Upload
vuongnhu
View
257
Download
10
Embed Size (px)
Citation preview
Multi Batch per Order Management
Page 1 © 2014 GORBIT GmbH
Multi Batch per Order – Management
GORBIT Rapid Deployment Solution
monitor and manage scenarios with
multiple batches in one production order
Multi Batch per Order Management
Page 2 © 2014 GORBIT GmbH
What is GORBIT Multi Batch per Order
Management?
GORBIT Multi Batch per Order Management
offers a solution for scenarios in those
several batches are produced in one
production order.
Do any of these issues sound familiar?
How can I manage flexible batch sizes from the MES
(Manufacturing Execution System) in SAP ERP?
How can I produce multiple batches in one production
order in SAP ERP in order to guarantee a clear allocation
between input and output batches?
Multi Batch per Order Management
Page 3 © 2014 GORBIT GmbH
GORBIT Multi Batch per Order
Allowing flexible
production orders
Less production orders in
SAP ERP reduce the
administration expense
Only extension,
no modification of
SAP ERP Standard
Batch process
Solution Highlights
Multi Batch per Order Management
Page 4 © 2014 GORBIT GmbH
Example: Transaction CO15 - Batch 1 and Batch 2 are produced with one
production order
Input Materials Output Materials
Production
Order 6003669
Via Material Documents confirmed:
� Batch A and Batch B are consumed for Batch 1
� Batch B and Batch C are consumed for Batch 2
Batch A
Batch B
Batch C
Batch 1
Batch 2
Multi Batch per Order Management
Page 5 © 2014 GORBIT GmbH
Batch
A
Input Materials
Batch
1
Output Materials
Problem: Batch Where Used List MB56 shows
Production
Order 6003669
Batch
B
Batch
C
Batch
A
Batch
B
Batch
C
Batch
2
Problem:
SAP Standard Batch-Where-Used List (MB56) shows incorrectly that Batch A,B and C are used for Batch 1
and Batch 2, even if Batch A is not consumed in Batch 2, just as Batch C is not consumed in Batch 1
Multi Batch per Order Management
Page 6 © 2014 GORBIT GmbH
Batch A
Batch B
GORBIT Solution:
Input Materials
Batch C
Batch 1
Output Materials
GORBIT
SOLUTION
Production
Order 6003669
Batch 2
GORBIT Solution Multi Batch Evaluation displays
the Batch Where- Used List correctly
� Batch A and Batch B are consumed in Batch 1
� Batch B and Batch C are consumed in Batch 2
Multi Batch per Order Management
Page 7 © 2014 GORBIT GmbH
Technical Solution - GORBIT
Materials Management:
MIGO, MB1A and MB1C
Production Management:
CO11, CO11N, CO15,
COR6, COR6N, and CORK
Reprocessing
Management:
COGI, MBST, CO13 and
CORS
BADI Methods
GORBIT
BADI
Methods
GORBIT
Interim
Database
GORBIT
Program
GORBIT
(Event)
Database
CHVW_INC
Batch
Where-
Used List
Advantages of GORBIT Multi Batch per Order
MB56:
Analyze
Batch
Where-
Used
List
Features Multi Batch per Order SAP Standard
Correct display in batch where used list (MB56)
Mapping between input and output batches creates
entries in SAP Standard Table CHVW_INC
Supported transactions Materials management: MIGO, MB1A, MB1C, MB31
Production: CO11, CO11n, CO15, COR6, COR6n, CORK
Reprocessing: COGI, MBST, CO13, CORS
YES NO
YES NO
controlled by event
Multi Batch per Order Management
Page 8 © 2014 GORBIT GmbH
Package
GORBIT-
NamespaceSAP\trans\cofiles
SAP\trans\data
Import
Transport -
Order
Implementation
Batch Where-
Used List
Technical Solution - Implementation
Transport-
Queue
DB
GORBIT
Package
GORBIT-Multi
Batch per Order
SAP
STMS
SAP - Administrator
Customizing
Standard
Manage
GORBIT-
Customizing-
Table
DB
GORBITDatabase
Management
GORBITDefine
manufacturing
control profile
SAP - User
Implementation and education: One day
Effort: one hour Effort: one hour
Multi Batch per Order Management
Page 9 © 2014 GORBIT GmbH
For more details about the solution and the service offers, please contact:
Juergen Beese
Managing Director
GORBIT GmbH
Office +49 (0) 201 22 03 78-0
Mobile +49 (0) 172 200 41 07
Mail [email protected]
www.gorbit.de
Sebastian Wettengl
Consultant
GORBIT GmbH
Office +49 (0) 201 22 03 78-0
Mail [email protected]
www.gorbit.de