Transmitted Via Overnight Delivery September 18, 2002 Mr. Bryan Olson EPA Project Coordinator U.S. Environmental Protection Agency EPA New England One Congress Street, Suite 1I00 Boston, Massachusetts 02114-2023 Re: GE-PittsfieldMousatonic River Site East Street Area I-North (GECD430) Addendum to Pre-Design Investigation Work Plan Dear Mr. Olson: In May 2002, the General Electric Company (GE) submitted to the U.S. Environmental Protection Agency (EPA) a document entitled Pre-Design Investigation Work Plan for the East Street Area I-North Removal Action (PDI Work Plan). That document was prepared in accordance with the Consent Decree (CD) for the GE-Pittsfield/Housatonic Pllver Site and the accompanying Statement of Work for Removal Actions Outside the River (SOW). Subsequently, in a letter dated August 29, 2002, EPA provided conditional approval of the PDI Work Plan and required, among other things, that GE prepare an Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval letter. In addition, this Addendum includes updated versions of Tables 3 and 4 and all figures from the PDI Work Plan, which have been revised based on EPA comments. Modifications to the PDI Work Plan 1. GE has revised Figures 1 through 6 to reflect the agreed-upon location of the northern extent of the East Street Area I-North Removal AcQon Area (RAA). As requ~red In Cond~hon No. 1 of EPA's condit~onal approval letter, and as shown on Figure 3, GE proposes to collect add~t~onal so11 samples along the northern port~on of the RAA, at locat~ons generally conesponding to pre-des~gn grid nodes RAA6-B7, M 6 - A l l , and RAA6-C2. These proposed sampling locat~ons have been mod~fied from the~r p d nodes to take into account the exlsting buildmg, the R.AA boundary, and property omersh~p, respectively. The PDI Work Plan tables and figures have been updated to reflect these add~honal samples. 2. Condlhon No. 2 of EPA's cconditlonal approval letter requlres that CE summarize available ~nfomatlon concerning pnor uses and operations wrthin the R M , and prov~de a bnef summav of ~nvesngatory hlstory of the . As des~nbed m the PDI Work Plan, the East Sbeet Area I -North RAA V :\GE_Pirafield_CD_ESA_ I _Nonh\CarrapondaKc\ 16022415.doc

Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

Transmitted Via Overnight Delivery

September 18, 2002

Mr. Bryan OlsonEPA Project CoordinatorU.S. Environmental Protection AgencyEPA New EnglandOne Congress Street, Suite 1I00Boston, Massachusetts 02114-2023

Re: GE-PittsfieldMousatonic River SiteEast Street Area I-North (GECD430)Addendum to Pre-Design Investigation Work Plan

Dear Mr. Olson:

In May 2002, the General Electric Company (GE) submitted to the U.S. Environmental ProtectionAgency (EPA) a document entitled Pre-Design Investigation Work Plan for the East Street Area I-NorthRemoval Action (PDI Work Plan). That document was prepared in accordance with the Consent Decree(CD) for the GE-Pittsfield/Housatonic Pllver Site and the accompanying Statement of Work for RemovalActions Outside the River (SOW). Subsequently, in a letter dated August 29, 2002, EPA providedconditional approval of the PDI Work Plan and required, among other things, that GE prepare anAddendum to the PDI Work Plan.

This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments containedin EPA's conditional approval letter. In addition, this Addendum includes updated versions of Tables 3and 4 and all figures from the PDI Work Plan, which have been revised based on EPA comments.

Modifications to the PDI Work Plan

1. GE has revised Figures 1 through 6 to reflect the agreed-upon location of the northern extent of theEast Street Area I-North Removal AcQon Area (RAA). As requ~red In Cond~hon No. 1 of EPA'scondit~onal approval letter, and as shown on Figure 3, GE proposes to collect add~t~onal so11 samplesalong the northern port~on of the RAA, at locat~ons generally conesponding to pre-des~gn grid nodesRAA6-B7, M 6 - A l l , and RAA6-C2. These proposed sampling locat~ons have been mod~fied fromthe~r p d nodes to take into account the exlsting buildmg, the R.AA boundary, and property omersh~p,respectively. The PDI Work Plan tables and figures have been updated to reflect these add~honalsamples.

2. Condlhon No. 2 of EPA's cconditlonal approval letter requlres that CE summarize available~nfomatlon concerning pnor uses and operations wrthin the R M , and prov~de a bnef summav of~nvesngatory hlstory of the . As des~nbed m the PDI Work Plan, the East Sbeet Area I -North RAA

V :\GE_Pirafield_CD_ESA_ I _Nonh\CarrapondaKc\ 16022415.doc

Page 2: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

Mr. Bryan OlsonSeptember 18, 2002

Page 2 of 5

1s cornposed of c~ght separate tax parcels, as well as a Grty-o~aed propefty located along East Street.Based on the results of a property deed search conducted by GE m 1999 and a more recent revlew ofproperty mfomatlon at the Berksh~rc GounQ Reg~sQ of Deeds, most of the parcels at this RAA havechanged o\;nersh~p over the pas? several decades. These o%mcrsh~g changes often reflected changes mproperty uses and operations. Based on mfomat~on available to GE, the hrstory of the o\~xership of mduses and operations at these parcels may be sumanzcd as follows:

• Parcel 510-8-1 is cunentiy o\%med by GE. GE has no infomation regarding the past ounership oruses of this parcel. Cmently, thrs vacant parcel contalns various subsurface piping associatedwith the East Street Area 1 Nol-thside 011 Recovery System (Figure 21, d~scussed below.

• For Parcel J10-8-2, Ernesto Marchisio purchased the parcel in 1924 from Pittsfield Coal GasCompany. Subsequently, GE purchased the parcel in October 1979 and demolished the existingstructure. The parcel is currently vacant and used for a small portion of the piping associatedwith the Northside Recovery System.

• Parcel 510-8-3 is owned by GE. GE has no information regarding the prior ownership and uses ofthis parcel. This parcel also currently contains certain components of the Northside Oil RecoverySystem.

• Parcels 510-8-4 and J10-8-5 were purchased by Vincenzo Bellora in 1929 and later sold toCorado Bellora in 1944. In 1955, oil was detected in the basement of the structure located onthese parcels. In response, a number of investigations and remedial actions were performed thateventually lead to the installation of the current oil recovery system. In 1979, the Belloraproperty was purchased by GE, and the structure on the parcels was demolished. These parcelsare also currently used for components of the Northside Oil Recovery System.

• Berkshire Street Railway purchased Parcel J10-8-6 in 1912 from George Cooper and used theexisting building in the manufacture of railway cars. Grossmans (a retail building supplycompany) purchased the parcel fiom the Small Business Administration in 1958 and sold it toEngar Realty Trust in 1964. In 1964, the Pittsfield Fire Department issued a permit for theremoval of two underground storage tanks (USTs) located within the existing building — a 5,000-gallon gasoline UST and a 5,000-gallon diesel UST. GE purchased Parcel 510-8-6 from EngarRealty Trust in 1984 and currently leases the existing structure to Maxmllian Technologies,Inc., which uses that structure to store various construction equipment and supplies. In the future,GE intends to demolish the existing structure as part of its ongoing Brownfields program.

• Parcel K1 0-14-1 is owned by the K & K Realty Corporation. The existing building on this parcelwas used as a Grossmans' retail store until the mid to late 1980s. Pittsfield Fire D e p m e n trecords indicate that permits were issued for the removal of two USTs from this parcel — a10,000-gallon fuel oil tank in 1960 and a 1,000-gallon gasoline UST in 1978, Cumently, theexisting building on this parcel is used as an office and support facility for a cons.tructioncompany.

• Parcel K11-10-15 is a railroad right-of-way. The Berhhire County Registw of Deeds lists theowner as Pcnn Cenwal Company,

Investlgatrve act~vities at this RAA date back to the initial discovery of oil in the basement of the bulldingon the Bellora p r o p m , as discussed above. Subsequently, in the early 1980s, investigations focused on

V:\GE_PittifieM_CD_ESA_ I _N«thlCorrespondHKc\l 6022415.doc

Page 3: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

Mr. Bryan OlsonSeptember 18, 2002

Page 3 of 5

hght non-aqueous-phase Ilquld JLNAPL) present on top of the water table m this and adjacent areas.These efforts resulted In the ~nstallat~on and operat~on of the Nofihside Qti Recovw System and therelated and ongoing monltor~ng and LNAPL recovery program, In additron to LXML-related actltit~es,GE has also conducted soil and gomdwater lnvest~gatlons wltbrn East Street Area 2 -Tdorth. Theseactlv~tles have been conducted wrth the mvolwment and approval of EPA and/or Massachusetts

t of Environmental Proteet~on NDEP). The lnveshgat~ons performed In the 1990s wereconducted pwsuant to an Adm~fi~smtrve Consent Order with MDEP and a Resource Consewahon andRecovery Act (RGRA) Correct~ve Aehon Permlt Issued by EPA. A s u m a q of historical i;roundwater~nvestlgat~ons has been previously prov~ded to EPA In a document entrtled Baseline Monitoring ProgrumProposal for Plant Site I Groundwater Mnagement Area , September 2000), while the PDI WorkPlan summanzed the prior soil invest~gations related to this RAA.

3. As required by Condition No. 3 of EPA's conditional approval letter, GE has adjusted the locations ofproposed pre-design samples RAA6-E1, 6-E2, RAA6-E3, M 6 - E 4 , RAA6-E5, and M 6 - C 4 tofall on or extremely close to their specific grid nodes. (Previously, these samples had been proposed atlocations slightly offset from the actual grid nodes.) In addition, pre-design soil sample RAA6-C3 hasbeen offset from its specific grid node to a location on GE-owned property. Figures 3 through 6 havebeen revised to reflect the adjusted sample locations.

4. EPA's Condition No. 4 required a modification of the pre-design sampling scope with respect tosubsurface utilities. Specifically, grid location RAA6-Dl0 has been changed fiom a surface soil samplelocation to a soil boring location and grid location RAA6-D9 has been changed from a soil boringlocation to a surface soil sample location. Figures 3 through 6 and Tables 3 and 4 have been revised toreflect this change.

In addition, information regarding the depth of the utility trench beds, as required by Condition No. 4 ofthe EPA's conditional approval letter, has been obtained from the City of Pittsfield. From this inquiry,the sewer connections in the vicinity of the East Street Area 1—North RAA range between 6 and 10 feetbelow ground surface (bgs) and the water main in the same vicinity is 5.5 feet bgs. Based on thisinformation, no additional utility-related changes to the scope of pre-design investigations are proposed.

5. Figures 4 through 6 and Table 4 has been revised to reflect modifications to the proposed AppendixK+3 sampling, as required by Condition No. 5 of EPA's conditional approval letter. A summary of thechanged Appendix DC+3 sample locations follows:

0- to 1-foot interval:

• RAA6-B17 was moved to W 6 - A 1 6 ;• RAA6-C5 was moved to RAA6-D5;• R.AA6-E5 was eliminated; and• RAA6-A11 was added.

1- to 6-foot interval:

• 6-C17 (3- to 6-foot depth sample) was moved to R , t6 -CIS ;• 6-A11 (1- to 3-foot depth sample) was added;• 6-C2 (1- to 6-foot depth sample) was added; and• 6-D5 (1- to 6-foot depth sample) was added.

V:\CE_Pittsfield_CD_ESA_l_Noitli\CootspoiKfcBce\160J24IJ.doc

Page 4: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

Mr. Bryan OlsonSeptember 18,2002

Page 4 of 5

6- to 15-foot interval:

• 6-A17 was moved to RAA6-B15; and• A6-C2 was added.

6. Cons~stent wlth Comment Xo. 6 of EPA's cond~tlonal approval letter. any md~ficatrons related tosample depths, locations and parameters that are ~dent~fied in the field will be comunlcated to EPA'sfield representatives for concurrence, pnor to sampfmg.

7. Consistent with Comment No. 7 of EPA's condit~onal approval letter, GE has modified the shadingpattern on Figures 2 through 6 to better differentiate between paved and unpaved areas.

8. In response to C o m e n t No. 8 of EPA's conditional approval letter, GE has further reviewed theexisting PCB and non-PCB soil data presented in Appendix A of the PDI Work Plan. In all eases wherean analyte was reported as non-detect (ND), no information on detection limits was available. Therefore,no additional reporting related to this situation can be provided.

Schedule

GE proposes to complete the investigations described in the PDI Work Plan and submit a Pre-DesignInvestigation Report for East Street Area 1-North within 6 months after EPA's approval of thisAddendum to the PDI Work Plan, subject to possible changes due to delays in obtaining accesspermission or weather-related delays. In the event that delays to this proposed schedule are identified, GEwill notify EPA and propose a revised schedule for completing the investigations and submitting a Pre-Design Investigation Report. With respect to access, if GE is unable to obtain access permission fromproperty owners after using "best efforts" (as defined in the CD) to do so, it will so advise EPA andMDEP and seek their assistance in obtaining such access pursuant to Paragraph 60.f(i) of the CD.

If you have any questions or concerns regarding ths Addendum, please contact Andrew Silfer or me.

Sincerely,

John F. Novotny, P.E.Manager - Facilities and Brownfields Programs

Attachments

V:\GE_Pinifietd_CD_E5A_l_North\Coirejpondoiee\160224IJ.doc

Page 5: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

Mr. Bryan OfsonSeptember 18,2002

Page 5 of 5

ce: Tim Conway, EPA*Holly Ingl~s, EPAPYhchacl Nal~pmslu. EPARose Howell, EPAK.G. Mltkevlc~us, USACEDawn Jamros, WestonSusan Steenslrup, MDEPAlan Weinberg, MDEP*Robert Bell, MDEP*Thomas Angus, IMDEP*Susan Keydel, MDEPNancy E. Harper, MA AG*Dale Young, MA EOEA*Mayor Sara Hathaway, City of PittsfieldRichard Scapin, Chair, Pittsfield City CouncilPittsfield Department of HealthJeffrey Bernstein, Bernstein, Cushner & KimmelTheresa Bowers, GradientMichael Carroll, GE*Rod McLaren, Esq., GE*Andrew Silfer, GEJames Nuss, BBL

James Bieke, Esq., Shea & GardnerProperty Owner - Parcel K10-14-1Public Information RepositoriesGE Internal Repository

(* w/out attachments)

V:\GE_Pittsficld_CD_ESA_l_Noirtk\Coiresponfcncc\l60224t5.doc

Page 6: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

Tables

BBIll

&$clmntl$t$

Page 7: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

TABLE 3

GEUERAL ELECTRIC COWPANY - PImSFIELD, M.aS.1CHC'SEmS

PRE-DESIGY INVESTlGATlON WORM PLA% FOR

THE EAST STREET AREA f - NORTH REMOVdt ACTIOV

St'319ZARY OF PROPOSED GRID G H A R 4 a E R I Z A T I O N OF PCBs

GRID

COORDLNATE

SAMPLE

TYPE 0-1 ft 1-3 ft | 3-6 ft 6-15 ft

PAVED AREAS

A13

A14

A15

A16

Al?

B14

B7

B15

B16

B17

C6

C14

C15

C16

C17

C18

D14

DI5

D16

D17

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:

PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:

PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:

PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:

PROPOSED:

EXISTING:

PROPOSED:

EXISTING:PROPOSED:

. .

RAA6-A13

_

RAA6-A14

-

RAA6-A15

_

RAA6-A16

. .

RAA6-A17

_

RAA6-B14

_

RAA6-B7

RAA6-B15

-

RAA6-B16

-

RAA6-B17

-

RAA6-C6

_

RAA6-C14

_

RAA6-C15

-

RAA6-C16

-

RAA6-C17

_

RAA6-C18

-

RAA6-D14

ESl-14

-

_

RAA6-D16

_

RAA6-D17

--

-

-

-

-

--

-

RAA6-A17

-

-

-

-

-

-

RA.\'--A:5

----

RAA6-A17

-

-

--

K-\Ad-ir

-

-

-

-

-

-

-

-

-

-

-

_

RAA6-C6

--

-

-

KAA^-Cir

-

-

-

!< \ V-; "

-

-

-

-

-

-

-

-

-

-

-

-

-

KAV'i-CI?

-

-

--

-

-

--

-

-

-

-

--

-

-

_

-

-

_

R.VV--V5

-

-

RAA6-A17

-

-

--

RAAh-ir

-

-

-

-

-

-

RAA6-C6

-

-

--KA V>-< 15

-

-

--

•<A v - i •:""

-

-

-

-

-

-

-

-

-

-

V\GE-P~rtsfield-CD-ESA~l-f'iorth\C~wespandence\1502ibls.xls P a p I of 3 9/18/2002

Page 8: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

TABLE 3

GENERitL ELECTRfC COMPANY - PImSFIELD, M'GSACWCSEmS

PRE-DESIGS INVESTIGATIOY WORK PLAN FORTHE EAST STWET AREA 1 - NORTH REMOVAt Am103

SIL'MMARY OF PROPOSED GRfD GNARAmERIZATION OF PCBs

GRIDCOORDINATE

D18

SAMPLETYPE

EXISTING:PROPOSED:

0-1 ft

. .

RAA6-D18

1-3 ft

-

-

3-«ft-

--

6-15 ft

-

UNPAVED AREAS

All

B18

C2

C3

C4

C5

D7

D8

D9

D10

Dll

D12

D13

El

E2

E3

E4

E5

E6

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

EXISTING:PROPOSED:

-RAA6-A11

..

RAA6-B18

-RAA6-C2

ESI-7

-

-RAA6-C4

-

RAA6-C5

-RAA6-D7

-RAA6-D8

-RAA6-D9

-RAA6-D10

-RAA6-D11

-

RAA6-D12

-RAA6-D13

ESI-9--. .

RAA6-E2

. .

RAA6-E3

ESI-8_

-RAA6-E5

. .

RAA6-E6

_

RAA6-A11

----

-

_

RAA6-A11

-

-

-

RAA6-C2

ESI-7

-

-

RAA6-C4

-

RAA6-C5

-RAA6-D7

--

-

--

-KAAd-Dl'l

-

-

-

-

--

-

-RAA6-D7

--

-

--

-

;< \A'i-niu

-

-

-

-

-

-

ESl-9

-_

RAA6-E2

-

RAA6-E3

ESI-8_

_

RAA6-E5

_

RAA6-E6

_

RAA6-A11

--

-

-

RAA6-C2

-RAA6-C3

-

RAA6-C4

- •RAA6-C5

_

RAA6-D7

-

-

---

-RAA'i-IJln

--

-

-

-

-

--

RAA6-E1

-RAA6-E2

-

RAA6-E3

_

RAA6-E4

_

RAA6-E5. .

RAA6-E6

V:\GE-Pittsfield-CD-ESAA1lNorth\G~~e~pmden~e~l 502tblsxis Page 2 of 3 9/18/2002

Page 9: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

TABLE 3

GENERAL ELEGTRiC COMPANY - P InSFIELD, 3 IASSACBUSEm

PRE-DESIGY INVESTIGATION WORK PLA! FOR

THE EAST STREET AREA 1 - NORTH R E M Q V U ACTION

SCIMsK=Y OF PROPOSED GRID CN.WmERIZATXON OF PCBs

VOTES:

1. nits table defines the so11 sampling icseatlons wh~ch wit be utillzcd to sat~sfy $nd-based sampling requrremts for PCBs

fo~ the East Street Area i -No& preaesrgn fnrestigat~on

2 Other existing so11 data will not be utsltzed In support of the pre-destgn sampl~ng requlremmts, but may be used In the

des~gn of the Removal Act~on( (as d~scussed tn the text)

3 Shaded depth lncremenls indlcate that sol1 sampitng is not requlred

4 Ex~sttng samples are assumed to represent a gnd node ~f they are located less than 50 feet from IOO-foot gnd nodes

5 Existing sample depths are assumed to satrsfy the depth interval requlrments e , elther 0 to 1, 1 to 3,3 to 6, or

6 to 15 feet, as applrcable) ~f the extsttng depthfs) constitute at least 50% of the depth requirement For example,

ex~stlng data for 10- to 12-foot and 12- to 14-foot depths writ satisfy the 6- to 15-foot requirements at a node, but

extstrng data for the 10- to 12-foot depth alone wrtt not

6 This table does not Include all exrstrng sod PCB samples collected at East Street Area 1-North Refer to Table I for

a complete 11st of all exrstlng sot1 PCB samples

7 — = Not Applicable

V:\GE__Pittsfield_CD_ESA_l__North\Correspondence\1502tbls.xls Page 3 of 3 9/18/2002

Page 10: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

TABLE 4

G E N E W ELECTIUC COMPAYY - PITTSFIELD, M..1SS;\CWI:SETTS

PRE-DESIGS I%TXSTIGrlllON W O W PLAY FOR

THE EAST S m E T M A 1 - \ORTW RE3iIOV.a AC'I'iOY

PROPOSED SOIL SAMPLING LOCATIONS, DEPTHS, AND PARAMETERS

SAMPLEID

RAA6-A13

RAA6-A14RAA6-A15

RAA6-A16RAA6-A17

RAA6-B7

RAA6-B14

RAA6-B15

RAA6-B16RAA6-B17

RAA6-C6

RAA6-C14RAA6-C15

RAA6-C16RAA6-C1?

RAA6-C18RAA6-D14

RAA6-D16RAA6-D17RAA6-DI8

GRIDCOORDINATE

A13

A14

A15

A16A17

B7

B14B15

B16B17

C6

C14C15

C16C17

C18Di4

D16D17D18

SAMPLEDEPTH

0-1 ft

1-3 ft3-6 ft

6-15 ft0-1 ft

0-1 ft1-3 ft3-6 ft

6-15 ft0-1 ft0-1 ft

1-3 ft3-6 ft6-15 ft0-1 ft1-6 ft

6-15 ft0-1 ft0-1 ft

1-3 ft3-6 ft

6-15 ft0-1 ft0-1 ft0-1 ft

1-6 ft6-15 ft0-1 ft0-1 ft

1-3 ft3-6 ft

6-15 ft0-1 ft0-1 ft

1-3 ft3-6 ft

6-15 ft0-1 ft

0-1 ft0-1 ft0-1 ft0-1 ft

ANALYSESPCBs

PAVEE

X

XXX

XXX

XXXXXXXXXXXX--

-

XXXXXXXXXX

XXX

XXXXXXX

VOCs

AREAS_

-

-_

_

-

X_

X_

X--

-__

X--_

X-_

X-

X--_

X--

X--

-_

X--_

| SVOCs

-_

--__

X-

X-

X_

--—-

X_

_

X--

X_

X---

X--

X——

--

X_

-

-

INORGANICS

-_-

-__

-

X-

X_

X-_---

X---

X--

X-

X---

X_

-

X——

-_

X---

PCDDs/PCDFs

---

--

-

X-

X-

X—--

—-

X——-

X--

X-

X—-

X--

X——

--

X-_

-

V:\GE~P~ttsfield~C~ESA_ l ~North~Corresp~ndence~~ 1502tbl~.xls Page I of 3 9/1S/2002

Page 11: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

TABLE 4

GENERAL C G0MI"AI.Y - PITTSFIELD, MASSACHUSETTS

PmDESIGX IhWSTICATIO'S WORK PLAY FORTHE EAST STREET AREA 1 - NORTH REslCIOVAL ACTION

PROPOSED SOIL SAMPLING LOCATIONS, DEPTHS, AND PARAMETERS

SAMPLEID

GRIDCOORDINATE

SAMPLEDEPTH

ANALYSESPCBs VOCs SVOCs | INORGANICS PCDDs/PCDFs

I NPAVED AREAS

RAAb-Ali

RAA6-B18RAA6-C2

RAA6-C3RAA6-C4

RAA6-C5

RAA6-D5

RAA6-D7

RAA6-D8RAA6-D9

RAA6-D10

RAA6-D11RAA6-D12RAA6-D13RAA6-E1

RAA6-E2

RAA6-E3

RAA6-E4

RAA6-E5

RAA6-E6

Aii

BIBC2

C3C4

C5

D5

D7

D8

D9

D10

DllD12D13El

E2

E3

£4

E5

E6

G-i it1-3 ft3-6 ft

6-15 ft0-1 ft0-1 ft

1-6 ft6-15 ft6-15 ft0-1 ft

1-6 ft6-15 ft0-1 ft

1-6 ft6-15 ft0-1 ft

1-6 ft0-1 ft1-3 ft3-6 ft

6-15 ft0-1 ft0-1 ft0-1 ft1-3 ft3-6 ft

6-15 ft0-1 ft0-1 ft0-1 ft0-1 ft

6-15 ft0-1 ft1-6 ft

6-15 ft0-1 ft1-6 ft

6-15 ft6-15 ft0-1 ft1-6 ft

6-15 ft0-1 ft

1-6 ft6-15 ft

A

XXXXX

XX

XXXXXXX-

-

XXXXXXXXXXXXX-

XXXXXXXXX

XXXXX

XX_

--_

X

X_

X_

-_

--

XXXX-_

-_

X__

X_

X-

XX_

_

-

XX_

-

__

_—

-

XX_

__

XX-

X-

-—

-

XXXX-

-

--

X-

X-

X-

XX-

-

X

X--_____

-

XX_

---

XX-

X-

--

--

XXXX-

--_

X--

X-

X-

XX-_

-

XX--_

--_

-

XX-_

__

XX-

X-

-—

--

XXXX-

-

--

X-

X-

X-

XX-_

-

X

X---_-__

-

V:\GE_PittsfieId_CD_ESA_l_N«th\Coirespondence\lS02tbU.xb ge 2 of 3 9/18/1002

Page 12: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

TABLE 4

GENERAL ELECTRIC COMPANY - PITT5FIELD, MASSACHUSETTS

PRE-DESIGN INVESTIGATION W O m PLAN FOR

THE EAST STREET M A Z - YORTW REMOVAL ACTIOY

PROPOSED SOIL SAMPLIIG LOCATIOYS, DEPTHS, A?iD P.-UWMETERS

NOTES:

1. Thrs table ~dmtrfies fa11 sawles to be caliected and the analyses to be perfonr~d as pait of the pre-den@ tnvestlgatren

at East Sheet Area 1 -?+larch

2 The Append~x UC+3 sample ~ntenals shorn a h \ e may be mdtfied tn the field based on the results of photoionizatton

detector JPID) readings and vlsual observations at the t~m of sample colIect,on

3 -- = Not Apptlcable

V~\GE-P~tzsfield-CD-ESA~l~North~Co~~esponde~f~e?502tbIs.xls Page 3 of 3 9/18/2002

Page 13: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

Figures

BBL^ L &LEE,1NC.

enginsers %scfenflsfs

Page 14: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

1. JWPiHB 5 6*5ED OK /&am. PHOTCCRWHS AND PHaiDGSWHyETWC MAPPINGHT L « K » « B HAPPNG, IKS. - FUOWH IN APRn. 1MO: DATA PBMDEU B\CEWCBAL ELEC^IC COUPjUiV. AN(J BIASUIHO AND BOUCK ENdNEHK, P.C.P.C, COfiSTRUCHOW P1AHS.

i HOT

J. STE

FIATUBES SHC*N.

LJ (W—. OT-Bf fPi C /

EAST STREET AREA 1 - MORTH

GENERAL ELECTRIC COM PAWFFTTSF1ELD, MASSACHUSETTS

PRE-DESIGN INVESTIGATION WORK PLANFOR EAST STREET AREA 1 - NORTH

SITE LOCATION

^

Page 15: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

^ H J S ^

EAST STREET A3EA 1NORTHSIDE RECOVERY SYSTEM

SUMMARY OF SOIL PCB SAMPLE RESULTS(PPM DRV WT.)(S AMPLE INCREMENTS IN FEET)

LOMti.il II127123133ESI-7esi-aS S I - 9£31 — 14•:• K'H

0 - 0.5

0.451.11.9- _—

o - :-—

———1.B—

0.5 - 2- -

2 - 2.5- -

; 1.31.40.342.2—.— —

2 - 4

1.71.4

0.Z3

4 - 5

ND

——

4 - 6

—0.47.7WDND—

5 - 7

6 - 7

2.G

—— —

ND

6 - fl

.—i.a E2.7j—

no—

——

———

5—

9 - 1 0——-0.1

101.5\.a

-_

10 - 12—_—

0X6—

17 - •'•- -

ND

11 - ;i—

NDND—0.3

I . UAFFING IS 3*SE0 (M «SlAL PHOTOGRAPHS ANDPH(3T(KRJUIUE; IRIC U^PRUC BT LOCi™000 UAPPthoO. INC-FLOW IM *PR1L 1990; OATA MC1T3D FROU PHOTT3Ct3P1E5Of MASSACHUSETTS HICHVI*^ DEFAHTUEKf UhAWiHfiSDCPICrNG UERfifJ. ROAD B£*U6HUEHT, 1/14/48iSUrTVET INFORMATION PftOVlKD BY W*TE ENflHI0EPIC11NC (SLOCATBO EAST S l B e d , 5 / 3 / 0 1 .

Z. A U LOCHhTIONS ARE APPROXIMATE.

3. NOT WJ. PMraCAl rtATUBES SHOWN.

4. UTUTY LOCATIONS ARE APM13WMATE.

LEGENDAPPROXIMATE REMOVAL ACTION AREA BOUNDARY

FENCE

PROPERTY LINE (APPROXIMATE)

E M - ' * EXISTING SOIL BORING LOCATION( 1 - FOOT OR GREATER SAMPLE DEPTH)

BUJLDING

BUILDING 59 TO BE DEMOLISHED

PAVED AREA

WATER UNE

• - r . - ' • : • • •

J l l

1. — = Mo aamp

2. ND = Nr>t delected.

J- [2.7] ^ Duplicate analjaii result shewn in brackets.

SUMMARY OF SOIL PCB SAMPLERESULTS WITH UNKNOWN DEPTHS

(PPM DRY WT.)

PCB ConcentratloT

100-

GHAPHIC SCALE

200/

5CWER LINE

RECOWRY SYSTEM

MANHOLE

APPROXIMATE LOCATION OF BANDSURROUNDING SUBSURFACE UTILITIES (25FEET WIDE ON EACH SIDE OF UTILITY)

H F * ^ JU

tl U1B9XDIJJMC

5 / B / 3 ^R&10HW iBLf/«1109C0l /4O1A1K11.DIU

GENERAL ELECTRIC COMPANYPITTSFIELD, MASSACHUSETTS

P RE-DESIGN INVESTIGATION WORK P U NFOR EAST STREET AREA 1 - NORTH

EXISTING SAMPLING LOCATIONS

BBLBLAilAKP. MUCK S, LEi.^

FIGURE

Page 16: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

jio-e-3v, jio-e-t i Jio-s-5

69

SUMMARY OF SOU PCB SAMPLE RESULTS(PPM CRT WT.)(5AMPLE INCREMENTS IH FEET}

O E51-1*

Location IDES-. 7ESI-aE:SI-9ES1-14

:: - : : ; :

0 L 4 S

1.11.9

:> -—

—1.8

J 0.5 - Zl . i

0.343.2

2 -

—- -

V - 41.71 10.730.21

4 - S 4 - 6o. 4

' 7.7

ND

; -

:•• B - B

i.a [2.7]—-NOND

8 - 9 B - 10

5

y - 10

_ _

ia

——

- -

in -

0.0*

12 \Z

ND

14 - If:ND

ND

10.3

1. UAPPINC 15 BASCEh CN UDlM. Pi • 3TO0RATI • i ANDK,rtJlC'iH.*JJUUH ^ LUHPIMt BT LOCKWOW UAPPlNt. INC.-rUWH IN APHL 1990; CATA DISTZH) FHQ« PHOTOCOPIESOF UASS*CHUSFTni ttSHMh* DEFARTUEHt OfiAWSHCSCTICT1NC WEKHll HOMJ nEWJGNUENT, l /H /9 f l ; >WDSl^VEY INFWMAHON PROWDED Blf V/KTZ ENCIHEtRINf;OEPICHNC BQJKATm EAST S'SEET, S/7/01.

Z. ALL LOCAtlOftS ARE ftPPHOKIHME.

3. NOT ML PHYSICAL FEATUMS SHOWN.

LEGENDAPPROXIMATE REMOVAL ACTION AREA BOUNDARY

I ENCE

PROPERTY LINE (APPROXIMATE)

EXISTING SOIL BORING LOCATION( 1 - FOOT OR GREATER SAMPLE DEPTH)

1 0 U - F 0 0 T SUBSURFACE SAMPUNG GRID

50-FOOT SURFACE SAMPLING GRID

BUILDING

BUILDING 69 TO BE DEMOLISHED

AREA

TABLE NOFES:

1. — = Nn arvip

2. KD - Net del silted.

3. [2.7] = Daplica[4 Ofialyilfi roaull sh^wn in

100'

CRAPHIO SCALE

2Q01

PROPOSED SURFACE SOIL SAMPLE LOCATION

PROPOSED SOIL BORING LOCATION

WATER UNE

SEWER LINE

APPROXIMATE LOCATION OF BANDSURROUNDING SUBSURFACE UTILITIES (25FEET WOE ON EACH SIDE OF UT1UTY)

X: 44109X1)1.UWG

P: PMEHltjVLT-31,g/18/OJ 5"R-5i-0HW SOL OWH/«SSW/H0«B0lil

GENERAL ELECTRIC COMPANYP1TTSFIELD, MASSACHUSETTS

PRE-DESIGK INVESTIGATION WORK PLANFOR EAST STREET AREA 1 - NORTH

PROPOSED PCBCHARACTERIZATION LOCATIONS

BBBIAS JMD. BQ1TCK \ .tfc. INC.

FIGURE

3

Page 17: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

-

1. UAFP1H5 15 BASED ON *EMAi PHQTOflflAPtiS AND

A1CL 1J9Q; OihTA DlHTZm FUCW PK3KKOP1ESOF PASSAChJSETS rtCHW*r (IffMTMFHt fifrAWNM

MC WiRRILL H3AD flEALIONHCHT, 1/14/93; ANOTV INFCRUAT10N PftO\CCT B~t WHITE EN3»IT! ^C

RELOCMED EAST STKET, 5/7/01.

3. ALL LCCMlOftlS JkflC APP frail MA 1*.

3. WOT AU. PHY9CM. FWRfflES 5H?¥»>.

*. EMCThC Win PMP0S6O KM. SAMPLES U5ID 10 SATISFYAPPEUdlX IX+J CHAKWTEHZATOH INCLUDES *HALT5ES fVDLAT.^ ORGANIC COUHJJNDS (WSaJ, SDJI-VOUTLED4CANIC CCHPCUH3S (SVOCn}. P6l.TthLti!*l*TE5HHEHZO-P-DI0yiN3 tKCOi^lX^CHLOK •JATQO

« IHCftGANICS.

^ ; ; . : ; / , .

LEGEND

APPROXIMATE REMOVAL ACTION AREA BOUNDARY

FENCE

PROPERTY LINE [APPROXIMATE)

BUILDING

BUILDING 69 TO BE DEMOLISHED

PAVED AREA

PROPOSED SOIL BORING LOCATION

PROPOSED SURFACE SCHL SAMPLE LOCATION

GRAPHIC SCALE

0N"*r WT-JUJ"

/ / im-51-COIW SDL DUWN/4DI83011/401 P.f, 1IM f «;

GENERAL ELECTRO COMPANY

PLTTSFIELD, MASSAChJU SETTS

PRE-DESIGN INVESTIGATION WORK PLANFOR EAST STREET AREA 1 - NORTHPROPOSED APPENDIX IX+3

SAMPLING LOCATIONS(0- TO 1-FOOT DEPTH INTERVAL)

BBLi.li. INC.

FIGURE

4

Page 18: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

^ " ^ ̂ ^-t^ir^'*"'**! ̂ t ;" "" -l

1, UAPFIMC IS BASED OH AER W. PfHDTDCfUPMS AMDPHOTMKMJMETRIC MAPPING BV LKKVflMO UAPPnlG, TJC.- F l U m IN AfJ*. 19S01 OATA DiaiZ£D mOF HA55ACWJ51TTS HIGHWAY UtJ'AMMEUT OftAWHOSKPitTlHS yiCRfilLJ. HDAO KLflLIWME!JT 1/14/ftSi MVSURVEY lhFDnk"*HOM PRCVIDtU ur WH| r t t / p i E

Oll^S ReWJCATHJ EAST SlKEFT, 5/7/m.

LEGEND

APPROXIMATE REMOVAL ACTION AREA

FENCE

2. ALL LOCAT10MS AflE

A MOT A'X PHYS CAL FEATURES SHOWM,

-(. EMSHHG AND PftCPCSCt SOIL SAMPLES U3Q TOAPP&JDiy IV+J CH*fi*ClEarATTON ' DELUDES AHALTSES f MVCLAl*£ ORGANIC COUFOUNGS ^VOCB), StMI-VDLATlLE0H5AWIC COMPOUNDS (SVClCaJ.mBENZO-P-DIOMNS ( P O f t J PCM9EMB5flJRAHS ffwil WO IHOftGAHICS.

PROPERTY UNE (APPROXIMATE)

BUILDING

BUILDING 69 TO BE DEMOLISHED

Zh££.\ PAVED AREA

100'

WAFHIC SCALE

2001

EXISTING SOIL BORIMG LOCATION( 1 - FOOT OR GREATER SAMPLE DEPTH)

PROPOSED SOIL BORING LOCATION ( 1 - TO3-FOOT DEPTH INTERVAL)

PROPOSED SOIL BORING LOCATION ( 1 - TO6-FOOT DEPTH INTERVAL)

iSAAB-MS PROPOSED SOIL BORING UOCATTOU ( 3 - TO6-FOOT DEPTH INTERVAL)

- i + - & U W SDt. DUW

GENERAL ELECTRIC COMPANYPITTSRELD. MASSACHUSETTS

PRE-DESIGN INVESTIGATION WORK PLANFOR EAST STREET AREA 1 - NORTH

PROPOSED APPENDIX IX+3SAMPLING LOCATIONS

(1- TO 6-FOOT DEPTH INTERVAL)

BB. POKE M5E. WC.

FIGURE

Page 19: Mr. Bryan Olson · Addendum to the PDI Work Plan. This letter serves as the Addendum to the PDI Work Plan and addresses each of the coments contained in EPA's conditional approval

FIGURE HOTCLi:

1. KAPHP,S IS BASE? O>; AE=HAL P>«TlKflAPM5 AMP

-FUCftm H A * L IMOi 3A"A DICIT7ED fRCMOF

MC.

3 PE*UCNMEWT, 1 /14 /M:pwyiceti ar wni t : twawi

RELOCATES EAST 31FEET, 5 /7 /Ot .

Z ALL LDCAT0N5 U E APPROXIMATE.3, NOT ALL PHYSCAL FEATJAES SHOWN.4, DdSTING AND PADPQSCIh S3 t SAMPLES USftl T6

APPEHDIK IK+3 CWAftAtrtfil^AiiOiH IHO.IJ0ES AHA1TSCS FDAD5 CVO^l, SOi(!-VDLAT1LE

CCMPOUHJS (SWJCl),DIBtNEO-P-DIOJfJS (Kaf f i^ /P

(PCDFa^ AT* I

LEGEND1 - - — — APPROXIUATT; REMOVAL ACTION AREA BOUNDARY

FENCE

PROPERTY LINE (APPROXIMATE)

-14 EXISTING SOIL GORING LOCATION

( 1 - PDOT OR GREATER SAMPLE DEPTH)

BUILDING

BUILDING 69 TO BE DEMOLISHED

PAVtD AREA

PROPOSED SOIL BORING LOCATION

. . . • .

' . ' • : .

5CALE

3.0H6L 0U"\ DfF-BEF*

N/401E5OO1/4Q1 WB0S,l>Vl3QUA

GENERAL ELECTRIC COM PAN YPITT5FIELD, MASS ACH USE TT5

PRE-DESIGN INVESTIGATION WORK PLANFOR EAST STREET AREA 1 - NORTH

"PROPOSED APPENDIX IX+3SAMPLING LOCATIONS

16- TO 15-FOOT DEPTH INTERVAL)

BBI FIGURE