EPCM - CONCEPT E --- Engineering P L F / C U F
P --- Procurement PERFORMANCE
C --- Construction O & M
M --- Management
ROI , IRR , DSCR , Debt : Equity
Detailed Project Report – Financial Closure
Capacity Utilisation Factor(CUF) =Energy measured (kWh) /
(365*24*installed capacity of the plant).
Major Components of EPCM Site Selection and Feasibility Analysis
Design [ DC/AC ] & Detailed Engineering - BOM
Signing of Legal / Power Purchase Agreements
Civil / Structural / Electrical Drawings
CEIG/TNEB Approvals
Procurement of Materials / Execution Strategy
Installation of the Plant within the Time Schedule
Synchronization and Handing over of plant
TNEB / MNRE / TEDA Inspection
Site Selection & Feasibility
VAO / DTCP / Statutory Approvals
Dry and Non Agricultural land / PCB /
Location of Substation and Transmission Grid
Approachability of the land from main road
Right Of Way Issues
Availability of Resources – Water / Elecy / House
Work force mobilization
Shadow Free Land , Data of flood and storm 20 years
Soil Test Report , Contour Mapping
Design & Detailed Engineering DC design
Structure Design according to Wind Speed
PV Syst layout of the plant
BOM preparation
Procurement plan
Site Mobilization Plan
Installation Plan
Commissioning Action Plan
Civil Work Heat & Rain HOT TEMP > 45 DEG
RAIN / STORM // Weeds / Bushes //
Design of all erection structure - Module Mounting, lighting post, lightning arrestor
Design of trenches, water supply, Drainage etc…
Structural Work Ground Mounted / Roof top / Stand Alone
Wind Load calculations
Selection of Structural Material /Hot Dip Galvanising
Structural Analysis for the load
Sasonal Tilting / Auto Tilting structure
Construction, supply and erection the mounting structures in the land
DC Design DC Design Calculation
Shadow free analysis
String Combiner Box / MJB
DC BOM preparation
Panel layout diagram
PV SYST generation report
Generation Guarantee file
S C A D A
No Network
No Signal
No Telephone
Line
Controls like
Tripping /
Closing Risky
Remote
Monitoring
AC Design Selection of Inverters , Central vs String
LT Cable Design
LT Panel
Transformer Design
HT Cable Design
HT Panel
Relay & Control Panel
Synchronization Check Panel
Revenue Metering & Power Evacuation
Power Evacuation Delay in TNEB Works
Construction Power
Bay & Space Availability
Transmission Line Routing
Protection & Tripping Systems
Compact SS & Power Evacuation
Grid
Availability
Fluctuations
Frequency
Lower
Monthly
Shutdown
Tripping
Feeders
Rain , Wind
On RCC Roof
MRF, Chennai – 15.84 KW
KTV Foods, Chennai – 523KW
Reed Relays, Hosur – 50 KW BGS School, Bangalore – 50 KW
On Metal Sheet and Asbestos Sheet Roofs
KTV Foods, Chennai – 523KW
Naga Mills, Dindugul – 600KW
Braga Industries, Chennai – 20KW
KTV Foods, Chennai – 523KW
We Provide Professional Practical Solar Solution.
Thank You !
Pls Contact
Kumar -
9551663310
Technical Credentials NAME DESCRIPTION
P. Kumar
Vice President Engineering & Project.
Professional Engineer with 24 years of experience in Power PlantEngineering & Project Execution, Management, Operation & Maintenance.
2 Years in Auroville heading Renewable Power Sector.
15 Years served in Govt. Of Oman in charge of Power Generation &Distribution for Ministry of Defense.
Successfully Commissioned India’s FIRST 1 MWp Solar PV Plant underJNNSM Scheme .
Concept to Commisionning of more than 15 MW Solar Plants.
Team comprising of Team leader, EHS, Electrical installation andcommissioning engineers
29