MSDII Managerial Review. P10011 Rochester Institute of Technology 05/19/2010. Project Status. Flex Sensor Update Conceptually not fit for elbow Ergonomic issues. Infeasible implementation Pursue other uses of Flex. Project Status - Dan. Budget Risk Assessment Update Project Plan - PowerPoint PPT Presentation

Citation preview

Page 1: MSDII Managerial Review

MSDII MANAGERIAL REVIEWP10011

Rochester Institute of Technology

05/19/2010

Page 2: MSDII Managerial Review

Project Status• Flex Sensor Update

• Conceptually not fit for elbow• Ergonomic issues

– Infeasible implementation

– Pursue other uses of Flex

Page 3: MSDII Managerial Review

Project Status - Dan• Budget• Risk Assessment Update• Project Plan• Engineering Specs• Customer Satisfaction

Page 4: MSDII Managerial Review

  Bill of MaterialsPart Name Material Distributor Distributor

Part #Quantity Needed

Unit Price Total Price Lead Time

Status

Attachment

18-8 Helical Insert 4-40

Stainless Steel Mcmaster-Carr 91732A701 1 $5.56 $ 5.56 1 week Received

Zinc-Plated 4-40 .5in slotted machine

screws

Steel Mcmaster-Carr 90275A110 1 $2.91 $ 2.91 1 week Received

Zinc-Plated 4-40 5/16in slotted

machine screws

Steel Mcmaster-Carr 90275A107 1 $3.32 $ 3.32 1 week Received

Spirit Gum   Ben Nye SG-1 1 $5.00 $ 5.00 1 week Received

Prohstetic Adhesive   Ben Nye AD-1 1 $7.50 $ 7.50 1 week Received

Mastisol Medical Adhesive Ferndale Labs   1 $3.95 $ 3.95 1 week Received

Detachol Medical Adhesive remover

Ferndale Labs   1 $17.89 $ 17.89 1 week Received

Medical adhesive   Hollister 7730 1 $25.99 $ 25.99 1 week Received

Locktite 4014 Medical grade super glue

Mcmaster-Carr 1818A43 1 $16.39 $ 16.39 1 week Received

Cinched Velcro Band Velcro strip + buckle Mcmaster-Carr 3955T349 1 $5.79 $ 5.79 1 week Received

Heavy Duty Velcro Band

military grade velcro harness and metal

buckle

Mcmaster-Carr 3955T71 3 $2.62 $ 7.86 1 week Received

Enclosure

Neoprene 4x4x4" cube

neoprene Mcmaster-Carr 8882K13 1 $3.49 $ 3.49 1 week Received

Polyethelene 4x6x6" sheet

Polyethelene Mcmaster-Carr 8752K972 1 $41.65 $ 41.65 1 week Received

Rectangular Bar 5/8x1.5x12"

Black Delrin Mcmaster-Carr 8662K88 1 $12.71 $ 12.71 1 week Received

Rectangular Bar 1.25x2.25x12"

White Delrin Mcmaster-Carr 8739K59 1 $34.22 $ 34.22 1 week Received

Polyethelene 3/32x12x12" sheet

HDPE Sheet Mcmaster-Carr 8619K71 1 $4.76 $ 4.76 1 week Received

Ultra Soft sheet 1/8x12x12"

polyurethane 40 OO Duometer

Mcmaster-Carr 8514K411 1 $18.94 $ 18.94 1 week Received

Super Soft Sheet 1/8x12x12"

Neoprene 10A Durometer

Mcmaster-Carr 9109K22 1 $40.23 $ 40.23 1 week Received

Men's UA Eliminate MPZ

padded Under Armor UnderArmor 1201198 1 $64.99 $64.99 1-2 weeks

Received

Misc.Locktite Superflex General Purpose

SiliconeMcMaster-Carr 74945A65 1 $4.70 $ 4.70 1 week Received

  Totals   $ 323.15    

  Totals minus donated material   $ 293.51    

Page 5: MSDII Managerial Review

Risk Assessment• Risk: Patient cannot move naturally while using system

• Would adulterate reported data• Reviewed results with Customer and Advisor• Mitigated during design phase by making people’s movements a design

concern

• Risk: Testing phase does not occur under realistic circumstances• Enclosures would not survive ‘real’ conditions• Exposed enclosures to expected usage• Mitigated by testing beyond overloading test conditions upon completion to

find approximate factor of safety.

Page 6: MSDII Managerial Review

Risk Assessment

• Major Risk: Interfaces do not stay on patient• Sensor package reports useless data

• Solution• Careful attention paid to making the system viable for

patients with many body types• Mitigated by delivering multiple attachment styles

Page 7: MSDII Managerial Review

Risk Assessment• Risk: Lack of communication between P10010 and

P10011• Incomplete Design• Failure to explore possibilities completely• Mitigated by ensuring regular between groups and/or bi-weekly

meetings

Page 8: MSDII Managerial Review

Success Evaluation• Areas of success:

• Designed functional prototype• Tested several attachment techniques• Documented all results for future team

• Areas of lack of success• Flex sensor implementation

Page 9: MSDII Managerial Review

Joe Piehler• Punctual

• Attended all relevant meetings, on time• Prepared to work on arrival

• Thorough and Accurate • Test plan results recording• Majority of paper writing and proofreading

• Communicative • Always available by text or e-mail

• Professional and Ethical • Dedicated

• Never asked more of the team than I was willing to do myself

Page 10: MSDII Managerial Review

Joe Piehler• Test Plan

• Designed majority of tests• Carried out many tests individually• Designed and updated results of testing

• Project Plan• Updated as needed

• Wrote majority of final paper

Page 11: MSDII Managerial Review

Dan Shields• Punctual

• Always attended meetings• Attended associated presentations when possible

• Thorough and Accurate • Communicative

• Hard to reach by email• Professional and Ethical • Dedicated

• Underestimated project complexity• Overestimated my own productivity• I hate the flu• Stubbornness and Vindication Trap

Page 12: MSDII Managerial Review

Dan Shields• Acquired materials• Pursued Informed suggestions for attachments• Performed concept testing• Lead attachment• Testing of enclosures

Page 13: MSDII Managerial Review

Alex Frechette• Punctual

• Always made necessary meetings• Not always present for Fridays, my work was complete for what the

testing team needed on Fridays when testing was completed• Thorough and Accurate

• Comprehensive manufacturing plan• Manufactured quality hard enclosures

• Communicative • Easily assessable through email and phone

• Professional and Ethical • Dedicated

Page 14: MSDII Managerial Review

Alex Frechette

Hard Enclosure Manufacturing Lead

Learn Manufacturing techniques

Switching MaterialsModifications to design on fly

Delivering 6 enclosures

Small Hard Enclosure

Page 15: MSDII Managerial Review

Alex FrechetteWearing units testingApply Knowledge to appropriate sections of paperLoading Documents on Edge

Page 16: MSDII Managerial Review

Deliverables Checklist Manufacturing Plan Updated Project Plan Final BOM Test Results Updated Edge Functional Prototypes Paper Poster Foundation for Future Teams

Page 17: MSDII Managerial Review

Alex – MSD I Lessons Learned UniGraphics NX Software Pushed to order materials at end of MSD I Paid more attention to Material Selection

Polyethylene was chosen during BOM stage based on price and availability

Learned importance of the design process and documents Project plan, selection process,

Ask questions during design process Easier to ask questions early then make changes later

How to work as a team to complete deliverables

Page 18: MSDII Managerial Review

Alex – MSD II Lessons LearnedPlan accordingly to meet deadlines for teamParallel Manufacturing and testingValue of finding the right toolsPolyethylene poor machining propertiesDelrin is a much better choiceCommunication with P10010 Overall, learned how valuable the design process can be

Page 19: MSDII Managerial Review

Dan - Lessons Learned• Overextended• 80% confidence

• 20% whispering doubt, saying do more testing

• Communication• Give honest critique• Speak Up• Reinforce Others

• Limits• Organized Planning

Page 20: MSDII Managerial Review

Joe – MSD I Lessons Learned• Communication• Recording information• Risk Assessment and Project Plan• More expertise needed earlier• Tradeoffs between academic and practical goals• Effectiveness of Design Process

Page 21: MSDII Managerial Review

Joe – MSD II Lessons Learned• Communication!• Sliding scope of project• Facility Contingency• Earlier Flex testing

Page 22: MSDII Managerial Review

RUBRIC REVIEW