Page 1: Moving to a Results Based-Management Environment Progress Report January 2013

Moving to a Results Based-Management EnvironmentProgress Report

January 2013 1

Page 2: Moving to a Results Based-Management Environment Progress Report January 2013

GENERAL STANDARDS: Article 88 states that “In order to facilitate the formulation of the budget, the General Secretariat shall: Prepare, as far as possible, a classification of the mandates in each area, according to the level of priority the General Secretariat believes they should have;”

GENERAL ASSEMBLY: As stated in its 2010 Budget Resolution and previous resolutions, instructs the Secretary General:

a. To provide member states with a detailed report, on an annual basis, regarding the results achieved and the resources allocated for compliance with the mandates of the Organization. This information should be broken down by pillar, responsible area of the General Secretariat, and object of expenditure;

b. To continue, in consultation with the member states and in coordination with the Working Group on the Review of OAS Programs, the implementation of a planning process that identifies strategic objectives, establishes operational results, and aligns programs and projects to the mandates issued by the political bodies. The formulation of strategic objectives to guide the Organization’s planning process will be in keeping with the essential purposes of the Organization as set forth in the Charter of the Organization of American States, and will be adopted in due course by the General Assembly;

.

The main requirements regarding the follow-up of mandates are the following:

Mandates regarding Mandates Follow-Up

2

Page 3: Moving to a Results Based-Management Environment Progress Report January 2013

Mandates regarding Mandates Follow-Up

• c. To continue, in consultation with the member states and in collaboration with the Working Group on the Review of OAS Programs, the evaluation of the Organization’s programs and projects pursuant to the mandates issued by the political bodies and, subsequently, to define and establish the operational results in accordance with the strategic objectives and the alignment process referred to in the previous paragraph, which will be adopted by the General Assembly, taking into account the comparative advantages of the Organization, and to allocate budgetary resources accordingly; and

• d. To ensure that the budget formulation process be guided by strategic objectives, programmed results, and related indicators.

Page 4: Moving to a Results Based-Management Environment Progress Report January 2013

MEMBER STATES: During the 2008-2009 CAAP Sessions, the CAAP, at the request of the Permanent Mission of Mexico, instructed the GS/OAS to develop reporting tools that would inform the CAAP on the implementation of General Assembly mandates for the preceding three years. This was fully supported by all CAAP delegates.

During the 2010-2011 CAAP Sessions, the CAAP validated the classification structure for mandates, and on that accomplished an exercise of prioritization. Later, a new exercise to identify obsolete mandates began under the leadership of the Permanent Mission of Mexico.

GENERAL SECRETARIAT: The GS, through SAF, identified and classified more than 1700 mandates approved since 1935 to 2008, and linked to them the programmed resources from all the existing funds

In 2012, programmed results at the level of Sub-pillars and Groups of Mandates were identified.

Background

4

Development of a Mandates Management Tool further responds to requests from stakeholders that we more adequately account for compliance with mandates. In addition, it supports the GS/OAS transition to results-based budgeting.

Development of a Mandates Management Tool further responds to requests from stakeholders that we more adequately account for compliance with mandates. In addition, it supports the GS/OAS transition to results-based budgeting.

Page 5: Moving to a Results Based-Management Environment Progress Report January 2013

Challenges identified in April 2012

5

Record all current mandates.

Develop the capacity to report compliance with these mandates

Help the GS/OAS move towards a results-based budgeting system

Page 6: Moving to a Results Based-Management Environment Progress Report January 2013

Advances from April 2012

6

Record of mandates totally updated.

First version of the Results-Based Budget available.

Page 7: Moving to a Results Based-Management Environment Progress Report January 2013

Challenges identified in January 2013

7

Improve the accuracy of results programmed.

Develop the ability to report on the compliance of these mandates.

Page 8: Moving to a Results Based-Management Environment Progress Report January 2013

Mandates RegistrationMandates Registration

Aggregation and Classification of MandatesAggregation and Classification of Mandates

Linking Mandates to Planned Results and Programmed ResourcesLinking Mandates to Planned Results and Programmed Resources

Programmatic Reporting and Follow-upProgrammatic Reporting and Follow-up

Integration with OASES and OAS core systemsIntegration with OASES and OAS core systems

Development Plan

8

Page 9: Moving to a Results Based-Management Environment Progress Report January 2013

Aggregation and Classification of Mandates

Estructura de Mandatos y Resultados

9

Immediate Outcomes

Intermediate Outcomes

Final Outcomes

Outputs

Pillar

Sub-pillar

Group of Mandates

Aggregation and Classification of Results

Page 10: Moving to a Results Based-Management Environment Progress Report January 2013

Mandates Registration and Classification

Progress in the Implementation of theDevelopment Plan during 2012

The new Mandates approved in 2009, 2010 and 211 were registered and classified at the levels of pillars and sub-pillars. The current total of Mandates exceeds 2,300.

The new Mandates approved in 2009, 2010 and 211 were registered and classified at the levels of pillars and sub-pillars. The current total of Mandates exceeds 2,300.

Linking Mandates to Planned Results and Programmed Resources:

Planned results at the level of immediate results and their resources were linked to groups of mandates.Planned results at the level of intermediate results and their resources were linked to sub-pillars.

Planned results at the level of immediate results and their resources were linked to groups of mandates.Planned results at the level of intermediate results and their resources were linked to sub-pillars.

The Member States started a process of reviewing the validity of the mandates The Member States started a process of reviewing the validity of the mandates

Page 11: Moving to a Results Based-Management Environment Progress Report January 2013

2013 Results Based Budget at Pillar Level*

*Note: Figures are drawn from the Secretary-General’s budget proposal; version based on the Approved Program-budget is anticipated by the end of the firs quarter of 2013

Page 12: Moving to a Results Based-Management Environment Progress Report January 2013

Human Rights RBB at the level of Sub-Pillar

Page 13: Moving to a Results Based-Management Environment Progress Report January 2013

Human Rights RBB at the level of Group of Mandates

Page 14: Moving to a Results Based-Management Environment Progress Report January 2013

Human Rights RBB at the level of Group of Mandates by department

Page 15: Moving to a Results Based-Management Environment Progress Report January 2013

Mandates Registration and Classification:

Ongoing activities

Recording and classification of mandates is now a regular process in the management of the General Secretariat.Recording and classification of mandates is now a regular process in the management of the General Secretariat.

Linking Mandates to Planned Results and Programmed Resources:

A new additional format for the program-budget, based on the mandates structure, is being presented to the CAAP as the first draft for a Results Based Budget. Final results, linked to pillars, will be elaborated and presented to the CAAP during 2013.

A new additional format for the program-budget, based on the mandates structure, is being presented to the CAAP as the first draft for a Results Based Budget. Final results, linked to pillars, will be elaborated and presented to the CAAP during 2013.

Linking Mandates to Planned Results and Programmed Resources:

Programmed results and achieved results are being incorporated into the quarterly reports. Programmed results and achieved results are being incorporated into the quarterly reports.

Page 16: Moving to a Results Based-Management Environment Progress Report January 2013

Pending activities

Integration with OASES and OAS core systems

Page 17: Moving to a Results Based-Management Environment Progress Report January 2013

Moving to a Results-Based Management Environment17