  • Monenco IranConsulting Engineers

    Pioneer & Dynamic in Energy Industries

  • Playing a Proactive and central supporting role in Iran dynamic development

  • Contents:

    Message from the management 1Who we are 2

    What we do 3

    Goals & Prospects 4Key Dates in Monenco Iran 5

    Top Chart 6Main activity areas 7

    Quality Assurance and Productiviy 8Quality Certifi cates 9Research and Development 10Divisions 12

    Power Generation Division 12 Engineering Division 13

    Power Transmission and Dispatching Division 18 System and Planning Division 22Projects 23 Gas Turbine Power Plants 23 Combined Cycle Power Plants 24

    Steam Turbine Power Plants, Utilities & Other Projects 24

    HV & EHV Transmission Line Projects 25 Substation Projects 26 Dispatching and Automation Projects 28 Telecommunication Projects 29Engineers of Monenco Iran 34

    Monenco Iran in MAPNA Group 35Company Shareholding 36Company’s Offi ces and Branches 37

  • Continuous industrialization and the emergence of new economies in the world have meant that the global demand for power increases drastically. Inevitably any such persistent demand brings with it the challenge of how to satisfy that demand while addressing issues of sustainability. Developing economies are also faced with considerable pressure to install the most economical and qualifi ed and also cleanest possible means of generating power which their burgeoning industries so badly need.In this environment utilities around the world are under constantly increasing pressure to fi nd an operating profi t that expects ever-higher levels of investment, at the same time as keeping power costs competitive. Here the role of power engineering at different consequences is enormously high. Engineering works allocating a minor portion of the total cost has signifi cant effect on project cost and therefore on power cost. Since its establishment in 1973 Monenco Iran has steadily forged a relationship of solid trustworthiness through its continuing contributions to the realization of a community in which electricity can be depended upon with complete piece of mind. To respond to the broad based trust we enjoy today, going forward we will continue to supply and deliver high-quality engineering and design services to power industry and at the same time make them to deliver secured energy.Today Iran's electric power industry is undergoing major transformations precipitated by phased rapid and increasingly developments. In response Monenco Iran is pursuing vigorous initiatives on diversifi ed fronts both to build further on the trust now placed in it and to ensure the Company's sustained growth into the future. With respect to our design and engineering of power plants and power transmission/distribution networks, we are aggressively working to enhance related services and develop new rate schedules. On a Group wide basis, we are mustering our comprehensive resources in peripheral area already encompassing contribution and leading in submitting engineering services, amenities in support of lifecycle needs and information technology (IT) services. Through these and other undertakings across a broad spectrum, we aim to create new value for our customers and to support their business activities in unprecedented ways.Internally going forward we will seek greater management efficiency, more robust price competitiveness and an ever sounder fi nancial structure. We will also continue to devote the full complement of our resources to research targeting technologies always at the vanguard of the fi eld. In these ways we aim to achieve and maintain a competitive position at the top of our industry.We sincerely look forward to your ongoing support in the years ahead.

    Alireza Shirani President and CEO

    Message from the management

    1

  • Monenco Iran employs a wide range of talented engineers and project managers. They advise our clients on everything from front end engineering design through regulatory and environmental compliance, to project management and delivery.

    We work in diverse. Our scale and scope mean that whatever the territory or the technical challenges, we will have the experience and knowledge to help. Working on customers’ valuable assets, we have to take responsibility for their investment, treating our customers’ risk and reputation as our own. This has led us to build long-term relationships or partnerships with our customers, which have lasted over the lifetime of our company.

    The assets we look after often last for decades. To deliver value for money to our clients over the lifetime, we have to plan for the future from the very beginning of a contract. We also have to consider the long-term impact of what we do on other groups of stakeholders and on the community and environment.

    Our sustainability program, which runs right across the company commits us to progress not just against commercial achievements but also against broader objectives and values such as behaving ethically and respecting community concerns.

    We believe that we can only grow and succeed in the long term if we consider the long-term interests of all our stakeholders. By taking their needs into account, we ensure a healthy partnership with them and so safeguard our own future.

    We help our customers to create new lifestyles of enriched ease and comfort.

    Who we are2

  • What we do3

    Monenco Iran enjoying strong engineering capability and technical knowledge and committed to the national industry plays the main role in supporting industry of the country in a number of fi elds. We have commitment to apply highest level of standards and employ latest technology in our designs and engineering works and bring sustainability to development of the country.Today Monenco Iran has leading position in power plants engineering as well as in transmission / distribution of electricity while dispatching / telecommunication is one another branch of our challenges.

    In oil and gas industry we have a position although not proportional to our capabilities but very soon we get our position. We will upraise our position globally where we deserve and we will increase our share in the market.In other branches such as mine, civil engineering, geology and tectonic and all related technologies we have experienced many studies and designs and we have the knowledge and expert.We have well done studies and engineering services of coal fi red power plants and coal mines. Study of tectonic and geology in many projects and in many sites of the country is done by us.To render the services we have been well supported by engineers and scientist with valuable knowledge and experience in the related fi elds and based on that we are honored with the fi rst grade in the branch of “Mines and Geology Consultants” by Iran Management and Programming Organization. We help our clients in engineering and design of civil works, mines, installations and geological projects etc.

    We offer life-of-asset support by which we mean we look after a client’s investment from beginning to end. Working with our clients from the very start of their investment, we can help develop the initial concept, plan, funding and add value from the initial concepts through to detailed designs.When it comes to installation of the plant, we can manage the delivery, taking care of procurement and relationships with and between contractors as well as actual commissioning. Once the plant is commissioned, we offer long-term care and support services from maintenance to specialist support services such as energy effi ciency audits or environmental testing. We also offer a wide range of technical services tailored to the needs of a particular industry or customer system.

    We are Committed to the World Society

  • 4

    Goals & Prospects

    As a dependable partner, we forge relationshipsbuilt on trust.

    In the horizon of 10 years we make Monenco Iran a company on top of all of the consulting engineers in our f ield and we wil l be the leader in design, engineering, supervision and management of projects in energy and power industry, in electricity, oil and gas, petrochemical industry, mines and all other heavy industries and infrastructure.

    We must be one of the top international consulting engineers, well equipped with the latest know how and standards, and with all the modern tools and instruments.We are committed to customer’s requirements and will save their assets and investments.

    We have to reach to ideals in training high qualifi ed engineers.

    We are committed to social health and to our environmental protection responsibilities.In power generation and power transmission in all sections we have the major portion of the home market.

    We will expand it to the neighboring countries and all over the world.We will expand to all the fi elds and support the industries everywhere.

    We will expand Monenco family worldwide. In oil and gas and all other heavy industries we will improve our position and reach to a deserving position.We support our customers to achieve sustainable development.We pursue our strategy plan precisely and reach all of our goals.

  • Key Dates in Monenco Iran

    Monenco Iran has started in 1973 as a joint venture company between private sector of Iran and Montreal Engineering Company of Canada.

    In 1991 Monenco Iran reorganized with participation of the Ministry of Energy of Iran and this time with Monenco Agra of Canada.

    In 1997 Ministry of Energy sold its shares to MAPNA and a part to the members of Monenco.

    In 1999 AMEC from UK acquired Monenco Agra and therefore became the share holder of Monenco Iran.

    Finally the shareholders of Monenco are MAPNA, AMEC, and MIR .

    5

  • Top Chart6

    ManagingDirector

    Quality Management

    Business Development

    R&D

    Advisers

    Gas Turbine andUtilities

    Combined Cycle & Steam Turnbine

    Power Generation

    System & Planning

    EngineeringDivision

    Transmission and

    Dispatching

    AdministrationDivision

    Board of

    Directors

    Oil & Gas

  • Main activity areas 7

    We are leader in power plant design in Iran.

    Gas Turbine power plants Combined cycle power plantsCoal fi red power plants Cogeneration plants Oil and gas industries Process control, basic and detailed designsPlant rehabilitation, optimization and retrofi ttingSolar-thermal power plantsElectrical systems and network studiesDispatching, SCADA and Control systems Telecommunication and data transmission Over head HV and EHV transmission lines Distribution system, load & energy managment systemSubstationsTransformersCivil and architectural designsMechanical installation designsTowers and foundationsStudy of optimization, rehabilitation & retrofi ting Mines and geology

  • 8

    Quality Assurance and Productiviy

    The Quality Assurance and Productivity Department is responsible for Company productivity and quality of products including productivity control, monitoring and analyzing the processes, permanent improvement of the system and enhancing customer satisfaction. In line with ISO 9001-2000 requirements, this department has developed procedures and policies to aid employees compliance with procedures which are being constantly enhanced and measured to ensure conformity to customer need and applicable regulatory requirements and therefore total client satisfaction.This offi ce is responsible for control the quality policy and aims internal audits and management review to ensure the quality management system suitability, suffi ciency and effectiveness of monitoring, measuring and controlling the quality of processes.

    The Quality Assurance and Productivity Offi ce has important responsibilities including:

    • Identifying work processes and determining appropriate work fl ows especially for product related activities.

    • Determining, monitoring and measurement indicators for work processes and set specifi c target for each indicator such as reject rates, project delays, reworks, etc.

    • Monitoring and measuring the processes at specifi ed time intervals.

    • Collecting required data from previous steps and categorizing.

    • Analyzing the categorized data preferably by statistical methods.

    • Reporting the results to the related departments or individuals.

    • Making decision based on real and analyzed data and determining appropriate corrective & preventive actions

    • Defi ning and performing improvement projects .

  • 9

    Quality certifi cates

  • 10

    Research and Development

    Research and Development (R&D) in Monenco Iran aims to increase effi ciency and improve quality of products. Improvement of design, manufacturing procedures and engineering methods cause increase of effi ciency and reliability and decrease of expenses and wastes and fi nally cause increase client's satisfaction.Research groups of Monenco work closely with manufacturers, Universities and clients to develop the systems and products which are improved and meet future requirement by using new technologies.R&D of Monenco steps up the challenge of creating the pioneer systems and engineering services that enhance energy efficiency, reliability and productivity.Monenco meets the present and future demands of industries, while helping clients to make a better use of available resources, preserves the environmental impact and maintenance costs as low as possible.

    R&D duties include:

    Developing technical software’s for study, design, engineering and system rehabilitation of plants.

    Conducting technical and economy studies in order to maximize effi ciency of systems and to minimize costs.

    Improvement of plant performances, development of engineering and design of equipment and parts for manufacturers.

    Obtaining technical know how of new design and engineering and solution for optimization of plants.

    Modifying the procedures of operation, maintenance, protection and utilization of plants.

  • 11

    Helping the clients to apply updated and high technologyequipment in plants in order to achieve more reliable out puts and products.

    Design and engineering of renewable and new energies power plants due to their large potential in the country and in the world.

    Creating new methods to control more effi ciently theair, water and solid pollutants and to reuse and recycle wastes.

    Goals of R&D Department

    Exploring research capabilities and capacities in different Monenco Disciplines and help them to use the capabilities in their engineering works.

    Coordination between Monenco and MAPNA groups as major manufacturers in order to compile executive approaches in order to choose suitable technology.

    Seeking for improved approaches to attract and naturalize the selected technologies.

    Guiding the planning and design disciplines to identify useful research projects and allocate fi nancial supports for the projects.

    Providing required facilities for especial scientifi c training of the engineers in order to update their engineering and technical knowledge.

    Communication with academic and research centers inside and outside the country in order to activate necessary research projects.

    Research and Development

  • Power Generation Division is responsible for project management of power plant projects and has a number of project managers within its structure.

    According to the structure of Monenco Iran each project is managed by a project manager. Project managers are responsible to meet and observe the requirements of their projects in every engineering aspect according to the relevant contract and shall report to higher managers and also to their client.

    They keep project schedule on time and care about quality of the products.Design and engineering works are done in engineeringdisciplines and project managers are responsible for proper distribution of the works among different departments and disciplines of the Engineering Division.

    Head of Power Generation Division acts as Deputy Managing Director for all the projects of power plants and subsequent related projects.

    Power Generation Division has three departments namely:

    Gas turbine and utilitiesCombined cycle & Steam turbines Oil & Gas

    All the projects awarded to the division are distributed among the departments according to their responsibilities.Each department has a department manager, project managers and project coordinators.

    PowerGenerationDivision

    We havedesigned andengineered

    construction of more than 50 power plants

    with more than 22000 MW

    power generated.

    Divisions12

  • Engineering Division

    Our Engineering Service:

    • Project identifi cation and development support• Project management • Expertise, project appraisal and consulting • Energy studies • Feasibility studies and process evaluation• Financial studies• Environmental impact studies• Conceptual design• Basic and detailed design• Project estimation and optimization• Tender documents• Bid evaluation and contract documents• Project estimation and optimization• Project cost control• Project control and site supervision• Commissioning, acceptance test and start up • 3D modeling to design and calculate systems

    Engineering Division has the following discipline Departments. The engineers design different aspects of power plants, oil & gas Refi neries and other plants. Engineering Division consists of the following depart-ments:

    • Electrical Engineering Department• Mechanical Engineering Department • Civil Engineering Department• I&C Engineering Department• Process Engineering Department • General Engineering Department• 3D Modeling Department

    Divisions13

  • Design of electrical sections of power plants, transmission & distribution grids.Tender document and technical specifi cation for generators, transformers, accessories and electrical equipment.Design and design review of all electrical Installations of power plants and all other plants including all auxiliary supplies etc.Design and calculation of grounding grids (all the grid sections, NGR calcu-lation, layout, etc). DC / UPS system (battery, battery charger, design and calculation) Cabling (sizing, routing).Diesel generator (sizing and specifi cation / data sheet)Transformers of all size and voltage levels ( design and review, calculation, specifi cation and data sheet).LV MCCLoad fl ow & short circuit study, power system studyMV&LV protection systems, specifi cation, calculation & coordination Electrical tender documents preparationBid evaluationSwitchgear schematic and Installation detailsElectrical I / O list preparationDesign and review of electrical interface between generator, transformer etcGenerator design reviewIPBD reviewMV & LV motor design and reviewApplying latest edition of all software’s for LV switchgear design, Lighting calculation, lightning protection calculation, load flow and short circuit calculation, and grounding grid calculation etc.

    Engineering Division

    Electrical Engineering Department is responsible to deal with all the matters related to the electrical equipment and plants of power plants of any kind and capacity, Refi neries and all industial plants.The engineers are expert in the following activities:

    14

    Electrical Engineering Department

  • Mechanical Engineering Department

    The engineers of Civil Department are well trained to design heavy duty buildings and structures and following works are very well done by them:

    • Design architecture of high standard buildings including industrial buildings, offi ces and residentials • Design structures of heavy duty standard • Design special foundations for dynamical installations• Design layouts and landscapes.• Design and calculation of buildings and structures to meet requirements of the latest international standards.• Applying newest software’s in design and calculation of structures, foundations and buildings.

    Civil Engineering Department

    The mecanical engineers do followings very well:

    • Tender specifi cation for Boilers and Recovery boilers• Tender specifi cation for purchase of all balance of plant• Design of power units• Design of general layout of plants

    Optimization of power unit sizes and fi nding the most suit-able and profi table power units combination by running GTPRO

    • Design of cooling system • Design of compressed air system• Design of HVAC systems• Design of fi re fi ghting systems• Overall engineering in power plant• Piping design• Piping stress analysis• Design of pressure vessels and atmospheric tanks• Applying the best software’s to design and calculate sysystems as well as their 3 D modeling

    Engineering Division15

  • I & C Engineering Department

    Process Engineering Department

    Design of water treatment plant, waste water treatment plant, water supply and distribution systems, waste water collection systems.Technical specifi cation for water treatment plant, waste water treatment plant, condensate polishing plant, electro-chlorination plant, chemical laboratory, painting and coating.Steam & Water Cycle Quality Control.

    Determining control system architecture and automation system philosophy in order to reach the level of automation required for the system.Choosing proper system and preparing the control structure according to process and protection main requirements.Specifying data exchanging protocols according to the required topology, speed and capacity and data traffic and control system layout & confi guration.Specifying control system software requirements Data traffi c analysis and control system layout & confi guration. Preparing P&ID, PFD, instrument list/ index , data sheets and sizing based on the standards and latest supplier catalogues.Open and closed loop control diagrams design and preparing logic diagrams required for all layers and levels.Preparing cause and effect document, digital and analog I/O list, data acquisition structure and remote I/O for control systems.Preparing cable route diagrams, interconnection drawings, junction box layout, cabling, wiring and terminal diagrams, detailed interlocking drawings for systems and alarm drawings and documents.Control room design based on safety, environmental conditions, process and ergonomic standards.Preparing detailed instrument hookup drawings and instrument location layout.

    Engineering Division

    The engineers design and establish:

    The engineering works done by prosess engineering department are:

    16

  • • Conceptual design• Technical specifi cation for installation and test of equipment anand commissioning• Instruction manuals for factory and fi eld tests• Instruction manuals for erection and commissioning• Training courses for clients engineers and technicians• Safety manuals and instructions• Welding specifi cation and procedure• Quality control planning• Spare parts list• Pressure and strength testing manual• N.D.T specifi cation and test instructions• Inspection and test plan documents• Insulation manuals• Tender document for installation works• Review technical specifi cation

    General Engineering Department

    • Administration (installation & data base creation) of major 333D modeling software’s.• 3D modeling of equipment, piping, structure, and electrical • parts of different plants.• Extracting plan, view, section, and detailed drawings from 3d3d model of a plant.• Extracting different reports (material take off, line list, valve listlist, etc.) from 3D models.• Training programs in the above mentioned subjects.

    3D Modeling Department

    The engineers are expert in:

    Engineering Division17

  • Power Transmission and Dispatching Division

    Divisions

    The Division of Power Transmission and Dispatching is responsible for all projects in power transmission, networks, substations, transmission lines, dispatching centers and telecommunication networks of all kinds and voltage levels.The division is responsible for the project management and also for the design and engineering works of the projects.It has departments and disciplines within its structure which are responsible for engineering and design of different projects in all different sectors as mentioned above.Head of Power Transmission and Dispatching Division acts as Deputy to Managing Director of the Company for transmission projects and also for dispatching and telecommunication projects.The studies of power transmission line as a part of power system study of Iran in 1970s was originated by Monenco Iran. The 15000 km of transmission lines we engineered over the past 35 years include 400, 230 kV important transmission lines such as Karun 3, Chehel Sotun, Tiran etc and many other projects at 400, 230, 132, and 63 kV voltage levels. We have done engineering of optical fi ber ground wires on more than 2000 km of 400 and 230 kV transmission lines. Automation, assessment, power loss reduction, rehabilitation of distribution networks and also stability and load shedding studies are among the projects rendered by Monenco Iran.

    In Power Transmission We Design:Extra high voltage transmission lines and substations Power transformers and shunt reactors Integrated protection and control systems SCADA and telecommunicationDispatching centersDistribution networksSubstation automation and distribution networksPower supply to industry complexes Network and system studies

    The Division of Transmission and Dispatching have designed more than 15000 kilometer transmission line up to the highest voltage level in vast areas and conditions and more than 6000 MVA substations from 63 kV up to 400 kV including power transformers.Four departments namely Substations and Distribution Networks, Transmission Lines, Telecommunication, Dispatching and Automation are the structure of this division.

    18

  • Divisions

    Substations and Distribution Networks Department

    Power Transmission and Dispatching

    Transmission Lines Department

    The department is responsible for engineering, design and de-sign review of high voltage and medium voltage substations and distribution networks.The projects of this department include all voltage levels from 33kV up to 400 kV substations and switchgears of any capacity.Power transformers and shunt reactors are part of our common practice in this department.

    Some of important projects of the Department are:Shahmaran 2 substation 400/132/20 kV.Bam substation 400/132/20 kV.South Esfahan power plant 400kV substation.Jask 230/63/20 kV substation. Dehloran 230/132kV substation.Loshan 2 substation 230/63 kV. Chelshahid Amol 230/132 kV substation.Nowshahr 230/20 kV substation. 4n GIS substations 66/20 kV Sadra, Eghlid, Chougan, Galedar.

    Transmission Lines Department has performed lots of projects in many diffi cult and hard to access areas.We have completed many projects at various voltage levels up to 400 kV. More than 15000 kilometer transmission lines of any kind and design are built by us.

    Some of important projects of the Department are:

    Karoun3 dam to Tiran transmission line, 400 kV single circuit, 3 bundles.South Esfahan (power plant) to Karoun3 transmission line, 400 kV single circuit 3 bundles.Karoun3 dam to Karun3 S/S 400 kV transmission line, double circuit, 2 bundles and 4 strings OPGW. 230 kV transmission line from Kerman power plant to Rafsanjan 230 kV S/S, double circuit, curlew conductor and OPGW.Engineering services for installation of OPGW on many 400 kV and 230kV transmission linesEngineering services for purchase of 1000km OPGW and underground cable carrying OPGW.

    19

  • Masjed Soleiman 400kV transmission line, single circuit to Ahwaz 400/132/20 kV substation400kV transmission line, single circuit, 3 bundles, curlew conductor from Bisotoun to Islam Abad and khaneghin (Iraq) 400kV transmission line, single circuit from Ahar to Armenia 400kV substation230kV transmission line, double circuit Sarab to Ardebil 230kV substationSeveral transmission lines 132 & 63 kV all over the country

    In Telecommunication department we are expert in power line carrier (PLC), Tele protection systems and wireless networks such as land mobile radio systems, spread spectrum and mi-crowave links and of course in fi ber optics systems and cables. We have finished many projects involving the latest world class techniques satisfactorily. All power networks’ needs to data, voice and video transfer is satisfactorily supplied by us.All engineering works at different stages of projects such as feasibility study, data acquisition and processing, site survey, present status report, design review, tender documents, technical specifi cation, bid evaluation, etc is handled perfectly by us.

    Some of important projects of the Department are:Supervision and site engineering works for purchase, installation and commissioning of fi ber optics equipment for IPDC.

    Feasibility study for Purchase of fi ber optics network for Tehran Regional Electric Company for world bank loan assessment.

    Design of master plans of UHF and VHF radio networks for West Regional Electric Company.

    Design of master plan of fi ber optics and PLC network for Gilan regional electric company.

    Design of master plan and bid evaluation of telecommu-nications network including fi ber optics, PLC, trunk radio and Tele protection systems for Khuzestan Regional Electric Company.

    Design of master plan of fi ber optics network for Tehran, Azerbaijan and Khorasan Regional Electric Companies.

    Telecommunication Department

    DivisionsPower Transmission and Dispatching

    20

    We have designed and built more than 15000 kilometers EHV and HV transmission line all over the country in variable conditions and circumstances.

  • DivisionsPower Transmission and Dispatching

    The department of Dispatching and Automation has the responsibility to design, design review, tender documents preparation and all other engineering works related to dispatching centers and automation of substations and power plants control rooms.Design and engineering of National Dispatching Center and many Regional Dispatching Centers are well done and completed by this department.

    Some of key project done by the department:

    Engineering and project management of Iran National Dispatching Center. Bid technical and commercial evaluation of the project of Iran North East and South East Transmission Network Dispatching Centers.Tender document, evaluation, review and supervision for Karaj Dispatching Center. Tender document, evaluation, review and supervision for Semnan Dispatching Center.Tender document, evaluation, review and supervision for North Regional Dispatching Center.Tender document, evaluation, review and supervision for Yazd Dispatching Center.Supervision of West Regional Dispatching Center (WAOC)

    Dispatching and Automation Department

    21

  • General & detailed planning, identifi cation & design of the systems, monitoring & control, bidding and contract management are the main responsibilities of this division. Major duties of the division are summarized as follows:

    Strategic, Roadmap & Long-term PlanningDesign & Implementation of the Systems (e.g. PMS, EDMS, WFMS, EDP, KM)Development & Optimization of the SystemsPlanning & Analysis of the Projects Projects Monitoring & ControlPortfolio & Project Analysis Preparation of Action Plans for Company's DivisionsMonitoring & Control of Divisions activities Training, Publishing & Knowledge ManagementDevelopment of the Electronic Design ProcessesMethodology Analysis Development of the Reference Design ProcessesElectrical Archiving & LibraryElectronic Document management SystemEconomical/Technical Feasibility StudiesEnterprise Resource PlanningSystems, Software’s & Networks AdministrationMonitoring & Supporting Development StrategiesProposals Preparation and BiddingContract Management assistanceBudgeting & Cash fl ow Control

    System andPlanningDivision

    Mai

    n P

    roce

    sses

    Cus

    tom

    erR

    elat

    ions

    hip

    Pro

    ject

    Con

    trol

    & P

    lann

    ing

    Man

    agem

    ent P

    roce

    sses

    Sup

    porti

    ng P

    roce

    sses

    Con

    tract

    ors

    Eva

    luat

    ion

    Impl

    emen

    tatio

    n

    Des

    ign

    Des

    ign

    Rev

    iew

    Supe

    rvis

    ion

    on

    Con

    stru

    ctio

    n

    Con

    tract

    ors

    Eval

    uatio

    n

    Impr

    ovem

    ent

    Con

    trol o

    f D

    ocum

    ents

    &

    Rec

    ords

    Mon

    itorin

    g&

    Ana

    lysi

    s of

    Dat

    a

    Hum

    an R

    esou

    rce

    Man

    agem

    ent

    Infra

    stru

    ctur

    e &

    W

    ork

    Env

    ironm

    ent

    Man

    agem

    ent

    Sup

    plie

    r

    Con

    tract

    or

    Cus

    tom

    erC

    lient

    Monenco Iran Process Map

    22

    Divisions

  • Projects

    Reference and Experience Records

    1 234567891011121314151617181920

    KazerounAbadanDamavandHormozganSanandajShirvanIsfahanHamedanSouth IsfahanParandAli AbadOroumiyehArdebil South Pars Central (Besat)Ghaen ChabaharKhoramshahrKashanFajrRaysut ( Sultanate Of Oman)

    6 × 159 4 × 123

    12 × 159 6 × 159 4 × 159 6 × 159

    3 × 30

    2 × 30

    6 × 159

    6 × 159

    6 × 159

    4 × 159

    4 × 159 6 × 159 4 × 159

    2 × 159

    4 × 159

    2 × 159

    4 × 159

    1 × 30

    2003

    2003

    2004 2004

    2005 2005

    2006

    2006

    2006

    2007

    2007

    2007

    2008

    2008

    2009

    2009 2009

    2009

    2010

    1999

    Fars Khuzestan Tehran Hormozgan Kurdestan Khorasan Isfahan Hamedan Isfahan Tehran Golestan West AzerbaijanArdebil Bushehr Khorasan Sistan & Baluchestan Khuzestan Isfahan Khuzestan Oman

    Power plant Capacity (MW)Completion

    Date Region

    Gas Turbine Power Plants

    23

  • 1 234567891011

    12

    Montazer Ghaem 3×105 2000 TehranShahid Rajaie 3×105 2002 QazvinKhoy 1×105 2002 West AzerbaijanFars 3×105 2003 FarsNeyshabour 3×105 2003 khorasanShariati 1×105 2003 KhorasanNeka 1×160 2006 MazandaranYazd 1×160 2006 YazdKerman 4×160 2007 KermanKazeroun 3×160 2007 FarsDamavand 6×160 2008 Tehran

    Pare Sar

    Mobin Utility Complex Combined Heat & Power Plant

    Power Plant / Utility

    Bakhtar Petrochemical Utilities(Kermanshah,Lorestan,Mahabad,Kordestan,Gachsaran)

    Tabas Coal Fired Steam Power PlantAnd Mazino I Coal MineYazd Solar -Thermal Power Plant(Solar Portion)Mobin Utility ComplexCombined Heat & Power Plant(Extention Plants Unit 7&8)

    Mobin Utility ComplexCombined Heat & Power Plant(Extention Plants 7&8)- Pipe RackYazd Solar-Thermal Power Plant(Gas Turbine & Steam Turbine Portion)

    Fajr 2 Utility Complex(Combined Heat And Power Plant)

    6 × 123.4

    Utility

    2 × 325

    2 × 159 (G.T)+ 1 × 149 (S.T)

    2 × 150(G.T)+ 1×HRSG

    3 × 150(G.T)+ 1×HRSG

    2 × 159 (G.T)+ 1 × 149 (S.T)

    4 × 159(G.T)+ 2×HRSG

    Utility

    2006

    2006

    2007

    2008

    2008

    2008

    2009

    2010

    2010

    Bushehr

    West Regions of IRAN

    Yazd

    Yazd

    Bushehr

    Bushehr

    Yazd

    Khuzestan

    Bushehr

    Combined Cycle Power Plants

    Steam Turbine Power Plants, Utilities & Other Projects

    Phase 15&16 - South Pars Gas Field Utility Project

    Power plant Capacity (MW)Completion

    Date Region

    Capacity (MW)

    Completion Date Region

    1

    2

    3

    4

    5

    6

    7

    8

    9

    2012 Gilan

    Projects

    4 x 159+ 2 x 160

    24

  • HV & EHV Transmission Line Projects

    400400400400400400400400400400400400400400400400400

    230,132230,63230,63

    230230230230230230230

    FARABERECERECKREC

    KHRECKRECIPDCIPDCIPDC

    KHRECIPDCIPDC

    KHRECWRECIPDC

    WRECIPDCKRECWRECGRECIPDCKRECIPDCIPDCIPDCIPDC

    WREC

    Project Voltage level (kV) ClientCompletion

    Date

    200120032003200520072007200720042005200620062006200420062009200720052008200720062004200420022003200220052005

    Karoun 3 take off Yard Karoun 3 - Tiran Karoun 3 - South Isfahan Sirjan-Khatounabad (OPGW) Shadmehr - Neyshaboor (OPGW) Kerman - Bam Masjed Soleyman - Ahwaz2 Ali Abad - Esfarayen (OPGW) Tabriz - Khoy (OPGW) Shahmaran2 Neyshabour - Esfarayen (OPGW) Bandar Abbas - Sirdjan (OPGW) Shadmehr - Ghaen (OPGW) Bistoon - Eslam Abad - KhanegheynAhar - Armenia Bistoon - Eslam Abad - Khanegheyn Khorramabad - Kermanshah (OPGW) Zangi Abad Trandmission Lines Cheshmeh Sefi d & Mahidasht Gilan Power Plant - Chabocksar (OPGW) Zanjan - myane - Tabriz (OPGW) Kerman - Rafsandjan (OPGW) Laft - Dargahan (OPGW) Bandar Lengeh - Jenah (OPGW) Bandar Abbas - Dorahi Minab (OPGW) Bandar Abbas - Bandar Pohl (OPGW) Kermanshah Ring (OPGW)Rafsandjan - Sarcheshmeh (OPGW) Hamedan - Sanandaj (OPGW)Kermanshah - Sanandaj (OPGW)Sarcheshmeh - Sirdjan (OPGW)Sarab - Ardebil Jahrom PowerPlant - Jahrom2Lar – Emaddeh (Beyram - Eshkenan) Mehran – Dehloran - Zarrin Abad & Arcovaz South Ahwaz - De’bel Tabas - Eshghabad

    1 23456789101112131415161718192021222324252627282930313233343536

    37

    230230230230230230

    132,63132,63

    132

    132

    200520052005200520062006

    2004 2006

    2001

    2002

    IPDCIPDCIPDCIPDCARECFRECFRECWREC

    SUGER CANE REFINERYKHREC

    25

    Projects

  • 132

    132

    13213263636363

    2005

    2006

    200720072005200520052006

    1998

    20022004200520052005200520052005

    2006

    200520052006

    Rafsandjan - Zarand - Bafgh (OPGW)

    Mobin Petrochemical Industries

    Islam Abad - Ghal’e Ganj & Shahmaran 1 to2OEID - Dehloran Kermanshah Ring (OPGW)Bistoon - Siman Gharb Hava Nirooz - Nassadji Modifi cation of Marivan - Sanandaj Gilan Systems Study , Transmission & Distribution Networks PlanningNetwork and Load Flow StudyGilan Network Study (Package)Engineering of 1000 km OPGWDistribution Network of Bonab (Study)Gharb Network Study (Package)Kermanshah Distribution Network (Supervision)Ilam & Sanandaj Distribution Network (Supervision)Tehran’s Network OPGW (Study)Upgrading Conductor size for using in Khouzestan transmission lines (Study)OPGW installation on Kermanshah Ring (Study)Distribution of Bonab 2 - (Supervision)Azerbaijan Distribution Master Plan (Study)

    38

    39

    404142434445

    46

    4748495051525354

    55

    565758

    Projects

    IPDCMOBIN

    PETROCHEMICAL Co.

    KRECOEID

    WRECWRECWRECWREC

    GREC

    TAVANIRGRECIPDCARECWRECWRECWRECTREC

    KWPA

    WRECARECAREC

    Substation Projects

    ClientCompletion

    Date Project Voltage level (kV)

    Shahmaran 2 & Bam Extension of Shahre Kord SubstationLordegan DCS Substation Naghshe Jahan & Ravand Kashan Substations Extension Cheshmeh Sefi d & Mahidasht Substations ExtensionExtension of Mehran, Dehloran, Zarrin Abbad Substations Jask. GIS & DCS Substation

    400/132/20400/63400/63

    230/63, 63/20 230/63, 63/20230/132/20 230/63/20

    2008200920092005200720072005

    KRECERECERECERECWRECWRECHREC

    Project Voltage level (kV)Completion

    Date Client

    1234567

    26

  • Project Voltage level (kV)Completion

    Date Client

    Electrical Energy Supply & Distribution of Sungun Copper ComplexLoad Flow, Short Circuit & Protection Coordination of Sungun Copper ComplexZandjan Dispatching Building Yazd Dispatching Building Evaluation of Contractors, Consultants & Manufacturers

    33

    34

    3536

    37

    MV/LV

    MV/LV

    2004

    2006

    20042005

    2006

    NICICO

    NICICO

    ZRECYREC

    WREC

    89 10111213141516171819202122232425

    26

    27

    282930

    31

    32

    Jask SubstationNaghshe Jahan & Ravand Kashan Substations ExtensioJahrom2 SubstationSanandaj - Eslam Abad - Sarcheshme SubstationsNoshahr SubstationLoshan SubstationMapna Buildings Complex In Fardis Chel Shahid Amol Substation ExtensionPareh SarFars Substations (6)Azadvar SubstationDashte Abbas SubstationMobin DCS SubstationsBeyhagh Substation South Pars SubstationKhosf SubstationNil Abad and kalat SubstationsOEID - Dehloran SubstationIsfahan Substations II ( Moorook, Padena, Tchadegan, Anarak, Kavire Kashan & Golab SubstationsIsfahan Substations II (Mobarake, Farrokhshahr, Shalamzar, Oshtordjan & Montazeriyeh)Pirbazar and Shaft SubstationTehran Substations Isfahan 11 Substations Oshtordjan, Montazeriyeh, Mobarake, Malek shahr & Moorook DCS SubstationsElectrical Energy Supply & Distribution of Sarcheshmeh Copper Complex and Equipment Optimization

    200420072009200520082008200820062008200620032006200820042007200520042007

    2004

    2004

    200520062006

    2007

    2003

    HRECERECFRECWRECMRECGREC

    MAPNA MRECMAPNAFREC

    KHRECWREC

    MOBINPETRO KHRECNIPC

    KHRECKHRECOIED

    EREC

    EREC

    WRECTRECEREC

    EREC

    NICICO

    230/63/20230/63 230/63 230/63230/63 230/63 230/63230/63

    230132/66/20

    132/20132/20 132/20132/20132/20132/20132/20 132/12

    63/20

    63/20

    63/20 63/20 63/20

    63/20

    MV/LV

    27

    Projects

  • Fars RDC Dispatching Centers Azerbaijan Interface System Mazandaran Interface System

    383940

    200820082008

    FRECARECMREC

    Projects

    Dispatching and Automation ProjectsProject

    Completion Date Client

    SAOC (Supervision)Tehran Dispatching CenterNAOC Dispatching Center Mazandaran Regional Dispatching Center Tehran Dispatching CenterNAOC Dispatching InterfaceAzerbaijan Regional Dispatching CenterMazandaran RDC - Feasibility & ExtensionZanjan RDC- DispatchingBakhtar Dispatching Interface SystemYAZD Dispatching CenterMRDC Dispatching Center Connection to ZimavarNAOC Interface System, Site Supervision Semnan Dispatching CenterAzerbaijan InterfaceIsfahan Network AutomationAzerbaijan Interface SystemNAOC Dispatching Center Tabriz & Orumieh Automation of Distribution NetworkGharb Dispatching Center(Supervision)Markazi Region, Interface SystemProvisional Acceptance of Kermanshah Interface SystemNAOC Dispatching, Site SupervisionMarkazi Region, Interface System and SupervisionJask 230kV DCS SubstationYazd RDC Dispatching Yazd Regional Dispatching Center Interface System Kermanshah DDC Automation of Distribution NetworkYazd RDC Inspection Arak & Hamedan Dispatching & TelecommunicationYazd DDC Automation of Distribution NetworkDehloran, Dashte Abbas & Zarrin Abad Substations SCADA SystemTehran RDC DispatchingNAOC DCS SystemsYazd RDC Arak Interface System (Supervision)Lorestan RDC

    1 23456789

    10111213141516171819202122232425262728293031323334353637

    FRECTRECMRECMRECTRECMRECARECMRECZRECBRECYRECMRECMRECSRECARECEDECARECMRECADECWRECBRDCWRECMRECBRECHRECYRECYRECWRECYRECBRECYRECWRECTRECMRECYRECBRECBREC

    1998199819992000200020012001200320032003200320032003200320032004200420052005200520052005200520052006200520052005200520072007200720072007200820082008

    28

  • Telecommunication ProjectsProject Completion Date Client

    Design of master plan of PLC network of Yazd RECSupervision over installation and commissioning of telecommunication equipment of Yazd REC Tender documents for supply, installation and commissioning of Metropolitan optical network for Khorasan REC Tender documents and technical specifi cation for purchase of PLC outdoor equipment for Fars RECDesign of Master Plan of Fiber Optical Network for West RECDesign of telecommunication network for radio equipment of South Yazd Substations (Yazd REC)Design of Master Plan of fi ber optic network for Azerbaijan RECSupervision over installation and commissioning of optical equipment of Tehran REC Feasibility Study for TREC Optical Network for World BankPlanning of RDC communications over fi ber optics network for Tehran REC

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    2002

    2003

    2003

    2003

    2003

    2005

    2006

    2006

    2006

    2007

    YREC

    YREC

    KHREC

    FREC

    WREC

    YREC

    AREC

    TREC

    TREC

    TREC

    *REC: Regional Electric Company

    Technical specifi cation & tender documents for purchase of PLC & Tele - protection terminals for Iran Power Development CompanyDesign of Master Plan of PLC network for West RECDesign of telecommunication network in Fuman & Siah-kalteh Substations (Gilan REC)Design of Master Plan of telecommunication (Optic/Radio/PLC) network for Khouzestan RECDesign of fi ber optics network of Tehran Regional Electric Distribution CompanyDesign of Master Plan of fi ber optical network for Tehran RECDesign of RDC telecommunication network and preparation of tender documents for purchase of equipment, installation and commissioning of fi ber optics, radio and PLC equipment for Bakhtar RECDesign of VHF & UHF radio network For West RECDesign of fi ber optic network for Khorasan RECDesign of Master Plan of telecommunication network of Gilan RECSupervision over installation and commissioning of optical equipment for IPDC Supervision over installation and commissioning of PLC/Radio equipment for Bakhtar RDC Design of comprehensive telecommunication network for Khorasan RECSupervision on installation and commissioning of optical equipment for West REC Tender document and technical specifi cation for purchase of PLC & Tele - protection terminals for Tehran REC

    11

    12

    13

    14

    15

    16

    17

    181920

    21

    22

    23

    24

    25

    2007

    2007

    2007

    2008

    2008

    2008

    2008

    200820082008

    2008

    2008

    2008

    2008

    2008

    IPDC

    WREC

    GREC

    KZREC

    TBTB

    TREC

    BREC

    WRECKHRECGREC

    IPDC

    BREC

    KHREC

    WREC

    TREC

    29

    Projects

  • Damavand power plant is located in the east of capital Tehran. Damavand combined cycle power plant has 12 gas turbine units V 94.2 each 159.5 MW which are completed and are in service. 6 units steam turbines of160 MW capacity and heat recovery steam generators are under construction. The plant feeds power to 400 kV national grid.

    DAMAVAND

    PARANDParand power plant is located in the south west of capital Tehran. Parand has 6 gas turbine units V 94.2 each with 159.5 MW capacity and all are in service.The plant shall be extended to 6 more gas turbine units and to combined cycle packages.

    Projects

    We have designed and supervised construction of more than 22000 MW gas turbine and combined cycle power plants of the country:

    30

  • 31

    KERMAN

    KHOY

    Kerman power plant is located in south east of Iran. Kerman combined cycle power plant has 8 gas turbine units V 94.2 MW and feed 4 steam turbines 160 MW through 8 heat recovery boilers.

    Khoy power plant is located in the north west of Iran in Azerbai-jan region. Khoy combined cycle power plant has two gas turbine units and feed 1 steam turbine 105 MW through 2 heat recovery boilers.

    Projects

  • SHAHID RAJAEE

    Fars power plant is located in the center of Iran in Fars region near to Shiraz. Fars combined cycle power plant has 6 gas turbine units feeding 6 heat recovery boilers and 3 steam turbines each 105 MW.

    Shahid Rajaee power plant is located in the west of capital Tehran near to Qazvin. The plant has the capacity of more than 2000 MW.Shahid Rajaee combined cycle section has 3 steam turbines 105 MW which are fed by 6 gas turbines through heat recovery boilers.

    FARS

    Projects32

  • Projects33

    NEKA

    KAZEROUN

    Neka power plant is located in the north of Iran at the coast of Caspian Sea. Neka is a famous and large power plant playing important role in supplying power need of the country grid (altogether more than 2000 MW). Neka combined cycle section has one steam turbine 160 MW fed by two gas turbines through two heat recovery boilers.

    Kazeroun power plant is located in south west of Iran. Kazeroun combined cycle power plant has 6 gas turbine units V 94.2 MW and 3 steam turbines 160 MW.

  • 19%

    5%

    13%

    14%

    3%15%

    2%

    27%

    2%

    Engineers of Monenco Iran

    Computer Engineers 12

    Economists: 10

    Civil Engineers 67

    Technicians & CADists 90

    Others 62

    34

    Industrial Engineers 25

    Mechanical and Process Engineers 68

    Electrical and I&C Engineers 127

    Geologists and Mine Engineers 8

  • Monenco Consulting Engineers is the engineering member of MAPNA Group.MAPNA is the leading manufacturer and general turnkey contractor in the region. MAPNA has mainly concentrated in power plants, utilities, Refi nery plants, railway and construction projects.

    MAPNA Group consists of investment, manufacturing, engineering and contracting companies.

    Among the Group members i.e. MAPNA Turbine Manufac-turing (TUGA), MAPNA Generator Manufacturing (PARS), MAPNA Turbine Blade Manufacturing (PARTO), MAPNA Electrical & Control Manufacturing (MECO), MAPNA Boiler Manufacturing, MAPNA Railroad Industries, Mavadkaran, Sepahan Equipment Manufacturing, MAPNA International F.Z.E, MAPNA Tous Power Generation, MAPNA Assalooyeh Power Generation, MAPNA Power Plants Construction & Development. (MD -1), MAPNA Combined Cycle Power Plants Construction & Development (MD -2), MAPNA Special Projects Construction & Development (MD -3), MAPNA Operation & Maintenance, Nasb Niroo, Iran Power Plant Investment (SANA), Non-Governmental Fund for Research and Technology in Iran Power Industry, Shahriar Turbine Parts, Faraz Niroo Transformer Manufacturing, Iran Power Plant Repair and Azarakhsh Power Generation Companies Monenco supports and cooperates with all other members of the group in construction and installation of new power plants and utilities, railway etc.

    The role of Monenco in this position is substantial and is responsible for all of engineering services, tender documents and evaluation, procurement services, basic design, detailed design, etc.

    In this position Monenco Iran has also the duty of supervision of the projects, which means, Monenco Iran shall have supervision and auditing offi ces in different places of the Country and outside of the Country where ever there is an active project. For this reason Monenco Iran has presently 9 supervision offi ces in various Regions of the Country.

    Monenco Iran in MAPNA Group

    MAPNA GROUP

    35

  • Company Shareholding

    Iran Power Plant Project Management Company (MAPNA)

    MAPNA Group is parent enterprise engaged in the development and implementation of thermal power plants, utilities and industrial projects under EPC & IPP schemes through its subsidiaries relying on 15 years of constant and outstanding performance. Since 1992, when MAPNA was established, the Company has constructed or has under-construction power plant projects generating more than 42000 MW of electricity with a total value of almost Euro 14 billion, having a share of 85% of the country’s total grid capacity. We pride our strategic role in the sustainable industrial growth and economic development of I.R Iran. AMEC plc. (UK)

    The AMEC story in Canada begins on September 16, 1907, with the incorporation of the Montreal Engineer-ing Company Ltd., which did business for 85 years be-fore being acquired by AGRA Inc. AGRA came into being in 1960, acquired Montreal Engineering (then known as Monenco) in 1992. AGRA itself was acquired by AMEC in 2000.AMEC celebrates 100 years in Canada. A century, they have led projects that transformed the landscape and helped shape the country.

    MIR Investment Company All engineers, managers and other staff of Monenco Iran are owners of their company and they sacrifi ce for the company.MIR is an investment enterprise built up by the personnel of Monenco Iran in order to take part in building Monenco’s structure higher and stronger as possible.

    MAPNA 72%

    AMEC 15%

    MIR 13%

    36

  • Main Offi ces:

    Offi ce 1: No.16, St 23 Gandhi Ave. Tehran, Iran Offi ce 2: No.17, St 23 Gandhi Ave. Tehran, Iran

    Offi ce 3: No.10, St 23 Gandhi Ave. Tehran, Iran

    Offi ce 4: No. 19, St 21 Gandhi Ave. Tehran, Iran

    Offi ce 5: No.51, Gandhi Ave, Floor 1 Tehran, Iran

    Offi ce 6: No.51, Gandhi Ave, Floor 4 Tehran, Iran

    Branches all around the Country:

    Tabriz: No.69, St 2 Golchin Ave, Baharestan Ave, Shahrak-e-Noor Tabriz Iran

    Kermanshah: No.49 -51, Hafez Ave, Golestan Boulevard, Kermanshah, Iran

    Ilam: Shahryar Ave, Farhangian phase, Hazrate Abolfazl Boulevard, Ilam, Iran

    Eslam Abad: Shahid Cheraghi Ave, Yadegar-e-Emam Boulevard, Eslam Abad, Iran

    Bam: No.2, Chape Farshid Besat 8 Ave, Moalem Boulevard, Bam, Iran

    Mahan: Next to Rahdarkhane, Shahrak-e- Enghelab, Mahan, Kerman

    Lamard: Central Post, Ashkenan city, Lamard, Fars Province, Iran

    Kahnuj: Heidar Abad Khasili, Kahnuj, Kerman

    Shahmaran: Emam Djomehe ghadeem alley Shahmaran, Kerman

    Company’s Offi ces and Branches

    37

  • www.monenco.com

  • www.monenco.com

    No.16 & 17, St 23 Gandhi Ave., Tehran, IranP. O. Box: 15875-8717Tel: +9821 81961 Fax: +9821 88777394Email: [email protected]

    Designed by: E

    lahe Alavi A

    mlashi