  • Oil & Gas introduction Course for Non-Engineers SEC

    1

    Module 6Dredging

  • Oil & Gas introduction Course for Non-Engineers SEC

    2

    1. Capital Dredging vs Maintenance Dredging

    Dredging is the under water removal of soil and subsequent transportation to another place, either for deepening or for profitable use

    Drivers: Swift population towards coastal areas, Economic growth, World population growth.

    DEFINITION:

    CAPITAL MAINTENANCE

    New IslandsNew Ports

    Remove silt/sand from to keep existing water ways to the required depth

  • Oil & Gas introduction Course for Non-Engineers SEC

    3

    2. Draught

    Water depth in the Port or Shipping channel required

    Desired depth in Vietnam -12/14m

    Tide Vungtau = 3 m Cai Mep/Thi Vai -10 to -13m; TOA/Van Oord 2010

    100.000 DWT = 8.000 TEU = approx. 16 m80.000 DWT = 6.000 TEU = approx. 14 m60.000 DWT = 4.000 TEU = approx. 12 m

    Soai Rap river / Hiep Phuoc -12? Currently -5/6

  • Oil & Gas introduction Course for Non-Engineers SEC

    4

    3. Soil conditions

    Type of soil and the condition it is in

    - Sand (Loose or Compacted)- Silt- Clay (Soft or Stiff)- Gravel- Rock- Coral

    Round

    Sharp

    Silt

    Gravel

    Modern Soil

  • Oil & Gas introduction Course for Non-Engineers SEC

    5

    4. Reclamation

    Creating Land in the Sea by dumping sand

    Maasvlakte 2 Netherlands

    Project Vungtau

    WHY?

    Hai phong

  • Oil & Gas introduction Course for Non-Engineers SEC

    6

    5. Soil improvement

    Improve the bearing capacity from reclaimed land

    Kansai Airport sinks 50 cm per year

    Methods:- Compaction- Wick/Vertical drains- Vibro floatation- Soil mixing

    Consolidation

  • Oil & Gas introduction Course for Non-Engineers SEC

    7

    6. Beach Nourishment

    Replenish sand removed by currents

    Break water

  • Oil & Gas introduction Course for Non-Engineers SEC

    8

    7. Dredging Contractor

    THE BIG 4:- Boskalis (Netherlands)- Van Oord (Netherlands)- Jan de Nul (Belgium)- Dredging International (Belgium)

    Together hold 60% of the world Dredging market.

    VINAWACO

    Why they are BIG?:- Buy best equipment (IHC)- In house training school- Large versatile fleet- OPEX over CAPEX

    Company to carry out the Dredging work

    Link with Offshore?

  • Oil & Gas introduction Course for Non-Engineers SEC

    9

    8. TSHD

    Trailing Suction Hopper Dredger

    Long Chau 1969

    Trailing is to moving in one direction with something resting on the ground.

    Hopper is area to contain the dredged material.

    Suction stand for the pump action, vacuuming the seabed.

    Hopper capacity can vary from 1.500 m3 up to 34.000 m3.

    How long to fill up?Slurrification

  • Oil & Gas introduction Course for Non-Engineers SEC

    10

    9. Cutter Dredger

    A stationary dredger that can mechanically excavate the seabed

    SlurryApplication?

  • Oil & Gas introduction Course for Non-Engineers SEC

    11

    10. Beaver DredgerSmaller cutter dredger by IHC

    Application?

    Vietnam owns 9 IHC Beaver Dredgers and about 10 more from other manufacturers

    Vietnam has 3 Hopper Dredgers operational between 1.500 m3 and 4.000 m3.

  • Oil & Gas introduction Course for Non-Engineers SEC

    12

    11. Dipper Dredger

    A stationary dredger that uses a bucket to excavate the seabed

    Vietnam: Clamshell or Grab Dredging

  • Oil & Gas introduction Course for Non-Engineers SEC

    13

    12. Excavator

    Dredging using an excavator on a pontoon

    Application?

  • Oil & Gas introduction Course for Non-Engineers SEC

    14

    13. Split Hopper

    Barge to transport dredged material that can dump quickly by splitting the hull

  • Oil & Gas introduction Course for Non-Engineers SEC

    15

    14. Multi CatWork boat to assist a cutter dredger with different tasks

    - Personnel transfer- Change cutter head or teeth- Hook-up of floating pipe line- Towing Dredger to site

    MOVIES

  • Oil & Gas introduction Course for Non-Engineers SEC

    16

    15. ProductionHow much dry material is dredged per second

    m = Density Mixturew = Density Water g = Density In situ

    Critical velocity 3 m/s

  • Oil & Gas introduction Course for Non-Engineers SEC

    17

    16. Suction/Drag head

    Suction mouth that is trailing on the seabed at the end of the suction tube

  • Oil & Gas introduction Course for Non-Engineers SEC

    18

    17. Cutter teeth

    Rock / Coral

    Sand / Gravel

    Clay / Silt

  • Oil & Gas introduction Course for Non-Engineers SEC

    19

    18. Impeller / Pump Housing

    Double walled pump

  • Oil & Gas introduction Course for Non-Engineers SEC

    20

    19. Discharge pressurePressure at the pressure side of the dredge pump

    Pressure

    Pressure

    Cavitation

  • Oil & Gas introduction Course for Non-Engineers SEC

    21

    20. Rain bowingEmptying the hopper by re-slurrifying the sand and spraying it from the bow

    How Far?

  • Oil & Gas introduction Course for Non-Engineers SEC

    22

    21. Floating PipelinePipe line to transport mixture from the dredger to the dump site

  • Oil & Gas introduction Course for Non-Engineers SEC

    23

    22. Booster StationInstallation in the pipeline to bring the pressure back up

    Booster

    Dumpsite

    6 km6 km

  • Oil & Gas introduction Course for Non-Engineers SEC

    24

    23. Bottom DoorsUnloading the hopper by dumping through bottom doors

    Bottom door

  • Oil & Gas introduction Course for Non-Engineers SEC

    25

    24. Barge LoadingPump the mixture in a barge that is moored next to the Hopper or Cutter

    The Dredging Cycle