Saigon M&C Tower Project Method Statement For Ductworks
Page 2
General Aim Scope of works Methodology
I. Duct Installation Works 1. Air Duct Connection
2. Air Duct Seal
3. Air Duct Insulation
II. Air Devices Installation Works 1. Volume Dampers (VD), Volume Control Dampers (VCD), Fire Dampers (FD).
2. Diffuser, Grille
3. Plenum Chamber, Silencer Chamber
4. Flexible Duct, Canvas Joints
5. Louver, Access Door, Outdooor Hood
A 12/03/09 FIRST ISSUE C.T.P J.R.P L.Q.K N.A.K
Saigon M&C Tower Project Method Statement For Ductworks
Page 3
General:
Items: - The Method Statement for Air Distribution Installation Works.
Aim: The aim of works is to describe mechanical works associated with installation of Air
Distribution Installation Works and to ensure compliance with contract requirements,
specification and quality control.
Scope of Works: The scope of work for this method statement shall include all the Ductworks for the
SAIGON M&C TOWER Project.
Methodology:
I. Duct Installation Works: Table1: Rectangular Duct Thickness Schedule
1. Air Duct Connection: Table 2: Regulation for air duct connection Schedule
Corner Angle Duct Connection Companion Angle Duct
Less than 600 (mm) C , TDC NA
601 to 1500 (mm) TDC NA
1501 to 2500 (mm) NA Flange-40x40x3.0mm
Duct size largest
dimension (mm)
Over 2500 (mm) NA Flange-40x40x4.0mm
Maximum Spacing (mm) 1100 1200
Size of Bolt & Nut (mm) 8 mm 8 mm
Diameter (mm) 3.2 mm 3.2 mm Rivet Maximum Spacing on
Center (mm) 65 mm 65 mm
Largest Dimension (mm)
Duct Size (L max) Up to 400 600 800 ~ 1250 1600 ~ 2500 Above 2500
Steel Sheet Thickness 0.5 0.6 0.8 1.0 1.2
Saigon M&C Tower Project Method Statement For Ductworks
Page 4
Table 3: Support, hanger, spacing schedule
Duct size Less than
400 400 ~ 999 1000 ~1999
2000 ~
2500 Over 2500
Angle steel V-30x30x2.5 V30x30x2.5 V-40x40x3 V-
50x50x3.5
U-
80x38x3.5
Round bar 2 x Φ8 2 x Φ10 2 x Φ10 2 x Φ10 2 x Φ12 Hanger
Max. pitch L 3000 3000 2500 2500 2500
Angle steel V-30x30x2.5 V30x30x2.5 V-40x40x3 V-
50x50x3.5
U-
80x38x3.5 Vertical
support Max. pitch L One point for each floor
1.1 Duct size over 1500mm:
For duct size largest dimension over 1500mm show be as Figure 01:
Detail A show be as Figure 02, Figure 03:
Figure 01: Typical duct connection detail (using flange joint)
Figure 02: Detail of bolt spacing for flange joint
100
Angle steel flange (see table 02)
Bolt hole 8mm
Sealed
100
100
Concrete slab
Air Duct
Detail A L ≤ 1200
Hanger rod M10
Angle steel (see table 3)
Anchor bolt
W
Air flow Air flow
Saigon M&C Tower Project Method Statement For Ductworks
Page 5
1.2 Duct size under 1500mm: For duct size largest dimension under 1500mm show be as Figure 04
Detail B show be as Figure 05, Figure 06, Figure 07
Figure 05: Detail of Cross Aim Brace Spacing
Figure 03: Detail of connection angle for flange
Figure 4: Branch duct connection detail (using Transverse Duct Connector (TDC) joint)
A ≤ 150 mm B ≤ 200 mm 100 mm ≤ C ≤ 150 mm
C
C
B C
A
B C A 4 hole Φ10
Air duct
Cross aim brace
W
Air flow
Air flow
L = 0.25W; L≥150mm
L
Main duct
Detail B
Branch duct
Change between section
Air flow
Rivet 3.2mm
5mm thk Washer Rubber gasket
Width: 25mm, 5mm thk
Air Duct
Angle steel flange (see table 02)
Bolt & Nut 8mm
Saigon M&C Tower Project Method Statement For Ductworks
Page 6
Table 4: Size, Thickness and Spacing of TDC Joint Schedule
Duct Size largest dimension (mm) Less than 700 700~1200 1200~1500
Size of TDC Duct End (minimum) (mm) 30 30 30
Thickness of TDC Corner (minimum) (mm) 1.2 1.2 1.2
Thickness of Cross Arm Brace (minimum)(mm) 1.0 1.0 1.0
Maximum Spacing (mm) 1100 1100 1100
Max 1100
Bolt M10
Cross Aim Brace (see table 4)
Air Duct TDC Corner (see table 4)
Figure 06: Cross Aim Brace detail
Bolt M10 TDC corner 1.2mm thk
TDC duct end (see table 4)
Rubber gasket (see figure 08)
Nut M10
Nut M10
TDC flange
Rubber gasket (see figure 08)
Rubber gasket (see figure 08)
Figure 07: Typical TDC assembly detail
Air duct Corner plate (see detail)
TDC joint
Saigon M&C Tower Project Method Statement For Ductworks
Page 7
Note:
Support, hanger will be concerned on method statement of M&E Support System Installation
Work: ME - REE - T+ - MS – G+ - GEN - 003
2. Air Duct Seal:
50
Seal TDC joint
Bolt hole 10mm
Air Duct
50
Angle flange joint Bolt hole 8mm
Seal
Air Duct
Figure 09: Position of Seal for TDC Joint
Figure 10: Possition of Seal for Angle Flange Joint
Bolt hole 8mm
Rubber gasket Width: 25mm Thickness: 5mm
15-20mm
Figure 08: Typical rubber gasket installation detail
Saigon M&C Tower Project Method Statement For Ductworks
Page 8
3. Air Duct Insulation: Table 5: Duct Insulation Specification Schedule
Applicable scope Material Type Density Thickness
Supply air duct 48kg/m3 25mm
Return air duct Glasswool Blanket
48kg/m3 25mm
Smoke exhaust duct Rockwool Board 60kg/m3 50mm
Supply air chambers
and sound
attenuation fittings
Glasswool Blanket 48kg/m3 50mm
Figure 11: Possition of Sealant for Duct Seam
Figure 12: Typical smoke exhause duct insulation detail
Seam
Board insulation 50mm (see table 5)
Alu. Sheet Cladding (if any)
Metal clips
Air duct
Pin Φ1.6mm (see figure 15)
Adhesive
Attached Alu. Tape (Width 50mm)
Seal (Inside Only)
Air Duct
Seal
Saigon M&C Tower Project Method Statement For Ductworks
Page 9
(Non-flammable)
Metal clip
Alu. foil facing
Alu. sheet cladding
Rockwool for smoke exhaust ductGlasswool for AC duct
Air duct
`
Pin Φ1.6mm (see figure 15)
Figure 14: Insulation detail for supply air chambers and sound attenuation fitings
Figure 13: Ducting insulation layer detail
Pins Φ1.6mm (see figure 14)
Metal clips Air duct
Glasswool 25mm thk Glass cloth
Saigon M&C Tower Project Method Statement For Ductworks
Page 10
Max. 300mm
Max. 300mm
Figure 15: Shape & distance of pins
Metal clip
Pin Φ1.6mm
Insulated duct
Bare duct
Max. 300mm
Max. 300mm
Saigon M&C Tower Project Method Statement For Ductworks
Page 11
Figure 17: Detail of typical insulation for diffuser box
50mm
50mm
Figure 16: Typical insulation menthod for TDC joint & flange joint
Plan view
Ceiling
Glasswool 25mm thk (outside duct)
Aluminum tape 25mm
Glasswool 25mm thk (outside duct)
Glasswool 25mm thk (inside diffuser box)
Screw
Air flow Chamber box
Front view
TDC joint
25mm
Metal slip Glasswool 25mm thk
Attached alu. tape 25mm
25mm
Metal slip
Flange joint
Pin Φ 1.6mm
Attached alu. tape 25mm
TDC or Flange joint Glasswool 25mm thk Alu. Tape 50mm
25mm
50mm Attached alu. tape 25mm
Saigon M&C Tower Project Method Statement For Ductworks
Page 12
II. Air Devices Installation Works: 1. Volume Dampers (VD), Volume Control Dampers (VCD), Fire Damer (FD):
Table 6: Quantity of hanger rods for Fire Damper
Rectangular Duct Spiral Duct
Duct size or Diameter (mm) Less than 300 Over 300 Less than 300 Over 300
Quantity of hanger rods (nos) 2 4 2 4
Figure 19: Detail of setting damper
Figure 18: Detail of typical insulation for grille (VHS type)
Glasswool 25mm thk (outside duct)
WallScrew
Frame
Tapping
Air duct
TDC joint
Air flow
L = 8D D: diameter of air duct
Concrete foundation
L
D
Air Fan
VD
VD
Air duct
Concrete slab
Saigon M&C Tower Project Method Statement For Ductworks
Page 13
Anchor bolt
Concrete floor slab
Angle steel
Insulation 25mm
Branch duct
Rubber pad
Bolt M8
Wall
Fire damper
Vertical duct
Access door FD
Wall
Concrete floor slab
Fire damper
VCD Access door FD
V-Angle steel
Rockwool 50mm
Duct elbow
Insulation 25mm
V-Angle steel
Anchor bolt
Hanger rod
Vertical duct
Bolt M8
Figure 20: Typical damper installation detail
PLAN VIEW
FRONT VIEW
Saigon M&C Tower Project Method Statement For Ductworks
Page 14
2. Diffusers, Registers:
Ceiling
SUPPLY AIR CHAMBER BOX
Glasswool 25mm thk
Glass wool 25mm thkInsulation (outside)
Opposed blade damper
Glass wool 25mm thkInsulation (outside)
Insulation (inside)
(if any)
Figure 21: Example of connection with chamber & duct
Connection with chamber box
H, W: Dimension of Diffusers opening size for ceiling (mm)
d : Diameter of flexible duct (mm)
Flexible
K = 150 ~ 300mm
D+50mm
Connection with Duct
Figure 22: Detail of typical installation for supply air diffuser
K
W×H
Ceiling
Air duct
W+50mm
H+50mm D
W×H
K Ceiling
Chamber box
D
Flexible
H+50mm
100mm or over
Saigon M&C Tower Project Method Statement For Ductworks
Page 15
RETURN AIR CHAMBER BOX
Ceiling
Screw Glass wool 25mm thkInsulation (outside)
Glasswool 25mm thkInsulation (inside)
EXHAUST AIR CHAMBER BOX
Opposed blade damber
Ceiling
Screw
(if any)
3. Plenum Chamber, Silencer Chamber: Sound Absorber for Chamber shall be used glasswool 50mm thk, 48 kg/cm3 density.
Table 7: Galvanized steel sheet thickness for Chamber
Longest Dimension of Chamber (mm)
Chamber Size (L max) (mm) Less than 800 800 ~ 1500 1500 or Over
Steel Sheet Thickness (mm) 0.8 1.0 1.2
Figure 24: Detail of typical connection for exhause air grille
Figure 23: Detail of typical installation for return air grille
Saigon M&C Tower Project Method Statement For Ductworks
Page 16
Figure 25: Silencer Elbow Chamber Detail
Figure 26: Silencer Chamber Detail
Sound Absorber by glasswool 50mm thk
RA
L
A Silencer Elbow
A
B Silencer Chamber
Sound Absorber by glasswool 50mm thk
Detail D
Detail E
Detail E
Pin Φ 1.6mm
GI sheet cover 0.6mm thk
25~50mm
Air Duct
Sound Absorber by glasswool 50mm thk
Saigon M&C Tower Project Method Statement For Ductworks
Page 17
4. Flexible Duct, Canvas Joints a) Flexible Duct:
Bolt M6
AIR DUCTFLEXIBLE DUCT
Screw 3.2Ø
G.I.sheet 0.6mm thkSteel band
Ceiling
SUPPLY AIR CHAMBER BOX
Opposed blade damper
Glass wool 50mm thkInsulation (outside)
G.I.sheet 0.6mm thkSteel band
Glasswool 25mm thkInsulation (inside)
Insulation (outside)(if any)Glasswool 25mm thk
Figure 27: Chamber Jointing Detail
Figure 28: Detail of typical connection between flexible duct & chamber box
Detail D
Pin Φ1.6mm
100~150mm75mm
25~50mm
Sound Absorber by glasswool 50mm thk
Saigon M&C Tower Project Method Statement For Ductworks
Page 18
b) Canvas Joints:
RETURN CHAMBER BOX
Ceiling Canvas
Flange joint (refer to detail G)Glasswool 25mm thk
Insulation (outside)
Glasswool 25mm thkInsulation (inside)
AIR DUCT
Screw
Figure 29: Canvas Joint Detail
Figure 30: Detail of typical connection between canvas & chamber box
L = 200 ~ 250 (mm)
Detail F
Galvanized steel sheet ( same as duct thickness)
Angle steel flange
Rubber gasket (width:5mm)
Cuff 5mm or more
Rivet 3.2mm
Bolt and nut M8
Canvas Joint
Washer
Air duct
LFlange joint
Air duct Air duct
Duct canvas Detail F
Saigon M&C Tower Project Method Statement For Ductworks
Page 19
5. Louver, Access door, Outdoor Hood:
a) Louver:
Figure 31: Typical Louver Installation Detail
Concrete slab
Louver Chamber box
Anchor bolt
Access door (see figure 32)
Hanger rod
Mortar Grout Anchor bolt
Wall
500mm Angle steel
(see table 3)
Saigon M&C Tower Project Method Statement For Ductworks
Page 20
b) Access door:
Sach lock
Air duct
Aluminium
Screw 3.2ØSteel plate
Steel plate
Sach lock
Aluminium
c) Outdoor Hood:
.
Figure 33: Typical Outdoor Hood Installation Detail
Chamber box
Outdoor hood
GI sheet cover 0.6 mm thk
Air duct
Wall
Insect Screen (if any)
Mortar
Sealant
Rockwool 60kg/m3
Screw
Figure 32: Typical Access Door Installation Detail