Mud Mixing Plant from start of fabrication to installation onboard MV Trinity Supporter
(Singapore) End client NIKO IndonesiaThis was a capital sale project not a rental project
2250 bbl Tank capacity with separate 250 bbl Brine mixing tank 2 x 585Kw Generators1 x air conditioned Circuit Breaker Module12 x mud guns20 x 11Kw Agitators3 x 8 x 6 x 14 Centrifugal Pumps2 x Big Bag Mixer2 x Hi - Ride Mixers1 x CD 500 Centrifuge2 x 9.2Kw Conveyors1 x Mud Lab1 x Storage Container
MV Trinity Supporter Deck during survey
Start of Fabrication after design acceptance
Day 1 start of installation at Loyang Offshore Base Singapore
Installation
Installation of CD 500 Centrifuge
Installed mixer pumps / Pipe work / Lighting / Electrics prior to commissioning phase
Utilities: Brine / Sea water / drill water / mixing pump transfer lines and equalization upper and lower manifolds, conveyor for centrifuge solids
transfer to future cuttings box lay down area.
The top of tanks were designed to have a modular grated deck eliminating trip hazards for the operators all valves shafts were extended so the operators had easy access during
operation, all agitator starters were mounted on easy reach stands directly next to each agitator,
The centrifuge could take suction from any tank and discharge to any tank
Looking Forward to Aft with access stairs to Port and Starboard side of tanks and Starboard Aft view of the Centrifuge package / mixing and equalization manifolds
pictures taken prior to commissioning and hand over to client the final commissioning was carried out at Anchorage East Coast Bay Singapore.