PRE FEASIBILITY REPORT of ANJANI LIMESTONE MINE (III) (AREA: 4.75 Ha) Gudi Malkapuram Village Chintalapalem Mandal, Suryapet District, Telangana State. for LIMESTONE PRODUCTION: 0.15 million ton per annum (CAPTIVE LIMESTONE MINE) of M/s. ANJANI PORTLAND CEMENT LIMITED Prepared By B.S. ENVI-TECH (P) LIMITED Secunderabad – 500 017

M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

Table of Contents

PRE FEASIBILITY REPORT

of

ANJANI LIMESTONE MINE (III) (AREA: 4.75 Ha)

Gudi Malkapuram Village Chintalapalem Mandal, Suryapet District, Telangana State.

for

LIMESTONE PRODUCTION: 0.15 million ton per

annum

(CAPTIVE LIMESTONE MINE)

of

M/s. ANJANI PORTLAND CEMENT LIMITED

Prepared By

B.S. ENVI-TECH (P) LIMITED

Secunderabad – 500 017

Page 2: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

CHAPTER – 1 EXECUTIVE SUMMARY

1. Executive Summary

M/s. Anjani Portland Cement Limited (APCL), a public limited

Company with an installed capacity of 1.15 MTPA with two Kilns at

Chintalapalem Village.

The Mine having a Mining Lease area of 4.75 ha is being operated

with a valid Mining Lease (granted by the State Government of

Andhra Pradesh vide GO Ms no. 162 dated 02.07.2008) and Consent

for Operation (granted by Andhra Pradesh Pollution Control Board

vide its Order No (TSPCB/CFO/NLG/HO/2016-1689. Dated 07-10-

2016) APPCB/PTN/NGL/425008/HO/2009-1816 dated 2.11.2009

and Scheme of Mining approved by Indian Bureau of Mines (vide

Letter No AP/NLG/MP/Lst-3/HYD Dated 24.08.2015

As per EIA Notification 2006, the mining of major minerals does not

require Environmental Clearance. Hence, this Mine III is being

operated with a valid Mining Lease vide GO issued by State Govt of

Andhra Pradesh and Consent for Operation since 2009 issued vide

Lr.No (TSPCB/CFO/NLG/HO/2016-1689 dated 07-10-2016)

APPCB/PTN/ NGL/425008/HO/2009-1816 dated 2.11.2009 the

mining of major mineral in a Mining Lease area of less than 5 ha

has also been brought under the purview of EIA Notification vide SO

3067. In order to comply with the requirement of EIA Notification

2006, as amended, we are initiating the process of getting

Environmental Clearance for Mine III with an area of 4.75 ha for the

exiting mining capacity of 0.15 million ton per annum (no increase

in area, no increase in production and no change in process)

Present Proposal

APCL is operating its Mine III with a Mining Lease area of 4.75 Ha

with 0.15 MTPA of Limestone production falling in the jurisdiction of

Gudimalkapuram Village, Chintalapalem Mandal, Suryapet District,

Telangana State. This Captive Mine is named as “Anjani Limestone

Mine III”.

As per EIA Notification 2006, the mining of major minerals does not

require Environmental Clearance. Hence this Mine III is being

operated with a valid Mining Lease and Consent for Operation since

Page 3: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

2009 vide Lr. No. TSPCB/CFO/NLG/HO/2016-1689 Dated 07-10-

2016) APPCB/PTN/NGL/425008/HO/2009-1816 dated 2.11.2009,

Mining of major mineral in a Mining Lease area of less than 5 ha

has also been brought under the purview of EIA Notification. In order

to comply with the requirement of EIA Notification 2006, as amended,

APCL is initiating the process of getting Environmental Clearance for

Mine III with an area of 4.75 ha for the exiting mining capacity of

0.15 million ton per annum.

Current Status of Mining

Anjani Limestone Mine III caters the highly siliceous Limestone which

is used as dilution material along with raw material from other

Captive Mine to the interlinked Cement Plant (APCL).

The current mineable reserves are estimated to be 0.821 million

tonnes. The open cast, conventional, mechanized method of mining is

being adopted. The Limestone produced is transported to the crusher

located in Cement Plant, which is at a distance of 1.0 km.

The water requirement is 10 m3/day and is being sourced from mine

pit.

Power requirement is met from TSECB.

15 persons are employed for carrying out mining operations.

There is no capital investment, as the mine is already in operation.

Page 4: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

2.0 INTRODUCTION OF THE PROJECT / BACKGROUND

INFORMATION

i. Identification Of Project And Project Proponent. In Case Of

Mining Project, A Copy Of Mining Lease / Letter Of Intent Should

Be Given.

Project: APCL intends to obtain Environmental Clearance for its

operating mine i.e., Anjani Limestone Mine III for a Limestone

production of 0.15 million ton per annum at Gudimalkapuram

Village, Chintalapalem Mandal, Suryapet District, Telangana State.

Project Proponent

M/s. Anjani Portland Cement Limited (APCL) a public limited

Company with an installed capacity of 1.15 million tons per annum

with two kilns at Chintalapalem Village. Part of the Limestone

requirement is met from this subject mine .

The Mine having a Mining Lease area of 4.75 ha is being operated

with a valid Mining Lease (granted by the State Government of

Andhra Pradesh vide GO Ms no. 162 dated 02.07.2008) and Consent

for Operation (granted by Andhra Pradesh Pollution Control Board

vide its Order No (TSPCB/CFO/NLG/HO/2016-1689. Dated 07-10-

2016) APPCB/PTN/NGL/425008/HO/2009-1816 dated 2.11.2009

and Scheme of Mining approved by Indian Bureau of Mines (vide

Letter No AP/NLG/MP/Lst-3/HYD Dated 24.08.2015

As per EIA Notification 2006, the mining of major minerals does not

require Environmental Clearance. Hence this Mine III being operated

with a valid Mining Lease and Consent for Operation since 2009

TSPCB/CFO/NLG/HO/2016-1689 Dated 07-10-2016)

APPCB/PTN/NGL/425008/HO/2009-1816 DATED 2.11.2009 the

mining of major mineral in a Mining Lease area of less than 5 ha

has also been brought under the purview of EIA Notification vide SO

3067. In order to comply with the requirement of EIA Notification

2006, as amended, we are initiating the process of getting

Environmental Clearance for Mine III with an area of 4.75 ha for the

existing mining capacity of 0.15 million ton per annum.

Page 5: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

Present Proposal

APCL is operating its Mine III with a Mining Lease area of 4.75 Ha

falling in the jurisdiction of Gudimalkapuram Village, Chintalapalem

Mandal, Suryapet District, Telangana State. This Captive Mine is

named as “Anjani Limestone Mine III”.

ii. Brief Description of Nature of the Project

The Limestone Mine III is spread over an area of 4.75 Ha with about

mineral reserves of 0.821 million ton and is located at

Gudimalkapuram village, Chintalapalem Mandal, Suryapet District,

Telangana State.

The mining of the deposit involves deep hole drilling & blasting with

fully mechanized conventional open cast mining method. The

benches are 5m height. The Limestone is loaded into 17T dumpers

and transported to crusher located in Cement Plant (APCL).

At the end of mining operations, about 2.702 ha of mined-out area

will be developed into water reservoir, an area of 0.632 ha will be

developed with greenbelt which includes 7.5 m safety barrier zone,

1.410 ha will be used as Nala barrier zone, 0.006 Ha will be used for

roads and infrastructure.

iii. Need for the Project and its Importance to the Country and or

Region

Anjani Limestone Mine III augments the resources and reserves in

other Captive Mine of APCL. It caters the highly siliceous Limestone

which is used as dilution material along with raw material from other

Captive Mine to the interlinked Cement Plant (APCL).

iv. Imports Vs Indigenous Production

The Limestone produced from APCL – Mine III is meant for the

captive consumption in the Cement Plant (APCL). The basic raw

material for the Cement Plant is being met from the Captive Mine

located nearby and no import of Limestone is envisaged.

Page 6: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

v. Export Possibility

No export of Limestone is envisaged.

vi. Domestic / Export Markets

The Limestone produced from Anjani Limestone Mine III is meant for

the captive consumption in the Cement Plant (APCL) and no export of

Limestone is envisaged

vii. Employment Generation (Direct and Indirect) due to the Project.

15 persons are employed for carrying out mining operations.

Page 7: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

3.0 Project Description

i. Type of project including interlinked and interdependent

projects, if any.

APCL intends to obtain EC for its Limestone Mine III for a production

capacity of 0.15 million ton per annum spread over an area of 4.75

ha with about mineral reserve of 0.821 million ton will last about 8

years as supporting raw material. The Limestone produced from the

Mine III, is highly siliceous and is used as dilution material along

with raw material from other Captive Mine for the Cement

production.

Though the extent of Mine lease area is 4.75 Ha, due to the proximity

of the interstate boundary with Andhra Pradesh, at a distance of 4.3

km, it is falling under Category ‘A’ under Schedule 1(a). Hence, it

necessitates obtaining Environment Clearance from Ministry of

Environment and Forest & Climate Change (MoEF & CC).

ii. Location (map showing general location, specific location, and

project boundary & project site layout) with coordinates.

The Mining Lease area comprising 4.75 ha is situated at Gudi

Malkapuram Village, Chintalapalem Mandal, Suryapet District,

Telangana State.

The Mining Lease Area is a part of the Survey of India Toposheet No.

56/D/1. The site falls between 16°46'33.00" - 16°46'41.57" North

latitude and 80°0'43.53" - 80°0'53.37" East Longitude with an

average altitude of 67 m above MSL. The location map of the Mining

Lease Area is shown in Fig 1.

Nearest railway line connecting Mellacheruvu - Jaggayapeta of South

Central Railway line is at a distance of 5.8 km to NNW direction from

the Mine site. Key map showing the location of various features

around the Mining Lease Area is shown in Fig 2. The nearest railway

station i.e., Mellacheruvu RS ,is at a distance of 9.8 km in WNW

direction.

Nalgonda is the major town at a distance of 85.0 km in WNW

direction.

Page 8: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

The National Highway (NH 9) connecting Hyderabad - Vijayawada is

at a distance of about 17.5 km in NE direction and Major Road

Mellacheruvu to Mallareddygudem is at 3.2 km in SW direction to

the Mining Lease Area.

There are no wild life sanctuaries, national parks, elephant/tiger

reserves within 10km radius of the study area.

Nearest Settlements from the Mining Lease Area

Gudimalkapuram – 0.8 km – WNW

Nearest Reserved Forests from the Mining Lease Area

Chintalapalem RF – 1.2 km – SE

Page 9: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

MANDAL BOUNDARY

LEGEND

RAILWAY TRACK

RIVER

DISTRICT BOUNDARY

STATE HIGHWAY

TALUK HEADQUARTER

STREAMS

NATIONAL HIGHWAY9

DISTRICT HEADQUARTER

STATE HIGHWAY

NATIONAL HIGHWAY

REVENUE BOUNDARY

MINING LEASE AREA

LOCATION MAP

FIG - 1

INDIA

TELANGANA

N

Note:- Not to Scale

Thirumalagiri

Nagaram

Thungathurthi

Jajireddigudem

Nuthankal

Atmakur _S

Suryapet

Mothey

Nadigudem

Penpahad

Chivvemla

Garidepalle

Neredcherla

Huzur Nagar

Mattampalle Mellacheruvu

Kodad

Munagala

Chilkur

MINING LEASE AREA

ADILABAD

KOMARAM BHEEMNIRMAL

NIZAMABAD

JAGITYAL

KAMAREDDY

KARIMNAGAR

PEDDAPALLE

JAYASHANKAR

SANGAREDDY

RANGAREDDY

MAHABUBNAGAR

WANAPARTHY

NAGARKURNOOL

NALGONDA

KHAMMAM

KOTHAGUDEM

WARANGAL

YADADRI

SHAMSHABAD

HYDERABAD

MEDAK

SIDDIPET

Page 10: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

0.8km

S C

R

129

Vajinapalli

Dondepadu

Gudi Malkapuram

Revur

Mallareddigudem Tanda

Mallareddigudem

Kottagudem

Gundla Vagu

BM 794

Nemalipuri

R F

KR

IS

HN

A R

IV

ER

CHINTAPALEM R F

R F

B.S.ENVI-TECH (P) LTD.,

CLIENT :

TITLE :

SECUNDERABAD

PREPARED BY

KEYMAP

SCALE

2km10

FIG - 2

PROJECT :

M/s. ANJANI PORTLAND CEMENT LTD.,

N

Gudi Malkapuram Village, Mellacheruvu Mandal, Nalgonda District, Telangana,

ANJANI LIMESTONE MINE III129

LEGEND

SETTLEMENTS

SPOT HEIGHT

RIVER

FOREST

CANALS

STREAMS/ TANKS

ROADS

MINING LEASE AREA

DISTRICT BOUNDARY &

INTER STATE BOUNDARY

TELANGANA - ANDHRA PRADESH

MINING LEASE AREA

APCL CEMENT PLANT

TELANGANA

AN

DH

RA

P

RA

DE

SH

4.3km

Page 11: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

Salient features of Mining Lease Area are given in Table 1. Fig 3

shows the study area of 10 km radius around the Mining Lease Area.

80° 0

'

80° 0'

16° 5

0'

16° 4

5'

56 P

/14 6

5 D

/2 64 D

/6

56 O

/16 6

5 C

/4 65 C

/8

56 P

/13 6

5 D

/1 6

5 D

/5

Surv

ey o

f In

dia

Toposheets

Index t

o

R

AIN

-P

LA

NT

S

IT

E

MH

IL

- M

ELL

AC

HE

RU

VU

- M

IN

E S

IT

E

Jaggayyapeta

To

7.5

km

Mellacheru

vu

To

0.3

km

80° 5

'

16° 4

5'

80° 5

'

03

SCALE

36 k

m

PREPARED

BY

SECU

ND

ERABAD

SH

OW

IN

G 1

0 k

m R

AD

IU

S

TO

PO

GR

AP

HIC

AL

M

AP

FIG

- 3

REFER T

O T

HIS

MAP A

S:-

1:5

0,0

00

Published u

nder

the d

irection o

f

SH

EET 6

5/D

/1 F

IRST E

DIT

ION

the S

urv

eyor

Genera

l of In

dia

- 1

980

146

LEG

EN

D

SETTLEM

EN

TS

SPO

T H

EIG

HT

RIV

ER

CO

NTO

URS

FO

REST

CAN

ALS

STREAM

S/

TAN

KS

RO

AD

S

M/s. A

NJA

NI P

OR

TL

AN

D C

EM

EN

T L

TD

.,

CLIE

NT :

TIT

LE :

Gu

di M

alk

ap

ura

m V

illa

ge

, M

ella

ch

eru

vu

M

an

dal, N

algonda D

istrict, T

elangana,

AN

JA

NI L

IM

ES

TO

NE

M

IN

E III

MIN

ING

LEASE A

REA

PRO

JECT :

MIN

IN

G LE

AS

E A

RE

A

107

Vajinapalli

Dondepadu

Venkate

shnagar

Muktishw

ara

pura

m

Bugga M

adhavara

mM

adip

adu

Gudi M

alk

apura

m

Kancla

bodu T

anda

Kuntim

aadi

Mukty

ala

Ram

apura

m

Revur

Raghavapura

m

Hem

la T

anda

Jaggu T

anda

Kappala

kunta

Tanda

Yepal M

adhavara

m

Mallare

ddig

udem

Tanda

Mallare

ddig

udem

Kott

agudem

Tam

mavara

m T

anda

Shobhanadrigudem

Gollapeta

Kolluru

Vellatu

u

Nem

alipuri

Pulichin

ta

Chityala

100

60

80

80

80

60

40

200

60

40

100

S C

R

KU

NT

IM

AD

DI R

F

VE

NK

AT

AY

AP

AL

EM

R

F

CH

IN

TA

PA

LE

M R

F

BU

DA

VA

DA

R

F

GIN

JU

PA

LL

E R

F

R F

R F

YE

PA

L M

AD

HA

VA

RA

M R

F

MH

IL

- Y

EP

AL

MA

DH

AV

AR

AM

- M

IN

E S

IT

E

CH

IN

TA

LA

PA

LE

M R

F

DIS

TRIC

T B

OU

ND

ARY &

INTER S

TATE B

OU

ND

ARY

TELAN

GAN

A -

AN

DH

RA P

RAD

ESH

100

200 300

Gundla

Vagu

R F

ME

CH

WE

L- P

LA

NT

S

IT

E

100

129

BM

794

118

Z

UA

RI C

EM

EN

T

RA

IN

-M

IN

E S

IT

E

KA

KA

TIY

A C

EM

EN

T

KC

P M

IN

E S

IT

E

KC

P P

LA

NT

S

IT

E

JA

YP

EE

C

EM

EN

T

107

88

Chin

tala

pale

m

Medara

sani D

urg

am

480

85

100

40

100

Jadapalli Tanda

KRISHNA R

IVER

A

NJ

AN

I C

EM

EN

T

AP

CL C

EM

EN

T P

LA

NT

80

4.3km

16° 5

0'

TE

LA

NG

AN

A

AN

DH

RA

P

RA

DE

SH

Page 12: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

TABLE - 1

SALIENT FEATURES OF THE MINING LEASE AREA.

Feature Details

Altitude 67 m above MSL

Latitude & Longitude

1) 16°46'41.54"N - 80° 0'53.37"E 2) 16°46'37.10"N - 80° 0'49.70"E 3) 16°46'41.57"N - 80° 0'43.53"E 4) 16°46'33.00"N - 80° 0'45.00"E

Village, Mandal, District,

State Gudi Malkapuram Village, Chintalapalem Mandal, Suryapet District, Telangana,

IMD Station Khammam - 53 km - NNE

Maximum Temperature (oC) 47.2

Minimum Temperature (oC) 9.4

Relative Humidity(%) 35-83

Annual rainfall (mm) 1031.6

Nearest Water Bodies Krishna River : 4.1 km, WSW

Vemuleri River :10.5 km, ENE

Nearest Highway National Highway (NH-9) Connecting Hyderabad -

Vijayawada is at 17.5 km in NE Direction and Major Road Mellacheruvu to Mallareddygudem is at 3.2 km in SW direction from the Mine site.

Nearest Railway station Mellacheruvu RS : 9.8 km, WNW

Industries within 10km Radius

APCL CEMENT PLANT – 1.0 km - SSW

MHIL - Mellacheruvu - Mine : 9.2 km, WNW Zuari Cement Plant :5.2 km, NNE KCP Plant :7.9 km,–NE

KCP Mine Site :8.0 km, NE

Nearest Village Gudimalkapuram : 0.8 km, WNW

Nearest Town Nalgonda: 85.0 km, WNW

Inter State Boundary Telangana - Andhra Pradesh – 4.3 km - ESE

Nearest Airport Hyderabad ( Shamshabad ) : 165.0 km, WNW

Gannavaram(Vijayawada ) : 88.00 km, ESE

Nearest Forest

Chintalapalem RF : 1.2 km, SE

Yapalmadhavaram RF :7.0 km, WSW Budavada RF :8.3 km, NNE

Venkatayapalem RF :4.7 km, ESE

Historical places None within 10 km radius

*all distances mentioned in the above table are aerial distances and the

directions are from the Mine III.

Page 13: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

iii. Details of alternate sites considered and the basis of selecting

the proposed site, particularly the environmental considerations

gone into should be highlighted.

No alternate sites have been considered as the Mine is already in

operation.

iv. Size or magnitude of operation.

Mine area is 4.75 ha. The proposal is for obtaining EC for a

Limestone production of 0.15 million ton per annum.

v. Project description with process details (a schematic diagram/

flow chart showing the project layout , components of the

project etc. should be given)

APCL is adopting conventional, opencast mechanized mining which

involves deep drilling and blasting for breaking the rock, hydraulic

excavators to handle the broken material and loading into 17 T

dumpers for transporting the ROM material to crusher located in

Cement Plant (APCL)

Drilling operations are conducted with 115 mm dia of Atlas Capco

Wagon Drill with compressor of 450 cubic feet per minute. Hydraulic

excavators with bucket capacity of 0.6m3 is deployed to load the

blasted Limestone into Dumpers. The blasted/ excavated Limestone

is sent to crusher located in Cement Plant (APCL).

The maximum depth of the Limestone deposit is 12 m. Hence 3

benches have been developed.

DRILLING

The drilling of holes is done by using 115 mm drill.

BLASTING

Blasting is done using cap sensitive explosives (class-2) as booster

and Ammonium Nitrate/Fuel Oil (ANFO) is used in the ratio of 20:80.

Nonel detonators are utilized to control ground vibrations and fly

rock. For producing 0.15 million ton of Limestone per annum about

Page 14: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

19200 kg ANFO and 4800 kg Booster (per year) are required.

Explosives required for 3 weeks is stored in the company’s magazine.

APCL is adopting the following blasting parameters in the mine.

Bench height 5 m

Spacing 3m

Burden 3 m

Density 2.5 m

Yield per hole 185 tons

Charge per hole 80 kg

Powder factor 6.5 tons/kg

LOADING

Loading is carried out by hydraulic excavators of 0.6 m3 bucket

capacity.

HAULING/TRANSPORT

The Limestone is loaded into 17T dumpers and transported to

crusher located in the Cement Plant (APCL) for its captive use.

vi. Raw material required along with estimated quantity, likely

source, marketing area of final product/s, mode of transport of

raw material and finished product.

No raw material is required.

vii Resource optimization / recycling and reuse envisaged in the

project, if any, should be briefly outlined.

A total quantity of 3900 cum of inter burden is estimated to be

generated from the mining activity and is being consumed in Cement

plant.

vii. Availability of water its source, energy /power requirement

The water requirement is 10 m3/day and is being sourced from APCL

Mine pit.

Page 15: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

Power requirement is mainly for lighting in the mine area, and is met

from TSECB.

viii. Quantity of wastes to be generated (liquid and solid) and scheme

for their management / disposal.

A total quantity of 3900 cum of inter burden is estimated to be

generated from the mining activity. Waste/ subgrade material are not

anticipated as the Limestone is highly silicious and is used as

dilution material along with the Limestone from other Captive Mine of

APCL.

ix. Schematic representations of the feasibility drawing which give

information of EIA purpose.

Page 16: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

4.0 Site Analysis

i. Connectivity.

The mining lease area comprising of 4.75 ha is situated at Gudi

Malkapuram Village, Chintalapalem Mandal, Suryapet District,

Telangana State.

Nearest railway line connecting Mellacheruvu - Jaggayapeta of South

Central Railway line is at a distance of 5.8 km in NNW direction. The

nearest railway station is Mellacheruvu RS at 9.8 km in WNW

direction.

Nalgonda is a major town at a distance of 85.0 km in WNW direction.

The National Highway (NH9) connecting Hyderabad - Vijayawada is at

a distance of about 17.5 km in NE direction and Major Road

Mellacheruvu to Mallareddygudem is at 3.2 km in SW direction from

the Mining Lease Area.

ii. Land form, land use and land ownership.

Total area of 4.75 Ha is owned by APCL. An area of 0.642 Ha has

been brokenup as on October 2013.

iii. Topography

The Mining Lease area is gently undulating rocky plain, sloping

towards NE with an average altitude of 67 m above MSL. A seasonal

stream flows in the NE side of the Mining Lease area. The drainage

pattern is of dendritic type.

Surface plan of the Mining lease area is enclosed as Fig 4.

The Mining will be continued to about 8 years @ 0.15 million ton of

Limestone per year. The land use pattern is furnished in the following

table.

Page 17: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of
Page 18: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

LANDUSE PATTERN OF THE MINE AREA (Ha)

S.NO LANDUSE CURRENT STATUS LIFE OF MINE

(CONCEPTUAL

STAGE)

1 Area of Excavation 0.642 2.702

2 Roads/Built up area 0.006 0.006

3 7.5 m barrier zone - 0.632

4 Nala barrier zone 1.410 1.410

5 Undisturbed area 2.692 -

Total 4.75 4.75

At the end of mining operations, about 2.702 ha of mined-out area

will be developed into water reservoir, an area of 0.632 ha will be

developed as greenbelt which includes 7.5 m safety barrier zone,

1.410 ha will be used as Nala barrier zone, 0.006 ha will be used for

roads and infrastructure.

iv. Existing land use pattern (agriculture, non-agriculture, forest,

water bodies (including area under CRZ), shortest distances

from the periphery of the project to periphery of the forests,

national park, wild life sanctuary, eco sensitive areas, water

bodies (distance from the HFL of the river), CRZ, in case of

notified industrial area, a copy of the Gazette notification

should be given.

Total area of 4.75 ha is owned by APCL

No Sensitive Area like National Park/Wildlife Sanctuary/Elephant

Corridor/Tiger Reserve is located within 10 km of the Mine III.

The following are the Reserved Forests located in 10 km radius of the

Mining Lease Area

Chintalapalem RF : 1.2 km, SE

Yapalmadhavaram RF : 7.0 km - WSW

Budavada RF : 8.3 km, NNE

Venkatayapalem RF : 4.7 km, ESE

v. Existing infrastructure.

None

Page 19: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

vi. Soil classification

The Mining Lease area has very less topsoil interlocked in the joints

and fractures.

vii. Climatic data from secondary sources

The tropical climate of the region consists of hot and humid

summer, moderately monsoon and mild winter seasons. May is the

hottest month in the year. The maximum temperature during the

day time in summer was recorded as 47.20C and December the

coldest with the temperature as low as 9.40C. The months of

December, January & February are considered to have pleasant

climate.

viii. Social infrastructure available.

APCL has constructed a full-fledged colony in upwind direction

adjacent to the Cement plant consisting of 119 houses for the

benefit of employees. The Colony accommodates the employees of

Captive Mines also.

All the necessary infrastructure facilities such as School,

Dispensary, Park and Playground, Temple, Commercial Complex,

etc., are provided in the colony.

A full-fledged water supply and drainage system is already in place

and the wastewater generated from the colony is being treated in

the Sewage Treatment Plant (STP) to meet the standards. The

treated sewage is used for greenbelt development within premises.

Page 20: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

5.0 Planning Brief

i. Planning concept (type of industries, facilities, transportation

etc.) Town and country planning / development authority

classification.

The subject Mine is one of the Captive Limestone Mines of APCL and

is located at Gudimalkapuram Village, Chintalapalem Mandal,

Suryapet District, Telangana State with an extent of 4.75 ha. The

Limestone production capacity is 0.15 million ton per annum.

Limestone is being transported through trucks to the Cement Plant.

ii. Population projection

15 persons are employed for carrying out mining operations.

iii. Land use planning (breakup along with greenbelt etc.,)

During the life of the mine, about about 2.702 ha of mined-out area

will be developed into water reservoir, an area of 0.632 ha will be

developed as greenbelt which includes 7.5 m safety barrier zone,

1.410 ha will be used as Nala barrier zone, 0.006 ha will be used for

roads and infrastructure.

iv. Assessment of infrastructure demand (physical & social )

There is indirect employment to many more people, in the form of

contractual jobs, business opportunities, service facilities etc. This

will enhance the economic status of the area.

Apart from the jobs, the company is providing medical and

educational facilities to the employees which are availed by the people

in nearby villages.

v. Amenities / Facilities.

All the necessary infrastructure facilities such as School, Dispensary,

Park and Playground, Temple, Commercial Complex, etc., are

provided in the colony.

Page 21: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

6.0 Proposed infrastructure

i. Industrial area (processing area)

No processing is involved.

The mine is being operated following conventional, opencast fully

mechanised method of mining which includes deep drilling and

blasting, loading the broken material by heavy machinery like

hydraulic excavators and tippers for transporting the Limestone to

crusher at Cement Plant(APCL).

ii. Residential area (non-processing area)

No residential facility provided at mine.

iii. Greenbelt

An area of 0.642 ha will be developed under greenbelt in 7.5 m safety

barrier zone.

iv. Social infrastructure

The mining activity carried out in the area rather has a positive socio-

economic impact upon the nearby human settlement as indirect

employment potential is created due to mining and allied activities in

the area. Apart from these, the company promotes health and

education awareness in the area, time to time, by organizing health

and education camps.

v. Connectivity (traffic and transportation road / rail / metro /

water ways etc.,)

Nearest railway line connecting Mellacheruvu - Jaggayapeta of South

Central Railway line is at a distance of 5.8 km in NNW direction. The

nearest railway station is Mellacheruvu RS at 9.8 km in WNW

direction.

Nalgonda is a major town at a distance of 85.0 km in WNW direction.

Page 22: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

The National Highway (NH-9) connecting Hyderabad - Vijayawada is

at a distance of about 17.5 km in NE direction and Major Road

Mellacheruvu to Mallareddygudem is at 3.2 km inSW direction to the

Mining Lease Area.

Nearest Airport is Gannavaram(Vijayawada) Airport at a distance of–

88.00 km in ESE direction.

vi. Drinking water management (source & supply of water)

The drinking water requirement is 1 m3/day and is being sourced

from APCL Cement plant.

vii. Sewerage System

Domestic waste water from mines office is treated in septic tank

followed by soak pit.

viii. Industrial waste management

Not Applicable

ix. Solid waste management.

No waste generated from the Mine.

A total quantity of 3900 cum of inter burden is estimated to be

generated from the mining activity which is being consumed in the

Cement Plant.

x. Power requirement & supply / source.

The power required for illumination is met from TSECB.

Page 23: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

i. Policy to be adopted (central / state) in respect of the project

affected persons including home oustees, land oustees and

landless labourers (a brief out line to be given).

No Rehabilitation and Resettlement is involved as the Mine III is an

existing Mine in operation since 2009. Total area of 4.75 ha is already

owned by APCL.

8.0 Project schedule & Cost Estimates

i. Likely date of start of construction and likely date of completion

(time schedule for the project to be given).

The Mine, is an existing Mine operating with a capacity for 0.15

million ton per annum. Life of the mine @ 0.15 million ton per

annum, based on the current mineral reserve of 0.821 million ton

would be about 8 years.

ii. Estimated project cost along with analysis in terms of economic

viability of the project.

No project cost is involved as there is no additional capacity or

additional facility is required and only the existing capacity will only

be continued.

9.0 Analysis of proposal (Final Recommendations)

i. Financial and social benefits with special emphasis on the

benefit to the local people including tribal population, if any, in

the area.

Economic development of the region depends largely upon the nature

of activities undertaken in the surrounding region. Corporate

development invariably contributes towards acceleration of the

process of socio-economic upliftment of the rural society by means

of employment, health & study programme etc.,

Employment: 15 locals are already employed.

Page 24: M/s. ANJANI PORTLAND CEMENT LIMITEDenvironmentclearance.nic.in/writereaddata/Online/...Anjani Portland Cement Limited (APCL) a public limited Company with an installed capacity of

Medical facilities: Medical facilities are provided for employee as well

as people of nearby villages.

Educational facilities: Basic educational and vocational training

facilities are provided for the children of employees as well as nearby

villagers.

Infrastructure facilities: Approach roads are developed at par with

Mine roads.

Additional: The establishment of factory facilitates additional

auxiliary facilities like banking, post office & recreation facilities.