Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
299’ PLATFORM SUPPLY VESSEL
EDISON CHOUEST OFFSHOREM/V ROGER WHITEM/V ROGER WHITE
U.S. MEASUREMENTSDIMENSIONS 299’ X 60’ X 24’Draft (Lightship): 7’10”Draft (Loadline): 19’1”Clear Deck: 222’ x 50.5’Clear Deck Area: 11,211 ft2
Deck Strength: 1,200 lb/ft2
Deadweight Tonnage: 4,816.56 LT
CAPACITIES Ship’s Fuel Oil: 149,424.6 gallonsRig’s Fuel Oil: 262,979 gallonsBallast/Rig Water: 325,090.3 gallonsPotable Water: 34,826.2 gallonsDry Bulk: 12,444 ft3 @ 80 psiLiquid Mud: 13,647.4 barrelsMethanol: 1,000.84 barrels
METRIC EQUIVALENTS91.14 m X 18.29 m X 7.32 m2.39 m5.82 m67.67 m x 15.40 m1,042 m2
5,858 kg/m2
4,893.8 MT
565.63 m3
995.48 m3
1,230.6 m3
131.83 m3
352.37 m3 @ 5.5 bars2,169.76 m3
159.12 m3
MACHINERY Main Engines: Two (2) C-280-8 CAT Diesels, 7,200 bhpBow Thrusters: One (1) Brunvoll 1249 Tunnel (1,350 kW)
One (1) Rolls Royce Swing-down (1,160 hp)Stern Thrusters: Two (2) Brunvoll FU63 LTC 1550 (800 kW)Speed: 15 knotsGenerators: Two (2) x 910 kW, One (1) x 175 kW Emergency
SPECIAL FEATURES Ship Motion: Two (2) Passive Type Anti-Roll Tanks,
Bilge KeelsSteering: Two (2) Independent High Lift Rudder SystemsPositioning: DP 2Deck Crane: One (1) x 3,100 lb CapacityFirefighting: Two (2) x 1,200 m3/hr Monitors,
Water Spray System
ACCOMMODATIONS: 29
CLASSIFICATION ABS Maltese Cross A1 (Hull)ABS Maltese Cross AMS (Machinery)ABS LoadlineABS Subchapter L (OSV) and I (Cargo)ABS DP-2ABS FiFi 1USCG Oil Recovery Vessel AuthorizationSOLAS, MARPOL
LIFESAVING EQUIPMENT Four (4) x 25-Man Inflatable Life RaftsTwo (2) x 10-Man Inflatable Life RaftsOne (1) x RSQ 450A Rescue Boat with DavitOther gear as required by USCG/SOLAS
REGISTRATION: Hull #265 Vessel Type: Platform Supply Vessel Year Built: 2012, Gulf Ship
08/13M/V ROGER WHITEM/V ROGER WHITE Specifications
Brine/D
rill Water
Ballast
/Fresh W
ater
Fuel O
ilLiqu
id Mud
Auxiliar
yDry
Bulk
Dirty O
ilAnt
i-Roll
Potable
Water
Sewage
Void/Co
fferdam
Wash W
ater
Liquid M
ud Cle
aning
Methan
ol
Fuel O
il Overf
low
All specifications subject to change.
Schematics
UP
LAUNDRY
CASING
CASING
LOU
NG
E AR
EA
HEAD
FIRE SUPPRESSIONROOM
PAINTLKR
DN
VENTTRUNK
VENTTRUNK
WIR
EWAY
LKR BELOWSTAIR
MES
S AR
EA
A/C
CHAINLKR
CHAINLKR ST
ORA
GE
AREA
STORAGEABOVE
FREE
ZER
CO
OLE
R
DRY PROV
GALLEY
DISPOSE SERVE
2 MEN
4 MEN
HEAD
WIREWAY
MAIN DECK
CO
FFER
DAM
CO
FFER
DAM
POTABLE WATER
FUEL
OIL
DAY
TAN
K
FUEL
OIL
STLN
TAN
K
SPAR
ESP
ARE
MN
EN
G C
AT O
IL
SEWAGE
BALLAST/RIG WATER
BALLAST/RIG WATER
BALLAST/RIG WATER
WASHWATERC
OFF
ERD
AM
CO
FFER
DAM
POTABLE WATER
FUEL
OIL
DAY
TAN
K
FUEL
OIL
STLN
TAN
K
SDT
HYD
OIL
WIN
DLA
SS O
IL
AUX
ENG
CAT
OIL
DRY BULK DRY BULKDRY BULK DRY BULK
LIQUID MUDLIQUID MUD LIQUID MUD LIQUID MUD LIQUID MUD
LIQUID MUDLIQUID MUD LIQUID MUD LIQUID MUD LIQUID MUD
RIG FUEL RIG FUEL RIG FUEL RIG FUEL RIG FUEL
RIG FUEL RIG FUEL RIG FUEL RIG FUEL RIG FUEL
BALL
AST/
RIG
WAT
ERBA
LLAS
T/RI
G W
ATER
BALLAST/RIG WATER
BALLAST/RIG WATER
BALLAST/RIG WATER
BALLAST/RIG WATER
STEE
RIN
G C
OM
PART
MEN
T
STEE
RIN
GO
IL
ANTI
-RO
LL/R
IG W
ATER
ANTI
-RO
LL/R
IG W
ATER
VEN
T TR
UN
K AB
OVE
VEN
T TR
UN
K AB
OVE
VEN
T TR
UN
K AB
OVE
VEN
T TR
UN
K AB
OVE
EQUIPMENT AREA
UPDN
A/C
PORT SHAFTGEN SWITCH GEAR
STBD SHAFTGEN SWITCH GEAR
PORTTRANSITIONS
STBDTRANSITIONS
GEN
CO
NTR
OL
PAN
EL
DRY BULK
CONTROL ROOM
VOID
WASHWATER
BALL
AST/
RIG
WAT
ERBA
LLAS
T/RI
G W
ATER
STEE
RIN
GO
IL
BALLAST/RIG WATER
BALLAST/RIG WATER
BALLAST/RIG WATER
BALLAST/RIG WATER
DN
SPARE OIL(BELOW ANTI-ROLL TANK)
CPP SHAFT OIL(BELOW ANTI-ROLL TANK)
SPARE OIL(BELOW ANTI-ROLL TANK)
GEAR(BELOW ANTI-ROLL TANK)
RIG FUEL RIG FUEL RIG FUEL RIG FUEL RIG FUEL
LIQUID MUDLIQUID MUD LIQUID MUD LIQUID MUD LIQUID MUD
RIG FUEL RIG FUEL RIG FUEL RIG FUEL RIG FUEL
LIQUID MUDLIQUID MUD LIQUID MUD LIQUID MUD LIQUID MUD
CO
FFER
DAM
CO
FFER
DAM
POTABLE WATER
FUEL
OIL
DAY
TAN
K
FUEL
OIL
STLN
TAN
K
SPAR
ESP
ARE
MN
EN
G C
AT O
IL
SEWAGE
CO
FFER
DAM
CO
FFER
DAM
POTABLE WATER
FUEL
OIL
DAY
TAN
K
FUEL
OIL
STLN
TAN
K
SDT
HYD
OIL
AUX
ENG
CAT
OIL
BALLAST/RIG WATER
BALLAST/RIG WATER
BALLAST/RIG WATERDRY BULK DRY BULKDRY BULK DRY BULKUP
UP
MISC HYD OIL (BELOW)WINDLASS OIL (ABOVE)
UP
UP
UP
DRY BULK
ABOVE TANK TOP
VOID
BALLAST/RIGWATER
BALLAST/RIGWATER
SWIN
G D
N H
YD O
IL
BALL
AST/
RIG
WAT
ER
BALL
AST/
RIG
WAT
ER
BALL
AST/
RIG
WAT
ER
SHIP
’S F
UEL
SHIP
’S F
UEL
RIG FUELRIG FUEL
RIG FUEL RIG FUEL
RIG FUELRIG FUEL
SHIP’S FUEL SHIP’S FUEL
BALLAST/RIG WATER
BALLAST/RIG WATER
BALLAST/RIG WATER
BALLAST/RIG WATER
RIG FUEL RIG FUEL RIG FUEL
RIG FUEL RIG FUEL RIG FUEL
METHANOL METHANOL
METHANOL METHANOL RIG FUEL
CO
FFER
DAM
CO
FFER
DAM
NLS WASH WATER
RIG FUEL
SHIP’S FUEL
SHIP’S FUEL
FOOVERFLOW
DIRTY OILBA
LLAST/
RIG W
ATER
BELOW TANK TOP
All specifications subject to change.
M/V ROGER WHITEM/V ROGER WHITEC
OFF
ERD
AM
CASING
CASING
EMERGGEN RM
SWITCHBOARD
UP
UP DN
DN
CO
FFER
DAM
ELEV
ATED
FUEL
TAN
K
VENTTRUNK
VENTTRUNK
WIR
EWAY
BATTERYROOM
HEADHEAD
HEADSTORAGEROOM
A/C
HVACROOM
2 MEN
4 MEN
4 MEN2 MEN2 MEN
DECK 01
DN
CASING
CASING
A/C
A/C
HEAD
A/C
DN
DECK 03
DN
UP
CASING
CASING
CAPTAIN
VENTTRUNK
VENTTRUNK
WIR
EWAY
ELECTRONICEQUIPMENT
ROOM
HEAD HVACROOM
A/C
HEAD
2 MEN
HEAD RESERVEENGINEER(2 MEN)
CHIEFENGINEER(2 MEN)
2 MEN
UP DN
DECK 02
CASING
CASING
DECK 04
EDISON CHOUEST OFFSHORE16201 East Main StreetCut Off, LA 70345-3804
985-601-4444 Fax: 958-632-2282www.chouest.com