6
}u·., ;~}'~,I; ~ ~;:-j~T'-l ~Fri'';;;-I ~Tt''ff,'''i· ;TF TiFF.r *1';'1 "I'j1 y, - ~2(, II II EPBX (052212451200 Fa." :0522 2432381 (iovcrnmcnt «! 11)(.lI'I-:-\l1ll,IIY (li' r"I1I1I<1Ys l\csc<1lciI I )C,iglh 8: Si<lnd<1ldsOrg<1ni,al ion Lucknow - 22h 0\1 DID (0522) 2450115 DID (0522)2465310 No. ELl4.2.l5/SIL Chief Electrical Engineer, - Central Railway, Mumbai CST-400 001. Northern Railway, Baroda House, New Delhi-I 10 001. North Central Railway, Hastings Road, Allahabad- 21100 I Eastern Railway. Fairlie Place, Kolkata -700001. East Central Railway, Hazipur-844I 0 I. East Coast Railway. Chandrashekharpur, Bhubaneshwar-75I 0 16. Southern Railway, Park Town, Chennai-600 003. South Central Railway. Secunderabad-500 371. South Eastern Railway. Garden Reach, Kolkata -700043. South East Central Railway, Bilaspur-495004 Western Railway, Churchgate, Mumbai-400 020. West Central Railway. Jabalpur-48200 I. Chittaranjan Locomotive Works, Chittaranjan-713 331 (WB) Dated 01.08.2016 Sub: Minutes of Performance Review Meeting of Microprocessor based control and fault diagnostic system (M PCS) of M/s Stone India limited make held at RDSa on 20.07.2016. The minutes of performance review meeting of MPCS held at RDSa on 20.07.2016 had been issued and may be downloaded from RDSa website using following path: http://www.rdso.indianrail.vv<:lys.l!.ov.in ~ Directorates ~ Electric Loco ~ Important Letters/Documents ~ Important Letters/Documents ofTM Group This is for your kind information please. ~ ~, (P.K. Saraswat) for Director General/Elect. Copy to: I. Secretary (Elect.), Railway Board. Rail Bhawan, New Delhi- 11000 I (Kind attention: Shri A. K. Goswami DEE/RS/RB): For kind information please. 2. M/s. Stone India Limited, 16, Taratalla Road, Kolkata - 88 For information and necessary action. Encl: As above ~ ~, (P.K. Saraswat) for Director General/Elect Page 1 of 6

MOM... · 2019. 10. 17. · mm/cable was used instead of prescribed 10 mrrr' E-beam cable from shunt to ISCU in BA panel for each TM channel. All the sheds are advised to ensure provision

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • }u·., ;~}'~,I; ~ ~;:-j~T'-l~Fri'';;;-I~Tt''ff,'''i·;TF TiFF.r *1';'1

    "I'j1 y, - ~2(,II IIEPBX (052212451200

    Fa." :0522 2432381

    (iovcrnmcnt «! 11)(.lI'I-:-\l1ll,IIY (li' r"I1I1I

  • Minutes of Performance Review Meeting of Microprocessor based control and faultdiagnostic system (MPCS) held at RDSO on 20.07.2016 with Mis Stone IndiaLimited/Kolkata.

    Present:

    I.

    Name (S/Shri)

    RDSOP.K. Saraswat,DSE/TM, RDSaN. Sharma,SSE(D)/TM/Elect.

    SN

    I.

    Name (S/Shri)

    FirmDebnath KunduGM Railway Electronics, SIL

    SN

    2.

    1. Performance of Mis Stone India Limited (SIL):

    Population, failures and FRPCPY of MPCS of Mis SIL is given below:

    2013-14 2014-15 2015-16SIL .~.P F F%/Y P F%/Y P F F%/Y

    MPCS V2 49 15 30.6 52 18 34.62 75 28 37.33MPCS V3 -- -- -- -- -- -- 2 0 0.00Total 49 15 30.6 52 18 34.62 77 28 36.36

    Note: P = Population, F = Failures and F%/Y + FRPCPY

    Quarter wise failures for 2015-16 are given below:

    2015-16

    Firm P 1 Qtr 2 Qtr 3 Qtr 4 Qtr Total F%/Y

    SIL 75 12 4 8 4 28 37.33

    It is observed that, FRPCPY of Mis SIL for MPCS V2 is showing increasing trend.It is also observed that no failures are reported for MPCS V3.

    However, ELS/ER has informed that MIS SIL make MPCS V3 was provided duringMTR in Loco no. 22401/HWH. In this locomotive, it is observed that OJ is notclosing at once but DJ closes only after delay of II to 30 seconds and display showsnotch position of so" notch against actual notch position of 3211d notch. Due to theseproblems MPCS had to be replaced by ELS/HWH. Mis SIL is advised to submitdetailed investigation report to RDSa by 30.08.2016.

    Page 2 of 6

  • 2. Details of Item wise failures ofMPCS V2 are as under:

    Faulty Item 2013-14 2014-15 2015-16

    Internal hardware

    CPU card ') 2 3-'Display unit 2 ') I-'Filter card 2 2 2

    Input card 4 4

    ISCU 2 6

    Output card 2 3 2

    SCU I 3

    Calibration 2 3

    Software 4

    External I

    Modification I

    Found normal I 2

    Grand Total 15 18 28

    Population 49 52 75

    3. It is observed that there is only one failure of display unit, and there is improvement inits performance after completion of modification in display unit power supply for fuserating 2A to lOA fuse of f Iter card

    4. Compliance of Previous Minutes of Meeting held at RDSO on 6.4.2016.

    S.N.

    Item discussed OriginalTarget

    ObservationlRevised Target

    Performance of Mis SIL MPCS V2IS deteriorating. FRPCPY hadincreased from 30.6% in 2013-14 to37.33% 111 2015-16. Failures ofSCU, ISCU, input card, filter card,CPU card are cause of concern. MisSIL is advised to make reliabilityaction plan considering the failuresand submit to RDSO within twomonths.

    5.6.2016 Reliability ActionPlan not yetsubmitted.Mis SIL IS agamadvised to submitrei iabi Iity action planby 30.8.2016.

    I.

    Mis SIL was advised to demonstrateTM current calibration and theproposed maintenance schedule ofMPCS V2 at ELS/BZA, ELS/MGS,ELS/KYN, ELS/JHS & ELS/BLwithin three months. Joint reports of

    2. 5.7.2016 Demonstrationcarried out atELS/MGS on12.5.2016 & ELS/BLon 20.6.2016. MisSIL and Railways are

    Page 3 of 6~'11.jJ.-

    ~

  • S. Item discussed OriginalN. Target

    the exercise to be subrn itted toROSO for taking decision on theactivities covered in the proposedmaintenance schedule.

    ObservationlRevised Targetadvised to include theremarks of shed onthe calibrationprocedure and timerequired forcalibration in the jointnote.

    Mis SIL andRailways are advisedto do one cycliccheck of TM currentcalibration.

    TM currentcalibration of MisSIL make MPCS tobe carried out duringTOH.

    Revised Target -30.10.2016

    3. Mis SIL had informed that most of 5.7.2016the CPU card failures are due tofailure of RTC battery. Mis SIL hadinformed that life of their RTCbattery is only 2.5 years, and itneeds to be periodically replaced.Life of RTC battery of Mis Medhais 8 years and that of Mis ICECPLis 10 years. Mis SIL is advised toreview the design to increase the lifeof RTC battery and submit a reportto ROSO within three months. Locosheds are advised to check thebattery voltage of RTC batteryduring TOH and replace wheneverrequired.

    4. Mis SIL had informed that most of 5.7.2016the ISCU failures are due tocalibration issues. Mis SIL ISadvised to review design of sensingcurrent to find out permanentsolution and submit a report toROSO within three months.

    Report not yetsubmitted.

    Mis SIL andRailways are advisedto do one cycle ofreplacement of all theRTC batteries.

    RTC batteries of MisSIL make MPCS tobe replaced duringTOH.

    Revised Target:Submission of Report- 30.8.2016Battery Replacement- 30.10.2016Report not yetsubm ittedRevised Target -30.8.2016

    5. ELS/C B had informed that two 5.06.2016new locomotives with Mis SIL

    Completed on11.04.2016

    Page 4 of 6

    ~

  • 5.06.2016

    S. Item discussedN.

    OriginalTarget

    ObservationlRevised Target

    yet6.

    MPCS V3 had been commissionedbut firm had not provided anymanuals/TSD/training etc. Mis SILIS advised to provide copies ofmaintenance manual, TSD, datadownloading software and trainingto shed staff within two months tothe sheds where new MPCS V3locos are commissioned.ELS/BL had informed that TMcurrent is not logged in the faultdata. Mis SIL to examine andsubrn it report with in two months.

    5.06.2016 Report notsubmitted.Revised Target30.8.2016

    7. ELS/BL informed the TM currentdifference observed in forward andreverse directions at same notch.Mis SIL to examine the cause ofcurrent difference in both directionat same notch and submit report toRDSO within two months.

    Report notsubmittedRevised Target30.8.2016

    yet

    8. Mis SIL had informed that Loco no.27114/NKJ was failing frequentlydue to false QD acting. Oninvestigation it was found that 4mm/cable was used instead ofprescribed 10 mrrr' E-beam cablefrom shunt to ISCU in BA panel foreach TM channel.All the sheds are advised to ensureprovision of prescribed 10 mm2 E-beam cable from shunt to ISCU inBA panel for each TM channel.

    One cyclic check tobe carried out by MisSIL and Railways inall locomotives forensuring thatprescribed 10 mrrr' E-beam cable IS usedfrom shunt to ISCUin BA panel for eachTM channel.

    While commissioningof new MPCS, it'scompliance needs tobe ensured.

    Target date-30.10.2016

    5. During the meeting webpage of REMAN_EL of Mis SIL make MPCS V3 was openedand itwas observed that the webpage is not opening. Mis SIL is advised to ensure theproper working of Vendor server of MPVS V3. Mis SIL was also advised to develop abetter user interface for the website.

    6. Mis SIL is advised to expedite the testing ofREMAN_EL.

    Page 5 of 6

  • 7. On analyzing the individual failures, it was observed that Mis SIL had carried out somemodification in SCU .. W' phase connection was not found in SCU. Mis SIL andRailways are advised to do one cyclic check ofSCU connection.

    8. During the course of meeting it was learnt that Mis SIL had carried out some softwaremodifications also. Mis SIL is advised to submit details of all hardware and softwaremodifications carried out to ROSa by 30.8.2016. Mis SI L is further advised to carry outthe modifications only after prior approval of ROSa.

    Encl: Nil

    ~~ 11 lb'\. "0.(P.K. Saraswat)

    for Director GenerallElect