Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) 1 MSK PCH 4/28/2018 www.msk-group.org SAKIR ALMOROUJ k. For General Contracts

MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

Project Title :EPCC OF FLOW LINES &

TRUNK LINES (2018-2021)

1

MSK PCH

4/28/2018

www.msk-group.org

SAKIR ALMOROUJ k. For General Contracts

Page 2: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

4/28/2018MSK-PCH-CONTRACT 2

Page 3: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

34/28/2018Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

1.Introduction

FLOW LINES AND TRUNK LINES Project (the “Project”) and Related System Project is carried out by

MSK as EPC contractor for PetroChina International Iraq FZE according to letter of award dated on 27

Dec 2017. The project in handled in Halfaya Oil Field located 35 km southeast of Amarah city, Missan

Governorate, southern part of the Republic of Iraq. MSK activities are performed based on signed

service agreement with PetroChina for the period of four years until 2021.

Project Location; The Halfaya Oil Field is situated in the Missan governorate of Iraq, 35 km southeast of

Amarah city

Client; PetroChina International Iraq FZE Iraq Branch

Contractor; SAKIR ALMOUROJ K. FOR GENERAL CONTRACTS LTD (MSK)

Project name; EPCC OF FLOW LINES & TRUNK LINES (2018-2021)

Project number; PRID-3680 HFY-CONF&C0869-089301

Service order number; SO01

Project Activities;

A. Engineering

B. Procurement

C. Construction

D. Testing

E. Commissioning

Page 4: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

44/28/2018

1.1 HFY OIL FIELD MAP

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 5: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

4/28/2018 5

1.2 Reference

a) PCH and HALFAYA oilfield specifications and

requirements

b) Design Bases

c) 0893 ITB Final PDF files

d) The Project documents

e) Overall Layout

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 6: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

64/28/2018

2.1 SCOPE OF WORK FOR (SO01)

a) The flowlines shall be of carbon steel API 5L-PSL2- BNS/X52NS

b) The flowline shall be buried together in common trench where they have the same

route, the minimum cover of pipeline is 1200 mm (top of pipe)

c) The estimated lengths of the flowlines will base on Location Plan of the respective

well at the relevant Site

2.Understanding the Scope of Work for the project.

The Scope of work to be performed be Contractor is only for ENGINEERING AND

CONSTRUCTION OF FLOWLINES AND TRUNKLINES 2018-2021).This project consist of the

followings as per section 4.0 from contract:

1. Flow lines and trunk lines

2. Civil works

3. Anticorrosion protection.

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 7: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

2.2 Scope & Quantities;

No. Description Details Unit Quantity

1 Pipeline 6" with 3PE/3PP/FBE Coating m 29500

8" with 3PE/3PP/FBE Coating m 32200

2 Road Crossing (Excavation method) 6" pipeline road crossing m 700

8" pipeline road crossing m 750

3 Road Crossing (Jacking method) 6" pipeline road crossing m 700

8" pipeline road crossing m 750

4 Road Crossing (Reserved Culvert) 6" pipeline road crossing m 700

8" pipeline road crossing m 750

5 River/Channel Crossing (with excavation) 6" Pipeline River/Channel Crossing m 200

8" Pipeline River/Channel Crossing m 80

6 River/Channel/Road Crossing (HDD) 6" Pipeline River/Channel/Road Crossing m 450

8" Pipeline River/Channel/Road Crossing m 200

7 Underground pipeline/cable crossing Pipeline crossing each 39

Cable crossing each 20

8 Anchor block m³ 20

9 Drying and Nitrogen filling 6" pipeline m 900

8" pipeline m 300

Page 8: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

84/28/2018

2.3 Overall Layout

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 9: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

94/28/2018

3.Battery Limit

PAD WELL FLOWLINE NEW TL TIE-IN & CPF EXPANSIONM091

JK091D1

JK091D2

JK091D3

M0853D1

JK0853D1

JK0853D2

M0853D2

M0397D1

M0397D2

M0397D3

M0397D4

M0888D2

M0888

M0888D1

M0107D1

M0107D2

M0478D1

M0478D2

M0478D3

M0478D4

M0224D1

M0224D2

K0224H1

M064D1

M064D2

JK064

HF119 M119D2

HF005 JK005D1

HF064

MSK

PRID-3680

SO01

CONTRCATOR & PRIDWELLPADS &TIE-IN TIE-IN & OGM EXPANSION

HF091

(Old

HF082)

HF0853

(Old

HF085)

HF0397

(Old

HF039)

HF0888

(Old

HF080)

*HF0107

HF0478

(Old

HF040)

*HF0224

(Old

HF0236)

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 10: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

104/28/2018

4. Project Organization Chart

4.1 Project Management Organization

MSK-PRID-3680-Project Manager

Construction Manager

HSE Manager

QC Manager

Commissioning Supervisor

Planner Engineering Coordinator

Inspection Supervisor

Document Control Center (DCC)

Security Supervisor

Accountent

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 11: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

114/28/2018

4. Project Organization Chart

4.2 Project Engineering Subcontractor ORG.Chart

Page 12: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

124/28/2018

4. Project Organization Chart

4.3 Project Procurement ORG.Chart

HOME OFFICE ON SITE

HOME OFFICE ON SITE

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 13: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

134/28/2018

4. Project Organization Chart

4.4 Project Construction ORG.Chart Construction Manager

Civil EngineerPiping

Engineer

Instruent Engineer

Quality Engineer

Testing Supervisor

Workshop Supervisor

Equipment Supervisor

Surveyors

HSE Supervisor

Coating Supervisor

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 14: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

144/28/2018

4. Project Organization Chart

4.5 Project QA/QC ORG.Chart

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 15: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

154/28/2018

5-Project Milstones.

Service Order effective date:Mar 20nd 2018

Mobilization: 21-Apr-18

Engineering: 20-Mar-18

Construction-6’’ Pipeline & 8’’ Pipeline: 12-May-18

Commissioning and Demobilization: 28-Oct-18

Project Milstones.(Start Date)

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 16: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

164/28/2018

6. Overall Project Execution Schedule for SO 01 – Level 3 (Start Date & Finish Date)

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 17: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

174/28/2018

6. 1 Engineering Execution Schedule – Level 3 (Start Date & Finish Date)

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 18: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

184/28/2018

7. Site Mobilization Plan (Man Power, Tools & Tackles, Camp, Machinery etc.)

7. 6 HISTOGRAM

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

0

50

100

150

200

250

300

1 2 3 4 5 6 7 8 9 10

Project Week

Chart Title

Indirect Manpower Direct Manpower Equipment

Page 19: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

194/28/2018

8. Project Execution activities

8.1. TOPOGRAPHIC SURVEY

8.2 ENGINEERING

8.3 PROCUREMENT

8.4 CONSTRUCTION

8.5 COMMISIONING

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 20: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

204/28/2018

8. Project Execution activities

8.4.1 TYPICAL DRAWING FOR PIPELINES CROSSING

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 21: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

21

Page 22: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

224/28/2018

8. Project Execution activities

8.4.2 A Typical Drawing Right of Way and Working Strip Dimensions

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 23: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

23

Page 24: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

244/28/2018

9.Project Control System

The elements of project control system shall include:

• Work Breakdown Structure (WBS) for the project

• Project Execution Schedule

• Progress Measurement/Monitoring System

• Progress ‘S’ Curve

• Manpower Histograms

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301

Page 25: MSK PCHmsk-iq.com/en/MSK -PCH - Flow Lines and Trunk Lines -sara-93.pdf · 4 /28 2018 3 Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018 -2021) –SO01 PRID 3680 HFY CONF&C0869

254/28/2018

Thank You for Your

Attention

Project Title :EPCC OF FLOW LINES & TRUNK LINES (2018-2021) – SO01 -PRID-3680 HFY-CONF&C0869-089301