEST DATE _________________________

    READINGS BY ______________________

    DUCT AIR LEAKAGE TEST DATA

    (Optional)