10
! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( N2-S03 N2-Soils-106 N2-Soils-105 N2-Soils-104 N2-S N2-Wild-101 N2-Aqua-103 81N2-Aqua-104 N2-Aqua-105 34 33 34 46 45 44 43 42 41 40 39 38 37 36 35 48 51 50 49 48 47 L4 L3 Brannigan Creek Coordinate System: UTM Zone 14N NAD83 Data Source: MB Hydro, ProvMB, NRCAN Date Created: December 02, 2013 ± 1:10,000 0 240 480 120 Metres Map 64 Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations DOCUMENT PATH: G:\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N2\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131201.MXD ESS Features Water ! ( Water Crossing Wildlife Birds and Habitat Soils and Terrain Permafrost Points of Access* ! ( Proposed Access Point ! ( Major Stream Crossing Abandoned Rail Crossing Rail Crossing " ) Transmission Line Crossing Project Infrastructure Proposed Access Route Land Base 66 m Right of Way BPIII Final Preferred Route Angle Tower Locations # # *Labels correspond to BPIII Access Management Database Mining ! ! Transmission Line Highway Major Road Local Road Winter Road Railway (Operational) Railway (Discontinued) Provincial Park

N2-Soils-104MAP NUMBER : 64 ESS Group : Permafrost Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance N2-S03 N2-Soils-104 Permafrost Site: 33 to 34 E- 613022 N- 6200759

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: N2-Soils-104MAP NUMBER : 64 ESS Group : Permafrost Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance N2-S03 N2-Soils-104 Permafrost Site: 33 to 34 E- 613022 N- 6200759

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!l

!l

!(!(!(

!(!(

!(

!( !(!( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !(

Tower 33

E-610944, N-6197795

K24W

N2-S03N2-S03

N2-Soils-103

N2-Soils-106

N2-Soils-105

N2-Soils-104

N2-Soils-107

N2-Soils-106

N2-Soils-104

N2-Wild-101

N2-Aqua-103

81N2-Aqua-104N2-Aqua-105

30 2934 33 32 313446 45 44 43 42 41 40 39 38 37 36 354854 53 52 51 50 49 48 4755

L4

L3

Brannigan Creek

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: December 02, 2013

±

1:10,000

0 240 480120Metres

Map 64

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N2Environmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\11

1440

054_

BPIII

_EPP

\ARC

MAP\

ESS_

N2\B

PIII_

CENV

PP_N

1N2N

3N4C

1SEC

TION

BASE

MAP_

MAPB

OOK_

BTB_

STAN

TEC_

2013

1201

.MXD

ESS FeaturesWater!( Water Crossing

WildlifeBirds and Habitat

Soils and TerrainPermafrost

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Provincial Park

Page 2: N2-Soils-104MAP NUMBER : 64 ESS Group : Permafrost Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance N2-S03 N2-Soils-104 Permafrost Site: 33 to 34 E- 613022 N- 6200759

MAP NUMBER : 64

ESS Group : Permafrost

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S03 N2-Soils-104 Permafrost Site: 33 to 34 E- 613022 N- 6200759

E- 609855 N- 6197111 14N 790 m

N2-S03 N2-Soils-105 Permafrost Site: 35 to 36 E- 609247 N- 6196728

E- 609189 N- 6196692 14N 69 m

N2-S03 N2-Soils-105 Permafrost Site: 37 to 38 E- 608905 N- 6196514

E- 608671 N- 6196366 14N 277 m

N2-S03 N2-Soils-105 Permafrost Site: 39 to 40 E- 608506 N- 6196263

E- 608506 N- 6196263 14N 326 m

N2-S03 N2-Soils-105 Permafrost Site: 41 to 42 E- 607979 N- 6195931

E- 607902 N- 6195883 14N 91 m

N2-S03 N2-Soils-105 Permafrost Site: 43 to 44 E- 607867 N- 6195861

E- 607774 N- 6195803 14N 110 m

N2-S03 N2-Soils-105 Permafrost Site: 45 to 46 E- 607659 N- 6195731

E- 607093 N- 6195375 14N 668 m

N2-S03 N2-Soils-106 Permafrost Site: 47 to 48 E- 606754 N- 6195162

E- 606640 N- 6195090 14N 134 m

N2-S03 N2-Soils-106 Permafrost Site: 49 to 50 E- 606553 N- 6195036

E- 606507 N- 6195007 14N 55 m

N2-S03 N2-Soils-106 Permafrost Site: 51 to 52 E- 606381 N- 6194928

E- 606329 N- 6194895 14N 61 m

Potential Effects: Melting or loss of permafrost due to disturbance of the active layer Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage and rutting Use existing trails, roads or cut lines whenever possible as access routes Avoid organic soils containing permafrost to the extent possible Maintain shrub and herbaceous vegetation to the extent possible Remove trees by low-disturbance methods Confine vehicle traffic to established trails to the extent possible Implement erosion protection before commencing construction in accordance with Erosion/Sediment Control

Plan

ESS Group : Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N2-S03 N2-Aqua-103

Tributary of Brannigan Creek 609674 6196997 14N 2m 2m Marginal Low

N2-S03 N2-Aqua-104

Tributary of Brannigan Creek 607580 6195681 14N N/A N/A Marginal Low

N2-S03 N2-Aqua-105

Brannigan Creek 607326 6195522 14N 92m 92m Marginal Moderate

Potential Effects: Habitat loss & contamination from structure foundations & installations; increased erosion & sedimentation of streams; damage to stream banks; loss of riparian vegetation Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion Use existing trails, roads or cut lines whenever possible as access routes Identify and flag buffer areas prior to start of work Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements

7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction No instream works or fording from April 15 - July 15

Page 3: N2-Soils-104MAP NUMBER : 64 ESS Group : Permafrost Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance N2-S03 N2-Soils-104 Permafrost Site: 33 to 34 E- 613022 N- 6200759

MAP NUMBER : 64 cont’d

ESS Group : Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S03 N2-Wild-101 Waterfowl sensitivity area Site: L3 to L4 E- 607422 N-6195581

E- 607293 N-6195501 14N 152 m

Potential Effects:

Higher risk of wire collision, disturbance during breeding and nesting, risk of wire collision is localized to the right-of-way while construction disturbance can effect colonies up to 400 meters away

Specific Mitigation:

Adhere to reduced risk timing windows for protection of birds (August 1- April 30) Maintain setback during timing window Conduct priority assessment for bird diverters and other measures prior to transmission line stringing Install bird diverters or other measures at high priority sites

Page 4: N2-Soils-104MAP NUMBER : 64 ESS Group : Permafrost Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance N2-S03 N2-Soils-104 Permafrost Site: 33 to 34 E- 613022 N- 6200759

 

 

 

 

 

 

 

 

 

 

 

 

This page is intentionally left blank.

Page 5: N2-Soils-104MAP NUMBER : 64 ESS Group : Permafrost Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance N2-S03 N2-Soils-104 Permafrost Site: 33 to 34 E- 613022 N- 6200759

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!(!( !(!(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !(!( !( !( !(!( !( !( !(!( !(!( !( !( !(!( !(

K24W

N2-S03

N2-Soils-106

N2-Soils-108

N2-Soils-107

N2-Soils-106

N2-Soils-109

N2-Soils-110

N2-Soils-108

N2-Wild-101N2-Wild-102 81N2-Aqua-104N2-Aqua-105N2-Aqua-106N2-Aqua-106N2-Aqua-107

46 45 44 434854 53 52 51 50 49 48 4756 5560 59

58

5764 63 62 61

65 L4

L3L6 L5

Brannigan Creek

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: December 02, 2013

±

1:10,000

0 240 480120Metres

Map 65

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N2Environmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\11

1440

054_

BPIII

_EPP

\ARC

MAP\

ESS_

N2\B

PIII_

CENV

PP_N

1N2N

3N4C

1SEC

TION

BASE

MAP_

MAPB

OOK_

BTB_

STAN

TEC_

2013

1201

.MXD

ESS FeaturesWater!( Water Crossing

WildlifeBirds and Habitat

Soils and TerrainPermafrost

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Provincial Park

Page 6: N2-Soils-104MAP NUMBER : 64 ESS Group : Permafrost Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance N2-S03 N2-Soils-104 Permafrost Site: 33 to 34 E- 613022 N- 6200759

MAP NUMBER : 65

ESS Group : Permafrost

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S03 N2-Soils-106 Permafrost Site: 51 to 52 E- 606381 N- 6194928

E- 606329 N- 6194895 14N 61 m

N2-S03 N2-Soils-106 Permafrost Site: 53 to 54 E- 606271 N- 6194858

E- 606271 N- 6194858 14N 171 m

N2-S03 N2-Soils-107 Permafrost Site: 55 to 56 E- 604861 N- 6193973

E- 604697 N- 6193869 14N 194 m

N2-S03 N2-Soils-108 Permafrost Site: 57 to 58 E- 603450 N- 6193086

E- 603176 N- 6192914 14N 323 m

Potential Effects: Melting or loss of permafrost due to disturbance of the active layer Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage and rutting Use existing trails, roads or cut lines whenever possible as access routes Avoid organic soils containing permafrost to the extent possible Maintain shrub and herbaceous vegetation to the extent possible Remove trees by low-disturbance methods Confine vehicle traffic to established trails to the extent possible Implement erosion protection before commencing construction in accordance with Erosion/Sediment Control

Plan

ESS Group : Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S03 N2-Wild-102 Waterfowl sensitivity area Site: L5 to L6 E- 603357 N-6193028

E- 603166 N-6192908 14N 226 m

Potential Effects:

Higher risk of wire collision, disturbance during breeding and nesting, risk of wire collision is localized to the right-of-way while construction disturbance can effect colonies up to 400 meters away

Specific Mitigation:

Adhere to reduced risk timing windows for protection of birds (August 1- April 30) Maintain setback during timing window Conduct priority assessment for bird diverters and other measures prior to transmission line stringing Install bird diverters or other measures at high priority sites

ESS Group : Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N2-S03 N2-Aqua-106

Unnamed stream 603319 6193004 14N 25m 25m Marginal Low

N2-S03 N2-Aqua-107

Unnamed stream 603204 6192932 14N 29m 29m Marginal Low

Potential Effects: Habitat loss & contamination from structure foundations & installations; Increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion Use existing trails, roads or cut lines whenever possible as access routes Identify and flag buffer areas prior to start of work Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements

7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction No instream works or fording from April 15 - July 15

Page 7: N2-Soils-104MAP NUMBER : 64 ESS Group : Permafrost Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance N2-S03 N2-Soils-104 Permafrost Site: 33 to 34 E- 613022 N- 6200759

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!(!l

!(!(!(!( !( !( !(!( !( !( !(!( !( !( !(!( !(!( !( !( !( !( !( !( !(!( !( !( !( !(!( !(!( !(!( !(

K24W

N2-S03N2-S03

N2-Soils-108N2-Soils-111

N2-Soils-109

N2-Soils-110

N2-Soils-108

N2-Soils-111 N2-Wild-103N2-Wild-102

N2-Wild-105 N2-Wild-104

N2-Aqua-106N2-Aqua-106N2-Aqua-107N2-Aqua-108

N2-Aqua-109N2-Aqua-110

60 59

58

5764 63 62 6166

6573 7271

70

69 68 6774 L6 L5L8 L7

L10L9

L12 L11

Isbiste

r Cree

k

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: December 02, 2013

±

1:10,000

0 240 480120Metres

Map 66

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N2Environmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\11

1440

054_

BPIII

_EPP

\ARC

MAP\

ESS_

N2\B

PIII_

CENV

PP_N

1N2N

3N4C

1SEC

TION

BASE

MAP_

MAPB

OOK_

BTB_

STAN

TEC_

2013

1201

.MXD

ESS FeaturesWater!( Water Crossing

WildlifeBirds and Habitat

Soils and TerrainPermafrost

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Provincial Park

Page 8: N2-Soils-104MAP NUMBER : 64 ESS Group : Permafrost Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance N2-S03 N2-Soils-104 Permafrost Site: 33 to 34 E- 613022 N- 6200759

MAP NUMBER : 66

ESS Group : Permafrost

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S03 N2-Soils-108 Permafrost Site: 59 to 60 E- 602682 N- 6192604

E- 602560 N- 6192527 14N 144 m

N2-S03 N2-Soils-109 Permafrost Site: 61 to 62 E- 601784 N- 6192040

E- 601749 N- 6192017 14N 42 m

N2-S03 N2-Soils-109 Permafrost Site: 63 to 64 E- 601717 N- 6191998

E- 601665 N- 6191965 14N 62 m

N2-S03 N2-Soils-110 Permafrost Site: 65 to 66 E- 601483 N- 6191850

E- 601467 N- 6191840 14N 18 m

N2-S03 N2-Soils-111 Permafrost Site: 67 to 68 E- 600957 N- 6191520

E- 600854 N- 6191455 14N 67 m

N2-S03 N2-Soils-111 Permafrost Site: 69 to 70 E- 600664 N- 6191336

E- 600593 N- 6191291 14N 84 m

N2-S03 N2-Soils-111 Permafrost Site: 71 to 72 E- 600561 N- 6191271

E- 600542 N- 6191259 14N 22 m

N2-S03 N2-Soils-111 Permafrost Site: 73 to 74 E- 600491 N- 6191227

E- 598340 N- 6189876 14N 2540 m

Potential Effects: Melting or loss of permafrost due to disturbance of the active layer Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage and rutting Use existing trails, roads or cut lines whenever possible as access routes Avoid organic soils containing permafrost to the extent possible Maintain shrub and herbaceous vegetation to the extent possible Remove trees by low-disturbance methods Confine vehicle traffic to established trails to the extent possible Implement erosion protection before commencing construction in accordance with Erosion/Sediment Control

Plan

ESS Group : Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S03 N2-Wild-103 Waterfowl sensitivity area Site: L7 to L8 E- 600645 N-6191324

E-600481 N-6191221 14N 193 m

N2-S03 N2-Wild-104 Waterfowl sensitivity area Site: L9 to L10 E- 599906 N-6190859

E-599803 N-6190795 14N 121 m

Potential Effects:

Higher risk of wire collision, disturbance during breeding and nesting, risk of wire collision is localized to the right-of-way while construction disturbance can effect colonies up to 400 meters away

Specific Mitigation:

Adhere to reduced risk timing windows for protection of birds (August 1- April 30) Maintain setback during timing window Conduct priority assessment for bird diverters and other measures prior to transmission line stringing Install bird diverters or other measures at high priority sites

ESS Group : Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N2-S03 N2-Aqua-108

Small, unnamed lake 600563 6191272 14N N/A N/A Marginal Low

N2-S03 N2-Aqua-109

Tributary of Isbister Creek 600563 6191272 14N 2m 2m Marginal Moderate

Potential Effects: Habitat loss & contamination from structure foundations & installations; increased erosion & sedimentation of streams; damage to stream banks; loss of riparian vegetation Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion Use existing trails, roads or cut lines whenever possible as access routes Identify and flag buffer areas prior to start of work Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements

7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction No instream works or fording from April 15 - July 15

Page 9: N2-Soils-104MAP NUMBER : 64 ESS Group : Permafrost Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance N2-S03 N2-Soils-104 Permafrost Site: 33 to 34 E- 613022 N- 6200759

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!(

!(

!l

!(

!(

!(

!(

!( !(

!(

!( !( !( !(!(

!(!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

Tower 34E-596559, N-6188756

K24W

N2-S03

N2-S03

Tribu

tary

of Isb

ister

Creek c

rossin

g

N2-Soils-111

N2-Soils-112

N2-Soils-111

N2-Soil

s-113

N2-Wild-103

N2-Wild-105

N2-Wild-104

N2-Wild-

106

N2-Aqua-108

N2-Aqua-109

N2-Aqua-110

N2-Aqu

a-111

73 7271

7069 68 67

74

80

79

78 7776

75

82

81

84

83

L8L7

L10L9

L12L11

L16

L15

Isbiste

r Cree

k

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: December 02, 2013

±

1:10,000

0 240 480120Metres

Map 67

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N2Environmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\11

1440

054_

BPIII

_EPP

\ARC

MAP\

ESS_

N2\B

PIII_

CENV

PP_N

1N2N

3N4C

1SEC

TION

BASE

MAP_

MAPB

OOK_

BTB_

STAN

TEC_

2013

1201

.MXD

ESS FeaturesWater!( Water Crossing

WildlifeBirds and Habitat

Soils and TerrainPermafrost

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Provincial Park

Page 10: N2-Soils-104MAP NUMBER : 64 ESS Group : Permafrost Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance N2-S03 N2-Soils-104 Permafrost Site: 33 to 34 E- 613022 N- 6200759

MAP NUMBER : 67

ESS Group : Permafrost

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S03 N2-Soils-111 Permafrost Site: 73 to 74 E- 600491 N- 6191227

E- 598340 N- 6189876 14N 2540 m

N2-S03 N2-Soils-112 Permafrost Site: 75 to 76 E-598044 N-6189689

E-597808 N-6189541 14N 278 m

N2-S03 N2-Soils-112 Permafrost Site: 77 to 78 E-597662 N-6189450

E-597543 N-6189375 14N 141 m

N2-S03 N2-Soils-112 Permafrost Site: 79 to 80 E-597038 N-6189057

E-596559 N-6188756 14N 566 m

N2-S04 N2-Soils-112 Permafrost Site: 81 to 82 E-596559 N-6188756

E-596565 N-6188584 14N 172 m

Potential Effects: Melting or loss of permafrost due to disturbance of the active layer Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage and rutting Use existing trails, roads or cut lines whenever possible as access routes Avoid organic soils containing permafrost to the extent possible Maintain shrub and herbaceous vegetation to the extent possible Remove trees by low-disturbance methods Confine vehicle traffic to established trails to the extent possible Implement erosion protection before commencing construction in accordance with Erosion/Sediment Control

Plan

ESS Group : Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S03 N2-Wild-105 Waterfowl sensitivity area Site: L11 to L12 E- 598770 N-6190145

E-598689 N-6190095 14N 95 m

Potential Effects:

Higher risk of wire collision, disturbance during breeding and nesting, risk of wire collision is localized to the right-of-way while construction disturbance can effect colonies up to 400 meters away

Specific Mitigation:

Adhere to reduced risk timing windows for protection of birds (August 1- April 30) Maintain setback during timing window Conduct priority assessment for bird diverters and other measures prior to transmission line stringing Install bird diverters or other measures at high priority sites

ESS Group : Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N2-S03 N2-Aqua-110

Tributary of Isbister Creek 598721 6190115 14N 3m 3m Marginal Moderate

Potential Effects: Habitat loss & contamination from structure foundations & installations; increased erosion & sedimentation of streams; damage to stream banks; loss of riparian vegetation Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion Use existing trails, roads or cut lines whenever possible as access routes Identify and flag buffer areas prior to start of work Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements

7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction No instream works or fording from April 15 - July 15