95
1 MTR Feature Ads Installation Guideline for Contractor First Edition June 2007

MTR Feature Ads Installation Guideline for Contractor · 3 R S S C , U I &•F 香港勞工法例,工廠及工業經營條例,建築地盤(安全)規例 • Construction Safety Training

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

  • 1

    MTR Feature Ads Installation Guideline for Contractor

    First Edition June 2007

  • 2

    Content:

    1. General Safety Requirement working in MTR stations/ facilities於地下鐵路工作時之基本安全要求

    2. Procedure For Installation of Feature Ads按裝廣告主要之程序

    3. Use of Materials物料之使用

    4. Feature Ads ( different format) Requirement不同形式廣告按裝之要求

  • 3

    • F&IU, CSSR香港勞工法例,工廠及工業經營條例,建築地盤(安全)規例• Construction Safety Training Certificate平安咭• Personal Protective Equipment (PPE)個人保護裝備• Working Tools and Equipment工具• Hotwork熱作• Items not allowed to bring into MTR for installation地下鐵路工作時不能

    使用之工具• Electrical tools電器工具

    General Safety Requirement working in MTR stations/ facilities於地下鐵路工作時之基本安全要求

  • 4

    • For all feature Ads installation and/or modification and removal within the above mentioned area will be defined as construction work and will under the regulation of HKSAR, F&IU (Factory & Industrial undertaking) and Construction Site Safety Regulation (CSSR) will be enforced.所有於地下鐵路進行的廣告按裝均受香港勞工法例,工廠及工業經營條例,建築地盤(安全)規例作監管

    • All working staffs should have mandatory Basic Safety Training Certificate. ( Green Card) under Section 6BA(2) of the factories and industrial undertakings Ordinance Cap 59.所有於地下鐵路進行廣告按裝之人員必需為平安咭之持有人

    General Safety Requirement working in MTR stations/ facilities於地下鐵路工作時之基本安全要求

  • 5

    • Personal Protective Equipment個人保護裝備1. Safety Shoes – Studded sole, steel toe-cap safety shoes, highly

    resistant to abrasion安全鞋必需為防滑鞋底,鋼頭鞋面和防腐蝕2. Reflective Vest 反光衣3. Safety Helmet安全帽4. Others: whenever applicable其他裝備

    General Safety Requirement working in MTR stations/ facilities於地下鐵路工作時之基本安全要求

  • 6

    • All works related to work at height or use of scaffold tower must be complied with (F&IU) and SCCR Part 5A所有高空工作什使用工作台需按照香港勞工法例,工廠及工業經營條例,建築地盤(安全)規例進行

    • Equipment - Ladder 纖維梯• Ladder ( only fibre ladder allowed) and must be in safe working

    condition地下鐵路範圍內必須使用纖維梯• With inspection label ( every 6 months) 纖維梯必須最少每6個月檢

    查一次• Ladder is used for access only and never take as working

    platform at a height of 2 metres or more unless proper fall protection equipment is used纖維梯不得作為工作台, 而在2米以上工作必需採取有效之防止下墮措施(如安全繩)

    General Safety Requirement working in MTR stations/ facilities於地下鐵路工作時之基本安全要求

  • 7

    Equipment – Ladder 纖維梯

    General Safety Requirement working in MTR stations/ facilities於地下鐵路工作時之基本安全要求

  • 8

    Equipment – LadderWith Inspection label( with valid date andWith inspector’s signature)• 纖維梯必須最少每6

    個月檢查一次及貼上檢查標籤(標籤上需要注明檢查日期)

    General Safety Requirement working in MTR stations/ facilities於地下鐵路工作時之基本安全要求

  • 9

    Equipment – Reflective Vest 反光衣

    General Safety Requirement working in MTR stations/ facilities於地下鐵路工作時之基本安全要求

  • 10

    Equipment – Safety helmetWith Inspection label安全帽

    Inspection label, ( with valid date and with inspector’s signature)檢查標籤(標籤上需要注明檢查日期)

    General Safety Requirement working in MTR stations/ facilities於地下鐵路工作時之基本安全要求

  • 11

    Equipment – Scaffolding and Work at Height

    • Only properly trained workmen with adequate experience and under the supervision of a competent person shall erect, alter and dismantle scaffolds按裝,修改及拆除工作台必須為合資格人士

    • Ensure scaffold have been inspected by competent person with relevant statutory form 5 issued to certify the good and safe working condition for using工作台使用前必須有合資格人士檢查及簽署,方可使用

    • Workers should move within the guarded working platform area and no over body extension at works are allowed.工作人員在工作台不得將身體誇離工作台範圍使用

    • Workers working on scaffold must wear anchored safety belt.工作人員在工作台必須安全繩及扣在安全位置

    • Workers must wear appropriate PPE such as safety shoes, safety helmets and protective gloves when needed.工作人員在工作台必須穿著個人保護裝備

    General Safety Requirement working in MTR stations/ facilities於地下鐵路工作時之基本安全要求

  • 12

    Hot Work 熱作• No hot work is recommended during installation, all items shall be

    pre-fabricated and install/fix onto designated area only.不鼓勵熱作,特殊廣告製作應為製成品,現場應只為按裝

    • Any hot work need to apply in advance and subject to approval and additional charge.現場熱作需要預先申請及批准後,方可進行,而會有額外收費

    Items not allowed bring into MTR• Danger Goods ( category 1-10) 危險品• High Inflammable items ( thinner)易燃物品• Items will release toxis gas during combustion燃燒時會發出有毒氣

    體之物品

    General Safety Requirement working in MTR stations/ facilities於地下鐵路工作時之基本安全要求

  • 13

    Electrical Items電氣用品• Must comply with IEC Standard, BS Standard必須符合IEC和BS標準• Electrical Appliance must have, IEC60335 together with CE cert• LCD, Plasma TV must have IEC 60065 with CE cert• Lighting must have type test certificate EN60598 and CE cert.• Defective socket & extension cord cannot be used損壞之插座和拖板不得

    使用

    MTR station and facilities: 240V Single phase/ 50 Hz地下鐵路供電設施為240伏特

    General Safety Requirement working in MTR stations/ facilities於地下鐵路工作時之基本安全要求

  • 14

    Procedure of installation of Feature Ads特別型式廣告按裝程序

    • Site inspection and measurement現場檢查及度尺• Method Statement and Fixing Drawing施工程序文件及施工圖則• Material Submission施工物料呈交• JCDecaux Competent Person德高貝登人員• On site working team現場工作隊• Job Briefing, Safety Briefing工作簡報,安全簡報• Installation按裝流程• Completion of job and sign off完工及注銷

  • 15

    Site inspection and measurement現場檢查及度尺

    • All contractors are complusory to have a site inspection and measurement prior to the method statement and fixing drawing submission. All these activities can only be carried out at the non-traffic hours, and from Mon-Wed only. Contractor need to inform JCDecaux at least one working day in advance for such arrangement.承包商必須在特別型式廣告按裝前進行現場檢查及度尺,而檢查及度尺須於星期一至星期三進行,請於一個工作天前通知德高貝登

    • During the site inspection, shall made sure the following MTR facilities should NOT be covered, blocked during installation現場檢查及度尺請留意地下鐵路之設備將不會被阻擋

    • Hanging signages, clocks, wall mounted signages如指示牌,時鐘,掛牆指示牌等• Smoke detectors, ventilation shafts, sockets & Switches煙霧探測器,通風口,插蘇

    及開關掣• Fire hose reel and other emergency plungers消防喉及緊急掣

    Procedure of installation of Feature Ads特別型式廣告按裝程序

  • 16

    Site inspection and measurement現場檢查及度尺

    • While access doors and panels cannot be blocked, sticker need tohave die cut and the wordings shall be remained or relocated upon approval from MTR. ( SW – Switch board at the VE panel) 搪瓷板上之活門不可封蓋,必須沿邊整齊切割(包括鎖匙洞).而搪瓷板上之指示不得遮掩.除非有地鐵授權而將指示移動除外

    • If contractor not sure about the installation feasibility or items can be blocked or not, JCDecaux will provide technical assistance and need to be arranged in advance.如承包商不熟悉現場要求,德高貝登可提供技術支援

    Procedure of installation of Feature Ads特別型式廣告按裝程序

  • 17

    Method Statement

    • Written document to describe the location of work, scope of work, procedure of work, working team in charge, contact details & Material sample/ Structural calculation report or certificate ( if applicable) Also the statement shall mention the contractor shall be responsible the insurance and liability for their company’s staff and sub-ordinate and associate.施工程序文件要必須詳述工作地點,範圍,工作程序.聯絡人員資料.而文件必須列明有關第三者保險及責任保險之安排,而其他證明文件,報告或物料則在有需要時會要求提交.

    • Contact JCDecaux C/P prior to carry out installation施工程序文件必須列明承包商先要聯絡德高貝登人員而獲得批准後,方可施工

    • Safety briefing, Job briefing to working team, including sub contractor. On site working team PPE & working tools checking施工程序文件必須列明工作隊主管需向工作隊作工作簡報及安全簡報及工具檢查

    Procedure of installation of Feature Ads特別型式廣告按裝程序

  • 18

    Method Statement

    • Setting up working tools and Installation, progress monitoring工作隊主管需負責監督特別型式廣告按裝整個過程

    • Job completion, safety inspection 當特別型式廣告按裝過程完成後,須負責裝置是否安全及穩固

    • Report to JCDecaux C/P to sign off向德高貝登人員注消

    Procedure of installation of Feature Ads特別型式廣告按裝程序

  • 19

    Fixing Drawing施工圖則

    • Drawing to demonstrate the fixing details and use of material.施工圖則須清楚表達按裝方法及使用材料

    • Drawing should be clear and easy understanding, Dimension shall be mentioned within drawing圖則須簡易明白及標明尺寸

    • Installation location附有施工位置圖• Mock up of finished Feature Ads完工後的模擬圖• Use of material ( should match with the method statement)使用材

    料須注明• Method of fixing ( should clear demonstrate fixing details)按裝方法

    及程序須清楚表達

    Procedure of installation of Feature Ads特別型式廣告按裝程序

  • 20

    Material Submission施工物料呈交

    • All Materials used for installation will be requested to have a submission with material specification/ component and fire retardant rating.特別型式廣告會要承包商呈交物料及防火證明書以作批核

    • Decorative material: BS 476 part 7 class 1 (fire spread rate) , BS 6853 ( material use of passenger carrying train)一般物料須符合BS 476 part 7 class 1

    • Electrical material: Electrical Appliance must have, IEC60335 together with CE cert, LCD, Plasma TV must have IEC 60065 with CE cert, Lighting must have type test certificate EN60598 and CE cert. LSOH cable should be used for wiring.電器產品須符合EN60598及使用低煙無毒電線

    • Other type test certificate are subject to approval and will have longer lead time.其他安全認證需額外時間批核

    • Installation procedure: should follow electrical wiring regulation of EMSD code of practice.電力裝置須依照機電工程署指引按裝

    • For pre approved materials, please keep the invoice/ deliver note for checking upon request.批核之物料須保留單據以作檢查

    Procedure of installation of Feature Ads特別型式廣告按裝程序

  • 21

    JCDecaux Competent Person德高貝登人員

    • Represents JCDecaux Pearl & Dean Ltd as the on site person in charge.代表德高貝登之現場人員

    • Should contact JCDecaux Pearl & Dean Competent Person before installation.工作隊主管需向德高貝登之現場人員聯絡後方可進行按裝

    • JCDecaux C/P will perform an on site briefing before shipping in the material and carry out the installation德高貝登之現場人員會向工作隊簡報是日工作範圍

    • No installation shall be carried out without approval from JCDecaux Pearl & Dean C/P.沒有德高貝登之現場人員批准,不得進行按裝

    • JCDecaux C/P will check and verify the all the documents and qualification of the working team. To provide necessary information and assistance.德高貝登之現場人員會負責核對工作隊之資格及提供資訊及協助

    • Contact: Depot: 2750 9086, CM Yiu @9462 1489, C Wong @9121 5126,• Shall contact JCDecaux C/P after the installation completed, and need the

    approval of JCDecaux C/P before sign off.完成按裝後,須有德高貝登之現場人員批准,方可注消

    Procedure of installation of Feature Ads特別型式廣告按裝程序

  • 22

    On Site Working Team工作人員

    • Shall have a on site leader to represent the contractor’s company as well as the sub-contractor and their associate.工作隊必須有一名主管,代表主承包商及其外判承包商和所有工作人員

    • To be responsible for overall safety briefing, job briefing equipment checking before carry out the assignment.主管須於按裝前向所有工作人員進行工作簡報,安全簡報

    • To get the approval from JCDecaux C/P for installation and report to JCDecaux C/P after the installation job completed.主管作為承包商與德高貝登之現場人員之聯絡人,負責報開工及收工

    • To monitor whole installation process as well as quality, define any necessary safety measurements and ensure the safety of the construction site. Also protect any dangerous situations to person or property within the work area主管須全時間監督整個按裝工程及安排保護設施

    • To report to JCDecaux C/P any abnormal situation and/or damage of MTR facilities.向德高貝登之現場人員報告任何不尋常之情況及在安裝時之意外

    Procedure of installation of Feature Ads特別型式廣告按裝程序

  • 23

    Job Briefing and Safety Briefing工作簡報,安全簡報

    • To made sure every individual team member of working team well aware the escape route within station/ work site when there is fire or any other emergency situation.確定每位工作人員熟悉工作地方之逃生路線

    • To made sure every individual team member had equipped and have adequate knowledge to use the PPE and all working tools in safety manner.確定每位工作人員具備個人保護裝備及懂得正確使用有關工種之工具

    • To made sure every individual team member understand their scopeof work and do not infringe other location beyond their scope ofwork.確定每位工作人員清楚知道工作範圍及不得進行未得批准之活動

    • Report to the team leader when there is any abnormal situation and/or damage of MTR facilities向工作隊主管報告任何不尋常之情況及在安裝時之意外

    Procedure of installation of Feature Ads特別型式廣告按裝程序

  • 24

    Installation按裝程序

    • Prior to installation, team leader shall take photo to any damages at the installation location, If any damage are found after the campaign or removal, the remedial cost may be borne by the contractor.安裝前工作隊主管須檢查有關地方是否有花痕或損毀,并拍照作實.如在安裝或拆掉後發現,承包商或須負責有關維修費用

    • Working team shall, according to the approved method statement and fixing drawing, to carry out the installation work.工作隊須按照批准之安裝方法進行安裝

    • Working team shall, cease the installation if they did not bring/equipped with the approval material, tools. No works can be done until approved material, tools are brought on site.工作隊如在工程進行中發現材料/工具不足,必須停工.待有關材料/工具抵達後才可復工

    Procedure of installation of Feature Ads特別型式廣告按裝程序

  • 25

    Installation按裝程序

    • If any electrical installation involved, WR01 form will be signed by licensed electrician after job completed. Team leader shall be responsible for the submission to JCDecaux C/P.安裝如包括電力裝置,必須有持牌電工簽署WR01表格作實,工作隊主管須將表格交與德高貝登之現場人員

    • Working team shall not perform any other duty unless approved byJCDecaux in writing工作隊不得進行未經批准之工作

    Procedure of installation of Feature Ads特別型式廣告按裝程序

  • 26

    Completion and Sign off完工及注消

    • Working team leader shall, made sure the job is completed and installation is secure enough before asking JCDecaux C/P to counter check.工作隊主管須在安裝完成後檢查裝置之安全.方可要求德高貝登之現場人員復查

    • Shall clear the site and made sure no rubbish and working tools left behind.工作隊主管須清理現場垃圾及工具

    • During removal of Feature Ads installation, besides rubbish and working tools, residue of the sticker had to be removed as well當拆除特別型式廣告時,除垃圾外,膠漬須一并清理

    • Ceiling and wall drillings should made good after removal of Feature Ads installation天花或牆壁於安裝時如有鑽洞,須拆除時一并修補

    • Shall made sure all staffs and associates have left the MTR station/ facilities.拆除特別型式廣告後須確定所有物品及人員清走及離開

    Procedure of installation of Feature Ads特別型式廣告按裝程序

  • 27

    Use of Materials使用物料

    • Poster/Stickers 海報/膠貼紙• Forex board 纖維板• Polycarbonate纖維片• Vinyl畫布• Other Materials其他物料• Electrical Items電器用品

  • 28

    Poster Ads Production method

    • 4 sheet – Silk Screen Printing/ Digital printing on Yupo Paper (100grams), Digital printing on back lit film, Duratran

    • 12 sheet - Silk Screen Printing/ Digital printing on Yupo Paper (100 grams), Digital printing on back lit film, Duratran

    • Solus - Silk Screen Printing/ Digital printing on Yupo Paper, Digital printing on back lit film, Duratran, Digital printing on Vinyl ( please be reminded that some Solus require eyelet)

    • Escalator crown panel/ Broadview banner – Digital printing/ Offset printing on strawboard with gloss art paper, Digital printing on removable sticker with strawboard backing

    • Scrolling units ( 6 sheet, 12 sheet) - Digitial printing on Yupo paper*** Printing Materials will join will not be accepted***

    Use of Materials使用物料Poster Ads Material海報物料• Yupo paper• Back lit film• Duratran• Vinyl• Artpaper/ removable sticker

  • 29

    Sticker膠貼紙

    • Stickers – 3M 8648 with over laminate 3M 8936,• Stickers – 3M 3690 (rough surface station exterior)• Stickers – 3M Controltac Plus 162 w/ 3M over laminate 3645 ( floor sticker)• Stickers – Ritrama VJ 100M ( white sticker)• Stickers – Ritrama Rijet 90 Clear AVM ( clear sticker)• Stickers - Avery 7400• Stickers – Mactac 9800

    • For any in train format need to have over laminate, only 3M 8648 with over overlaminate 3M 8936 is allowed.如在車箱內使用膠貼紙透明保護膜,須使用3M8936透明保護膜

    Use of Materials使用物料Poster海報

    • Yupo Paper• Digital Print on back lit film• Duratran• Vinyl

  • 30

    Forex board 纖維板

    • Forex board shall have the BS 476 part 7 class 1 certificate

    Use of Materials使用物料

  • 31

    Vinyl畫布- Sioen (P7450, P7451, P7452, P7148)

    Use of Materials使用物料

  • 32

    Polycarbonate纖維片

    • Polycarbonate shall have the BS 476 part 7 class 1 certificate

    Use of Materials使用物料

  • 33

    Vinyl畫布-Starflex/ (SFF13, SBO 20)

    Use of Materials使用物料

  • 34

    Lenticular, Wood and other combustible material

    • Lenticular need to submit the material sample for approval.

    Use of Materials使用物料

  • 35

    Lenticular, Wood and other combustible material

    • No wood or plywood material will be allowed to use in MTR stations and facilities.

    • Other combustible materials will be subject based on approval• Fire retardant solution is NOT an exemption measurement for using

    the combustible material in MTR stations and facilities.

    Use of Materials使用物料

  • 36

    Electrical Items

    • Use of electrical appliances shall get the approval from JCDecaux Pearl & Dean C/P

    • MTR electricity output: 240V• All Electrical appliances must comply BS standard• LSOH cabling must be used.• Proper earthing is required

    Use of Materials使用物料

  • 37

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

    • MTR stations ( Concourse, passage, platform)• MTR stations ( Trackside)• MTR Exterior• MTR in train• MTR Property• Admiralty Billboard• WWH

  • 38

    General Requirement基本要求

    • The contractor shall maintain the Feature Ads advertising materials are in good appearance and conditions and shall rectify or remedy any defects immediately upon JCDecaux Pearl & Dean Ltd notification.承包商須負責維持特別型式廣告於良好狀況,德高貝登,在有需要時,通知承包商維修,已損毀之特別型式廣告

    • Contractors are responsible for removing sticker residue and made good the site immediately after the booking period.當展示期完成後,承包商須負責清潔(包括膠漬)及恢復於安裝前的面貌

    • No Silk Screen Printing for Feature Ads特別型式廣告不得使用絲印• No irritating smell material shall be used for Feature Ads含有難聞氣味之材

    料不得使用

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 39

    MTR stations ( Concourse, passage, platform)

    • Escalator Crown Panel立體電梯畫框(普通做法)

    • Total Extension length ( maximum 6 inches vertical and horizontal )總加闊度和高度,不得多6吋

    • On any single side, the maximum extension is 5”, and bottom sidemaximum is 1”闊度-左右每單邊最長為5吋,高度-高低

    • Total weight is limited to 4kg總重量不超過4kg

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 40

    5” 1”

    5”

    1”

    Escalator Crown Panel

    Card board extension less than 5”

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 41

    Inner side should have 3M VHB tape內框要有VHB雙面貼

    Tailor Made Crown Panel covering existing panel

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 42

    Inner side depth must be 35mm內框為35mm厚 35mm

    Inner part must use white color cardboard ( no grey board is allowed)內底框要有白咭紙

    An additional layer of white board (size: 490X690mm) must be place at the centre of the crown panel cover內底框要有一層490mmx690mm白咭紙

    Tailor Made Crown Panel covering existing panel

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 43

    At least 3 stripes of 1” VHB tape should be fully covered the backside whiteboard內底框要有3條1吋VHB雙面貼

    Bottom, right and left Inner edges ( grey board) , not necessary to apply VHB sticker內底框邊不需要VHB雙面貼

    All the grey board extension should be hollowed to reduce the weight立體電梯畫框需盡量減輕重量

    Tailor Made Crown Panel covering existing panel

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 44

    MTR stations ( Concourse, passage, platform)• Escalator Crown Panel• Total Extension ( all sides, more than 6 inches)• Additional layer of forexboard with VHB tape shall be applied.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 45

    Tailor Made Crown Panel (extension more than 6”) covering existing panel

    35mm cardboard

    Die cut 2mm forex board with VHB tape mounted on both side

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 46

    Standard Cardboard with Pop Up

    Cardboard extension max. 10mm/D

    Top and Bottom shall have enough rooms for insertion to the crown panel

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 47

    Standard Cardboard with Pop Up

    Staples should be used to secure Pop Up. A layer of clear sticker to protect the escalator frame

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 48

    Die Cut Design Tailor made escalator Crown panel

    Additional layer of L-shaped cardboard shall insert for additional support

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 49

    MTR stations ( Concourse, passage, platform)• 4 sheet, 12 sheet sticker extension• 4 sheet, 12 sheet covered with forex board• 4 sheet, 12 sheet covered by backdrop

    • No sticker shall be apply onto clear polycarbonate panel • Material ( e.g. metal tube/ aluminum tube) shall not have sharp

    edge(s) to avoid damages to the clear polycarbonate panel.• Recommend that metal tube/ aluminum tube wrapped by sticker• Access panel and doors shall be die cut or have accessible hinge

    door

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 50

    MTR stations ( Concourse, passage, platform)• POW, Solus POW, Pillars, Random Sticker, Sticker on glass pane, real

    time projection zone, Bulk head sticker

    • Clearance zone 0.5m to MTR facilities and 0.8m to other advertising• Wall shirting cannot be covered• Groove between VE panels and groove between mosaic tile wall and VE

    panel should have PC strip to underlay. • Super graphics at KOT station shall be properly protected• SW signage – Shall leave die cut or have permission to relocate in advance• Pillar’s wall mount signage and facilities can die cut• Pillar’s sticker signage cannot be removed• Pillar’s station name shall have breathing space• Glass pane, 1 panel’s clearance in between 2 advertising panels.• Only real time projection zone can apply sticker at the platform side of PSD

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 51

    MTR stations ( Concourse, passage, platform)• POW, Solus POW, Pillars, Sticker on glass pane, real time projection zone,

    Bulkhead sticker

    Groove between VE panels & groove between mosaic tile wall & VE panel

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 52

    Super graphics at KOT station shall be properly protected ( no sticker or glue candirect apply on super graphic)

    Wall Shirting

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 53

    80cm 50cm 50cm

    MTR stations ( Concourse, passage, platform)• Clearance zone 0.5m to MTR facilities and 0.8m to other advertising

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 54

    MTR stations ( Concourse, passage, platform)• SW signage – Shall leave

    die cut or have permission to relocate in advance

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 55

    MTR stations ( Concourse, passage, platform)• Pillar’s wall mount signage and facilities can die cut• Pillar’s station name shall have breathing space

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 56

    MTR stations ( Concourse, passage, platform)• Pillar’s sticker signage

    cannot be covered or removed

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 57

    MTR stations ( Concourse, passage, platform)• Glass pane, 1 panel’s clearance

    in between 2 advertising panels.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 58

    MTR stations ( Concourse, passage, platform)• Staircase, staircase sticker on floor, Floor sticker,

    balustrade

    • Staircase shall leave clearance at the non-slippery edge• All the walking guide path shall leave clearance• All the slope passage non-slippery strip must die cut• Balustrade safety sticker must leave 50% die cut, cannot be

    removed and remount onto the advertiser sticker, covered safety sticker must be properly protected. Emergency plunger and triangular safety message shall have 15cm clearance.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 59

    MTR stations ( Concourse, passage, platform)• Staircase shall leave clearance

    at the non-slippery edge (1 inch)

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 60

    MTR stations ( Concourse, passage, platform)• All the walking guide path shall leave

    clearance space

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 61

    MTR stations ( Concourse, passage, platform)• All the slope passage non-slippery

    strip must die cut

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 62

    MTR stations ( Concourse, passage, platform)

    • Balustrade safety sticker must leave 50% die cut, cannot be removed and remount onto the advertiser sticker, covered safety sticker must be properly protected. Emergency plunger and triangular safety message shall have 15cm clearance.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 63

    15cm 15cm

    15cm

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 64

    MTR stations ( Concourse, passage, platform)• Concourse bunting, Entry Exit gate bunting, Other

    bunting formats

    • General Guideline

    • Headroom clearance 2350mm/H• Bunting shall not block MTR signage, Ventilation shaft, CCTV,

    Smoke detector ( recommended clearance space, 6m)• MTR will assess the weight of bunting and give advice bunting

    can be hanged on Ceiling sub frame or require anchor bolt fixing.• False Ceiling shall not be the fixing point(s) or supporting point(s)

    for any Feature Ads installation unless written approval is received

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 65

    For Concourse Bunting:• Pockets shall allow 12mm Diameter metal rod to pass through• Total height of the bunting ( including pocket) MUST NOT exceed

    500mm/H – To keep head room clearance 2350mm/H

    For Entry Exit gate bunting• Method Statement and Fixing drawing shall submit for approval• Head room clearance must keep 2350mm/H

    For Other bunting formats:• Method Statement and Fixing drawing shall submit for approval• Structural calculation report or other report(s) may be required• Head room clearance must keep 2350mm/H

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 66

    For Concourse Bunting:• Pockets shall allow 12mm Diameter metal rod to pass through

    120cm

    50cm12mm Dia Pocket

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 67

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

    Special Bunting at HOK ( higher headroom space required)

  • 68

    MTR stations ( Concourse, passage, platform)• Recycle Bin, Station Dispenser, entry and exit gate sticker,

    Ticketing machine sticker, Ticketing machine top card

    • 3D model and display board Shall be fixed firmly onto the Dispenser• Both Station Dispenser and Ticketing machine top card shall have no grove

    and space for littering • Standard Size of Ticketing machine top card is 85cmX59cm/H, other sizes

    will need to get approval from MTR.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 69

    MTR stations ( Concourse, passage, platform)• Recycle Bin, Station Dispenser, entry and exit gate sticker,

    Ticketing machine sticker, Ticketing machine top card

    • 3D model and display board shall be fixed firmly onto the Dispenser

    Slanted design is preferred

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 70

    Station Dispenser

    Dispenser number should be die cut

    Display board extension should be firmly fixed.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 71

    MTR stations ( Concourse, passage, platform)• Both Station Dispenser and Ticketing machine top card shall

    have no grove and space for littering

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 72

    MTR stations ( Concourse, passage, platform)• I-Centre

    • All vertical advertising panels shall use forex board and VHB tape backing, having wire tied at the supportive structure

    • Curve shaped panel is spray paint finishing and cannot have sticker direct applied on it.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 73

    All vertical advertising panels shall use forex board and VHB tape backing, having wire tide at the supportive structure

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 74

    MTR stations (Concourse, passage, platform)• Plasma Ring

    • Die cut artwork shall not block the TV screen

    • Die cut graphic for downlightand speaker

    • Ceiling panel is spray paint finishing and shall not have sticker direct apply on it.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 75

    MTR stations ( Trackside)• Platform Screen Door, Trackside billboard

    • All sticker for PSD shall apply only on track side ( except AEL PSD can apply on platform side)

    • All PSD with emergency exits ( at both end of platform) shall be die cut

    • Ladder cannot lean on PSD during installation• Portable lighting device shall be equipped for illumination• As the trackside area installed a lot of cables and other electrical/

    electronics devices, all the contractors should not damage, touch, remove or relocate all the devices and facilities located at track side area.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 76

    • Only real time projection zone can apply sticker at the platform side of PSD

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 77

    MTR stations ( Exterior)

    • 3M sticker 3690 for rough finishing station exterior • For working at exterior, relevant document e.g. notice to police station,

    TD for road closure must be submitted JCDecaux for record purpose• Proper safety precaution shall be applied during installation.e.g.

    reflective cone, flash light, reflective vests and properly seal off the working site.

    • Contingency plan for Typhoon, strong monsoon wind and other emergency situation shall be submitted.

    • For billboard and other 3D attachments at the station exterior shall be removed before typhoon signal no.3 hoisted. ( only sticker wrapping can be excluded from this case)

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 78

    MTR stations ( in train )

    • 3M 8648 with 8936 over laminate sticker can only be used while client request to have over laminate at the train interior campaign

    • Inspection of in train damage together with JCD C/P shall be carryout prior to installation.

    • All the touch up shall made have cutting matt to protect the in train surface.

    • Gangway in between train compartment shall have proper protection to avoid damage to advertising sticker.

    • In train glass pane shall only apply on the side facing train doors.• All the rubber edge surrounding the Saloon window shall not be

    covered.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 79

    Gangway in between train compartment shall have proper

    protection to avoid damage.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 80

    For TCL train, Sticker Next to Saloon Window (SNTSW) shall use strawboard/ cardboard as the backing instead of Forex board.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 81

    MTR stations ( Advertising Train )

    • Besides method statement and fixing drawing, material sample andcertificate, structural report, electrical power consumption and fire loading report must be submitted for approval.

    • Structural report for display items shall meet the following G force calculation:

    • Longitude direction, 5G• Horizontal direction, 1G• Vertical direction, 2G

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 82

    MTR stations ( Advertising Train )

    • Total electrical power consumption shall be limited 10Amp 3 phase, all the fixing and wiring must comply with BS standard and all the cabling shall use LSOH type cable.

    • Fire loading report, shall include all the combustible materialsand the fire size cannot more than 5 Mega Watt

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 83

    MTR stations ( Advertising Train )

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 84

    MTR stations ( Admiralty Billboard and WWH sticker)• Admiralty Billboard

    • Method Statement and Fixing drawing shall be submitted for blanket approval.• Safety checklist should be submitted for Admiralty Centre Management Office

    and JCDecaux Pearl & Dean for record.• After installation, shall report to Admiralty Centre Management Office to sign

    off ( tel: 2528 4086)• For billboard at the station exterior shall be removed during typhoon signal

    no.3 hoisted. ( only sticker wrapping can be excluded from this case)

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 85

    MTR stations ( Admiralty Billboard and WWH sticker)WorldWide House

    • Method Statement & Fixing drawing shall be submitted for blanket approval.• Kindly contact Ms. San Cheung 2862 7220 for arrangement for installation. • Safety checklist should be submitted for WorldWide House Management Office

    and JCDecaux Pearl & Dean for record.• After installation, shall report to WorldWide House Management Office to sign

    off ( tel: 2523 0122)• Proper safety precaution shall be applied during installation, reflective cone,

    flash light, proper seal off the working site.

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 86

    Typhoon and other emergency requirementAll the contractor shall standby to depost exterior billboards while typhoon signal no.1 hoisted. Please kindly contact JCDecaux Pearl & Dean traffic department for arrangement with Station and Shopping arcade before carry out the deposting job. Other situations like strong monsoon wind and adverse weather condition, JCDecaux Pearl & Dean will request contractor to remove the exterior billboard.

    MTR Shopping Arcade:Tsuen Wan (Luk Yeung Galleria), Hang Fa Chuen (Paradise Mall), Tseung Kwan O (Grandiose) Clear water bay 8, Tsing Yi (Maritime Square) MTR Station Exterior: Central station (vent shaft), Hong Kong Station (AEL car park), Sunny Bay, TST (Exit C), MOK (Exit E), Quarry Bay (Exit A) and Coastal intake Station, Yau Ma Teiintake station, East Lantau intake station

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 87

    Exhibition

    •Each site got limitation 2 Mega Watt for combustible material•No cash transaction ( Rental of Octopus machine or using credit card machine)•Tidy displace of product and poster (presentation)•Staff behaviour (Eating/ Drinking, can have sales/promotion activities within exhibition site area)•Borrowing staff ID and fire extinguisher

    Feature Ads ( Different Formats) Requirement特別型式廣告按裝要求

  • 88

    Tidy sample整齊

  • 89

    Too many Shattered print out

  • 90

    Too many Shattered print out

  • 91

    Untidy set up

  • 92

    Too many Shattered print out

  • 93

    Too many brochure ( Fire loading)

  • 94

    Too many Shattered print out

  • 95

    Too many brochure ( Fire loading)