Monthly Environmental Report
April 2013
ii
April 2013 SH16 Monthly Environmental Report.docx
Document history and status
Revision Date issued Written By Reviewed by Approved by Revision Status
A 13.05.2013 M Cassidy M Cassidy M Cassidy For Issue
Distribution of copies Revision Purpose Issued to
A For Issue Auckland Council
Printed: 13/05/2013 07:51:00
Last saved: 13 May 2013 07:50 AM
File name: K:\EN Environment\EN51 Construction\04 Council Reporting\Monthly Report\2013 04 Report\April 2013 SH16 Monthly Environmental Report.docx
Author: Michael Cassidy
Environmental Manager: Michael Cassidy
Name of organisation: Causeway Alliance
Name of project: SH16 Causeway Upgrade Project
Document version: Revision A
Table of Contents
iii
April 2013 SH16 Monthly Environmental Report.docx
Contents
1.0 INTRODUCTION 6
1.1 PURPOSE OF THE REPORT 6
2.0 RESOURCE CONSENTS 6
2.1 CONSENTS TRIGGERED BY WORKS 6
2.2 ADDITIONAL CONSENTS REQUIRED 11
3.0 OVERVIEW of ACTIVITIES UNDERTAKEN 12
3.1 Construction 12
3.2 Environment 13
3.3 Communication and Stakeholder 13
4.0 MEETINGS, INSPECTIONS & EVENTS 13
5.0 ENVIRONMENTAL MONITORING 14
5.1 VEGETATION MANAGEMENT 14
5.2 CONSTRUCTION NOISE & VIBRATION 14
5.3 AIR QUALITY 14
5.4 CONTAMINATED SOIL 14
5.5 EROSION & SEDIMENT CONTROL 15
5.6 ARCHAEOLOGICAL 15
5.7 COASTAL MONITORING 15
5.8 MARINE MONITORING 15
5.9 ECOLOGICAL 15
6.0 STAKEHOLDER MANAGEMENT 15
6.1 QUERIES, CONCERNS, COMPLAINTS 15
7.0 WORKS PROPOSED FOR MAY 2013 16
Appendix A: SH16 Causeway Alliance Construction Zone Plan
Appendix B: SH16 Causeway Alliance 3 Month Construction Programme
Appendix C: SH16 Causeway Summary Construction Programme
Appendix D: SH16 Causeway Zone 5 Great North Road Interchange / Summary Programme
6
April 2013 SH16 Monthly Environmental Report.docx
1.0 INTRODUCTION
1.1 PURPOSE OF THE REPORT
To meet the reporting requirements for the SH16 Causeway Alliance a monthly report is required
by the Board of Inquiry to be prepared and forwarded to Auckland Council in the second week of
the following month.
This report describes and details the month of April 2013.
Milestones achieved during the period include:
• Auckland Council approval of SH16Causeway Upgrade CEMP including sub-plan
appendices.
• Auckland Council planning approval for Northern Asymmetric Widening and revised
construction methods received.
• Geotechnical site investigation works completed and confirmation of assumed
geotechnical parameters of existing causeway obtained.
• Value Engineering activities process completed, detailed design progressing, design
packages being issued for review.
• Site establishment commenced at Taupuni (temporary encampment) – (Te Atatu Road).
• Construction planning continuing, interfacing with detailed design programme and
procurement.
• Project Management Plans development continues towards a ‘readiness review’ end May
2013.
• Agreement reached of appropriate geometric layout between Causeway Bridge and SH16
over GNR Bridge. Reconciliation of cost adjustment is delayed awaiting detailed design.
• Agreement reached of appropriate sequence of works and access required to abutments
of Whau River bridges.
2.0 RESOURCE CONSENTS
2.1 CONSENTS TRIGGERED BY WORKS
Consent No. Purpose Description
Alteration to Designation
EPA 10/2.003
(ACC: Plan
Modification
202)
Alteration to designation A07-01, SH16, causeway and Rosebank Peninsula – NOR2.
Alteration to existing designation at Rosebank Interchange and Patiki bridges, including part of Rosebank Park Domain; modifications to land on existing causeway, ancillary safety and operational services, and maintenance, relocation of services, pedestrian and cycleway, landscaping and planting etc
7
April 2013 SH16 Monthly Environmental Report.docx
Consent Number Consent Purpose Conditions
Land Use Consents
EPA 10/2.010
(ARC: 38313)
Land Use Consents – Land Disturbance (Sectors 1 – 9 inclusive)
Earthworks and roading/ tracking/ trenching during construction - within and outside the Sediment Control Protection Area (includes the associated discharge of sediment laden water as a discharge consent)
As per Schedule B of the Board of Inquiry Designation and Consent conditions
EPA 10/2.009 (ACC: R/LUC/2010/3396
Land Use Consents – Activity on reclaimed land (Sectors 2 and 4)
Land Use Consent pursuant to Section 89(2) for the construction, operation and maintenance and ancillary activities of a State highway.
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
Coastal Consents
EPA 10/2.030
(ARC: 38334)
Activities within the CMA
For ongoing use of CMA by the State highway for transport purposes and associated construction activities including conveyance of spoil. [Sectors 2 and 4]
As per Schedule B of the Board of Inquiry Designation and Consent conditions
EPA 10/2.031 (ARC: 38335)
Erection of Temporary Structures in the CMA (Sectors 2 & 4)
This consent relates to the erection of temporary (construction) structures within the CMA including piers, ramps, bridges, conveyor structures, temporary staging platforms, temporary bird roost, stormwater discharge outfalls and other consequential activities such as disturbance and/or vegetation removal. In the CMA General Management Area (GMA), Coastal Protection Area (CPA) 2 and Mooring Management Area – Henderson Creek, Whau River and Pt Chevalier.
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.032 (ARC: 38336)
Erection of Permanent Structures in the CMA (Sectors 2 & 4)
This consent relates to the construction of permanent (operational phase) structures within the CMA including piers, ramps, bridges, stormwater discharge outfalls and other consequential activities such as disturbance and/or vegetation removal. In GMA, CPA 2 and Mooring Management Area – Henderson Creek, Whau River and Pt Chevalier.
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.033 (ARC: 38338)
Erection of Temporary Structures in the CMA (Sectors 3
This consent relates to the erection of temporary (construction) structures within the CMA including piers, ramps, bridges, conveyor structures, temporary staging
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
8
April 2013 SH16 Monthly Environmental Report.docx
and 4) platforms, stormwater discharge outfalls and other consequential activities such as disturbance and/or vegetation removal. In CPA 1 – Waterview Estuary.
EPA 10/2.034
(ARC: 38339)
Erection of Permanent Structures in the CMA (Sectors 3 and 4)
This consent relates to the construction of permanent (operational phase) structures within the CMA including piers, ramps, stormwater discharge outfalls and other consequential activities such as disturbance and/or vegetation removal. In CPA 1 – Waterview Estuary.
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.037
(ARC: 36576)
Reclamation in the CMA (Sectors 1 (0.11ha) and
2 (approx 0.4ha))
This consent relates to the temporary reclamation for access and construction purposes and permanent reclamation associated with motorway widening in CPA 2.
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.038
(ARC: 38342)
Reclamation in the CMA (Sector 4 (approx 4.5ha))
This consent relates to reclamation for access and construction purposes and permanent reclamation associated with motorway widening in CPA 1, north and south of causeway and includes associated vegetation removal and diversion of estuarine channels (including sediment works associated with diversion) required for the mitigation of effects on the reclamation. The Plan states that any non complying consent under 13.5.3 is a restricted coastal activity in specific conditions.
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.039
(ARC: 38343)
Disturbance of Foreshore and Seabed (Sectors 1, 2, 4 and 5)
Disturbance of the foreshore and seabed during construction including vegetation removal, use of motor vehicles, disturbance of sediment, temporary structures and erosion and sediment control measures including, in a GMA, CPA2 and Mooring Management Area for construction:
Sector 1 - Stormwater wetland and associated reclamation; Outfall discharging into Henderson Creek.
Sector 2 - Temporary staging platforms within Whau River; Piles for Whau River Bridges; Piles for new pedestrian/cycle facility; Rock lined channels.
Sectors 4 and 5 (north eastern side of causeway) - Temporary staging platforms adjacent to Pt Chevalier;
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
9
April 2013 SH16 Monthly Environmental Report.docx
Piles for ramps adjacent to Pt Chevalier.
EPA 10/2.040
(ARC: 38344)
Disturbance of Foreshore and Seabed (Sector 2)
Disturbance of the foreshore and seabed for vegetation removal, including mangrove removal, in any CPA 2. This includes the removal of mangroves to the west of Rosebank Park Domain.
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.041
(ARC: 38345)
Disturbance of Foreshore and Seabed (Sectors 4 and 5)
Disturbance of the foreshore and seabed during construction including vegetation removal and mangrove removal, use of motor vehicles, disturbance of sediment, temporary structures and erosion and sediment control measures including, in CPA1, to access existing lawful structures, but excluding the disturbance consequential to activities under which other consents are sought.
This includes disturbance for activities such as machinery access to temporary construction areas in the CMA (e.g. the estuary, Causeway Bridges, pedestrian/cycle way facility, coastal protection works, rock revetment / batters, and temporary staging platforms within Oakley Inlet etc).
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.042
(ARC: 38346)
Disturbance of Foreshore and Seabed (Sectors 4 and 5)
The use of motor vehicles in any CPA
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.043 (ARC: 38347)
Taking and use of inner coastal water (Sectors 2 and 4)
The taking and use of inner coastal water for use in the proposed coffer dam (construction of the reclamation).
As per Schedule B of the Board of Inquiry Designation and Consent conditions
EPA 10/2.044 (ARC: 38348)
Taking and use of inner coastal water (Sectors 2 and 4)
The damming and impounding of inner coastal water in the coffer dam during construction – General Management Area
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.045 (ARC: 38349)
Damming and impounding of inner coastal water (Sectors 2 and 4)
The damming and impounding of inner coastal water in the coffer dam during construction – CPA1
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.046 Discharge of Contaminants
This consent relates to the discharge of contaminants during
As per Schedule B of the Board of Inquiry Designation and Consent
10
April 2013 SH16 Monthly Environmental Report.docx
(ARC: 38350) (Sectors 1 through 5)
construction into the CMA and discharge of contaminants in stormwater flows during construction along Sectors 1 – 5, including point source and sheet flow discharges.
conditions
EPA 10/2.047
(ARC: 38351)
Discharge of Contaminants (Sectors 1 through to 5)
This consent relates to the discharge of contaminants during construction into the CMA and discharge of stormwater during construction along Sectors 1 – 5, including point source and sheet flow discharges
As per Schedule B of the Board of Inquiry Designation and Consent conditions
EPA 10/2.049
(ARC: 38353)
Discharge of Contaminants (Sector 2)
This consent relates to the permanent discharge of stormwater to the CMA for the operation of the Project – Sector 2 (Whau River, CPA 2 and Mooring Management Area).
As per Schedule B of the Board of Inquiry Designation and Consent conditions
EPA 10/2.050
(ARC: 38354)
Discharge of Contaminants (Sector 4)
This consent relates to the permanent discharge of stormwater to the CMA for the operation of the Project in Sector 4 (Causeway and Interchange, CPA1).
As per Schedule B of the Board of Inquiry Designation and Consent conditions
EPA 10/2.052 (ARC: 38356)
Occupation of CMA (Sector 1 and 2)
Occupation of the CMA by permanent structures in, on and over the seabed and foreshore for general state highway widening including piles and piers for new and widened structures including:
Sector 1- Stormwater wetland pond
Sector 2- Whau River Bridge; Whau River pedestrian/cycle facility
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.054
(ARC: 38359)
Occupation of CMA (Sector 2)
This consent relates to the occupation of the stormwater outfalls for – Sector 2 (Whau River, CPA 2 and Mooring Management Area.
As per Schedule B of the Board of Inquiry Designation and Consent conditions
EPA 10/2.055
(ARC: 38360)
Occupation of CMA (Sector 4)
This consent relates to the occupation of the stormwater outfalls for – Sector 4 (Causeway Interchange (Waterview Inlet and surrounds, CPA 1).
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.056
(ARC: 38361)
Occupation of CMA (Sectors 4 and 5)
Occupation of the CMA for construction works in, on and over the seabed and foreshore for Project works including stormwater outfall and ancillary works in General Management Area.
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.057
(ARC: 38362)
Occupation of CMA (Sectors 1 and 2)
Occupation of the CMA for construction works in, on and over the seabed and foreshore for Project works including piles and
As per Schedule B of the Board of Inquiry Designation and Consent conditions
11
April 2013 SH16 Monthly Environmental Report.docx
piers construction, reclamation construction and ancillary works in CPA2.
EPA 10/2.058
(ARC: 38363)
Occupation of the CMA (Sectors 3 and 4)
Occupation of the CMA for construction works in, on and over the seabed and foreshore for Project works including piles and piers construction, reclamation construction and ancillary works in CPA1.
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.059
(ARC: 38364)
Occupation of the CMA (Sector 4 and 5)
Occupation of the CMA by permanent structures in, on and over the seabed and foreshore for general motorway widening including piles and piers for new and widened structures including:
Sector 4- Causeway Bridges; Causeway pedestrian/cycle facility; Stormwater outfalls
Sector 5- Great North Interchange Ramps; Heritage bridge (pedestrian); Stormwater outfalls
As per Schedule B of the Board of Inquiry Designation and Consent conditions plus new Condition RC.1B
EPA 10/2.060
(ARC: 38365)
Activities within the CMA (Sectors 1, 2, 4, 5)
This consent relates to the ongoing use, operation and maintenance of CMA by the State highway for transport purposes.
As per Schedule B of the Board of Inquiry Designation and Consent conditions
EPA 10/2.061
(ARC: 38366)
Activities within the CMA (Sectors 1, 2, 4, 5)
This consent relates to the ongoing use, operation and maintenance of CMA by the State highway for transport (as an activity not provided for as a permitted, controlled or restricted discretionary activity, and is not prohibited by the Plan).
As per Schedule B of the Board of Inquiry Designation and Consent conditions
2.2 ADDITIONAL CONSENTS REQUIRED
2.2.1 Section 127; New Condition RC.1B
Auckland Council granted the NZTA consent on 19 February 2013 to change the wording of BOI Condition RC.1 to insert a new Condition RC.1B to the conditions of coastal consents 38335, 38336, 38338, 38339, 38342, 38345, 38356, 35361, 38363, 38364, 38360, 36576, 38346, 38348, 38349, 38344, 38343, R/LUC/2010/3396 as it relates to the SH16 Causeway (Sectors 2, 3 and 4 of the Waterview Connection Project) only.
The wording of Condition RC.1B is as follows:
RC.1B
Except as modified by the conditions below, the SH16 Causeway Upgrade Project works (Sectors 2, 3 and 4 of the Waterview Connection Project) shall be undertaken in general accordance with the information provided by the New Zealand Transport Agency (NZTA), in the resource consent applications, the supporting documents (as detailed in Condition DC.1), and in the supplementary
12
April 2013 SH16 Monthly Environmental Report.docx
information provided in evidence by the NZTA to the BOI, except where as amended by the application ·material provided with the s 127 application referenced by Council as 41113, 41114, 41118, 41119, 41120, 41123, 41124, 41125, 41126, 41128, 41371, 41120, 41372, 41373, 41374,41375,41376, RNCC/2010/3396/1, as follows:
a) Application form, AEE, appendices and plans titled 'SH16 Causeway Upgrade Project Section 127 Application to Auckland Council to Change Condition RC.1 (by adding a new condition RC.1 B) on Resource Consent Number EPA 10/2.009 (ACC:R/LUC/2010/3396), EPA 10/2.031 (ARC: 38335), EPA 10/2.032 (ARC 38336), EPA 10/2.033 (ARC:38338), EPA 10/2.034 (ARC:38339), EPA 10/2.038 (ARC:38342), EPA 10/2.039 (ARC:38343), EPA 10/2.040 (ARC: 38344), EPA 10/2.041 (ARC:38345), EPA 10/2.052 (ARC: 38356), EPA 10/2.056 (ARC:38361), EPA 10/2.058 (ARC: 38363), EPA 10/2.059 (ARC: 38364)' prepared by the Causeway Alliance and dated 20 November 2012 (Revision 1), including:
• Addendum to Technical Report G.3 Assessment of Avian Ecological Effects
• Addendum to Technical Report G.4 Assessment of Coastal Processes
• Addendum to Technical Report G.5 Assessment of Construction Noise Effects
• Addendum to Technical Report G.11 Assessment of Marine Ecological Effects
• Addendum to Technical Report G.15 Assessment of Stormwater and Streamworks Effects
• Addendum to Technical Report G.16 Assessment of Temporary Traffic Effects
• Addendum to Technical Report G.17 Assessment of Terrestrial Vegetation Effects
• Addendum to Technical Report G.19 Assessment of Vibration Effects
• Addendum to Technical Report G.20 Assessment of Visual and Landscape Effects
2.2.2 Te Atatu Pony Club LUC-2012-1444
Auckland Council granted the NZTA consent on 13 February 2013for works to relocate the Te Atatu Peninsula Pony Club on the Harbourview Orangihina park during the SH16 Causeway Upgrade Project for the creation of a levelled grassed area for the exercise of horses, provision of carparking hardstand area.
3.0 OVERVIEW of ACTIVITIES UNDERTAKEN
3.1 Construction
• Preliminary works to TAPC site compound “Taupuni “commenced – fencing, installation of
environmental controls, drainage, relocation of chattels etc occurring currently.
• Team focused on construction planning, work methodologies and programming.
• Review of 50% design packages coordinated between designers and constructors bi-
weekly.
• GNRI scope further defined and integrated programme developed with WCA.
• TTM development continues including impact assessment of various TTM
implementations.
• Deployment of NMV resources and assets coordinated successfully.
• Early works planned for key areas of project starting May 2013.
13
April 2013 SH16 Monthly Environmental Report.docx
3.2 Environment
• All environmental management plans have been submitted to Council for review and
approval – approval has been granted.
• Second Community Liaison Group Meeting held – good attendance, large representation
from Alwyn Avenue and from cyclists and local board members.
3.3 Communication and Stakeholder
• Reviewed and updated Communications and Stakeholder Engagement Minimum
Requirements for PAA relevant to the Causeway Upgrade Project.
• Registered to be part of NZTA’s 0800 4 HIGHWAYS (0800 44 44 49) free phone service.
• Team challenge to name Construction Yard 1. Favourite was Taupuni (temporary
encampment).
• Causeway Alliance shared Community Liaison Group meeting with Te Atatu Interchange
and Auckland Transport’s Proposal for bus interchange at Te Atatu, without complaint.
• Resolved Iwi communications contacts in advance of blessing.
4.0 MEETINGS, INSPECTIONS & EVENTS
02 April 2013 Construction Yard 1 Pre-Commencement Meeting (Auckland Council / Causeway
Alliance)
04 April 2013 North Traherne Island Environmental Pre Clearance Inspection (Bioresearches /
Causeway Alliance)
08 April 2013 Construction Yard 1 ESCP Site Meeting (Causeway Alliance / Southern Skies)
09 April 2013 Removal of Mimulus from Sth Traherne Swale; Transport to Piha (Causeway
Alliance, Dept of Conservation, NZTA, Auckland Motorway Alliance)
11 April 2013 Alwyn Avenue Amenity Tree Assessment (Causeway Alliance / Arborlab)
18 April 2013 Alwyn Avenue Amenity Tree Assessment (Causeway Alliance / Arborlab)
18 April 2013 SH16 causeway Upgrade Project meeting (Auckland Council / Causeway Alliance)
23 April 2013 Archaeological Pre-Commencement Meeting (Causeway Alliance / Clough
Associates)
24 April 2013 Te Kawerau a Maki Liaison Meeting (Causeway Alliance / Te Kawerau a Maki)
29 April 2013 Construction Yard 1 Bird Roosting Assessment (Causeway Alliance /
Bioresearches)
14
April 2013 SH16 Monthly Environmental Report.docx
5.0 ENVIRONMENTAL MONITORING
5.1 VEGETATION MANAGEMENT
Causeway Alliance undertook Amenity Tree S.T.E.M Assessment and site inspections of Alwyn
Ave.
6 trees with S.T.E.M assessments above 100 were identified.
Amenity
Tree No.
Species Location Health Fencing Observations/recommended
actions
7 Casuarina 26 Alwyn Ave Good - Protect during construction
activities
8 Ulmus 28 Alwyn Ave Good - Protect during construction
activities
9 Metrosideros 30 Alwyn Ave Good - Protect during construction
activities
10 Juniperus 30 Alwyn Ave Good - Protect during construction
activities
65 Eucalyptus 34 Alwyn Ave Good - Protect during construction
activities
66 Liquidamber 34 Alwyn Ave Good - Protect during construction
activities
5.2 CONSTRUCTION NOISE & VIBRATION
No noise – vibration complaints or monitoring was undertaken during the period.
5.3 AIR QUALITY
No air quality complaints or issues were received during the period.
Causeway Alliance Daily Site Reports did not indicate any air quality issues.
5.4 CONTAMINATED SOIL
No contaminated soil monitoring was undertaken during the period.
15
April 2013 SH16 Monthly Environmental Report.docx
5.5 EROSION & SEDIMENT CONTROL
CESCP No.1: Construction Yard 1 (included in Construction Yard 1 SSCEMP) approved 18 April
2013
CESCP No.6: GNRI Areas 1 & 2 Rev A approved 23 April 2013
CESCP No 7: GNRI Area 3 Rev A approved 23 April 2013
CESCP No.6: GNRI Areas 1 & 2 Rev B approved 30 April 2013
5.6 ARCHAEOLOGICAL
No archaeological site monitoring was undertaken during the period.
5.7 COASTAL MONITORING
No coastal monitoring was undertaken during the period.
5.8 MARINE MONITORING
No marine monitoring was undertaken during the period.
5.9 ECOLOGICAL
Pre-clearance inspection for Significant and Valued vegetation was undertaken in Zone 1A
(Traherne Island North).
Pre-clearance inspection for reptiles/lizards was undertaken in Zone 1A (Traherne Island North).
Assessment of avian roosting locations was undertaken in Zone 3 (Construction Yard 1).
Mimulus repens assessment and subsequent removal/relocation to endangered plant nursery.
6.0 STAKEHOLDER MANAGEMENT
6.1 QUERIES, CONCERNS, COMPLAINTS
A total of 12 calls or emails have been received to date all responding to Causeway Alliance offer
to have their names added to our database for project updates
5 compliments have been recieved - all from Cycle Action Auckland praising Causeway Alliances’
proactive engagement regarding shared path signage.
16
April 2013 SH16 Monthly Environmental Report.docx
No complaints have been recorded or received during the April period.
7.0 WORKS PROPOSED FOR MAY 2013
Refer Appendix B for 3 Month Construction Programme
May will see the project take occupation of various locations along the alignment, works will be
relatively small scale and be associated with preparing areas for more significant earthwork and
road widening activities later in the year.
The majority of works programmed for May involve vegetation removal, clearing and demolition,
installation of environmental controls and site accommodation.
Zone 1 Causeway is on the critical path to commence the installation of ground improvements
throughout the May-June period.
Zone 2 will commence ground clearing activities in the vicinity of east and west bound Whau
Bridge.
Zone 3 main site office establishment on Te Atatu Road will continue. Preparation for demolition
and removal of buildings in Alwyn Avenue will also commence.
Zone 5 early works activities will commence in the Great North Road Interchange Areas (Refer
Appendix D) to ensure a comprehensive programme interface with associated works for the
Waterview Connection Alliance.
The environmental focus for May is on pre-inspections prior and during vegetation removal and
ground clearance to ensure ecological and archaeological stand over requirements are met.
�
������������� ������������������������������������������
� �
�
������������ ���������������������������������������������������
� �
����������
�����������
��������
�������� �������
�������
������������� ���������������������
������������� ���������������������
������������� ���������������������
������������� ���������������������
������ ��������������������
������ ��������������������
������ ��������������������
������ ��������������������
����!�"��������������#����������$�
����!�"��������������#����������$�
����!�"��������������#����������$�
����!�"��������������#����������$�
%��������"������&
��'����()�����(
%��������"������&
��'����()�����(
%��������"������&
��'����()�����(
%��������"������&
��'����()�����(
%��������"������'����()��������(
%��������"������'����()��������(
%��������"������'����()��������(
%��������"������'����()��������(
%����*���"������+��',,���()����-�(
%����*���"������+��',,���()����-�(
%����*���"������+��',,���()����-�(
%����*���"������+��',,���()����-�(
%����*���+��-��������
%����*���+��-��������
%����*���+��-��������
%����*���+��-��������
%����*���+�����������
%����*���+�����������
%����*���+�����������
%����*���+�����������
%����!�������������',,���()
%����!�������������',,���()
%����!�������������',,���()
%����!�������������',,���()
%���������"������+��'����()
%���������"������+��'����()
%���������"������+��'����()
%���������"������+��'����()
%����.�����������/�+��������0��#$�������� �������
%����.�����������/�+��������0��#$�������� ��������(�#���
%����.�����������/�+��������0��#$�������� ��������(�#���
%����.�����������/�+��������0��#$�������� ��������(�#���
�������� �����
�������� �����
�������� �����
�������� �����
��%���(�#������&
��1�
��%���(�#������&
��1�
��%���(�#������&
��1�
��%���(�#������&
��1�
��2�()������&
��1�
��2�()������&
��1�
��2�()������&
��1�
��2�()������&
��1�
��+������(��������������
��+������(��������������
��+������(��������������
��+������(��������������
���������1
���������1
���������1
���������1
���������$���3�(�������
���������$���3�(�������
���������$���3�(�������
���������$���3�(�������
��"�� �#��()����(����
��"�� �#��()����(����
��"�� �#��()����(����
��"�� �#��()����(����
��+�������1�
��+�������1�
��+�������1�
��+�������1�
�����#$����� �� ��
�����#$����� �� ��
�����#$����� �� ��
�����#$����� �� ��
����������0��1������� ��
����������0��1������� ��
����������0��1������� ��
����������0��1������� ��
&��*�!��*-������0��1��������1�
&��*�!��*-������0��1��������1�
&��*�!��*-������0��1��������1�
&��*�!��*-������0��1��������1�
&��*-��*.�������1�
&��*-��*.�������1�
&��*-��*.�������1�
&��*-��*.�������1�
&��*.���������������
&��*.���������������
&��*.���������������
&��*.���������������
&����������������0��1�3�(���
&����������������0��1�3�(���
&����������������0��1�3�(���
&����������������0��1�3�(���
*�&
��������4���&
�� �+���
*�&
��������4���&
�� �+���
*�&
��������4���&
�� �+���
*�&
��������4���&
�� �+���
*�&
���--��!����&
�� �&
���
*�&
���--��!����&
�� �&
���
*�&
���--��!����&
�� �&
���
*�&
���--��!����&
�� �&
���
+��*�!��*��������0��1��������1�
+��*�!��*��������0��1��������1�
+��*�!��*��������0��1��������1�
+��*�!��*��������0��1��������1�
+��*��������
+��*��������
+��*��������
+��*��������
*�+��������4���&
�� �+���
*�+��������4���&
�� �+���
*�+��������4���&
�� �+���
*�+��������4���&
�� �+���
*�+���--��!����&
�� �&
���
*�+���--��!����&
�� �&
���
*�+���--��!����&
�� �&
���
*�+���--��!����&
�� �&
���
*�&
���4����--��&
�� ����������#$�
*�&
���4����--��&
�� ����������#$�
*�&
���4����--��&
�� ����������#$�
*�&
���4����--��&
�� ����������#$�
*�+���4����--��&
�� ����������#$�
*�+���4����--��&
�� ����������#$�
*�+���4����--��&
�� ����������#$�
*�+���4����--��&
�� ����������#$�
/�#����&
��1��*����*-�������1�
/�#����&
��1��*����*-�������1�
/�#����&
��1��*����*-�������1�
/�#����&
��1��*����*-�������1�
/�#����&
��1��*-������������1�����&
�� �+���
/�#����&
��1��*-������������1�����&
�� �+���
/�#����&
��1��*-������������1�����&
�� �+���
/�#����&
��1��*-������������1�����&
�� �+���
��2�()������&
��1�
��2�()������&
��1�
��2�()������&
��1�
��2�()������&
��1�
����*�&�� ������
����*�&�� ������
����*�&�� ������
����*�&�� ������
�����',,��������0����(���
�����',,��������0����(���
�����',,��������0����(���
�����',,��������0����(���
��
��
��
��
��
��
��
��
��
��
��
��
��
��
��
��
��
�������
!�� �����
!��������
����"������
�� ����� #������� �$������� ��
�� ����� #������� �$������� ��
%����� �&'����((���"���)
�* �� �$�+���� �"�������+�
,��� #������ -
,��� �� �'��-� �"������
%��. �$�/��*"0� ����,��$���-�12����,��+3�,��$� �
���������� �������������������������������������
45���� �)�6��*�) �-
2�� ����(���
���7�$�7��
��������������
2�� ����(��
�����������
� ������� ���� �����
�������/��*
� ��������/��*
,��������� ��������/��*
�� "���
�
�
������������ ����������������������������������������
� �
Pre
ferr
ed
Pro
po
ne
nt
Co
nse
nt
Am
en
dm
en
t /
Ap
pro
va
l
Ma
rin
e R
ese
rve
Acts
de
cis
ion
Co
nfirm
Pla
n B
TO
CS
ign
-off
PA
Asig
ne
d
Ma
na
ge
me
nt
Pla
ns
Fin
alise
De
sig
n C
on
ce
pt
Ea
rly W
ork
s D
esig
n
Ro
ad
s -
De
sig
n /
Ch
eck /
RF
C
Dra
ina
ge
- D
esig
n /
Ch
eck /
RF
C
Utilitie
s -
De
sig
n /
Ch
eck /
RF
C
Ge
ote
ch
- D
esig
n /
Ch
eck /
RF
C
Str
uctu
res -
De
sig
n /
Ch
eck /
RF
C
Mo
bilis
e t
ea
m
Wh
au
Riv
er
Bri
dg
e -
EB
Stitc
hW
ha
u R
ive
r B
rid
ge
- W
B (
Ph
ase
B -
ce
ntr
e &
ea
st)
Me
dia
n b
arr
ier
rep
lace
me
nt
to a
pp
roa
ch
es
Pro
cu
rem
en
t En
ab
lin
g /
sta
gin
gS
tag
ing
re
mo
va
l
Stitc
h
Cycle
wa
y /
fo
otp
ath
44
00
-49
50
EB
wid
en
ing
WB
wid
en
ing
48
80
-50
00
Pro
cu
rem
en
t -
Re
tain
ing
wa
lls
EB
- R
eta
inin
g W
all 2
-3 M
SE
slo
pe
Me
dia
n b
arr
iers
/ lig
htin
g
EB
Ea
rth
wo
rks
Sto
rmw
ate
r E
BP
atiki R
d B
rid
ge
WB
pa
ve
me
nt
Sta
ge
1P
ave
me
nt
EB
Pa
ve
me
nt
- m
ed
ian
La
nd
sca
pin
g
Insta
ll T
TM
EB
EB
Co
ffe
r D
am
s /
infill /
dra
ina
ge
bla
nke
t 2
00
0-1
26
0
EB
Ea
rth
wo
rks /
pre
loa
d
Ca
use
wa
y 1
26
0-2
10
0 S
ett
lem
en
t
EB
Re
mo
ve
to
e /
co
asta
l p
rote
ctio
n
Sto
rmw
ate
r E
B 1
26
0-2
10
0
Pa
ve
me
nt
EB
12
60
-30
50
Ea
rth
wo
rks C
en
tra
l 1
26
0-2
10
0
Sto
rmw
ate
r W
B
Ea
rth
wo
rks -
Ce
ntr
al 2
10
0-3
05
0
Me
dia
n b
arr
ier
/ lig
hts
Pa
vin
g -
Ce
ntr
al 1
26
0-2
10
0
OG
PA
WB
En
ab
lin
g /
sta
gin
g
Ca
use
wa
y B
rid
ge
- E
BW
B s
ub
str
uctu
re r
em
ed
ials
Ca
use
wa
y B
rid
ge
- M
ed
ian
Are
a 1
- G
NR
-SH
16
WB
On
-ra
mp
0-6
00
m
Are
a 2
- G
NR
-SH
16
WB
On
-ra
mp
60
0-1
20
0m
Are
a 3
- S
H1
6-G
NR
EB
Off
ra
mp
- t
em
p
Are
a 5
- a
cce
ss
Are
a 6
-
SH
16
EB
wid
en
ing
WC
A -
me
dia
n w
ork
s
Are
a 8
- a
cce
ss
Are
a 8
SH
16
go
re
Sh
ift
EB
tra
ffic
to
ne
w E
B la
ne
s9/9
/2015
Re
loca
te W
B t
raff
ic n
ort
hb
etw
ee
n o
ld &
ne
w m
ed
ian
s29/2
/2016
Ta
rge
t P
ractica
lC
om
ple
tio
n26/8
/2016
Allia
nce
co
ntin
ge
ncy
We
stb
ou
nd
La
ne
sD
elive
rab
le22/1
2/2
016
De
sig
n /
pre
co
nstr
uct
Ea
rth
wo
rks
Te
mp
ora
ry W
ork
s e
tc
Dra
ina
ge
/ U
tilitie
s
Str
uctu
res
Pa
ve
me
nt
/ b
arr
iers
EB
wid
en
ing
(te
mp
pa
ve
)E
B w
ide
nin
g S
tag
e 3
OG
PA
WB
/ E
B
WB
22
50
-28
00
co
ffe
r d
am
s /
in
fill /
dra
ina
ge
bla
nke
tw
ick d
rain
sW
B 2
25
0-2
80
0 E
art
hw
ork
s /
pre
loa
dW
B 2
25
0-2
80
0 s
ett
lem
en
tC
oa
sta
l p
rote
ctio
n
Cycle
wa
y 6
50
-12
00
WC
A a
cce
ss
Se
ttle
me
nt
Oa
kle
y B
oa
rdw
alk
Are
a 1
0 -
GN
R-S
H1
6 E
B O
n R
am
p S
tag
e 1
SH
16
-GN
R E
B O
ff-r
am
p 2
60
-68
0m
Are
a 5
em
ba
nkm
en
t o
nly
Are
a 3
SH
16
EB
68
0-1
04
0S
ett
lem
en
t
Are
a 4
B -
SH
16
EB
10
40
-12
00
m c
off
er
da
ms e
tcw
icks
Pre
loa
dS
ett
lem
en
t
Are
a 1
0 -
GN
R-S
H1
6 E
B O
n R
am
p S
tag
e 2W
etla
nd
WC
A -
Ra
mp
2 s
up
ers
tru
ctu
re
Are
a 9
- M
ed
ian
/ f
ina
l p
ave
me
ntsG
NR
IC
om
ple
tio
n31/5
/2016
GN
RI
co
ntin
ge
ncy
EB
wic
k d
rain
s 2
00
0-1
26
0
wic
k d
rain
sE
B c
off
er
da
ms /
in
fill /
dra
ina
ge
bla
nke
t 2
10
0-2
80
0
WB
- R
eta
inin
g w
alls R
W2
-2b
/ R
W2
-5c /
RW
2-5
b
WB
Ea
rth
wo
rks S
tag
e 1 W
B s
torm
wa
ter
/ u
itlitie
s
WB
Ba
rrie
r w
alls R
W1
-1d
/ R
W2
-2a
/5a
Sta
ge
2
Cycle
wa
y 3
05
0-4
40
0
Me
dia
n E
/W
Me
dia
n b
arr
ier
wa
ll R
W2
-1c
Me
dia
n E
/W b
ala
nce
Me
dia
n s
torm
wa
ter
Tra
ffic
to
sh
ou
lde
rs(b
ull r
un
)S
hift
tra
ffic
so
uth
(pa
rt b
ull r
un
)
Sh
ift
tra
ffic
no
rth
to E
B la
ne
sZ
on
e 2
In
sta
llT
TM
EB
Zo
ne
s 2
& 3
co
mp
lete
EB
21
00
-28
00
Ea
rth
wo
rks /
pre
loa
dE
B 2
10
0-2
80
0 s
ett
lem
en
tC
oa
st
pro
tect.
/ S
W
Pa
ve
WB
19
00
-30
50
DS
M t
o b
rid
ge
ab
utm
en
ts -
We
st
/ E
ast
WB
12
60
-22
50
Sta
b.
be
rm /
fill /
co
asta
l p
rote
ctio
nS
W /
Utilitie
s
Utilitie
s /
Cycle
wa
y 2
25
0-3
05
0C
ycle
wa
y 1
26
0-2
25
0
3rd
la
ne
3rd
la
ne
EB
19
00
-30
50
Me
dia
n r
eta
inin
g w
all
Sto
rmw
ate
r M
ed
ian
21
00
-30
50
Me
dia
n b
arr
ier
/ lig
htin
g
Pa
vin
g -
Ce
ntr
al 2
10
0-3
05
0
De
mo
/ E
art
hw
ork
s W
B 1
26
0-2
22
0
Pa
vin
g -
WB
12
60
-22
00
Co
mp
lete
SW
OG
PA
EB
Are
a 1
- A
cce
ss/E
art
hw
ork
sW
CA
- w
ork
s
WC
A -
Ra
mp
3 s
ub
str
uctu
reW
CA
- R
am
p 3
su
pe
rstr
uctu
reA
rea
5 p
ave
me
nt
WC
A -
su
bstr
uctu
res
Are
a 9
- t
em
p w
ork
s /
sh
ift
EB
sth
Are
a 9
- n
ort
h
WC
A -
MS
E w
all /
Ra
mp
2 s
ub
str
uctu
re
Are
a 2
- W
B c
om
ple
tio
n
Job N
oD
ate
Dra
wn
Pro
gra
mm
e N
oR
ev N
o
No
Rev
isio
nA
pp
Dat
e101
D426
5/1
2/1
2
CW
B�����������
����� ��� �� ���
AD
raft
2
� ����� ������
���������������
�����������������
���� �� �� ���
��������������� �
������
�����������������
�����!�� ����� ��
������� �����
� ��������������
��
BR
evis
ion
B2
2/1
CR
evis
ion
C3
1/1
DR
evis
ion
D5
/3
Utilitie
sco
mp
lete
30/6
/2015
Wh
au
Riv
er
Bri
dg
eco
mp
lete
30/6
/2015
Zo
ne
2 e
ast
en
d -
me
dia
n w
ork
s (
with
Zo
ne
1)
Sta
gin
g
Wh
au
Riv
er
Bri
dg
e W
B -
Esta
blish
we
st
acce
ss
Sta
gin
g /
WR
B W
B (
We
st
en
d o
nly
) /
rem
ove
sta
gin
g
Ea
rly w
ork
s T
rah
ern
e I
sla
nd
Cri
tica
l
Cause
way
Bridge
N
Patik
i Rd W
B
On R
am
p B
ridge
Patik
i Rd
On R
am
p
Whau R
iver
Bridge
Rose
bank
Dom
ain
Rose
bank
Board
walk
Rose
bank
Rd
Off R
am
p
Rose
bank
Rd
On R
am
p
Tra
hern
e Isl
and
Board
walkC
ause
way
Boa
rdw
alk
Oakl
ey
Board
walk
Gre
at N
ort
h R
oad
Inte
rchange
�
������������ �������������������������������������������� ��
�
�