Minnesota State University Moorhead | Renovation of Dahl & West Snarr Halls | 100% Pre-Design Report
June 11, 2010 | Elness Swenson Graham Architects, Inc.
section3:project description
60
7/30/2019 MSUM part 2
2/57
MSUM: RenovationofDahlandWestSnarrHalls Section3A:DahlHallProjectDescription Architecture
PredesignReport
Page1of
5
Section3A:
DahlHallProjectDescription Architecture
ApplicableBuildingCodes:
State:
2007Minnesota
State
Building
Code
(2006
IBC
with
Minnesota
Amendments)
2000GuidelinesfortheRehabilitationofExistingBuildings(GREB)
Federal:
ADA AmericanwithDisabilitiesAct(1990)
1989 FairHousingAct (ResidentialUnits)
Additional:
MnSCUFacilityDesignStandards
Alternatesthatwereconsideredduringthepredesignprocessarelistedinthefollowingnarrative.
RefertoAlternateCostsSummary inSection5foroptionsthatare included inTotalConstruction
Cost.
Sitework
Replacesidewalk/rampingfromvestibulestomainsidewalkforbetterdrainageandsafety.
Provideadditionallandscapingbedsaroundentrances. Providea$6000budgetlineitemfor
additionalsitefurnitureinpredesignbudget.
SiteAlternate#1:Providealternatefor$50,000foradditionallandscaping/sitework. Replace
exteriorconcretestairsandrampsatstairtowerexits.
HazardousAbatement
DahlHallhadbeensurveyedpreviouslybyTwinCityTestingandthefindingswererecordedinaHazardous
MaterialSurvey
Report
dated
July
17,
1987.
MSUM
contracted
with
Legend
Technical
Services
in
June,
2010,
toprovideanupdatedsurvey. Theupdatedsurveyindentifiesmaterials,includingCATIACM9floortile,th
arerequiredtoberemovedpriortotherenovationprojectifthematerialsaretobeimpactedinsucha
mannerastorenderthemfriable. Thesurveyalsoindentifiesmaterialsrequiredtoberemovedpriortothe
renovationincludingRACMaircellinsulation,hardfittingsonaircelltankinsulation,andhardfittingsfor
fiberglasspipeinsulation. Materialsinalldisturbedareasaretoberemovedbylicensedhazardousmaterials
abatementcontractorspriortomainrenovationactivities.
Basement
Renovationstotheexistingbasementarenotincludedinthescopeofthepredesign,withthe
exceptionofworkrequiredforrevisionstomechanicalandasrequiredforcoderevisions. Because
theplasterceilingatthelowerlevelstorageroomwasremovedwithanearlierproject,theexposed
steeljoists
in
that
area
are
unprotected.
Renovation
will
include
anew
fire
rated
ACT
ceiling
at
the
unprotectedsteeljoists.
FirstfloorVestibules/AluminumEntrances
Allaluminumentrancesandglazingwillbereplacedwithaluminumstorefronttypewithinsulating
visionglassandequippedforkeyedaccessentryonlybyresidents&staff. Providenewquarrytile
flooringandbase,paintedwallsandnewlightingatvestibules.
61
7/30/2019 MSUM part 2
3/57
MSUM: RenovationofDahlandWestSnarrHalls Section3A:DahlHallProjectDescription Architecture
PredesignReport
Page2of
5
FirstFloorLobbyandReception/Offices
Therenovationprojectwillincludedemolishingthereceptiondeskandofficeareaforanew
configuration.ProvidenewInformation/welcomedeskwithwoodveneerfinishes,tilebase,and
quartzcountertopincustomconfiguration,withaluminumsecuritygrille.Officestohavepainted
wallswithVCTflooringandvinylbase,and2x2ACTceiling,andnewlighting.Newheavydutywelded
hollowmetaldoorframes,flush,solidcorewooddoorsandnewhardwareatallfirstfloor
lobby/office/custodial/loungefunctions. ProvidenewpairofdoorsonholdopenswithcardaccessbetweenLobbyandCorridor. LoungewallthatfacesLobbytohavefullheightceramictileaccent
wall. Lobbyflooringtobedemolishedandnewceramictilefloorandbasetobeinstalled.
FirstfloorToilet
Providenewsingleuseraccessibletoiletroomatfirstfloorwithceramictilefloorandbaseoverliquid
appliedwaterproofingmembrane,paintedgypsumboardwallsandceiling,andtoiletaccessories.
FirstfloorCorridor
TheexistingglazedtilewallsattheStair/Elevator/Trashcoreandlobbyaretobeskimcoatedand
painted.Existingmailboxesaretobereused.
FirstFloorLounge
Therenovationofthefirstfloorloungewillincludeallnewfinishes,includingcarpetandbase,new
ACTtileandgypsumboardsoffitsandlightingandpaintedwalls.Theexistingglazedtileexteriorwalls
willbeskimcoatedandpainted.Providenewkitchenwith16ofwoodbaseanduppercabinets,solid
surfacecountertopsandEnergyStarAppliancesincludingfullsizebottommountfreezer/refrigerator,
sink,microwave,rangeandfullyventedhood. Existingfireplacetoremain.(Providealternateto
modifyexistingfireplaceforgas confirmavailability.) Providenewratedhollowmetaldoorframe
withsolidwoodcoredoorsandsideliteglazingtolounge.
StaffandGradApartments
The
existing
staff
apartment
and
accessible
unit
will
be
demolished
and
reconfigured
for
a
new
two
bedroomstaffapartmentandanewefficiencygradapartment.Thenewstaffapartmentwillhavea
fullkitchenwithwoodbasecabinetsandsolidsurfacecountertopsandenergystarappliances.The
unitwillhaveonefullbathroomwithatub. Thefinisheswillbecarpetwithwoodbaseintheliving
room,dining,hallwayandbedrooms.Bathroomswillhaveceramictilefloorandbasewith
waterproofingbelowandpaintedwalls. Kitchenwillhavesheetvinylandwoodbase.Theapartment
willalsohavearesidentialstylelaundryroom. Theefficiencyapartmentwillhavesimilarkitchen,
bathroomandfinishes,butwillhavea36x48showerinsteadofatub.
CorridorImprovements
Therenovationtothecorridorsonallfloorswillinclude: theadditionofanACTceilingsystem(to
concealmechanical,electricalandtechnology)andnewlighting,paint,newcarpetandcarpetbase.
Paintall
hollow
metal
door
frames.
All
wood
doors
to
be
refinished.
Provide
semi
recessed
fire
extinguisherslocatedsoallfloorareasarewithin75traveldistanceofanextinguisher.Removeand
replaceallexistingcabinets(allfloors.)
62
7/30/2019 MSUM part 2
4/57
MSUM: RenovationofDahlandWestSnarrHalls Section3A:DahlHallProjectDescription Architecture
PredesignReport
Page3of
5
StudentRooms
Therenovationtothestudentroomswillinclude: paintingallwallsandceilings,removingexisting
builtinbeds/storageunit(whichareboltedtothefloors),removingbuiltinwardrobes,repairingwall
plaster,removingexistingVATtileandinstallingnewVCTand4vinylbase.Providerobeshooksin
room(2)perbed. Theupgradesincludemodifyingtwounitdoorsperfloortoenlargetheopening
foranew36x80solidcorefireratedwooddoortoprovideaccessibility.
Bathrooms
Therenovationstotherestroomswillinclude: demolishingallexistingfixtures,toiletpartitions,
finishes,andinteriorwalls(glazedtile).Providenewplumbing,electrical,mechanicalandfixtures,
countertops,toiletandshowerplasticpartitionsinanewplanconfiguration.Existingglazedtile
exteriorwallfinishistoremainandwillneedtobeprotected. Newwallswillhavefullheightceramic
tile. Lavatoriesaretobesolidsurfacecountertopwithintegralbowlswithoverflowdrainswithfull
metalframedmirrorabove. Existingtileflooringandshowerbasesaretobedemolished.New
ceramictileflooringandmoldedstoneonepieceshowerreceptorsaretobeinstalledoverliquid
appliedwaterproofingmembrane. Showerwallsaretobesolidsurfacepanelswithasealantjointat
thecornersandperimeter.Provideallnewtoiletaccessoriesincludingtoiletpaperholders,soap
dispensersand
shower
curtain
rods.
Provide
(1)
robe
hook
at
each
toilet
stall
and
(2)
at
each
shower
stall. Enlargedooropeningtobathroomsandprovidenewhollowmetaldoorframeand36x80
solidcoreflushratedwooddoor.Provide(1)accessibletoiletstallandshowerstallperfloor.
FloorLaundry
Provideanewfloorlaundryoneachfloor finallocationtobedetermined. Eachlaundrytohave(3)
stackedwashersanddryersandasinkandplasticlaminatecountertop.NewflooringistobeVCT
with4vinylbase.Wallsaretobepaintedgypsumboard.Provide2x2ACTceiling.Providenew
ratedhollowmetaldoorframewith36x84solidcorestainedwooddoorandnewhardware.
FloorLounges
The
renovation
to
the
lounge
areas
on
all
floors
will
include:
new
flooring
and
base,
wall
repairs
and
paint,installationofanewACTceilingsystemandnewlighting. Theexistingtilewallalongthe
bathroomwallistobeskimcoatedandpainted. Removeexistingceramictileatdrinkingfountainand
replacewithnewceramictileatthewallandfloor.
Stairwells
Therenovationtothestairwellswillinclude: paintingallwallsandmetalatstairs,andinstallingnew
floortile,basetreads,andnewlighting. Demolishexistingguardrailandhandrailandprovidenew
paintedsteelguardrailsandhandrailstomeetcode. Handrailsshallbealuminumtubingwithfittings
andterminations. (Confirm2hourfireratingatstairwalls.) Providenewpaintedsteelshipsladder
atcenterstairattopfloortoroofwithroofhatch.
ShaftWalls
Provide(2)newtwohourratedshaftswithinsulatedsteelstudandgypsumboardconstructionper
floorfornewmechanicalmakeupair.
Elevators
Providesmokesealatexistingelevators.Elevatorwallsareconstructedwith8lightweightblockwith
plasterfinish.(verify2hourrating.)
63
7/30/2019 MSUM part 2
5/57
MSUM: RenovationofDahlandWestSnarrHalls Section3A:DahlHallProjectDescription Architecture
PredesignReport
Page4of
5
Painting
Paintingisasindicatedabove.Ceilingsshallbepaintedwithtwocoatsofeggshelllatex.
Wallpaintshallbetwocoatsofsemiglosspaint. Painthollowmetaldoorsandframes,handrails,
guardrails,mechanicalequipment,etc.
InteriorWalls
Typicalcorridorwallsandunitdemisingwallsareconstructedwith4PYROBARwithplasterfinish.Allexistingexposedglazedtilefinishistobeskimcoatedandpainted(excepttheexteriorwallsat
bathrooms.)
Newtypicalnonratedwallsaretobeconstructedwith35/8inchsteelstudsat16incheso.c.and
onelayer5/8inch(paperlessmoistureresistant)gypsumboardoneachside. Bedroom&bathroom
wallsshallinclude31/2inchfiberglassbattinsulation. Demisingwallsatapartmentaretohavetwo
layersgypsumboardeachsideandfullinsulationfor55 59STC. Corridorwallstohave50 54STC.
InteriorDoorsandFrames
Existingdoorsandframesthataretoremainaretoberefinished.
Newdoors,
including
common
area
doors,
shall
be
flush,
13/4
inch
thick,
solid
core,
5ply,
prefinishedstainedandvarnishedmapledoors,30x68typical.
Heavydutyweldedhollowmetalframes,painted,foralldoors.
InteriorDoorHardware
Providenewdoorhardwareatalldoors.LocksetsshallbeANSIGrade1mortiselocksetswithlever
handlesand6pincylindersmatchingcampusstandardsandexistingkeysystem,US26Dfinish.
ClosersshallbeLCN4010/4110seriesorequivalent.
Finishes
Verifyifanypaintisleadbasedpaintwithhazardousmaterialsreports.
All
new
finishes
are
to
be
Low
Emitting
Materials
Substructure
ExistingConditions:Existingfootingsarecastinplacereinforcedconcrete.Noknownsettlement
issuesatthetimeofthispredesign.
Proposed:Nomodificationstoexistingfootingsarerequired.
Superstructure
ExistingConditions: Existingstructureconsistsof3oflightweightconcreteon12(typ.)steelbar
[email protected]/westdirectionandbearonsteelbeamsandcolumnsatthe
exteriorwallandaninteriorrowofcolumnsandbeamstypically.Theexteriorwallsarenotload
bearingtypically. Steelcolumnsattheexteriorareexposedtotheelementsandareexpressedasa
verticalsteel
column.
Plaster
ceiling
throughout
is
assumed
to
provide
fire
rating
(to
be
confirmed.)
Proposed: Norevisionsareproposedtoexistingstructureexceptasrequiredformechanical
revisions.
64
7/30/2019 MSUM part 2
6/57
MSUM: RenovationofDahlandWestSnarrHalls Section3A:DahlHallProjectDescription Architecture
PredesignReport
Page5of
5
Exteriorwallconstruction
ExistingConditions:Existingexteriorwallsareconcretemasonryunitconstructionwithbrickand
glazedtileexterior.Thewallconstructionprovidesnoairspace,insulationorflashing.
Theinteriorsideoftheexteriorwallshasglazedtilefinish mostofwhichhaveplasterfinish.Exterior
wallsatbathroomsandcommonareasareexposedglazedfilefinish.
Proposed:ExteriorWallAlternate#1:Providealternatetoprovide2rigidinsulation,stainlesssteel
channelsandprefinishedcompositemetalpanelfinishatexteriorglazedtilewalls.
ExteriorWallAlternate#2: Atinteriorsideofexteriorwalls,provide15/8furringchannels,
1rigidinsulationoninteriorsideofexteriorwallsand5/8moistureresistantgypsumboard.
Paintallwalls.
Existingroofconstruction
ExistingConditions: Existingroofconstructionis12steelbarjoistswith11/2steeldeckwithrigid
insulationandbuiltuproofing. Noevidenceorreportsofrooffailuresatthetimeofthisreport.
RoofAlternate#1: Providealternatefornewpenthousestohousemechanicalheatrecovery
units.ExteriorWindows
ExistingConditions: Exteriorwindowswerereplacedin1999.
Proposed:Recaulkexterioratwindows.Replaceweatherstripping/sweepsatallwindows.
WindowsAlternate#1: ProvidealternatetoreplaceallexistingwindowswithMnSCU
approvedaluminumwindows.
Exterior
Doors
ExistingConditions: Exteriordoorsarealuminumstorefronttypewithinsulatedvisionglassin
curtainwallframesandareinpoorcondition.
Proposed:Allexteriordoorsandframes(includinginnerframesatvestibules)shallberemovedand
replacedwithaluminumstorefronttypewithinsulatingvisionglassandequippedforkeyedaccess
entryonlybyresidents&staff. Allexitdoors,framesandhardwareatstairstobereplaced.
Roofing
ExistingConditions: MSUMFRRMreportsindicatethatroofisdueforreplacementin2038. Nonew
roofisproposedexceptasrequiredformodificationstomechanicalsystems.
Proposed:
Patchabandonedopeningsandinstallnewopeningsasrequiredformechanical/electrical
revisions. Lightningprotectionisnotproposed.
65
7/30/2019 MSUM part 2
7/57
MSUM: RenovationofDahlandWestSnarrHalls Section3B:WestSnarrProjectDescription Architecture
PredesignReport Page1of5
Section3B:
WestSnarrHallProjectDescription Architecture
ApplicableBuildingCodes:
State:
2007Minnesota
State
Building
Code
(2006
IBC
with
Minnesota
Amendments)
2000GuidelinesfortheRehabilitationofExistingBuildings(GREB)
Federal:
ADA AmericanwithDisabilitiesAct(1990)
1989 FairHousingAct (ResidentialUnits)
Additional:
MnSCUFacilityDesignStandards
Alternatesthatwereconsideredduringthepredesignprocessarelistedinthefollowingnarrative.
RefertoAlternateCostsSummary inSection5foroptionsthatare included inTotalConstruction
Cost.
Sitework
Existingconcreteatthenorthofthemainnorthentryiscrackingandisinneedofreplacement. The
Renovationprojectincludesreplacingallconcretesidewalksatthenorthentry.
SiteAlternate#1: Providebudgetallowanceof$50,000foradditionalsitework.
HazardousAbatement
WestSnarrHallhadbeensurveyedpreviouslybyTwinCityTestingandthefindingswererecordedina
HazardousMaterialSurveyReportdatedMarch25,1987.MSUMcontractedwithLegendTechnicalServices
June,2010,toprovideanupdatedsurvey. Theupdatedsurveyindentifiesmaterials,includingCATIACM9
floortileandCATIIwindowcaulk,thatarerequiredtoberemovedpriortotherenovationprojectifthe
materialsaretobeimpactedinsuchamannerastorenderthemfriable. Thesurveyalsoindentifiesmateria
requiredtoberemovedpriortotherenovationincludingRACMaircellinsulation,hardfittingsonaircell,an
hardfittingsforfiberglasspipeinsulationandexteriorwindowglazing.Materialsinalldisturbedareasareto
beremovedbylicensedhazardousmaterialsabatementcontractorspriortomainrenovationactivities.
Basement
WestSnarrHalldoesnothaveafullbasement.Amechanicalroomandtunnelconnectionislocated
belowthefirstfloor.NoworkisproposedinthisareaexceptasrequiredforrevisionstoMEP.
FirstfloorVestibules/AluminumEntrances
Allaluminumentrancesandglazingwillbereplacedwithaluminumstorefronttypewithinsulating
visionglass
and
equipped
for
keyed
access
entry
only
by
residents
&
staff.
Provide
new
quarry
tile
flooringandbase,paintedwallsandnewlightingatvestibules.
FirstFloorLobbyandReception/Offices
Therenovationprojectwillincludedemolishingthereceptiondeskandofficeareaforanew
configuration.ProvidenewInformation/welcomedeskwithwoodveneerfinishes,tilebase,and
quartzcountertopincustomconfiguration,withaluminumsecuritygrille.Officestohavepainted
gypsumboardwallswithcarpetflooringandcarpetbaseand2x2ACTceilingandnewlighting.New
66
7/30/2019 MSUM part 2
8/57
MSUM: RenovationofDahlandWestSnarrHalls Section3B:WestSnarrProjectDescription Architecture
PredesignReport Page2of5
heavydutyweldedhollowmetaldoorframes,flush,solidcorewooddoorsandnewhardwareatall
firstfloorlobby/office/custodial/loungefunctions. Providenewpairofdoorsonholdopenswithcard
accessbetweenLobbyandCorridor. Lobbyflooringtobedemolishedandnewceramictilefloorand
basetobeinstalled.
FirstfloorAlternate#1: Providealternatecosttodemolishexistingstairbetweenfirstandsecond
floorsandconstructnewonestoryadditionfornewstairtorunbetweenfirstandsecondfloors.Infillflooropeningwherestairisdemolished. Newadditionistohavefrostfootings,exteriorwalls
constructedofCMUbackupwallsandmasonryveneerandcurtainwall.
FirstfloorToilet
Renovationincludesguttingtheexistingmenandwomenstoiletroomsonthefirstfloorand
providingtwonewsingleuseraccessibletoiletrooms. Newbathroomsaretohaveceramictilefloor
andbaseoverliquidappliedwaterproofingmembrane,fullheightceramicwalls,paintedgypsum
ceiling,andtoiletaccessories.
FirstfloorCorridor
Providenew
2x2
ACT
ceiling
and
gypsum
board
soffits,
new
lighting,
painted
gypsum
board
walls
andceramictilefloorsandbase. Providenewrearloadinghorizontalmailboxeswithintegral
directory,3x4x15anodizedaluminumfinish. Provide1boxforeachresidentroom,and1out
goingmailbox. Eachboxistohaveremovablecorecylinderstobekeyedtomatchresidentroom
doors.
FirstfloorStudyatLink
ExistingstudyroomatthenorthsideofthelinktoEastSnarrhasanexistingmetalgrillethat
separatestheroomfromthelink.Removethegrilleandadd44highpaintedsteelrailingwith
verticalpickets. Providenewcarpetandcarpetbase.
First
Floor
Lounge
Therenovationofthefirstfloorloungewillincludeallnewfinishes,includingcarpetandbase,new
ACTtileandgypsumboardsoffitsandlightingandpaintedwalls.Providenewpairofsolidcorewood
doorsinHMframeonholdopenswithsideliteswithfrostedglazing.
Kitchen
Therenovationincludesguttingtheexistingkitchenandinstallingnewkitchenwith16ofwoodbase
anduppercabinets,solidsurfacecountertopsandEnergyStarAppliancesincludingfullsizebottom
mountfreezer/refrigerator,sink,microwave,rangeandfullyventedhood.Wallstobepainted
gypsumboard.Ceilingtobe2x2ACT. ProvideVCTfloorwith4vinylbase.
StaffApartment
Theexisting
staff
apartment
will
be
demolished
and
reconfigured
for
the
new
two
bedroom
apartment.Thenewapartmentwillhaveafullkitchenwithwoodbasecabinetsandsolidsurface
countertopsandenergystarappliances.Theunitwillhavetwofullbathrooms onewithafulltuband
thesecondwitha3642shower. Thefinisheswillbecarpetwithwoodbaseinthelivingroom,
dining,hallwayandbedrooms.Bathroomswillhaveceramictilefloorandbasewithwaterproofing
belowandpaintedwalls. Kitchenwillhavesheetvinylandwoodbase.Theapartmentwillalsohavea
residentialstylelaundryroom.
67
7/30/2019 MSUM part 2
9/57
MSUM: RenovationofDahlandWestSnarrHalls Section3B:WestSnarrProjectDescription Architecture
PredesignReport Page3of5
CorridorImprovements
Therenovationtothecorridorsonallfloorswillinclude: theadditionofanACTceilingsystem(to
concealmechanical,electricalandtechnology)andnewlighting,paint,newcarpetandcarpetbase.
Paintallhollowmetaldoorframesandprovidenewdoorhardwareatalldoors. Allwooddoorstobe
refinished. Providesemirecessedfireextinguisherslocatedsoallfloorareasarewithin75travel
distanceofanextinguisher.Removeandreplaceallexistingcabinets(allfloors.) Providealternateto
keepexistingcarpetonupperfloors.
StudentRooms
Therenovationtothestudentroomswillinclude: paintingallwallsandceilings,removingexisting
carpetandinstallingnewcarpetand4vinylbase.Removeexistingwoodlightvalence. Provide
robeshooksinroom(2)perbed. Removeexistingwardrobesanddeskunits.
StudentRoomsAlternate#1: Existingwardrobes,deskunitsandexistingcarpettoremain.
Refinishexistingwardrobesanddeskunits.
Bathrooms
Therenovations
to
the
restrooms
will
include:
demolishing
all
existing
fixtures,
toilet
partitions,
finishes,andinteriorwalls(glazedtile).Providenewplumbing,electrical,mechanicalandfixtures,
countertops,toiletandshowerplasticpartitionsinaconfigurationsimilartotheexisting.Newwalls
willhavefullheightceramictile. Lavatoriesaretobesolidsurfacecountertopwithintegralbowls
withoverflowdrainswithfullmetalframedmirrorabove. Existingtileflooringandshowerbasesare
tobedemolished.Newceramictileflooringandmoldedstoneonepieceshowerreceptorsaretobe
installedoverliquidappliedwaterproofingmembrane. Showerwallsaretobesolidsurfacepanels
withasealantjointatthecornersandperimeter.Provideallnewtoiletaccessoriesincludingtoilet
paperholders,soapdispensersandshowercurtainrods.Provide(1)robehookateachtoiletstalland
(2)ateachshowerstall. Enlargedooropeningtobathroomsandprovidenewhollowmetaldoor
frameand36x80solidcoreflushratedwooddoor.Provide(1)accessibletoiletstallandshower
stall
per
floor.
FloorLounges
Therenovationtotheloungeareasonallfloorswillinclude: newcarpetand4vinylbase,
installationofanewACTceilingsystemandnewlighting. ProvidenewHMdoorframewithsolid
corewooddoorandsidelitewithfrostedglazing. Providenewkitchenwith12ofstainedwoodbase
anduppercabinets,solidsurfacecountertopsandEnergyStarAppliancesincludingfullsizebottom
mountfreezer/refrigerator,sink,microwave,rangeandfullyventedhood.
Laundry/Custodial/StorageonStudentFloors
TherenovationtotheLaundry/Custodial/Storageareasonallfloorswillinclude: NewVCTflooring
andbase,paintatwallsandceiling,andnewlighting.AtLaundryonly,providenew2x2ACTceiling.
Stairwells
Therenovationtothestairwellswillinclude: paintingallwallsandmetalatstairs,andinstallingnew
floortile,basetreads,andnewlighting. Demolishexistingguardrailandhandrailandprovidenew
paintedsteelguardrailsandhandrailstomeetcode. Handrailsshallbealuminumtubingwithfittings
andterminations. (Confirm2hourfireratingatstairwalls.)
68
7/30/2019 MSUM part 2
10/57
MSUM: RenovationofDahlandWestSnarrHalls Section3B:WestSnarrProjectDescription Architecture
PredesignReport Page4of5
ShaftWalls
Provide(2)newtwohourratedshaftswithinsulatedsteelstudandgypsumboardconstructionper
floorfornewmechanicalmakeupair.
Elevators
Providesmokesealatexistingelevators.Elevatorwallsareconstructedwith8CMU.(verify2hour
rating.)
Painting
Paintingisasindicatedabove.Ceilingsshallbepaintedwithtwocoatsofeggshelllatex.
Wallpaintshallbetwocoatsofsemiglosspaint. Painthollowmetaldoorsandframes,handrails,
guardrails,mechanicalequipment,etc.
InteriorWalls
Interiorwallsaretypicallypaintedconcretemasonryunits. Paintallnewandexistingwalls.
Newtypicalnonratedwallsaretobeconstructedwith35/8inchsteelstudsat16incheso.c.and
onelayer
5/8
inch
(paperless
moisture
resistant)
gypsum
board
on
each
side.
Bedroom
&
bathroom
wallsshallinclude31/2inchfiberglassbattinsulation. Demisingwallsatapartmentaretohavetwo
layersgypsumboardeachsideandfullinsulationfor55 59STC. Corridorwallstohave50 54STC.
InteriorDoorsandFrames
Existingdoorsandframesthataretoremainaretoberefinished.
Newdoors,includingcommonareadoors,shallbeflush,13/4inchthick,solidcore,5ply,
prefinishedstainedandvarnishedmapledoors,30x68typical.
Heavydutyweldedhollowmetalframes,painted,foralldoors.
InteriorDoorHardware
Provide
new
door
hardware
at
all
doors.
Locksets
shall
be
ANSI
Grade
1
mortise
locksets
with
lever
handlesand6pincylindersmatchingcampusstandardsandexistingkeysystem,US26Dfinish.
ClosersshallbeLCN4010/4110seriesorequivalent.
Finishes
Verifyifanypaintisleadbasedpaintwithhazardousmaterialsreports.
AllnewfinishesaretobeLowEmittingMaterials
Substructure
ExistingConditions:Existingfootingsarecastinplacereinforcedconcrete.Foundationwallsare
concretemasonryunits. Noknownsettlementissuesatthetimeofthispredesign.
Proposed:Nomodificationstoexistingfootingsarerequired.
Superstructure
ExistingConditions: Existingstructureconsistsofsteelcolumnsencasedinconcreteand8
reinforcedconcreteslabs. Existingcolumnshavesteelgrillageonallfloors.Thesecondfloor
structurecantilevers4overfirstfloorbetweenmasonrywingwallsonallfoursides. Thereisa
continuousreinforcedconcretebeamateachexteriorwallthatservesatthelintelforthewindow
openings.
69
7/30/2019 MSUM part 2
11/57
MSUM: RenovationofDahlandWestSnarrHalls Section3B:WestSnarrProjectDescription Architecture
PredesignReport Page5of5
Thefloortofloorheightsareasfollows:
BasementMechanicalRoom: 68 Firstfloor: 118: SecondFloor: 94 ThirdFloor: 94Fourth
Floor:
9
4
Proposed: Norevisionsareproposedtoexistingstructureexceptasrequiredformechanical
revisions.
Exteriorwallconstruction
ExistingConditions:Existingexteriorwallsareconcretemasonryunitconstructionwithbrickexterior
and1cavityinsulation.Thecavityistypicallygroutedfull. Interiorfaceofexteriorwallsispainted.
Proposed: Nonewexteriorwallsareproposedwiththepredesign.
Existingroofconstruction
ExistingConditions: Existingroofconstructionis8reinforcedconcretewith1rigidinsulationand
builtup
roofing.
No
evidence
or
reports
of
roof
failures
at
the
time
of
this
report.
Proposed:Nonewroofisproposedexceptasrequiredformodificationstomechanicalsystems.
RoofAlternate#1: Providealternatefornewpenthousestohousemechanicalheatrecovery
units.
ExteriorWindows
ExistingConditions: Exteriorwindowsareoriginal.Windowsaretypically50wideand40high.
Thefirstfloorwindowstypicallyhavea26hightransomwindow. Firstfloorentranceshavea
porcelainpanelbelowthewindow.Windowtransomheadsatthefirstflooraretypically955/8
AFF.Window
heads
on
second,
third
and
fourth
floor
are
typically
at
6
8
AFF.
Proposed:Recaulkexterioratwindows.Replaceweatherstripping/sweepsatallwindows.
WindowsAlternate#1: ReplaceallwindowswithMnSCUapprovedwindows.
ExteriorDoors
ExistingConditions: Exteriordoorsarealuminumstorefronttypewithinsulatedvisionglassin
curtainwallframesandareinpoorcondition.
Proposed:Allexteriordoorsandframesshallberemovedandreplacedwithaluminumstorefront
typewithinsulatingvisionglassandequippedforkeyedaccessentryonlybyresidents&staff.
RoofingMSUMFRRMreportsindicatethatroofisdueforreplacementin2027. Nonewroofisproposed
exceptasrequiredformodificationstomechanicalsystems. Patchabandonedopeningsandinstall
newopeningsasrequiredformechanical/electricalrevisions. Lightningprotectionisnotincludedin
scope.
70
7/30/2019 MSUM part 2
12/57
!""#$%#$
&'(
$))
*$ +,-./0-#.# 1/-
23$4 /-05 /1-6,05
!7"#$$#
$(!"#$(
"")#)
"'(!%#$#"86$"#$"#$)
&'(9"$)#7$"$"$6$$6
6#"$""""6$#"
6::6;:6$':
7/30/2019 MSUM part 2
13/57
1
! 6 $ " $ "7$
')')$'(!"$
)""=$)3#'$4
7$6'76):$6
"(!"$"$7)',00-):$
7$ $ $' 7$ 6 ' 6 ' &>?$'7$)'&
1($$$))$$
"))$)(
!7$'(8"
37)'+000-4"#=$""$'$$":
"(!"$$$'6$6'
$$6&>?&>1(
!#)$""
$ $'( "6 ') "#)#(
!
8'#"$#)(
9
#$#'))()
$3"$4")
"$#$(!'')6")6
$)(*')"#)$
"(8"#)6"$(8
)')$#$"
)$#$(!$)#
#$(!#$)$#)):"'"
$)"')(":)
')$"')))(!
###$(
)#'')(!$
#)#)":($
7)$#")'
$#=$(
)")#
$#("#$$)$"
")($#)
)))(
72
7/30/2019 MSUM part 2
14/57
$)')""
"')($)"$#%00
#'6"'/0@(A(
!$(!')#
#$$(!)')))(9"$'3##4"$
)"):$')3##4(
"
!#$$':(
!#$"#$':9-834=$)$#
B.-(C$:6$"#$
$$#$(-)#)(&7
"#"("#=$#$
0#)(!#
"")9-8,(8"#$,0
#
!)))"(
!)$(!#$$)
$#''"')(8"'""1'
))$#:(
8"=$)"#$A$8$)')(8)
";$#))(8""
()73)46$)#
'(
$
8"DE"#'"$'
')(-%"#$'$
')"$$$)(@))
,'#$"$$)F$)$)"#=$"
(
'"97(
)"97
)97
73
7/30/2019 MSUM part 2
15/57
,
%&'&(!)*&'#
! " " # $%# $
&'( $))
*$ +,-./0-#.# 1/-
23$4 /-05 /1-6,05
!7"#$$#
$(!"#$(
"")#)"
'(!%#$#"(8
6$"#$"#$)&'(9"$)#7$"$"$6$$6
6#"$""""6$#"
6::6;:6$':?$'7$)
'&>1"'7)'000-(
!
!#$$'
74
7/30/2019 MSUM part 2
16/57
')"
))(
!#$""$#
$)$)%(&)1"'(!')#'"(!6)6
)( * #)" ') $) )#))
$#'')'(
)')$$#($)"
$)'%')=$);$#(
"
!#$$':(
!#$"#$':9-834=$)$#
B.-(C$:6$"#$
$$#$(-)#)(&7"#"("#=$#$
0#)(!#
"")9-8,(8"#$,0
#
8#$"$))(
$))6$)
')($))
":(
$ 8"DE"#'"$'
')(-%"#$'$
')"$$$)(@))
,'#$"$$)F$)$)"#=$"
(
'"97(
)"97
)7End of Report
J:\2010\201001400\DOCS\MSUM West Snarr and Dahl Halls Preliminary Mech Narrative draft.docx
75
7/30/2019 MSUM part 2
17/57
MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical
PredesignReport Page1of11
Section3D:
DahlHallandWestSnarrHallProjectDescription Electrical
ElectricalScope DahlHall
POWERDISTRIBUTION
ElectricalService
Electricpowerisderivedfroma300kvapadmountedtransformerlocatedattheNWsideofthe
building,viaanexistingundergroundfeederof1200amps.
ThemainswitchboardisGeneralElectric1200amps,120/208volts,3phasewithfullneutral,extern
TVSS,1200ampmainfusibleswitchandfuseddistributionswitcheswithfaultcurrentlimitingfuses,
containedwithinmultiplesectionswithlimitedexpandability. Theswitchboardisabout15yearsold
andingoodcondition.
Groundingelectrodeconductorisconnectedtobuildingwaterservice.
ElectronicdigitalmeteringsimilartoSiemensmodel9330willbeprovidedintheswitchboardfor
connectiontocampusHoneywellBuildingEnergyManagerEMSsystemtoreplacetheexistingEmon
Dmontypemetering.
NormalPowerDistribution
Powerdistributionsystemconsistsofcopperfeedersfromthemainswitchboardserving120/208vo
1phase,3wire,circuitbreakertypepanelboardscontainingcopperbus. Theexisting100amp30
circuit,1phase
panelboards
are
grouped
in
three
vertical
locations,
north
central
south,
with
each
verticalgroupingofpanelboardsconnectedinafeedthruconfiguration.Theexistingpanelboardsar
filledandhavenosparecapacitynorspace.Theexisting600amp,singlephase,fusibledistribution
panelboard adjacenttothemainswitchboardwillbereplacedwithalargerthreephasepanelto
house200amperecircuitbreakerstoservenewthreephasepanelboardsonthevariousfloors.
Existingpanelboardswillbereplacedwithamodern42circuit,200amp120/208volt,3phase,4wir
fullyrated,copperbussing,maincircuitbreakertypepanelboardscontaining25%sparespacesfor
futuregrowth,locatedineachfloorelectricalroomtoserve120/208voltresidenceroomsand
corridorcircuits. New200ampfeederswillbeprovidedfromthenewpowerdistributionpanelboar
A100amp,120/208volt,3phase,4wireelectronicgradepanelboardwithcopperbus,oversized
neutralbusandintegralTVSS(transientvoltagesurgesuppression),fullyrated,maincircuitbreaker
type,willbeprovidedtoservethecomputerlabandsimilarhightechA/VandTVequipmentinthe
mainfloorcommonareaandofficeareas.Isolatedgroundtypereceptacleswillbeprovidedtoserve
equipmentfedfromthispanelboard.
76
7/30/2019 MSUM part 2
18/57
MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical
PredesignReport Page2of11
PowertoexistingHVACequipmentandelevatorwillbedistributedviaexistingcopperfeedersfrom
themainswitchboardtotherespectiveequipment. Powertonewairhandlingequipmentwillbe
distributedvianew208volt,3phase,3wirecopperfeeders fromthemainswitchboardfused
distributionsection.
Powerto
new
kitchenette
in
lounge
Room
110
and
to
additional
laundry
washers
&
dryers
will
be
derivedfromanew100Amp,208/120volt,3phase,4wire panelboardlocatedinthemain
mechanical/electricalroom.
Powerdistributionequipmentwillbefieldmarkedwithalabelcontainingtheavailableincident
energyorrequiredlevelofPersonalProtectiveEquipmentforpotentialarcflashhazardsperNFPA
70E.
BranchCircuitry
Newbranchcircuitswillbecopperconductors,withseparateneutralperphase,installedinEMT.
Singlebedroomswillcontainonebranchcircuitperroom,withseparateneutralperphase. Doublebedroomswillcontaintwobranchcircuitsperroom,eachwithseparateneutralperphase. Branch
circuitswillbecopperconductorsinstalledinEMTuptotheroomandthenextendedinsurface
Wiremoldracewaywithintheresidencerooms. Allexistingbranchcircuitconductorsanddeviceswi
bedisconnectedandremovedfromtheresidenceroomsandreplacedwithnew.
Allbranchcircuitswillcontainaseparatecopper,insulatedgreengroundingconductor. Thesteel
racewaywillnotbeusedastheonlygroundconductorforequipmentgroundingpurposes.
Duplexreceptacleswillbespecificationgrade,20ampererated,andGFIratedwherelocatednextto
sinks,wet
areas,
and
exterior
areas.
Receptacles
serving
dedicated
computer
outlets
will
be
isolated
groundtypewithorangeface
Alllightswitchesandduplexreceptacleswillbeprovidedwithnylonplatestoreducebreakage.
LIGHTING
ExteriorLighting
Exteriorbuildingmountedareafloodlightingforperimetersecurityconsistsofroofmounted250
wattHPSfloodlights and150wattHPSwallmountedlightsatvestibules101,102,103and104, all
controlledbyphotocell.Thesefixtureswillnotbereplacedatthistime. Thenorthandsouthbuilding
entriescontain500wattquartzfloodlightswhichwillbereplacedwithmodern,lowglare150wallH
floodlightfixtures,controlledbyphotocell.
AnyaddedexteriorwalkwaylightingwillbeacornshapedluminariessimilartoSternbergA850with
internalindirectreflectortomatchcampusstandard,175wattMetalHalidelamps,mountedon14
footpolestomatchcampusstandard. Lightswillbecontrolledbyphotocellandcontactor. Nonew
lightsareanticipatedatthistime.
77
7/30/2019 MSUM part 2
19/57
MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical
PredesignReport Page3of11
InteriorLighting
Commonareaswithlayinceilingswillbefluorescent1x4layinT5lampsandelectronicballasts,wit
indirectinternalreflector,controlledbylocalswitchesincombinationwithoccupancysensors,and
daylighgtingcontrolwhereapplicable,for30footcandlestomeettheStateofMinnesotaB3
requirements.
Corridorlightingconsistsoffourfootlong,singleT8lampsurfacemounteddownlightinstalledin
1998. Thesefixtureswillallbereplacedwithamodern2lamp T5fluorescentdirectindirecttype
fixtureprovidingbetterlightdistributionthroughoutthecorridorsfor30footcandlestomeetthe
StateofMinnesotaB3requirements.
Lightinginresidenceroomswillbetotallyreplacedwitha2x4surfaceceilingmounted2lamp,T5
fluorescentfixturewithdurableDRroughdutyacrylicbasketcontrolledbylocalroomswitch.
Portablefluorescenttasklightswillbeprovidedatstudydesklocationswithcordandplugfor
connectiontoroomduplexreceptacle.
Lightinginoffices,meetingroomsandspaceswithcomputerswillbefluorescent2x4layin orsurfac
mountedT5lampsandelectronicballasts,withindirectinternalreflectorwithlouveredbottom
basketforglarecontrolonVDTs,controlledbylocalswitchincombinationwithoccupancysensors,
for50footcandlestomeettheStateofMinnesotaB3requirements.
Existinglightinginthebasementstorageareaconsistsoffourfootfluorescentsurfacemountedwra
aroundacryliclensfixturesandwillnotbereplacedatthistime.
Existinglightinginstorageandutilityspaceswillbereplacedwithnewsurfaceorsuspended4foot
industrialfluorescentstripswithT5lamps,electronicballastsandmetalwireguards,controlledby
occupancysensors,for20footcandlestomeettheStateofMinnesotaB3requirements.
Existinglightinginconferenceroomswillbereplacedwithnewfluorescent1X4pendantmounted,
direct/indirectwithcenterbasket. Thefluorescentlightfixtureswillbeprovidedwith1%electronic
dimmingballasts. Amanualdimmingsystemwillbeprovidedforalllightingwithinconferenceroom
forA/Vpresentations.
Existinglightinginloungeswillbereplacedwithmodernfluorescent1x4layin,recessedround
compactfluorescent orsurfacemountedlinearfluorescentfixtureswithacryliclensesandelectroni
ballasts,controlledbyoccupancysensorsandbuildinglightingcontrolpanel,for30footcandlesto
meettheStateofMinnesotaB3requirements.
Existingstairway
lighting
will
be
replaced
with
wall
mounted
up/down
fluorescent
rough
duty
type
withDRacryliclensmountedforeaseofaccessformaintenance,controlledbybuildinglighting
controlpaneltomeettheStateofMinnesotaB3requirements.
Dualtechnologyoccupancysensorcontrolswillbeutilizedinstorageroomsandsimilarnon
circulationspacestomeettheStateofMinnesotaB3requirements.
78
7/30/2019 MSUM part 2
20/57
MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical
PredesignReport Page4of11
Mechanicalandelectricalroomslightingwillbecontrolledbylocalswitchonlyforsafetypurposes,n
occupancysensorcontrol.
ExistingemergencyexitlightingisprovidedviamodernLEDexitlightscontainingbatterybackup,and
willnotbereplacedatthistime,exceptforafewolderfluorescentexitlightfixturesscatteredaroun
thebuilding.
Existingemergencyegresslightingisprovidedbyduallowvoltagelampedunitlightingequipment
locatedthroughouttheegresspathway,andwillnotbereplacedatthistime.
LightningProtectionSystem
Alightningprotectionsystemdoesnotexistandwillnotbeprovided.Avariancerequestmustbe
submittedtoMNSCU.
MiscellaneousSystems
Twospare2inchconduitswillbeprovidedfromthemainmechanicalroominthebasementtothe
penthouseforfutureequipmentneeds.
Twospare1inchconduitswillbeprovidedbetweenallmechanicalroomsinadaisychain
configurationwithjunctionboxesonallfloorsnotcontainingamechanicalroom.
Aduplex120voltreceptaclewillbeprovidedwithin8feetofeveryEMSfieldpanel.
COMMUNICATIONS
Voiceand
Data
Thebuildingcontainsaverylimitedstructuredcablesystem(backbone)withhubatthefrontentrydeskand
limitedwiredoutletsinthecomputerlab. Allresidenceroomsareservedbywirelessnetworkserviceonly.
Noadditionalhardwiredvoiceordataoutletsarerequiredatthistime.CampusisconsideringaddingDSLas
separateproject.
EntertainmentCATV
AseparateentertainmentCATVcoaxcabledistributionsystemexiststhroughoutthebuilding servin
allresidenceroomsatthistime,providedbyCableOne,alocalcabletelevisionvendorat1024Page
Drive,
Fargo,
ND.
No
changes
are
anticipated
at
this
time.
Further
discussion
with
the
Campus
A/V
Departmentwillberequiredtodeterminefuturecableservicearrangementsandcableownership
issues. ThecablesystemispresentlymaintainedbyCableOne.
79
7/30/2019 MSUM part 2
21/57
MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical
PredesignReport Page5of11
ELECTRONICSAFETYANDSECURITY
FireAlarm
TheexistingSimplex4002nonaddressablefirealarmpanelwillbereplacedwithanewmultiplexed,
microprocessorbased,networkedfirealarmsysteminthebuilding. Interconnectionofsprinklerflow
and
control
valves
will
be
provided
for
on
campus
central
station
annunciation.
Main
fire
alarm
controlpanelwillbelocatedinthemainelectricalroom. HoneywellXLS1000FireAlarmwithnetwo
cardforoperatingonamultipriority,peertopeertokenringnetworkisthepreferredsupplierof
equipmentforcompatibilitywithothercampusequipment.
Aremotefirealarmannunciatorpanelwillbelocatedinthemainentrywherereadilyaccessibleto
localFireDepartmentpersonnel.
Alarmandtroubleindicationwillbetransmittedviaseparatefiberopticcabletothedatacenterinth
LivingstonLordLibraryforinterconnectiontothecampusSecurityDispatchformonitoringpurposes
Nonsecuritycorridordoorswillbefittedwithmagneticdoorholdersconnectedtofirealarmsystem
tocloseuponalarm.Manycorridordoorscontainmagneticholdopensatthistimeandwillbe
connectedtothenewfirealarmsystem.
Existingductsmokedetectorswillbereplacedwithanalogaddressableductsmokedetectorsprovid
forallAHUsandfire/smokedamperoperations.
Existingareatypesmokedetectorswillbereplacedwithanalogaddressablephotoelectricsmoke
detectorswithlocalalarminresidencerooms,andinelevatorlobbiesforsignalingtheelevatorand
forfirealarm.
Existingvisualandauralsignalalarmindicatingapplianceswillbereplacedwithnewappliances
throughoutthebuilding. Combinationvisualandauralsignalalarmindictingapplianceswillbe
providedineachhandicappedresidenceroom. Auralonlysignalalarmindicatingapplianceswillbe
providedinallothernonhandicappedresidencerooms.
Voiceannunciationcapabilitieswillbereviewedwiththecampussecurityforpotentialpublic
announcementpurposes,suchasweatherdanger,terroristthreats,orothernecessaryemergency
messages. CampushasanexistingE2CampusserviceconsistingofText/Voice/Emailbasedsystemfo
massnotification. CoordinationwiththeDirectorofCampusSecuritywillbenecessaryforfurther
requirements.
Allwiringwillbeinstalledinconduit. Newconduitwillberedincolor.
80
7/30/2019 MSUM part 2
22/57
MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical
PredesignReport Page6of11
DoorSecuritySystem
Conduitandbackboxesonlywillbeprovidedbythecontractoratentriesandexitsforfuture
installationofcampusstandardsecuritydoorhardwareformonitoringandcontrolofselectdoors,
whichisHoneywell accesssystems. Intercomstationsatmainentrieswillbeprovidedbythe
contractorwithproductsimilartoVikingElectronicstomatchcampusstandard.Coordinationwithth
Directorof
Campus
Security
will
be
necessary
for
further
requirements.
Allwiringforintercomstationsandcardreaderswillbeinstalledinconduit.Cardreadersand
intercomstationswillbeprovidedinthefuturebytheUniversity.
VideoSurveillanceCamerasystem
ThecontractorwillprovideconduitandbackboxesonlyforfutureinstallationofCCTVvideocameras
inselectpublicspacesandentriestothebuildingforsecuritysurveillancepurposes. Conduitwill
terminateinthemainmechanical/electricalroomforfutureinstallationofcable.Thesefuturevideo
cameraswillberemotemonitoredandrecordedatcentralsecurityoncampusviaanIPbased
HoneywellDigital
Video
Manager
Version
300.1.7283.
Coordination
with
the
Director
of
Campus
Securitywillbenecessaryforfurtherrequirements.
Allwiringinthefuturewillbeinstalledinconduit. CCTVcameraswillbeprovidedinthefuturebyth
University.
EndofReportforDahlHall
ElectricalScopeforWestSnarrHall
POWERDISTRIBUTION
ElectricalService
Electricpowerisderivedfroma500kvapadmountedtransformerservingthisbuildingwith600am
of120/208volts,3phasepowerviaanundergroundfeedertothetunnelandthenroutedtoa600
amp,3poledisconnectswitchlocatedinthetunnelaccess. Thisserviceisundersizedforthefuture
remodelingandwillbeupgradedto1200Amps.ThesamepadmountedtransformeralsoservesEas
SnarrHall.
Anew1200ampmainswitchboardwillbeprovidedat120/208volts,3phase 4wirewithfullneutra
copperbussing, externalTVSS,1200ampmaincircuitbreakerandfuseddistributionswitcheswith
faultcurrent
limiting
fuses,
contained
within
multiple
sections
for
expandability.
The
existing
TVSS
unitwillberelocatedandreconnectedtothenewmainswitchboard. Entireassemblywillbesizedfo
50%futuregrowth.
Groundingelectrodeconductorwillbeconnectedtobuildingwaterservice,structuralsteeland
auxiliarygroundrodsasnecessary.
81
7/30/2019 MSUM part 2
23/57
MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical
PredesignReport Page7of11
ElectronicdigitalmeteringsimilartoSiemensmodel9330willbeprovidedintheswitchboardfor
connectiontocampusHoneywellBuildingEnergyManagerEMSsystem.
Anew1200ampundergroundserviceentrancefeederinracewaywillbeprovidedfromthenew
switchboardbacktotheservicepadmountedtransformer.
NormalPowerDistribution
Powerdistributionsystemwillconsistofcopperfeedersfromanewmainswitchboardserving
120/208volt,3phase,4wire,fullyratedcircuitbreakertypepanelboardscontaining25%spare
spaces. Thepanelboardswillbelocatedoneachbuildingleveltoservelighting,smallmotorandplu
powerloads.
Existing225amp,120/208volt,3phasecircuitbreakerpanelboardsarefilledwithcircuits,areserve
by100ampratedfeeders, anddonotcontainsufficientcapacitynorsparebreakerstoservethe
remodelingprojectwithinthisbuilding. Eachexistingpanelboardwillbereplacedwithamodern42
circuit,200
amp
120/208
volt,
3phase,
4wire,
fully
rated,
copper
bussing,
main
circuit
breaker
type
panelboard locatedineachfloorlaundryroomtoserve120/208voltroomandcorridorcircuits. Ne
200ampfeederswillbeprovidedfromtheswitchboardfuseddistributionsection.
Electronicgradepanelboardswithcopperbus,oversizedneutralbusandintegralTVSS(transient
voltagesurgesuppression),fullyrated,maincircuitbreakertype,willbeprovidedtoservecomputer
andsimilarhightechA/VandTVequipmentinthemainfloorcommonareaandofficeareas.Isolate
groundtypereceptacleswillbeprovidedtoserveequipmentfedfromthispanelboard.
PowertoHVACequipmentandelevatorswillbedistributedvianewcopperfeedersfromthemain
switchboardfuseddistributionsectiontotherespectivemotorizedequipment.
Powertothenewaircooledcondenserunitservingthefirstfloorwillbedistributedviacopperfeede
fromthemainswitchboardfuseddistributionsection.
120voltoutletboxeswillbelocatedthroughoutthecorridorceilingplenumareaforfuture
amplifier/repeatersforwirelessdatadistributiontoportablelaptopcomputers.
Powerdistributionequipmentwillbefieldmarkedwithalabelcontainingtheavailableincident
energyorrequiredlevelofPersonalProtectiveEquipmentforpotentialarcflashhazardsperNFPA
70E.
BranchCircuitry
Newbranchcircuitswillbecopperconductors,withseparateneutralperphase,installedinEMT.
Lightingandreceptacleswillbeonseparatebranchcircuits,exceptinresidenceroomscontainingon
onebranchcircuit.
82
7/30/2019 MSUM part 2
24/57
MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical
PredesignReport Page8of11
Singlebedroomswillcontainonebranchcircuitperroom,withseparateneutralperphase. Double
bedroomswillcontaintwobranchcircuitsperroom,eachwithseparateneutralperphase. Branch
circuitswillbecopperconductorsinstalledinEMTformaximumflexibilityandchangesinthefuture.
Allbranchcircuitswillcontainaseparatecopper,insulatedgreengroundingconductor. Thesteel
racewaywill
not
be
used
as
the
only
ground
conductor
for
equipment
grounding
purposes.
Duplexreceptacleswillbespecificationgrade,20ampererated,andGFIratedwherelocatednextto
sinks,wetareas,andexteriorareas. Receptaclesservingdedicatedcomputeroutletswillbeisolated
groundtypewithorangeface
Alllightswitchesandduplexreceptacleswillbeprovidedwithnylonplatestoreducebreakage.
LIGHTING
ExteriorLighting
ExteriorbuildingmountedareafloodlightingconsistsofwallmountedHighPressureSodiumtype
fixtureswithinternalglarecontrol,allcontrolledbyphotocell,andwillremainunchangedatthistim
ThenorthexteriorentrylightingconsistsofrecessedHPSdownlightswithglasslenscontrolledby
photocell,andwillremainunchangedatthistime.
AnynewexteriorwalkwaylightingwillbeacornshapedluminariessimilartoSternbergA850with
internalindirectreflectortomatchcampusstandard,175wattMetalHalidelamps,mountedon14
footpolestomatchcampusstandard. Lightswillbecontrolledbyphotocellandcontactor.
InteriorLighting
Lightingincommonloungeareasonfloors2,3,and4willbereplacedwithsurfacemounted1x4
fluorescentlampsandelectronicballasts,withindirectinternalreflector,controlledbylocalswitches
incombinationwithoccupancysensorsanddaylightingcontrolwhereappropriate,for30footcandle
tomeettheStateofMinnesotaB3requirements.
Corridorlightingconsistsoffourfootlong,twolamp,T8surfacemountedwraparound,electronic
ballastedfluorescentfixturesinstalledin2003. Thesefixtureswillnotbereplacedatthistime.First
floorcorridordoesnotcontainanymanualswitchingandwillrequireadditionofautomaticcontrol
suchasoccupancysensororlightingcontrolpanel.
Lightinginresidenceroomswillbetotallyreplacedwitha2x4surfaceceilingmounted2lamp,T5
fluorescentfixturewithdurableDRroughdutyacrylicbasketcontrolledbylocalroomswitch.
Portablefluorescenttasklightswillbeprovidedatstudydesklocationswithcordandplugfor
connectiontoroomduplexreceptacle.
Lightinginoffices,smallmeetingroomsandsimilarspaceswithcomputerswillbefluorescent2x4lay
in orsurfacemountedT5lampsandelectronicballasts,withindirectinternalreflectorwithlouvere
83
7/30/2019 MSUM part 2
25/57
MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical
PredesignReport Page9of11
bottom basketforglarecontrolonVDTs,controlledbylocalswitchincombinationwithoccupancy
sensors,for50footcandlestomeettheStateofMinnesotaB3requirements.
Existinglightinginstorageandutilityspaceswillbereplacedwithnewsurfaceorsuspended4foot
industrialfluorescentstripswithT5lamps,electronicballastsandmetalwireguards,controlledby
occupancysensors,
for
20
foot
candles
to
meet
the
State
of
Minnesota
B3
requirements.
Existinglightinginconferenceandlargermeetingroomswillbereplacedwithnewfluorescent1X4
pendantmounted,direct/indirectwithmetalperforations. Thefluorescentlightfixtureswillbe
providedwith1%electronicdimmingballasts. Amanualdimmingsystemwillbeprovidedforall
lightingwithinconferenceroomsforA/Vpresentations.
Existinglightingingangbathroomsandshowersconsistsofsurfacemountedfourfootlong,twoT8
lamps,andwraparoundlens,andappearstobequiteadequate. Thesefixtureswillrelocatedto
accommodatetheintendedremodeling. Asanoption,thesefixtureswillbereplacedwithnew
shallow, surfacemounted,T5fluorescentfixtureswithelectronicballastsandDRacrylicwraparou
lenswithwetlocationlabel.Newcontrolswillbelocaloccupancysensor.
Existinglightinginlaundriesandkitchenswillbereplacedwithmodernfluorescent1x4layinor
surfacemountedfixtureswithT5lamps,acryliclensesandelectronicballasts,controlledby
occupancysensorsandbuildinglightingcontrolpanel,for30footcandlestomeettheStateof
MinnesotaB3requirements.
Existingstairwaylightingwillbereplacedwithwallmountedup/downfluorescentroughdutytype
withDRacryliclensmountedforeaseofaccessformaintenance,controlledbybuildinglighting
controlpaneltomeettheStateofMinnesotaB3requirements.
Dualtechnologyoccupancysensorcontrolswillbeutilizedinstorageroomsandsimilarnon
circulationspaces
to
meet
the
State
of
Minnesota
B3
requirements.
Mechanicalandelectricalroomslightingwillbecontrolledbylocalswitchonlyforsafetypurposes,n
occupancysensorcontrol.
ExistingemergencyexitlightingisprovidedviamodernLEDexitlightscontainingbatterybackup,and
willnotbereplacedatthistime.
Existingemergencyegresslightingisprovidedbyduallowvoltagelampedunitlightingequipment
locatedthroughouttheegresspathway,andwillnotbereplacedatthistime.
LightningProtection
System
Alightningprotectionsystemdoesnotexistandwillnotbeprovided.Avariancerequestmustbe
submittedtoMNSCU.
COMMUNICATIONS
VoiceandData
84
7/30/2019 MSUM part 2
26/57
MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical
PredesignReport Page10of11
Thebuildingcontainsalimitedstructuredcablesystem(backbone)withhubatthefrontentrydesk,wired
outletsinthestaffapartmentandnorthstudentlounge. Residenceroomsareservedbywirelessnetwork
serviceonly. Noadditionalhardwiredvoiceordataoutletsarerequiredatthistime.Campusisconsidering
addingDSLasaseparateproject.
EntertainmentCATV
AseparateentertainmentCATVcoaxcabledistributionsystemexiststhroughoutthebuilding servin
allresidenceroomsatthistime,providedbyCableOne,alocalcabletelevisionvendorat1024Page
Drive,Fargo,ND.Nochangesareanticipatedatthistime.FurtherdiscussionwiththeCampusA/V
Departmentwillberequiredtodeterminefuturecableservicearrangementsandcableownership
issues. ThecablesystemispresentlymaintainedbyCableOne.
ELECTRONICSAFETYANDSECURITY
FireAlarm
The
existing
Simplex
4002
non
addressable
fire
alarm
panel
will
be
replaced
with
a
new
multiplexed,microprocessorbased,networkedfirealarmsysteminthebuilding. Interconnectionofsprinklerflow
andcontrolvalveswillbeprovidedforoncampuscentralstationannunciation.Mainfirealarm
controlpanelwillbelocatedinthemainelectricalroom. HoneywellXLS1000FireAlarmwithnetwo
cardforoperatingonamultipriority,peertopeertokenringnetworkisthepreferredsupplierof
equipmentforcompatibilitywithothercampusequipment. ThispanelalsoservesEastSnarrbuildin
andconnectionswillbemaintainedtothisbuilding.
Aremotefirealarmannunciatorpanelwillbelocatedinthemainentrywherereadilyaccessibleto
localFireDepartmentpersonnel.
Alarmand
trouble
indication
will
be
transmitted
via
separate
fiberoptic
cable
to
the
data
center
in
th
LivingstonLordLibraryforinterconnectiontothecampusSecurityDispatchformonitoringpurposes
Nonsecuritycorridordoorswillbefittedwithmagneticdoorholdersconnectedtofirealarmsystem
tocloseuponalarm.
Existingductsmokedetectorswillbereplacedwithanalogaddressableductsmokedetectorsprovid
forallAHUsandfire/smokedamperoperations.
Existingareatypesmokedetectorswillbereplacedwithanalogaddressablephotoelectricsmoke
detectorswith
local
alarm
in
residence
rooms,
and
in
elevator
lobbies
for
signaling
the
elevator
and
forfirealarm.
Existingvisualandauralsignalalarmindicatingapplianceswillbereplacedwithnewappliances
throughoutthebuilding. Combinationvisualandauralsignalalarmindictingapplianceswillbe
providedineachhandicappedresidenceroom. Auralonlysignalalarmindicatingapplianceswillbe
providedinallothernonhandicappedresidencerooms.
85
7/30/2019 MSUM part 2
27/57
MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical
PredesignReport Page11of11
Voiceannunciationcapabilitieswillbereviewedwiththecampussecurityforpotentialpublic
announcementpurposes,suchasweatherdanger,terroristthreats,orothernecessaryemergency
messages. CampushasanexistingE2CampusserviceconsistingofText/Voice/Emailbasedsystemfo
massnotification. CoordinationwiththeDirectorofCampusSecuritywillbenecessaryforfurther
requirements.
Allwiringwillbeinstalledinconduit.
DoorSecuritySystem
Conduitandbackboxesonlywillbeprovidedbythecontractoratentriesandexitsforfuture
installationofcampusstandardsecuritydoorhardwareformonitoringandcontrolofselectdoors,
whichisHoneywellaccesssystems. Intercomstationsatmainentrieswillbeprovidedbythe
contractorwithproductsimilartoVikingElectronicstomatchcampusstandard.Coordinationwithth
DirectorofCampusSecuritywillbenecessaryforfurtherrequirements.
Allwiringforintercomstationsandcardreaderswillbeinstalledinconduit.Cardreadersand
intercomstationswillbeprovidedinthefuturebytheUniversity.
VideoSurveillanceCamerasystem
ThecontractorwillprovideconduitandbackboxesonlyforfutureinstallationofCCTVvideocameras
inselectpublicspacesandentriestothebuildingforsecuritysurveillancepurposes. Conduitwill
terminateinthemainmechanical/electricalroomforfutureinstallationofcable.Thesefuturevideo
cameraswillberemotemonitoredandrecordedatcentralsecurityoncampusviaanIPbased
HoneywellDigitalVideoManagerVersion300.1.7283. CoordinationwiththeDirectorofCampus
Securitywill
be
necessary
for
further
requirements.
AnexistingCCTVcameramonitorsthevendingareawithcableconnectionbacktoaDVRinRoom
J101. Thissystemwillremainoperational.
Allwiringinthefuturewillbeinstalledinconduit. CCTVcameraswillbeprovidedinthefuturebyth
University.
End of Report for West Snarr HallJ:\2010\201001400\DOCS\MSUM West Snarr and Dahl Halls Preliminary Elect Narrative.docx
86
7/30/2019 MSUM part 2
28/57
Section 3E: Dahl Hall Predesign Space ProgramApril 23, 2010, Revised June 10, 2010
Dahl HallProgram Use/ Space Quantity Area Total Notes
Double Rooms 152 183 27,816 Quantity Beds Total Beds
Doubles used as Doubles 143 2 286
Designated Doubles used as Singles 2 1 2RA Unit (Double used as Single) 6 1 6Desk Manager (Double used as Single) 1 1 1
295Assignable Beds
Efficiency Staff Apartment 1 475 475Area Director Apartment 1 730 730 29,021
Residential Total
Activity/Lounge 6 384 2,304(2 per floor)
Bathroom 6 556 3,336(2 per floor)
Laundry 6 230 1,380(2 per floor)
Study Room 2 178 356(1 per floor, floors 2-3)
7,376
Student Amenity Total
Public Restroom 1 80 80
Main Lobby 1 650 650Lounge 1 2,000 2,000Kitchen 1 250 250Vending 1 80 80Computer Lab 1 90 90
3,150First Floor Common Total
AdministrationReception / Work Room 1 300 300
RD Director Office 1 178 178
Hall Council Office 1 90 90
3,718Admin Total
Trash/ Recycling 3 68 204(1 per floor, floors 1-3)
Custodial 3 136 408(1 per floor, floors 1-3)
Custodial Closets 6 25 150
(2 per floor, floors 1-3)
762Trash/Cust Total
Existing Basement Space Program is not included/ Basement is not a part of the renovation
Electrical Closets 3 24 72
Mechanical Penthouse 3 824 2,4722,544
Mech/ Elec Total
Total 43,421 Total Building Program Space
1.25 Net to Gross Factor (circulation, exterior walls, etc.)54,485 Total Building Area
MSUM: Dahl and West Snarr Halls Predesign Report
Section 3E: Dahl Hall Predesign Space Program
Page 1 of 1
87
7/30/2019 MSUM part 2
29/57
Section 3F: West Snarr Hall Predesign Space ProgramApril 23, 2010, Revised June 10, 2010
West Snarr HallProgram Use/ Space Quantity Area Total Notes
Doubles 51 178 9,078 Quantity Beds Total Beds
Doubles used as Doubles 45 2 90
RA Unit (Double used as Single) 3 1 3
Desk Manager (Double used as Single) 2 1 2
Showroom 1 0 0
95
Assignable Beds
Hall Director Apartment 1 880 880 9,958
Residential Total
Activity/Lounge 3 222 666
(1 per floor, floors 2-4)
Bathroom 6 225 1,350
(2 per floor, floors 2-4)
Laundry 3 150 450
(1 per floor, floors 2-4)
2,466Student Amenity Total
Public Restroom 2 150 300
First Floor Lounge 1 500 500
Meeting/Seminar (Honor's Lounge) 2 485 970
Meeting/Seminar 2 170 340
Meeting/Seminar 1 125 125
Kitchen 1 170 170
Vending 1 80 80
2,485
First Floor Commons Total
Administration
Reception / Work Room 1 250 250
RD Director Office 1 150 150
2,885
Admin Total
First Floor Mechanical 1 330 330
Trash/ Recycling 3 95 285
(1 per floor, floors 1-4)
First Floor Custodial 1 80 80
695
Trash/Cust Total
Basement Mechanical Existing
Electrical Closets (floors 2-4) 3 24 72
Mechanical Penthouse 1 824 824
896
Mech/ Elec Total
Total 19,385 Total Building Program Space
1.32 Net to Gross Factor (circulation, exterior walls, etc.)
25,534 Total Building Area
MSUM: Dahl and West Snarr Halls Predesign Report
Section 3F: West Snarr Hall Predesign Space Program
Page 1 of 1
88
7/30/2019 MSUM part 2
30/57
RENOVATIONOFDAHL&WESTSNARRHALLS:PRE-DESIgN
Moorhead,Minnesota
11June2010
DAHLHALL:BasementPlan
Storae
ExistinLaundry
Room
Laundry
Room
ExistinStudWalls
StaffLoune
RHAssoc.Room
ExistinCMUWalls
ExerciseRoom(
Closed)
Kitchen
Storae
Mechanical
Jan.
gMW
Linens
gM
W
Laundry
Shop
NOTE:Basementisnotincludedin
Pre-DesinScope,exceptasrequiredfor
modicationstoM/E/P,asrequiredto
addsprinkler&asrequiredtomeetcode.
89
7/30/2019 MSUM part 2
31/57
RENOVATIONOFDAHL&WESTSNARRHALLS:PRE-DESIgN
Moorhead,Minnesota
11June2010
DAHLHALL:FirstFloorPlan
Newplumbin,HVAC,
xtures,
nishes&lighting
Seeoptiontocreate
LaundryRoom
Lounes&Corridors:
New
lighting&nishes
Units:
New
nishes&
lighting
UpradeElectrical
FirstFloorAmenities:
Recongure,
new
nishes&
newlihtin
Bathrooms:
Newplumbin,HVAC,
xtures,
nishes&lighting
NOTE:Entireoorupgradesincludeadding
sprinklersthroughout&M/E/PUpgrades
Student
Loune
Loune
Lobby
Student
Loune
Receptio
n
Ofce
A
rea
Dir
ector
Ofce
Cust
g
RemodelStaff
Apartment
Recongure&
Remodel
Accessible
Unit
Trash
Hall
Council
Ofce
Computer
Lab
Ramps:
RequireReplacement
Steps:
RequireReplacement
SeeProposed
Plan
90
7/30/2019 MSUM part 2
32/57
RE
NOVATIONOFDAHLHALL:PRE-DEsIgN
Moorhead,
Minneota
11June2010
ProposedRenovationsto
FirstFloorCommonsArea
sTAFFAPARTMENT
EFFICIENCY
APARTMENT
Recep
tion
Mail/Work
Meetin
Room
AreaDirector
Ofce
Cutodian
Elev.
Trah
Vetibule
Vetibule
Toilet
Vending
FireRated
PartitionWall
Loune
New
Fireplace
Vet
ibule
Vetibu
le
Kitchen
Bathroom
Livin
Bedroom2
Kitchen
Bedroom1
Bathroom
Livin/Bedroom
Kitchen
Counterseating
V
IE
W
s
PartitionWall
Caua
lseatin/TVArea
91
7/30/2019 MSUM part 2
33/57
RENOVATIONOFDAHL&WESTSNARRHALLS:PRE-DESIgN
Moorhead,Minnesota
11June2010
DAHLHALL:2&3FloorPlans
Bathrooms:
Newplumbin,HVAC,
xtures,
nishes&lighting
Bathrooms:
Newplumbin,HVAC,
xtures,
nishes&lighting
Student
Loune
Stu
dy
Room
Stor.
T
Corridors:
Newlihtin&
new
nishes
Amenities:
New
nishes&
newlihtin
Units:
New
nishes&lighting
UpradeElectrical
NOTE:Entireoorupgradesincludeadding
sprinklersthroughout&M/E/PUpgrades
Possiblyadd
Laundryto
eachoor-
conrm
location.
92
7/30/2019 MSUM part 2
34/57
RENOVATIONOFDAHL&WESTSNARRHALLS:PRE-DESIgN
Moorhead,Minnesota
11June2010
WESTSNARRHALL:FirstFloorPlan
FIRSTFLOORSCOPE:
Gutrstooramenitiesspaces&recon-
gureforstudentamenity,staffapart-
ment&live/learnspaces
NOTE:Entireoorupgradesincludeadding
sprinklersthroughout&M/E/PUpgrades
Student
Loune
Honors
Loune
OldWeiht
Room
Vendin
Reception
Ofce
Work
Staff
Apartment
T T
Bathrooms:
Newplumbin,HVAC,
xtures,
nishes&lighting
93
7/30/2019 MSUM part 2
35/57
RENOVATIONOFDAHL&WESTSNARRHALLS:PRE-DESIgN
Moorhead,Minnesota
11June2010
WESTSNARRHALL:2-4FloorPlans
NOTE:Entireoorupgradesincludeadding
sprinklersthroughout&M/E/PUpgrades
Bathrooms:
Newplumbin,HVAC,
xtures,
nishes&lighting
Corridors:
Newlihtin&IT
Units
New
nishes&lighting
UpradeElectrical&IT
Amenities:
New
nishes&lighting
Amenities:
New
nishes
&lihtin
94
7/30/2019 MSUM part 2
36/57
RENOVA
TIONOfWESTSNARRHALL:PRE-DESIgN
Moorhead,
Minnesota
24May2010
FirstFloorPlan
95
7/30/2019 MSUM part 2
37/57
RENOVA
TIONOfWESTSNARRHALL:PRE-DESIgN
Moorhead,
Minnesota
24May2010
2
-4
FloorPlans
96
7/30/2019 MSUM part 2
38/57
Minnesota State University Moorhead | Renovation of Dahl & West Snarr Halls | 100% Pre-Design Report
June 11, 2010 | Elness Swenson Graham Architects, Inc.
section4:sustainability/energy statutes
97
7/30/2019 MSUM part 2
39/57
!"""#$%&'((
%)*%+,),-&$./01
12#3%)0"
(
412#3
1 """ #
"1
%5567896# -" 4#:.- 4#"" .""" 5 4### ";5"
98
7/30/2019 MSUM part 2
40/57
Minnesota State University Moorhead | Renovation of Dahl & West Snarr Halls | 100% Pre-Design Report
June 11, 2010 | Elness Swenson Graham Architects, Inc.
section5:financial information
capital expenditures
99
7/30/2019 MSUM part 2
41/57
! ""
!"#
## ! ! ! $%&
!&$$$'(!)
! *
++)
Dahl Hall
Estimated Construction Cost $4,885,138
Design Contingency 10% $488,514
Total Base Construction Cost $5,373,652
Hazardous Abatement $390,000
Construction Contingency 10% $537,365
Total Construction Cost $6,301,017
Total Soft Costs 2,313,298
Total Project Cost $8,614,315
West Snarr Hall
Estimated Construction Cost $2,361,875Design Contingency 10% $236,188
Total Base Construction Cost $2,598,063
Hazardous Abatement $112,000
Construction Contingency 10% $259,806
Total Construction Cost $2,969,869
Total Soft Costs 1,706,535
Total Project Cost $4,676,404
100
7/30/2019 MSUM part 2
42/57
Section5B:
PROJECTBUDGETWORKS
HEET
RENOVATIONOFDAHLHALL-
S
CHEDULEOPTION#2-
CONSTRUCTIONSUMMEROF2011AND
2012
MINNESOTAST
ATEUNIVERSITYMOORHEAD P
redesign%
PredesignBudget
Appropriation
Budget
Comments
1
PropertyAcquisition
Land,LandEasements,Options
Buildings(Purchase)
Legal
Surveys
SUBTOTAL
0
0
2
PredesignFees(0.5-1%
of5a-d)
DesignFees
0
Paidfromdifferentbudget
SUBTOTAL
0
0
3
DesignFees(6-12%of
5a-d)
8%
7%
TotalA
rchFees
3.aReimbursables
1%
53,7
37
$376,156TotalA
rchFees
3.bSchematicDesign
(20%o
f3b-f)
75,2
31
20%
3.cDesignDevelopment
(25%o
f3b-f)
94,0
39
25%
3.d
ConstructionDocuments
(30%o
f3b-f)
112,8
47
30%
3.eBidding
(5%o
f3b-f)
18,8
08
5%
3.fConstructionAdministr
ation
(20%o
f3b-f)
75,2
31
20%
SUBTOTAL
429,892
0
4
ProjectManagement(3-10%5a-d)
6.14%
Advertising
DesignerSelectionBoar
d
LegalFees
StateStaffProgramManagement(.80%programcost)
1.00%
76,000
1%ofT
otalProjectCost
Non-StateProjectManagement(0-3%o
f5a-d)
2.00%
107,473
SystemsCommissioning(0-1%o
f5c)
1.00%
53,737
OtherCosts(2-6%of
5a-d)
SiteProperty&TopographicSurvey
0.37%
20,000
HazardousMaterialA
batementDesign&Monitoring
50,000
SoilBorings&Geotec
hnicalSurvey
0.00%
0
StateCodeReview
0.47%
25,000
A.DesignSupportConsultants
0.37%
20,000
Design/ProjectManualReviews
Geotechnical/Masonry/FlashingDesignReviews
Window/Curtain
WallDesignReviews
MechanicalDesignReviews
BrickMaterialsPre-SelectionTesting
B.Inspection&Testi
ngConsultants
0.93%
50,000
AsphaltPaving
Draintile
Flashings
Geotechnical
HVACBalancing
Masonry
Roof
Sealant
SpecialTesting
Structural
Waterproofing
101
7/30/2019 MSUM part 2
43/57
Section5B:
PROJECTBUDGETWORKS
HEET
RENOVATIONOFDAHLHALL-
S
CHEDULEOPTION#2-
CONSTRUCTIONSUMMEROF2011AND
2012
MINNESOTAST
ATEUNIVERSITYMOORHEAD
0
Predesign%
PredesignBudget
Appropriation
Budget
Comments
5
ConstructionCosts
5.aSiteandBuildingPrepa
ration
5.bDemolition(Permanent
removalofbuilding)
54,485GSF
5.cConstruction
BaseConstructionCost
5,3
73,6
52
$99$/GSF
baseme
ntnotinlcudedinpredesign
$18,216BaseC
onstructionCost/Bed
5.d
Infrastructure,Roads,Utilities
0
5.eHazardousMaterialAb
atement
390,0
00
5.fConstructionContingen
cy(5-10%o
f5a-d)
10
%
537,3
65
SUBTOTAL
6,301,017
0
$116$/GSF
6
OnePercentforArt(1%
of5a-d)
SUBTOTAL
0
0notrequired
7
SUBTOTAL
0
0notincluded
8
Occupancy(4-10%of5a-d)
FurnitureFixturesand
Equipment
ResidentRooms
531,0
00
1800unitfurniturecostperbed
CommonSpaces
191,7
50
295assigna
blebedsinDahl
650commo
nfurniturecostperbed
Telecommunications(V
oice&Data;ifnotincludedinConst.)
150,0
00
includessecurity,AVandITatcommonareas
SecurityEquipment(If
notincludedinConst.)
OtherCosts:
PostOccupancyEva
luation
0
SUBTOTAL
872,750
0
TOTALSUBTOTAL
8,005,869
0
9
Inflation
MidpointofConstruction(mo/yr)
1/2012.
InflationMultiplier
7.60%
InflationCost
608,4
46
TotalP
rojectInflation
SUBTOTAL
608,446
0
54,485GSF
10GRANDTOTAL
0
8,614,315
0
$29,201TotaProjectCost/Bed
$158TotalP
rojectCost/GSF
COMMENTS:
2,313,298TotalS
oftCosts
1TotalProjectcostdoesn
otincludeDebtServiceReserve,
CapitalizedInterest,orIssueCosts
OFFICEOFTHEC
HANCELLOR
[INSERTNAMEOFC
OLLEGE/UNIVERSITY]
By:_________________
_____________________________________
`
Title:_____________________________________________________
Date:_______________
_____________________________________
Relocation(Cannotbef
undedbybondfunds)
Title:___________
Date:__________
By:____________
102
7/30/2019 MSUM part 2
44/57
SECTION5C:PROJECTBUDGETWORK
SHEET
RENOVA
TIONOFWESTSNARRHAL
L-
BASEDON
SUMMER2013CONSTRUC
TION
MINNESOTA
STATEUNIVERSITYMOORHEAD
RENOVATIONOFWESTSNARRHALL
Predesign%
PredesignBudget
Appropriation
Budget
Comments
1
PropertyAcquisition
Land,LandEasements,Options
Buildings(Purchase)
Legal
Surveys
SUBTOTAL
0
0
2
PredesignFees(0.5-1%o
f5a-d)
DesignFees
0
Paidfromdifferentbudget
SUBTOTAL
0
0
3
DesignFees(6-12%
of5a-d)
8%
7%
Arch
Fees
3.a
Reimbursables
1%
25,981
$181,864Total
ArchFees
3.b
SchematicDesign
(20%o
f3b-f)
36,373
20%
3.c
DesignDevelopmen
t
(25%o
f3b-f)
45,466
25%
3.d
ConstructionDocum
ents
(30%o
f3b-f)
54,559
30%
3.e
Bidding
(5%o
f3b-f)
9,093
5%
3.f
ConstructionAdministration
(20%o
f3b-f)
36,373
20%
SUBTOTAL
207,845
4
ProjectManagement
(3-10%5a-d)
8.23%
Advertising
DesignerSelectionBoard
LegalFees
StateStaffProgram
Management(.80%programcost)
0.80%
20,785
Non-StateProjectM
anagement(0-3%o
f5a-d)
2.00%
51,961
SystemsCommissio
ning(0-1%o
f5c)
1.00%
25,981
OtherCosts(2-6%
of5a-d)
SiteProperty&T
opographicSurvey
0.77%
20,000
HazardousMaterialAbatementDesign&Monitoring
50,000
SoilBorings&Ge
otechnicalSurvey
0.00%
0
StateCodeReview
0.96%
25,000
A.DesignSuppor
tConsultants
0.77%
20,000
Design/ProjectManualReviews
Geotechnical
/Masonry/FlashingDesignReviews
Window/CurtainWallDesignReviews
MechanicalD
esignReviews
BrickMateri
alsPre-SelectionTesting
B.Inspection&T
estingConsultants
1.92%
50,000
AsphaltPaving
Draintile
Flashings
Geotechnical
HVACBalan
cing
Masonry
Roof
Sealant
SpecialTesting
S t t l
103
7/30/2019 MSUM part 2
45/57
SECTION5C:PROJECTBUDGETWORK
SHEET
RENOVA
TIONOFWESTSNARRHAL
L-
BASEDON
SUMMER2013CONSTRUC
TION
MINNESOTA
STATEUNIVERSITYMOORHEAD
Predesign%
PredesignBudget
Appropriation
Budget
Comments
5
ConstructionCosts
5.a
SiteandBuildingPreparation
5.b
Demolition(Permanentremovalofbuilding)
25,534GSF
5.c
Construction
BaseConstructionCost
2,598,063
$102$/GSF
5.d
Infrastructure,Roa
ds,Utilities
$26,784Base
ConstructionCost/Bed
5.e
HazardousMateria
lAbatement
112,000
5.f
ConstructionContingency(5-10%o
f5a-d)
10%
259,806
SUBTOTAL
2,969,869
0
$30,617Total
ConstructionCost/Bed
6
OnePercentforArt(1%o
f5a-d)
SUBTOTAL
0
0not
required
7
SUBTOTAL
0
0not
included
8
Occupancy(4-10%of5a-d)
FurnitureFixturesandEquipment
ResidentRooms
6.72%
174,600
1800unitf
urniturecostperbed
CommonSpaces
2.43%
63,050
97assignablebedsinWestSnarr
FirstFloorSpaces
200,000
650comm
onfurniturecostperbed
Telecommunication
s(Voice&Data;ifnotincludedinConst.)
2.50%
145,700
includessecurity
SecurityEquipment(IfnotincludedinConst.)
OtherCosts:
PostOccupancy
Evaluation
0
SUBTOTAL
11.65%
583,350
0
TOTALSUBTOTAL
4,024,791
0
9
Inflation
MidpointofConstruction(mo/yr)
6/2013.
InflationMultiplier
16.19%
InflationCost
651,614
TotalProjectInflation
SUBTOTAL
651,614
0
10GRANDTOTAL
0
4,676,404
0
1,706,535Total
SoftCosts
COMMENTS:
25,534GSF
1TotalProjectcostdo
esnotincludeDebtServiceReserve,
CapitalizedInterest,orIssueCosts
$48,210TotaProjectCost/Bed
$183Total
ProjectCost/GSF
OFFICEOFTH
ECHANCELLOR
[INSERTNAMEO
FCOLLEGE/UNIVERSITY]
By:______________________________________________________
Title:____________
_________________________________________
Relocation(Cannotbefundedbybondfunds)
Title:___________
By:____________
104
7/30/2019 MSUM part 2
46/57
MSUM Predesign for Dahl and West Snarr HallsSection 5D: Dahl Hall- Alternate Costs Summary
Dahl Hall Renovation
Alt # Item
EstimatedConstruction
Cost w/accepted
Alternates
Alternate Costs- NOTINCLUDED IN BASE
CONSTRUCTION
COST Notes
Base Cost Dahl Hall- First Floor 834,154$
Dahl Hall- Second and Third Floors 1,113,032$
Dahl Hall- Mechanical/Electrical 2,407,725$
Basement (sprinkler/new ACT throughout) 153,793$
Sitework 21,425$
Alt 1 Penthouse 183,715$
Alt 2 Gas Fireplace at Lounge 7,529$
Alt 3 New Aluminum Windows 460,044$
Alt 4
Add 2" rigid insulation & composite metal panelon SS framing to exterior walls 650,000$ Either Alt 5 or 6- not both
Alt 5
Add 1" rigid insulation and 5/8" moisture
resistant gypsum board on metal stud furring 93,765$ Either Alt 5 or 6- not both
Alt 6 Additional Landscaping 50,000$
Alt 7 New weatherstripping at existing windows 20,000$
Estimated
ConstructionCost
Alternate Costs- NOTINCLUDED IN BASE
CONSTRUCTIONCOST
SubTotal Base Construction Cost 4,885,138$ 1,110,044$
Design Contingency 10%$488,514
Total Construction Cost (used on Project Budget Worksheet) 5,373,652$
54,485 Building Area Does not include basement area
99$ Cost/GSF
285 Number of Beds
18,855$ Cost per Bed
105
7/30/2019 MSUM part 2
47/57
MSUM Predesign for Dahl and West Snarr HallsSection 5E: West Snarr Hall- Alternate Costs SummaryRevised 06/02/10
West Snarr Hall Renovation
Alt # Item
EstimatedConstruction
Cost w/accepted
Alternates
Alternate Costs-NOT INCLUDED IN
BASE
CONSTRUCTION
COST Notes
Base Cost Renovate West Snarr Hall 2,028,225$
Alt 1 New Entrance and Stair Addition 61,238$
Alt 2 New Windows 210,019$
Alt 3 Penthouse 244,953$
Alt 4 New flooring, ACT and lighting at Links 27,459$
Alt 5 Refinish existing wardrobes/ keep exist carpet 24,699$
Alt 6
New foundation/ exterior wall to bump-out meeting
rooms 74,952$
EstimatedConstruction
Cost
Alternate Costs-NOT INCLUDED IN
BASE
CONSTRUCTION
COST
SubTotal Base Construct ion Cost 2,361,875$ 309,670$
Design Contingency 10%
$236,188
Total Construction Cost (used on Project Budget Worksheet) 2,598,063$
25,534 Building Area Does not include basement area102$ Cost/GSF With Contingency
97 Number of Beds26,784$ Cost per Bed With Contingency
106
7/30/2019 MSUM part 2
48/57
Minnesota State University Moorhead | Renovation of Dahl & West Snarr Halls | 100% Pre-Design Report
June 11, 2010 | Elness Swenson Graham Architects, Inc.
section6:financial information
ongoing operating expenditures
107
7/30/2019 MSUM part 2
49/57
MSUM:RenovationofDahlandWestSnarrHalls Section6A:ProgramProformaAssumptions
PredesignReport Page1of4
Section6A:ProgramProformaAssumptionsRenovationofDahlHallandWestSnarrHallJune17,2010
OverviewofMasterPlanInAugust2009,AlexanderandAssociates,inpartnershipwithAngeliniandAssociates,
completedamasterplanforHousingandResidentialLifeatMinnesotaStateUniversity
Moorhead.
Themasterplanreportsuggestsrenovatingmostexistingfacilities,buildinganewsuitestyle
residencehall,andengaginginapublic/privatepartnershipfortwoapartmentbuildingslocated
oncampus. Atthistime,HousingandResidentialLifeisfocusingonrenovatingexisting
facilitiesinstead
of
proposing
anew
residence
hall.
In
addition,
we
will
soon
begin
exploring
theneedforandfeasibilityofadditionalhousing.
ScheduleSummer2010: GranthamHall: Renovatestudentrooms
JohnNeumaierHall: PurchasefurnitureforloungesSummer2011: DahlHall(PhaseOne): Renovaterooms,bathrooms,andcommonareas.
Renovationwillnotincludebasement.
Summer2012: DahlHall(PhaseTwo): Renovaterooms,bathrooms,andcommonareas.Renovationwillnotincludebasement.
Summer2013: WestSnarrHall: Renovatestudentrooms,bathrooms,andcommonareas.
Summer2013: EastSnarrHall: Renovatestudentrooms,bathrooms,andcommonareas.Summer2014: SouthSnarrHall: Renovatestudentrooms,bathrooms,andcommon
areas.
Summer2015 NelsonHall(PhaseOne): Renovatestudentrooms,bathrooms,andcommonareas.
Summer2016: NelsonHall(PhaseTwo): Renovatestudentrooms,bathrooms,andcommonareas.
FinancingThe
proforma
assumes
the
following
projects
will
be
bonded:
Dahl,
West
Snarr,
and
Nelson.
Theremainingprojects(Grantham,JohnNeumaier,EastSnarr,andSouthSnarr)willbepaidfor
withR&Rfunds.
RatesPartofthestrategyforaffordingtorenovatemanyoftheexistingfacilitiesinvolvescharginga
higherroomrateforrenovatedfacilities. Theproformaassumesanannual4%rateincrease. In
108
7/30/2019 MSUM part 2
50/57
MSUM:RenovationofDahlandWestSnarrHalls Section6A:ProgramProformaAssumptions
PredesignReport Page2of4
addition,asafacilityisreopenedafterrenovation,anadditionalonetime14%feewillbe
charged(4%+14%). Thefollowingyear,theroomrateincreasewillreturnto4%.
OccupancyTheproformaassumesthefollowingoccupancyatthe10
thclassdayofthefallsemester. The
annualizedoccupancy
assumption
is
94%.
DoubleRoomsinBallard,Dahl,EastSnarr,SouthSnarr,WestSnarrHalls: 98%
DoubleRoomsinNelsonHall: 94%
SingleRooms: 99%
DoubleasSingleRooms: 99%
DahlHallandWestSnarrHallProformaAssumptionsDahlHallBondingRequirementTheprojectedbondingrequirementfortheDahlHallrenovationprojectis: $9,850,745. The
followingassumptionsweremadetodeterminetheprojectedbondingrequirement:
PHASEONE(Summer2011)
Projectcostestimate: $5,228,175Annualconstructioninflation: 5.66%
Inflatedprojectcost: $5,524,090
Capitalizedinterest: $300,000
Debtservicereserve: $516,099
Otherissuecosts: $91,551
PhaseOne
bonding
requirement:
$6,431,740
PHASETWO(Summer2012)
Projectcostestimate: $2,777,694
Annualconstructioninflation: 10.89%
Inflatedprojectcost: $3,080,185
Capitalizedinterest: $0
Debtservicereserve: $274,350
Otherissuecosts: $64,470
PhaseTwobondingrequirement: $3,419,005
TOTALDAHLHALLBONDINGREQUIREMENT: $9,850,745
109
7/30/2019 MSUM part 2
51/57
MSUM:RenovationofDahlandWestSnarrHalls Section6A:ProgramProformaAssumptions
PredesignReport Page3of4
WestSnarrHallBondingRequirement****NOTE: WestSnarrisnotincludedinthe2011BondSale. Theproformaassumesfundinginafuturebondsale(assume2013). ****TheprojectedbondingrequirementfortheWestSnarrrenovationprojectis: $5,486,532.
Thefollowingassumptionsweremadetodeterminetheprojectedbondingrequirement:
Projectcostestimate: $4,024,791
Annualconstructioninflation: 19.14%
Inflatedprojectcost: $4,672,551
Capitalizedinterest: $300,000
Debtservicereserve: $440,254
Otherissuecosts: $73,727
Totalbondingrequirement: $5,486,532
BondAssumptionsThe
proforma
assumes
a5%
bond
rate,
and
a20
year
term.
DebtServiceTheproformaassumesthefollowingannualdebtservicepaymentsfortheDahlandWestSnarr
renovationprojects:
Dahl: $793,147
WestSnarr: $437,556
****NOTE: WestSnarrisnotincludedinthe2011BondSale. Theproformaassumesfundinginthe2013BondSale. ****MnSCUFeeAssessmentInadditiontotheannualMnSCUfeeassessment,theproformaassumesanadditionalfeeof0.25%ofparvalueforthetermofthebond.
RevenueCapacityDahlHallhastotalcapacityof302beds,comprisedof150doublerooms(300beds)and2
designateddoubleassinglerooms(2beds). Ofthese302beds,288arerevenuegenerating.
TheremainingbedsareoccupiedbyResidentAssistantsandaDeskManager.
WestSnarrHallhasatotalcapacityof102beds,comprisedof51doublebeds. Ofthese102
beds,94arerevenuegenerating. TheremainingbedsareoccupiedbyResidentAssistants,
LearningCommunity
Dragon
Mentors,
and
ashow
room
used
on
Admissions
tours
gi