7/28/2019 Multiple Activity Chddart http://slidepdf.com/reader/full/multiple-activity-chddart 1/7 Multiple activity chart Activities of more than one item (worker,machine or equipment) are recorded on a time scale to show their relationship Objectives  To determine the period of idleness on the part of men and machines  To determine the number of machines which an operator should be able to look after

Multiple Activity Chddart

Embed Size (px)

Citation preview

Page 1: Multiple Activity Chddart

7/28/2019 Multiple Activity Chddart

http://slidepdf.com/reader/full/multiple-activity-chddart 1/7

Multiple activity chart

• Activities of more than one item(worker,machine or equipment) are recordedon a time scale to show their relationship

• Objectives•  To determine the period of idleness on the part

of men and machines

 To determine the number of machines whichan operator should be able to look after

Page 2: Multiple Activity Chddart

7/28/2019 Multiple Activity Chddart

http://slidepdf.com/reader/full/multiple-activity-chddart 2/7

• In organising teams of workers onmass production work

 To determine the number of workersnecesssary to perform a job involvingteam work

Page 3: Multiple Activity Chddart

7/28/2019 Multiple Activity Chddart

http://slidepdf.com/reader/full/multiple-activity-chddart 3/7

Flow diagram

•  The process charts show only the sequenceof activities in a process but does notindicate the path of movement of materials

and men on the shop floor•  The flow diagram can be used to anlyse the

movement of materials to study

i. the different plant layouts and selectoptimum layout

Page 4: Multiple Activity Chddart

7/28/2019 Multiple Activity Chddart

http://slidepdf.com/reader/full/multiple-activity-chddart 4/7

ii. Extent of traffic over the differentroutes of the plant

iii.Identify extent of back tracking,cross traffic and obstacles encounteredduring the movement of material

iv.Study the activity relationshipbetween departments/sections/workcentres

Page 5: Multiple Activity Chddart

7/28/2019 Multiple Activity Chddart

http://slidepdf.com/reader/full/multiple-activity-chddart 5/7

• Steps of flow diagram

• i. draw to scale the plan of work area

• ii. Mark the relative position of machines, store and inspection booth

• iii. From different observations draw

the actual movement of materials orthe worker on the diagram andindicate direction of movement

Page 6: Multiple Activity Chddart

7/28/2019 Multiple Activity Chddart

http://slidepdf.com/reader/full/multiple-activity-chddart 6/7

• Different colours are used to identifydifferent types of movements

eg : worker with empty trolley andworker with loaded trolley

Page 7: Multiple Activity Chddart