Module V Final Wrap-Up. Review what we’ve discussed today Take the Post-Test Answer any remaining questions. Module V Objectives. 2. Final Wrap-Up. • Caltrans Statewide NPDES Permit • California General Construction Permit • Caltrans Storm Water Management Plan. Regulatory Background. 3. - PowerPoint PPT Presentation
Citation preview
Module VFinal Wrap-Up
Module Topic
0 Overview
I Introduction
II Soil Stabilization (SS) and Sediment Control (SC)
IIITracking, Wind Erosion, and Construction Site Management BMPs
IVIncorporation of Construction Site BMPs into the Design Process
V Final Wrap-Up
Module V Objectives
• Review what we’ve discussed today• Take the Post-Test• Answer any remaining questions
2
• Caltrans Statewide NPDES Permit
• California General Construction Permit
• Caltrans Storm Water Management Plan
Regulatory Background
Final Wrap-Up
3
Department Policy
• The SWDR is to describe the strategy for including Construction Site BMPs into the contract documents.
• Must consider the BMPs as separate bid line items for all projects.
• Design and Construction Divisions must concur with the strategy.
Final Wrap-Up
4
Caltrans-Approved Best Management Practices
(BMPs)• Design Pollution Prevention
BMPs• Treatment BMPs• Maintenance BMPs• Construction Site BMPs
5
Final Wrap-Up
Caltrans Storm Water Quality
Manuals
Final Wrap-Up
6
• Splash erosion• Sheet erosion• Rill erosion• Gully erosion• Channel erosion
Types of Erosion
Final Wrap-Up
Sediment is the most common pollutant washed from construction sites. 7
Tracking, Wind Erosion,
and Construction Site Management
8
Final Wrap-Up
• Prevent storm water contact with disturbed soil areas (DSAs)
• Protect DSAs from erosion• Minimize sediment in storm water
before discharge• Control discharges of sediment
from other sources• Prevent non–storm water
discharges• Prevent storm water contact with
other potential construction site pollutants
Water Pollution Control Strategies during
Construction
Final Wrap-Up
9
Minimum effective combination of soil stabilization and sediment controls
Figures and TablesFinal Wrap-
Up
10
Selection Process of
Construction Site BMPs
Final Wrap-Up
11
Start with the Construction Site BMPs Consideration Form
Use of Checklist CS-1,
Parts 1 - 6
27.1 ac17.3 ac7.4 ac2.5 ac
12.4 ac
3
12
Use of Checklist CS-1,
Parts 1 - 6
13
14
Example Project Proposed Construction Site
BMPs Deployment Plans (D-Plans)
Designate separate bid line items for appropriate BMPs.
• Scheduling• ESA Protection• Soil Stabilization• Slope Interrupter Devices• Concentrated Flow Devices• Sediment Control• Tracking Control• Wind Erosion Control• Concrete Washouts• Construction Site
Management
Standard Special Provisions for
Construction Site BMPs
Final Wrap-Up
15
•SSP 07-340 WPCP Preparation Requirements
•SSP 07-345 SWPPP Preparation Requirements•SSP S5-630 Relations with the RWQCB•SSP 07-346 Construction Site
Management
Standard Special Provisions for
Construction Site BMPs
Final Wrap-Up
16
• Include Water Pollution Control quantity sheets
• Include special provisions of selected bid line items
• Include details of selected bid line items
• Provide estimated quantities for selected bid line items
• Provide estimated costs for selected bid line items
Finalize PS&E Package for
Construction Site BMPs
Final Wrap-Up
17
At each design phase (PID, PA/ED, PS&E), include the following:
• Temporary BMP selected• Quantity and cost information• Construction Division
concurrence information
Final Wrap-Up
18
Include Construction Site BMP Strategy in the Storm Water
Data Report
Course Summary
You now should be able to Select appropriate Construction Site BMPs Incorporate Construction Site BMPs Estimate quantities and costs for Construction
Site BMPs Incorporate a Construction Site BMP strategy
into the Storm Water Data Report
19
Questions
Mar/CC 580, Richmond-San Rafael Bridge Seismic Retrofit 20
A few last questions
The Construction Site BMPs Consideration Form must be initialed and included in the Storm Water Data Report at all phases of design. True or False?
21
Are rainfall intensity curves and average yearly rain days needed for the designer to select the appropriate soil stabilization and sediment controls?Name the three elements of the Construction Site BMPs strategy.
To be or not to be?
The Post-Test
• Repeats the test given at the beginning of the course
• Has a time limit of 15 minutes
• Covers course topics
• Evaluates what you have learned
• Helps evaluate the effectiveness of this training
22
Post-Test
23
Remember your efforts will
improve the project delivery process by
24
Helping contractors develop more accurate, competitive bids for all Caltrans construction projects
Reducing construction costs arising from contract change orders (CCOs) and claims
Facilitating implementation of preferred temporary BMPs during construction of the project
Sunset over San Francisco Bay Area
Questions