Pre-installation Guide
1-1
CUSTOMER DETAILS
CUSTOMER: HI-TECH (VIETNAM)
SERIAL No: MP0593-ICP
SALES CONTACT: FRANK FEILI
TYPE OF SYSTEM: LPX ICP (SR)
DATE GUIDE WAS PREPARED: 18th JANUARY 2008
ISSUE: 01
DATE GUIDE WAS UPDATED:
Pre-installation Guide
IMPO• The
• The ves 9 metres between rack & other system parts. How other obstructions or if cables are routed via cable trays
• STS o gasbox. Only fit correctly rated regulators. It is also reco line. Failure to provide this equipment may result in unne
• In or p.
• A he se to commission the equipment. Failure to provide this e
• All fa ent.
• STS ing the pumps in the grey area away from the oper
• If this quirements of the latest issue of STS quality docu stallation tester. These documents are available from STS notified if an appropriate electrical tester is available to pr
• The responsibility of the customer to ensure it is suitably rated
• A su pplied electronics rack.
• An in
1-2
RTANT NOTESinformation contained within this guide is accurate at time of placement of order.
electronics rack is supplied with 10 metres cables as standard, which allowing for cable drops, leaever, please note that the effective distance between parts may be reduced even further to avoid .
only recommend the use of orbitally welded VCR fittings for all gas line installations from source tmmended a wall-mounted isolation valve, high flow valve & non return valve be fitted in each gas cessary delays in the commissioning of the system.
der to check the foreline for leaks, STS recommend fitting an isolation valve on the chamber pum
lium leak detector or similar equipment must be made available for STS’s appointed engineer to uquipment may result in unnecessary delays in the commissioning of the system.
cilities points of connection to have flexibility designed in to allow for vibration due to a seismic ev
recommend a noise survey assessment as part of the installation. STS also recommend positionators point of use, if possible.
system is to be electrically installed by non STS personnel, it must be installed in line with the rements: Q000130, Q000131, Q000135 & electrical drawing ED322778, using a suitable electrical in by mailing the address below. If STS engineers are to electrically install this system they must beevent any delay.
supply cable to this tool must be sized in accordance with local electrical rules/regulations & is the prior to installation.
itably rated mains circuit breaker should be installed up stream of the main breaker on the STS su
put from a fire system can be linked in to the STS EMO circuit if required.
Pre-installation Guide
CE DEPARTMENT AT:
1-3
FOR FURTHER INFORMATION PLEASE CONTACT STS SERVI
Pre-installation Guide
CONT
SECTIO
SECTIO
SECTIO
SECTIO
1-4
ENTS
N 1 SYSTEM ENVIRONMENT & FOOTPRINT
N 2 SYSTEM INSTALLATION DRAWINGS
N 3 DATA SHEETS
N 4 SYSTEM SERVICES INSTALLATION CHECKLIST
Pre-installation Guide
ABOUThis gui safely to the specifications, qualified personnel must install e
• Elec
• Cool
• Gas
• Extra
• Com
1-5
T THIS GUIDEde describes the facilities requirements of the LPX ICP system. In order for the system to operateach of the following user-supplied services prior to the arrival of an STS service engineer:
trical facilities
ing water facilities
supply facilities
ction requirement
pressed air
Pre-installation Guide
ENTAL
1-6
SECTION 1SYSTEMS ENVIRONM
CONDITIONS
Pre-installation Guide
SYSTEAir parti
ROOM
Maximu
Minimum
RELAT
Maximu
Minimum
SYSTE
Air parti
ROOM
Maximu
Minimum
RELAT
Maximu
Minimum
1-7
MS ENVIRONMENTAL CONDITIONS (CLEAN ROOM)cle count local to the system Class 1,000 or better
TEMPERATURE
m 25oC
5oC
IVE HUMIDITY AT 20oC
m 75%
25%
MS ENVIRONMENTAL CONDITIONS (GREY AREA)
cle count local to the system Class 10,000 or better
TEMPERATURE
m 25oC
5oC
IVE HUMIDITY AT 20oC
m 75%
25%
Pre-installation Guide
1-8
FOOTPRINT LAYOUT
Pre-installation Guide
TION
2-1
SECTION 2SYSTEM INSTALLA
INFORMATION
Pre-installation Guide
HOW TThe Sysincludedshow a requiredshow whconnectprovide CUSTOmade toparticula
In the excustomeprovide the fittinby referThe spesupply c2.3 of threquiremon pageSystemreferringbe able servicesof conne
2-2
O USE THIS GUIDEtem Services Diagrams in this section each
different service for the system. They ere the service is to be
ed & who should it (i.e. STS or the MER). Reference is the tables for the r service.
ample shown here, the r will be required to the nitrogen supply to g at conditions shown ring to the table ref. (A). cification for this air an be found on page is section. The exhaust ents (M) are detailed
2.9. By examining the s Service Diagrams & to the tables you will to determine the required & the points ction.
Pre-installation Guide
NITRO
E
FLOW RATE SUPPLIER
) 22 SLPM Customer
ired.
12 SLPM (Dry pump)
Customer
) 1 SLPM Customer
) 22 SLPM Customer
2-3
GEN REQUIREMENTS
TABLE REF
LETTER
SERVICEREQUIRED PURITY INLET
PRESSURE
MAX SAFETY
PRESSUR
A Loadlock vent 99.99% 2-6 Bar (g) 10 Bar (g
B Loadlock pump purge Varian SH100
No purge requ
FITTING FOR THE ABOVE SUPPLY IS 8MM PUSH FIT
C Process pump purgeEdwards iH80
99.99% 2.8-3.2 Bar (g) 7 Bar (g)
FITTINGS FOR THE ABOVE SUPPLIES ARE 1/4” SWAGELOK COMPRESSION
D Anti-condensation 99.99% 2-6 Bar (g) 10 Bar (g
FITTING FOR THE ABOVE SUPPLY IS 1/4" PUSH FIT
E Chamber vent, turbo purge & gas line purges
99.9995% 1 Bar (g) 10 Bar (g
FITTING FOR THE ABOVE SUPPLY IS 1/4” VCR MALE
Pre-installation Guide
WATERECOM
NOTE• Plea
OW RATE SUPPLIER
300 l/h Customer
120 l/h Customer
Air cooled.
340 l/h Customer
2-4
R REQUIREMENTSMENDED CONDITIONS OF HOUSE COOLING WATER:-RESISTIVITY: 10 Kohm.cm
SOLID CONTENT: 30 ppm
PH VALUE: 6 - 8
TEMPERATURE: 15oC - 25oC
se also refer to the "Cooling Requirements" section of this document, page 2-9.
TABLE REF
LETTERSERVICE REQUIRED PURITY INLET
PRESSURE FL
FMachine supply 100 Microns 2-4 Bar (g)
FITTING SIZE 3/8” QUICK COUPLING
G
Process chamber dry pump
Edwards iH80100 Microns 2-4 Bar (g)
FITTING SIZE 1/2” QUICK COUPLING
HLoadlock chamber
dry pumpVarian SH100
No water required.
I RF generators in cabinet 100 Microns 2-4 Bar (g)
FITTING SIZE 3/8” SWAGELOK COUPLING
Pre-installation Guide
COMP
Y RE
FLOW RATE SUPPLIER
g) 10 SLPMCustomer
2-5
RESSED AIR REQUIREMENTS
TABLE REF
LETTER
SERVICE REQUIRED CONTAMINANTS INLET
PRESSURE
MAXSAFET
PRESSU
JCompressed air
supply unit <5 micron particles 5 Bar (g) 10 Bar (
FITTING SIZE 8MM PUSH FIT
Pre-installation Guide
PROC
NOTES• Proc & BCl3). In order to minimise this effect, thought
shou e).
• Shou sing an electrostatic clamp.
FLOW RATE SUPPLIER
Process dependant Customer
2-6
ESS GASES REQUIREMENTS
ess performance can be influenced by pressure variation in certain gases (particularly C4F8, SiCl4ld be given to their storage conditions (for instance, store indoors to maintain a stable temperatur
ld Argon not be required as a process gas, it must still be made available for de-chucking when u
TABLE REF
LETTER
SERVICE REQUIRED PURITY INLET
PRESSURE
MAXSAFETY
PRESSURE
KProcess gases
99.995%EXCEPT GASES
SiCl4 & BCl31 Bar (g) 6 Bar (g)
FITTTING SIZE 1/4” VCR MALE CONNECTION
Pre-installation Guide
HELIU
FLOW RATE SUPPLIER
50 SCCM Customer
2-7
M BACKSIDE COOLING REQUIREMENTS
TABLE REF
LETTER
SERVICE REQUIRED PURITY INLET
PRESSUREMAX SAFETY PRESSURE
LHelium gas 99.999% 1 Bar (g) 6 Bar (g)
FITTING SIZE 1/4” VCR FEMALE CONNECTION
Pre-installation Guide
EXHA
TYPE OF EXHAUST WHO SUPPLIES
Factory Customer
Factory Customer
.pipe Factory Customer
2-8
UST REQUIREMENTS
TABLE REF
LETTER
SERVICE REQUIRED
EXTRACTIONRATE FITTING
M Loadlock pump >40 l/m @ 13789 Pa less than atmospheric pressure
NW40
N Process chamber pump
>50 l/m @ 13789 Pa less than atmospheric pressure
NW40
O Gas box >550 l/m @ 100 Pa less than atmospheric pressure
89mm (3.5”) dia
Pre-installation Guide
COOL
NOTE• Plea
WHO SUPPLIES
120 l/h at 25oC Customer
2-9
ING REQUIREMENTS
se also refer to the "Water Requirements" section of this document, page 2-4.
TABLE REF
LETTER
SERVICE REQUIRED TYPE OF COOLING
PLower electrode
coolingFed from the SMC HRZ chiller
This unit requires house cooling water at 4 bar (g) &
FITTING SIZE 1/2” SWAGELOK COMPRESSION.
Pre-installation Guide
SYSTE
NOTE• If this quirements of the latest issue of STS quality
docu stallation tester. These documents are available from STS notified if an appropriate electrical tester is available to pr
• The responsibility of the customer to ensure it is suitably rated
• A su pplied electronics rack.
SUPPLIER
Amps/Phase Customer
sed connection Customer
2-10
M ELECTRICAL SUPPLY REQUIREMENTS
system is to be electrically installed by non STS personnel, it must be installed in line with the rements: Q000130, Q000131, Q000135 & electrical drawing ED322778, using a suitable electrical in by mailing the address below. If STS engineers are to electrically install this system they must beevent any delay.
supply cable to this tool must be sized in accordance with local electrical rules/regulations & is the prior to installation.
itably rated mains circuit breaker should be installed up stream of the main breaker on the STS su
TABLE REF
LETTERSERVICE REQUIRED RATING
R 3 phase supply, neutral & protective earth (PE).Noiseless earth not required (TE).
380 Volts 50 Hz 56
S Country of origin phone connection to RG45 connection to rack.
10/100 mbs internet ba
Pre-installation Guide
TURB
CAUT
orrectly (see page 24 of the operating instructions).
ts a burn hazard. While this flange is protected by an h care to avoid burns.
2-11
O INFORMATION
ION WHEN USING THE TURBO
If you are involved in removing the turbo, it is essential that the splinter guard is re-installed c
When the turbo is in use the basic flange can become so hot (>80oC, >176oF) that it represeninsulated collar (which should not be removed) the rest of the body should also be treated wit
Pre-installation Guide
3-1
SECTION 3DATA SEETS
Pre-installation Guide
4-1
SECTION 4CHECK LIST
Pre-installation Guide
re
STS
r the
e.
4-2
SYSTEM SERVICES
CHECK LIST
To enable STS to commission your new system you a
asked to complete and sign the services checklist.
After completion please fax the complete section back to
on the fax number shown on Page 4.6. Arrangements fo
Commissioning Engineer to visit you can then be mad
Pre-installation Guide
LOAD
ELECT
N
OCUSTOMERS SIGNATURE
N
OCUSTOMERS SIGNATURE
4-3
LOCK PUMP
RICAL INCOMING SUPPLY
SYSTEM SERVICESERVICE CONNECTIO
FITTEDPLEASE ANSWER YES/N
Loadlock pump to system flexible connection pipe
Loadlock pump exhaust connection
Loadlock pump nitrogen purge supply inlet (if required)
SYSTEM SERVICESERVICE CONNECTIO
FITTEDPLEASE ANSWER YES/N
Electrical supply into the electronics cabinet
Pre-installation Guide
GAS B
PROC
ONNECTION TEDWER YES/NO
CUSTOMERS SIGNATURE
ONNECTION TEDWER YES/NO
CUSTOMERS SIGNATURE
4-4
OX
ESS CHAMBER
SYSTEM SERVICESERVICE C
FITPLEASE ANS
All process gas lines to the gas box
All process gas line nitrogen purge (if required)
Gas box process chamber vent
Gas box exhaust
SYSTEM SERVICESERVICE C
FITPLEASE ANS
Helium backside cooling supply
Nitrogen supply
Water cooling supply (house water)
Water cooling supply for chillers & pumps (house water)
Compressed air
Pre-installation Guide
PROC
N
OCUSTOMERS SIGNATURE
4-5
ESS CHAMBER BACKING PUMP
SYSTEM SERVICESERVICE CONNECTIO
FITTEDPLEASE ANSWER YES/N
Backing pump to system flexible connection pipe
Backing pump exhaust connection
Backing pump nitrogen purge supply inlet (if required)
Water cooling supply (if required)
Pre-installation Guide
CUSTO
SYSTE
All servi me to commission the system.
Signed
Print Na
Date:
er.
4-6
MER DECLARATION
M No..........................…………….
ces have been installed to the system and the system is ready for a STS approved engineer to co
.................................................
me: .................................................
.................................................
After completing this form and signing it please
fax a copy of the complete document back to
STS on +44 1633 652437
Please address it for the attention of the Service Manag