MUSURUMILLI PROJECT Project cost : 207.00 cr Ayacut : 22643 ac TUNNEL MAIN CANAL 2.7 KM RESERVOIR MAIN CANAL HEAD SLUICE 2.7 mt X 1.6 mt LEFT EARTH DAM NON OVER FLOW DAM RIGHT EARTH DAM SPILL WAY 86.5 mt DYKE 138 mt SEETHAPALLI VAGU EBD VAGU PICKUP WEIR 15 km 35. 4 km MAIN CANAL MAIN CANAL HEADREGULATOR EPC Package Works under progress

MUSURUMILLI PROJECT Project cost : 207.00 cr Ayacut : 22643 ac TUNNEL MAIN CANAL 2.7 KM RESERVOIR MAIN CANAL HEAD SLUICE 2.7 mt X 1.6 mt LEFT EARTH DAM

Embed Size (px)

Citation preview

Page 1: MUSURUMILLI PROJECT Project cost : 207.00 cr Ayacut : 22643 ac TUNNEL MAIN CANAL 2.7 KM RESERVOIR MAIN CANAL HEAD SLUICE 2.7 mt X 1.6 mt LEFT EARTH DAM

MUSURUMILLI PROJECT

Project cost : 207.00 cr

Ayacut : 22643 ac

TUNNEL

MAIN CANAL 2.7 KM

RE

SE

RV

OIR

MAIN CANAL

HEAD SLUICE 2.7 mt X 1.6 mt

LEFT EARTH DAM

NON OVER FLOW DAM

RIGHT EARTH DAM

SPILL WAY 86.5 mt

DYKE 138 mt

SEETHAPALLI VAGU

EBD VAGU

PICKUP WEIR

15 km

35.4 km

MAIN CANAL

MA

IN C

AN

AL

HEADREGULATOR

EPC Package Works under progress

Page 2: MUSURUMILLI PROJECT Project cost : 207.00 cr Ayacut : 22643 ac TUNNEL MAIN CANAL 2.7 KM RESERVOIR MAIN CANAL HEAD SLUICE 2.7 mt X 1.6 mt LEFT EARTH DAM

1 PROJECT PROFILE : Across Seethapallivagu

2 Administrative Sanction :G. O. Ms. No. 204, I & CAD, Dt: 31-12-2004 for Rs. 207.00 Crores

3 No. of EPC Packages : 2 Nos

4 Agreement value of 2 packages : 118.72 Crs.

5Budget provision for 2006-07

: Rs.33.00 Crs.

6Expenditure of the project

2004 – 05 : Rs. 11.88 Crs.

2005 – 06 : Rs. 21.59 Crs.

Cum. Exp. : Rs. 33.47 Crs

8 Ayacut New ayacut : 22,643 acres

9 Land Acquisition

Required : 3633 acres

Acquired : 855 acres

10 Forest Land : 0.85 hectares Govt. of AP have accorded permission vide G.O.Ms.No.119, Dt.31-10-05 for diversion of forest land

MUSURUMILLI PROJECT

Page 3: MUSURUMILLI PROJECT Project cost : 207.00 cr Ayacut : 22643 ac TUNNEL MAIN CANAL 2.7 KM RESERVOIR MAIN CANAL HEAD SLUICE 2.7 mt X 1.6 mt LEFT EARTH DAM

11 Mob. Advance (Rs. in Crores) Paid Recovered

2004-05 :5.85 --

2005-06 : 5.35 2.22

Total : 11.20 2.22

MUSURUMILLI PROJECT