Upload
samarjit-sharma
View
686
Download
1
Tags:
Embed Size (px)
Citation preview
+PORTFOLIO
SAMARJIT SHARMABHARATI VIDYPEETHCOLLEGE OF ARCHITECTURE, PUNE.
Email: [email protected]: +91 9975305975
+ARCHITECTURAL DESIGNAD-I
GRAM PANCHAYAT
AD-II
CLUB HOUSE AND SPORTS COMPLEX
PRIMARY SCHOOL
AD-III
COLLEGE OF HOTEL MANAGEMENT AND CATERING TECHNOLOGY
BANK
AD-IV
MULTI ACTIVITY CENTER
ECO- HOUSING COMMUNITY OF 1000 TENEMENTS
+AD-I: GRAM PANCHAYAT
Project Description:
As first year Bachelor of Architecture students, we were asked to design a Gram Panchayat for a semi rural community. For this purpose, we visited the settlement of Bhor, which is about 80 k.ms from Pune and studied the settlement for a better understanding of what was required to design a Gram Panchayat.
Having studied the settlement we drew up a list of requirements for the Panchayat which included shops, a bank counter, a post office, a main office, multi purpose hall and a central gallery with adequate toilet facilities.
We were asked to prepare detailed plans, elevations and sections for the same, along with a site plan showing the roof profile and a model.
+AD I: GRAM PANCHAYAT
Plan of Ground Floor
Section
Elevation
Site Plan Section
+AD-II: CLUB HOUSE AND SPORTS COMPLEX
Project Description:
My main project for my 2nd year B. Arch, for Architectural Design was the design of a Club House and its associated Sports Complex. For a better understanding of the functioning and operation of a club, I conducted a case study of the R.S.I Club in Pune. Additional research for the layout of the golf course, swimming pool, tennis courts and other facilities were done using internet and library resources.
The project involved the design of a club house and sports complex. The sporting facilities included a tennis stadium, a swimming pool, a golf course and a boating facility. The indoor facilities included a ball room, a billiards room, a bar room, pantry, kitchen, a club office and adequate storage and toilet facilities. Additionally, the structure was to be constructed in timber, using roofing and flooring details learnt in the 1st and 2nd year in Building Technology.
Detailed plans, elevations, sections along with landscape rendition of the site was expected, along with a model for the club house.
+AD II: CLUB HOUSE & SPORTS COMPLEX
Plan of Ground Floor of Club House
Site Plan Plan of Ground Floor of Sports Complex
Site Sections
+AD II: CLUB HOUSE & SPORTS COMPLEX
Plan of Tennis Stadium
Views of Model of Club House
Sections
+AD-II: PRIMARY SCHOOL
Project Description:
The secondary project of my 2nd year B. Arch, for Architectural Design was the design of a Primary School. For a better understanding of the functioning and operation of a primary, I conducted a case study of the Bishop’s School in Pune. Additional research of basic anthropometric and design data were done using internet and library resources.
The project involved the design of a primary school from classes 1 to 4 each with 2 sections of 30 students each, i.e. 240 students. It involved a close study of basic anthropometry, for making the structure more user friendly. Special care was taken in the design and layout of each classroom to better facilitate the educational process.
Detailed plans, elevations, sections along with a site plan showing the parking layout for all the users was carried out.
+AD-II: PRIMARY SCHOOL
Plan of Ground Floor
Section
Elevation
Site Plan
+AD-III: COLLEGE OF HOTEL MANAGEMENT AND CATERING TECHNOLOGY
Project Description:
This project was the major project for my 3rd year Architectural Design portfolio and was divided into two parts. The first part was the design of the Main College building and the site layout. The second part was the design of the Student’s Accommodation Facilities, i.e. the Hostels.
A major in-depth case study of the IHMCT in Lonawala was conducted, along with comparative analysis of similar institutes in Pune, from which we were able to understand the basic requirements and functioning of the Institute and the student’s accommodation.
The project involved numerous design requirements. Special emphasis was put by me on sustainability, in order to make the design as sustainable and eco-friendly as possible, within the restrictions of economy and scale.
Detailed drawings of plans, sections and elevations along with landscaping details for the site were submitted for the final presentation.
+AD-III: COLLEGE OF HOTEL MANAGEMENT AND CATERING TECHNOLOGY
Site Plan Ground Floor Plan of Main Building
1st Floor Plan of Main Building 2nd Floor Plan of Main Building 3rd Floor Plan of Main Building
+AD-III: COLLEGE OF HOTEL MANAGEMENT AND CATERING TECHNOLOGY
Longitudinal section showing working of stack Front Elevation of Main Building
Side Elevation of Main BuildingLateral section showing working of stack
+AD-III: COLLEGE OF HOTEL MANAGEMENT AND CATERING TECHNOLOGY
Ground Floor Plan of Hostel
Front Elevation
Side Elevation
Section
G + 1/2/3 Floor Plans of Hostel
Section
Site Section
+AD-III: BANK
Project Description:
This was a small project of 4 weeks duration which formed a part of my 3rd year Architectural Design portfolio. For understanding the functioning of a bank we conducted case studies of numerous banks ranging from small scale bank counters to large scale, multi activity oriented, main branch banks all over Pune.
The project involved the design of a bank counter along with conference rooms, strong rooms, manager’s cabin, server room and adequate toilet facilities and other requirements. Additionally, space was to be provided in the building for future expansion.
Detailed drawings of plans, elevations, sections along with working drawings of for the structural system and toilet block were submitted for final presentation. A model showing the basic structure of the bank was also submitted.
+AD-III: BANK
Plan of Ground Floor
Section
Elevation
Site Plan Plan of 1st Floor
Center-line Plan
Working Drawing plan of Toilet
Model
+AD-IV: MULTI ACTIVITY CENTER
Project Description:
This is first of the two projects that I am currently working on for my 4th year Architectural Design portfolio. The project is based on a live site after careful consultation and analysis of the current Development Plan for Pune. Case studies for the various aspects of the project were carried out in Pune and Mumbai.
The project comprises of 6 major activity centers which are namely, 1. A municipal Ward Office, 2. A corporate office (G+8 structure), 3. Drama theatre for 750 people, 4. An Art gallery, 5. A Public Library and 6. A restaurant for 70 to 100 people.
The project is currently under progress.
+AD-IV: MULTI ACTIVITY CENTER
+AD-IV: MULTI ACTIVITY CENTER
Ground Floor Plan of Drama theatre and Restaurant
Section of Drama theatre and Restaurant
1st Floor Plan of Drama theatre and Restaurant
Views of Drama theatre and Restaurant
+AD-IV: MULTI ACTIVITY CENTER
ELEVATIONs
SOUTH SIDE ELEVATION
EAST SIDE ELEVATION WEST SIDE ELEVATION
NORTH SIDE ELEVATION
+AD-IV: MULTI ACTIVITY CENTER
Ground Floor Plan of Art Gallery and Library
Section of Art Gallery and Library
1st Floor Plan of Art Gallery and Library Roof Plan of Art Gallery and Library
+AD-IV: MULTI ACTIVITY CENTER
Workspace (200)
Conference (100)
Toilet
Toilet
Print Room
Reception/ Waiting Area
A.H.U
Workspace (200)
Server Room
Pantry
Tiffin Space
Manager's Room
Store
Lobby Floor Plan of Corporate Office
Common Floor Plan of Corporate Office
Toilet
Toilet
A.H.U
Entrance Foyer
Security Desk
Lobby Cafe
Basement (G-1) Parking Plan of Corporate Office
Basement (G-2) Parking Plan of Corporate Office
+ East Side Elevation
South Side Elevation
West Side Elevation
North Side Elevation
+
Views of Corporate Office
+AD-IV: ECO- HOUSING PROJECT
Project Description:
This is second of the two projects that I am currently working on for my 4th year Architectural Design portfolio. The project is based on a live site after careful consultation and analysis of the current Development Plan for Pune. Case studies for the various aspects of the project were carried out in Pune in various prominent housing societies like Raheja, Paranjape and Ganga.
The project comprises of a eco housing society for 1,000 tenements (5,000 people) subdivided into 1/2/3 BHK apartments, Row houses and bungalows based on the economic viability of the project.
The project is currently under progress.
+AD-IV: ECO- HOUSING PROJECT
Zoning Layout of Site
162.0
54.0
147.1
29.0
77.0
78.9
154.0
77.0
29.0
121.0 121.0
29.077.1
121.0 135.2
45.1
62.0
35.035.0
59.462.0
35.0 35.0
54.5
35.0
124.4
124.035.0
14.5 123.3
123.7
14.5
12.116.4 11.7 7.4
13.06.0
6.0
11.7
6.0
11.5
104.6
41.0
30 mt w id e r o a d
30 mt w id e g r een bel t
r iv er
ser v ic es
o pen spa c eo pen spa c e
o pen spa c e 350.0
103.9181.7
371.4
271.2
l o w r ise r esid en t ia lbu i l d in g s
n y a t i empir e
Pa r k a r ea
o pen spa c eo pen spa c e 30 mt w id e r o a d
30 mt w id e g r een bel t
r iv er
ser v ic es
o pen spa c eo pen spa c e
o pen spa c e
l o w r i se r esid en t ia lbu i l d in gs
n y a t i empir e
Pa r k a r ea
o pen spa c eo pen spa c e
Site layout
+AD-IV: ECO- HOUSING PROJECT
Common floor layout of 1 BHK apartment building
1 BHK APARTMENTS VIEWS
FRONT ELEVATION
SIDE ELEVATION
+AD-IV: ECO- HOUSING PROJECT
Common floor layout of 2 BHK apartment building
2 BHK APARTMENTS VIEWS
FRONT ELEVATION
SIDE ELEVATION
+AD-IV: ECO- HOUSING PROJECT
Common floor layout of 3 BHK apartment building
3 BHK APARTMENTS VIEWS
FRONT ELEVATION
SIDE ELEVATION
+
u p k it c h en /l i v in gr o o m8.0x 6.7
En t r y3.5x 2.1
po r c h4.4x 2.2
mast erBed r o o m4.6x 3.6
ba l c o n y3.3x 1.5
t o il et3.2x 2.8
bed r o o m3.6x 3.6
t o il et1.5x 2.6
u p k it c h en /l i v in gr o o m8.0x 6.7
En t r y3.5x 2.1
po r c h4.4x 2.2
u pk it c h en /l i v in gr o o m8.0x 6.7
En t r y3.5x 2.1
po r c h4.4x 2.2
u pk it c h en /l i v in gr o o m8.0x 6.7
En t r y3.5x 2.1
po r c h4.4x 2.2
u p k it c h en /l i v in gr o o m8.0x 6.7
En t r y3.5x 2.1
po r c h4.4x 2.2
u p k it c h en /l i v in gr o o m8.0x 6.7
En t r y3.5x 2.1
po r c h4.4x 2.2
u pk it c h en /l i v in gr o o m8.0x 6.7
En t r y3.5x 2.1
po r c h4.4x 2.2
u p k it c h en /l i v in gr o o m8.0x 6.7
En t r y3.5x 2.1
po r c h4.4x 2.2
mast erBed r o o m4.6x 3.6
ba l c o n y3.3x 1.5
t o il et3.2x 2.8
bed r o o m3.6x 3.6
t o il et1.5x 2.6
mast erBed r o o m
4.6x 3.6ba l c o n y
3.3x 1.5
t o il et3.2x 2.8
bed r o o m3.6x 3.6
t o il et1.5x 2.6
mast erBed r o o m
4.6x 3.6ba l c o n y
3.3x 1.5
t o il et3.2x 2.8
bed r o o m3.6x 3.6
t o il et1.5x 2.6
mast erBed r o o m4.6x 3.6
ba l c o n y3.3x 1.5
t o il et3.2x 2.8
bed r o o m3.6x 3.6
t o il et1.5x 2.6
mast erBed r o o m4.6x 3.6
ba l c o n y3.3x 1.5
t o il et3.2x 2.8
bed r o o m3.6x 3.6
t o il et1.5x 2.6
mast erBed r o o m4.6x 3.6
ba l c o n y3.3x 1.5
t o il et3.2x 2.8
bed r o o m3.6x 3.6
t o il et1.5x 2.6
mast erBed r o o m
4.6x 3.6ba l c o n y
3.3x 1.5
t o il et3.2x 2.8
bed r o o m3.6x 3.6
t o il et1.5x 2.6
AD-IV: ECO- HOUSING PROJECT
Ground floor plan of Row Houses
First floor plan of Row Houses
Roof plan of Row Houses
First floor plan of Row House
Ground floor plan of Row House
Roof plan of Row House
+AD-IV: ECO- HOUSING PROJECT
Ground floor plan of bungalow
po r c h2.1x 4.6
l iv in gr m3.9x 4.6
K it c h en /d in in g3.8x 4.6
g a r a g e6.4x 6.0
u p
u t i l i t y
d n
bedr o o m3.1x 2.9
g u estr o o m4.6x 4.3 t o i l et
3.4x 2
ma st erba t h4.2x 2.1
M a st erbed r m5.3x 2.85
+3.6
First floor plan of bungalow
Roof plan of bungalow
+ Views of the interiors of a sample 1bhk Apartment
+
LAND SCAPE DESIGN
+SLOPE ANALYSIS
MASTER PLAN
MASTER PLAN
SECTIONS
+SHADOW ANALYSIS
SCIOGRAPHY ON 22ND DECEMBERSCIOGRAPHY ON 21ST MARCH
+HISTORY SKETCHES
+RENDERING
STUBBING
WATER COLOUR
INKING
PENCIL COLOUR
+GRAPHICS
SCIOGRAPHY AND
PERSPECTIVE
+
BUILDING CONSTRUCTION AND TECHNOLOGY
+BUILDING TECHNOLOGY
ALUMINIUM WINDOWS
SUSPENDED TIMBER CEILING
SLIDING AND FOLDING DOORS
STEEL TRUSSES
+BUILDING TECHNOLOGY
RCC BEAMS
FURNITURE
RCC SLAB
CBRI