N93-22616 'JAPANESE PLAN FOR SSF UTILIZATION
Toshio Mizuno
National Space Development Agency of Japan
ABSTRACT
The JEM program has made significant progress. The JEM PDR was completed in July 1992;
construction of JEM operation facilities has begun; and the micro-G airplane, drop shaft, and micro-
G experiment rocket are all operational. The national policy for JEM utilization was also established.
The Space Experiment Laboratory (SEL) opened in June '92 and will function as a user support
center. Eight JEM multiuser facilities are in phase B, and scientific requirements are being defined
for 17 candidate multiuser facilities. The National Joint Research Program is about to start. Precursor
missions and early Space Station utilization activities are being defined.
PREIBEDING PA6E BLANK NOT FILMED147
https://ntrs.nasa.gov/search.jsp?R=19930013427 2018-11-09T17:57:34+00:00Z
FREEDOMPresentation to NASA SSF Utilization Conference
Japanese Plan for SSF Utilization
T. Mizuno
August 4, 1992
Huntsville Alabama
_ Nr45DrJ,
FREEDOM
f_' "lr mm
Experlrnent Logistics Module- Pressurized Section (ELM--PS)
J
_ Manipulator
_ _osed Facility
Pressurized Module _ Alrlock__
_pedment Logistics Module
/ - Exposed Section (ELM-ES)
JEM Configuration
I_ N/J_ D/'J.pRECEDING PAGE BLANK NOT FILIV_D
149
FREEDOM
CONTENTS
1. JEM Program Budget Status
2. JEM Utilization Policy Status
3. JEM Development Status
4. JEM Operations Capability Development Status
5. Status of Ground Research to Develop Generic Experiment Support
Technology
6. Status of User Support Center Construction
7. Multluser Facility Development Status
8. Organization National Joint Research Using Space Environments
9. Status of Precursor Mission and JEM Early Utilization Definition
10. Other Topics
/50t_ l%l_r'_/'_
FREEDO,_I
H-/t-H ,
1. JEM Program Budget Status (JFY1992)
1.1. JEM Development
(JEM EM, JEM multiuser experiment facility,
TR-1 A, etc.)
1.2. JEM Operations Preparation
(JEM Operations facility,
Crew training facility, etc)
¥33.7B(-262M$)*
¥24.6B(-190M$)
¥4.2B(-32M$)*
¥3.0B(-23M$)
@1Dollar=129yen
• multiyear government guarantee for appropriation
N/&5DrJ.
2. JEM Utilization Policy
2.1. Report by SAC SS panel was Issued in April 1992.
2.2, Report addresses the following:
(1) Need of national research program for promoting JEM Utilization.
(2) Importance of developing multiuser facilities
Identification of facility list and development policy.
(3) Cost sharing by users consistent with JEM and multiuser facility
verification/operation phase.
(4) Identification of AO issues and experiment selection timing and
frequency.
(5) Importance of precursor missions.
151ONI'JL DI'&
FREEDOM
AO, Experiment Selection, PUP,/COUP/TOP
TIME (year)
I X"-5 I X"-4 I X"-3 I X"-2I I I
X"PUP X"COUPVV
J II
TOPV
i X"-I I X" iI I I
Reference Mls_elected Mission Set (BaselineMission) J
9)))Ground Research i
Screened Experiments Group _ & Precursor Fright Experiment I|
.....
3. JEM Development Status
3.1. JEM PDR
Contractor PDR
System PDR
January to March 1992
June to July 1992
3.2. Technology Development Test
JEM Maintenance and Repair simulation using MSFC WETF in Nov.1991
3.3. Engineering Model (EM) and Proto-Flight Model (PFM)
EM Contracts started in March 1991
PFM budget request is being prepared
Construction of JEM Test Facility at TKSC
Construction starts in summer 1992
3.4.
152
J. Rscal Year
Month
Milestone
Activity Phase
JEM
Development
JEM Op*r-_l_
System
PDRCDR
JEM Develo ment Schedule1988 1989
4 8 12 4 8 12
Phase B
System Design
I I
Preliminary Design ReviewCritical Design Review (#1, Interface; #2, JEM)
1990 1991 1992 1993 1994 1995 1996 1997 1998
4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12
NASAPOl NASAMrc CDR FEEV _ .,EUooR L_ _ L.u/_chIV V
JEM PDR 01 #2
i 1
[ I| !
C EM Integration and Testing II
L._[PFM Integration and Testing J
I I i I i I I
EM Engineering Model
PFM Proto Fright Model
D/3,
FREEDOM
_..-_.'_//_ .",.."j,#' n'-H, ff'
"_,,,,_"
4. JEM Operations Capability Development Status
4.1. Design of JEM Operations System
PRR March 1991
System Review Oct. 1993
4.2. Crew Recruiting
• MS candidate was selected in April 1992
• SS/SO will be recruited every two years=
4.3. Construction of JEM Operations Facility
• Weightless Environment Test Facility construction started in March
1992
• Astronaut Training Facility Construction will start in summer 1993
• Construction of SS Operations Facility (Regional Operation Center
for JEM) will start in summer 1993
O D/&153
_._'f_ll_ -'-" ,
4.4,
Q
4.5.
Development of JEM Operations Planning system
Strategic/Tactical planning software and database are being defined
JFD (JEM Flight Demonstration)
JEM Manipulator servicing capability demonstration test will be held
in 1996 using STS
0
5. Status of Ground Research to Develop Generic Experiment Support
Technology (GEST)
5.1. Drop Shaft/Drop Tube
• JAMIC Facility (10 sec. p-G) has been operational since 1991
• MGLAB Facility (4.5 sec. l_-G) will be operational in 1993
5.2. GEST Development using p-G Airplane (MU-300 Business Jet)
• Routine 6 month/year parabolic flight since Sep. 1990
5.3. GEST Development using TR-1A Rocket
• Successful first flight in Sep. 1991
• Next flight in Aug. 1992
1540
Themes and Co-Investigators of TR-IA Rocket Microgravlty Experiments Program
Experiment Module TR-IA No.1 TR-IA No.2 TR-IA No.3September 16, 1991 August-September, 1992 August-Septembc;r,lg93
Module for Experiment Field observation of boundary and environment phase in crystal growthObservation Technologies
Katsuo Tsukamoto (Tohoku U), Kazuhlko Kurlbayashl (ISAS), Tsutomu Sawada(NIRIM)
Module for Measuring Basic Marangonl convection gent_ralion and controlPhysical Properties ofFlulds(FTX) Hisao Azuma (NAL), Akira Hlrata (Waseda U), Keilchi Kuwahara(IHI)
Module for ExperimentingEnvironment MaintainingTechnologles(BDH)
General-purpose Furnace(ITF)
Temperature-gradientFurnace(TGF)
High-temperatureFurnacO(HTF)
Bubble generation,growth and movement
Yoshiyukl Abe(Electrotechnlcal Lab), Masamlchl Ishlkawa(MRI), Shlnya Ishil(Ml-II)
Melting and solidification ofparticle-dispersed alloyYujl Muramatsu (NRIM)
(Not applicable)
Melting and solidification ofhigh-temperature oxidesuperconductorKazumasa Togano(NRIM)
(Not applicable)
Semiconductor liquidgrowth
Tatau Nlshlnaga (Tokyo U)
Melting and solidification ofvitreous material
Junjl Hayakawa(GIRIO)
Ceramic material
compositionOsamu Odawara(Tl'r)
Effects of mlcrogravlty onthe shape of solid-IlquldboundaryKyolchl Kinoshlta(N'l-F)
(Not applicable)
Beginningof1tOkm"
TR-IA MISSION PROFILE
_gOkmJ
/theexperiment Endoftheexperiment
t+80sec/ _,, t+441sec
_RateControl __,Re-entry/
Pay]oadSep, , Parachutehp,
/Telem__j
NASOA
155
FflEEDOM
m
6.1.
6.2.
Status of Japanese User Support Center (USC) Construction
NASDA Space Experiment Laboratory (SEL) at TKSC
SEL plays an integral role for Japanese USCs
SEL became operational in June 1992
Discipline USCs Concept
Major National Institutes are expected to function as
discipline-oriented User Support Center
E.G. NAL for Fluid physics
NIRIM for Inorganic Materials
NRIM for Metals
ISAS for Astronomical Observations
Telesclence Technology Application
Telesclence technology will be applied to link NASDA SEL and
Discipline Centers
156 N/'JL.SD/'
unnun n n n n HIa niln! nilamIll IIR ill liD air
' _,."_''__im__i_l._flal ill i|1 i|1 Hi
7. Onboard Multi-User Facility_(MUF) Development Status
7.1. Selection of MUF
• MUF Candidate List was completed by Pre-AO survey
List includes three categories, a definitive one, one which needs to
be coordinated among international partners, and one which needs
to reflect each year's AO
• JEM EM system/MUF verification test
• JEM traffic model study Identifies early stage of MUF
157_ N/J_D/_.
7,2,
7.3.
7.4.
Technology Development Status
5 MUF technology development will continue until early 1993
Requirements Update by User Advisory G
9 Advisory groups were established
Requirement update will be completed by summer 1992
Coordination among International Partner
Multilateral (MUWG)
Bilateral
N SD/I
FREEDOM
II imi,I_l I I III LIIIII I II
e
8.2.
Organized National Joint Research usina Space Environments
Significance of the Joint Research
Enhance research by coordinating/complementing research amongnational institutes, universities, private sectors
Easy to accommodate experiments in SS
Joint Research Plan
STA authorizes the Joint Research (Core Research)
NASDA develops experiment technology and offers space flightchance
Assigned Institute for Core Research conducts the research
managementE.G. NAL, NIRIM, NRIM
JSUP supports general management of the Joint Research
The plan will be implemented in mid 1992 and will evolvestep-by-step
JEM ULI } |zatLon Preparation
l: rL"e
resodrch
Pr ivill(_'
SeCIor_at ional
1.ab
,_l(:,nl,!el i C
/
I.i [e Science*
(Joiu_ Study
wi th X]SD,'O
Fluid Hew Functioned Metal/AI Icy
Phen(bnenon * Ceram its * _dter ia I *
(Joint Study (Joint Study (Joint Study
with .qASDA) wi th .q,LSDA} wl Lh NASDA}
Develop_2nt on the Ground, _ircrart Exl_'.rlmeut
l..]
Semiconductor
._aterial*
(Joint Study
uith _ASDA)
Coal)us t Ion *
(Joint Study
with .qASD,L)
°..
JESt O* i I izai ion
Pnamol.inn
Progr;nl
K,:search insti
rule iu charge
T .............
_ulti User Facility
Space Experiao.n£ C_neril'Experi@ent Tc_ht_logy : _tetcabillty,Tclesei_me, Coapatibi I i ty NA SDA
[ Space
Promotion [nfrastruc. ture Mic_-gravity Simulation Experlment(Paraboric-Fllght,Soundlng Rocket(TR-IA_l_|3)) | Environment
[ Utilizatl(m
Space Experiment Laboratory ; Technology development,Database _ Project
TI NASDA
J_ I_velopeent a_ Operation l Space Sgation
*; Research Core Name
F_ 7EED OM
9. Status of Precursor Mission and JEM Early Utilization of Definition
9.1. Space Experiment Status
(1) TR-1A sounding rocket
#1 Sep. 1991, #2 Aug. 1992, #3 Summer 1993
follow-on flights are under study
(2) IML-1
Jan. 22, 1992, 2 NASDA Experiments
(3) FUWATT '92 (SL-J/FMPT)
Sep. 1992, 34 Japanese Experiments
(4) SFU Feb.-June 1994
(5) IML-2 July 1994, 12 Japanese Experiments
Nr .s D/),
FREEDOM
9.2. Definition of follow-on Precursor Mission
(1) Preliminary study of Follow-on TR-1A flight, E1 participation,
Spacehab Utilization
(2) Dialogue with international partners for potential cooperation
9.3. Definition of Early Utilization of the Space Station
(1) Traffic model study of JEM early utilization
(2) Dialogue with international partners for potential cooperation
_ N_SD/_
J F Y
Space 5tatio_
ST5 / Sl+
Free Flyer
User Support
Alrplan.
NU-300
Sovndini Rocket
TR'iA
hta hie
NultLuser F*cLILCy
SpKa Japer|ant Lab.L
JEM Utilization Prepari Lio_ Sohadu|e
5151181 HI/S0 f42/gO H31g[ H4/g2 IIS/g3 #5/04 liT/g5 H|/g5 Hg/g7
,7 v TOP _'9| A0 'DR COUP
I_l+-I FXI'[ IMI.-2
9|/i gZ/U 94/7
SFU
54/2-5
Verk shop
Y Y
18 19
T
II0
0evel_plent
ProAo
III
• • • V V V V V V v
11+ 113 114 I15
• YVY
90/7
hvetoplemt
TTT TVT TTT TTT TTT TTT
Y • • V
II #2 83
|1/| 92/I 93Ig
Pkala [K
0petition
PFI
naveJopaent
• 0eftaed
V P|senini
HLO/91
JEN JEH
l| 12
JEM Early Utilization Traffic Model(as is June. 1992)
Experiment
Equip.
LSE
UP mass
(Except
Specimen)
1998 1999
MB12(JEM#1) UF5 UF6 MB15(JEM#2] UF7 UF8
IF 1"GHF 1"ZMF 1"PCF 1"
CleanbenchCCF
SGF 1"LF T
EPF 1"
TES 1"SPSS 1"FPEF 1"
VGF 1"
1" FPEF(_, _mp)
1" PSAS
-0.5DRE
1" ISCS 1"SEMS 1`
1"
Refrigerator 1"
Freezer 1`
-1DRE
-2EEU
Imageprocessor SCF 1"
-2,5DRE -0.75DRE -0.75DRE
IF : Isothermal Furnace
SGF : Solution Growth Facility
-0.625DRE
-3EEU
PCF : Protein Crystallization Facility
FPEF: Fluid Physics Experiment FacilityPCEF: Physics and Chemistry Experiment FacilityCCF : Cell Culture FacilityGHF : Gradient Heating FurnaceISCS : Intersatellite Communication SystemTES :Teleoparation Experiment SystemEaT : Earth Observation TEST
SAHF: Small Animal Holding FacilityZMF : Zone Melting Furnace
LF : Levitation Furnace
PSAS: Physiological Signal Acquisition SystemSEMS: Space Environment Measurement SystemSPSS: Small Payload Support SystemSCF : Separation Centriluge FacilityEPF : Electrophoresis FacilityVGF : Vapor Growth Facilely
J_:M PM ExporimonL Rick lnlLill=kJon Model
|aotSlrleJ Furucl
(PDIU} (I'PDO)
I iallo
ProcellOr
CroMnd ImltallaLiom Tpl'e
Exporlaen_ Riot
ZOnO Gradient
Mo|timl llQatinl
FurII¢I Furnlco
+PUI U) |l'J_mJ
GrOVlmJ Ins+ll|atioA T_pe
Exporiaont Ra¢_
Fluid F_yllCs
ExporJleA¢
Levitation FIc|iJt_
P_rnacq -Uora Talp-
$olutloa
Gr_J=
JFecilic_
PD|g PPDD
Drauor Type mAporlaomt hck
Protola
CrysLl||ila- [loctroplmra-
+Ion sis
F_cJJJsp F+¢JJi=¥
Phzsie|ollcal
$11aJl AquJll-
Llgm $¥1+¢ui
PDIU PPDI
Clean bone5
Call
Call+to
Ficiilt_
$$pet_¢lol
CcoLtlrule
r+clllt_
PDIV PPDD
+#/ri¢+tllet] Ja_etJJ_J]Jle
Froo=er ColLlunicition
$Tlten
Praeer TTpe Es_rlMnL hck Praalr TypI Esperisemt Rac_ User $tOtlll _1¢_ UI0t $torale Rack
|PH cellini) (£LS-p5)
3 EM
lace
(nvirnnnent
Heasureaent System
F'F Expo r I mon t Pay I o nd
Earth Observation Test
I
!
Teleoperation Small
_mpeYinent Animal HoJdinz
Sys ton Fnc i I icy
A L L s C hme n L Model
IntersaLnlllte
Connnni©ntJon
SylteB
Small Payload
Support Symtna
,Vapor CrymLmlli-
zation Facility
• Fluid Physics
Experiment
Facility
- ]ligh Teip -
10, Other Topics
(1) Space Experiment Data Base Development Status
• Data Base in Japanese became operational in June 1992
• Data Base in English will be operational in mid 1993
(2) Telesclence Test Bed
• Telesclence Test Bed was Installed in NASDA SEL in June 1992
• Telesclence Demonstration Test for JEM MTC operation will be inNov. 1992
f
1 1/3.Si"j/3,