MoDOT – ACEC St. Louis Partnering Meeting
September 14, 2017
Agenda
• Introductions & Department Update Bill Schnell • Design/Planning Updates Tom Evers • STL City Jeff Bohler • STL North County Lisa Kuntz • I-270 Design Build Justin Wolf • STL SW County Tom Montes-de-Oca • Franklin/Jefferson Shirley Norris • St. Charles Tim Schroeder • On-Call/Maintenance Projects Tom Evers • Construction Inspection Mike Castro • ACEC Update Dan Meckes • AGC Steve Lewis
Missouri’s Transportation System at a Glance
• Missouri’s transportation system is the nation’s seventh largest
• It safely and reliably connects: – People with jobs and services – Businesses with suppliers and customers – Students with schools – Visitors with destinations
• Citizen’s Guide to Transportation
Funding in Missouri available online
Long Range Transportation Plan
• Sets the state’s 25-year vision for transportation
• Allows us to assess and then better address the needs of our customers
• Public and stakeholder input is important to our success
2018 LRTP Update
The LRTP update will:
• Update Missouri’s transportation system goals
• Assess customer expectations for the transportation system for the next 25 years
• Review performance measures
• Update the financial plan
• Address updated federal requirements as needed
2018 LRTP Update
The LRTP update will:
• Analyze national and state trends and innovations
• Assess current and future infrastructure needs
• Begin preparing for Autonomous and Connected Vehicles (AV/CV)
Updating our LRTP goals
Preservation Take care of the transportation system and services we enjoy today
Safety Keep all travelers safe, no matter the mode of transportation
Economic Development Invest in projects that spur economic growth and create jobs
Connections & Choices Give Missourians better transportation choices
The 2014 LRTP established four goal areas:
Updating our LRTP goals
• MoDOT will seek public and stakeholder participation online from September 11 through October 11, 2017
• Input from online tool will help confirm goals and rank transportation priorities
Design/Planning Updates
• Training - Road 2 course Nov 6-9, TMC 209
• MoDOT’s ADA Transition Plan
• Cost Share Program
• Future Design Build Projects
• Planning Studies
New Scoring Criteria
Criteria for Evaluating Consultants
• Project Understanding & Innovation (25 points)
• Past Performance (25 points)
• Qualifications of Personnel Assigned (20 points)
• General Experience of Firm (10 points)
• Familiarity/Capability (10 points)
• Accessibility of Firm & Staff (10 points)
St. Louis City
• Jeff Bohler • Project Manager • 314-453-5052
• Signals – Route D
• Pavement
– Halls Ferry Circle – Hall Street
• Bridges – I-44/ Jefferson Bridge Replacement – I-55 Bridge Deck Rehabilitations – I-64 22nd Street Expansion, Ewing, Sarah – I-70/ Broadway – Overpasses
St. Louis County - North
Lisa Kuntz
(314) 453-1879 [email protected]
Upcoming Projects:
1) Route D: Resurface and ADA improvements from I-170 to City Limits
2) Interchange improvements at Route 364 and Route 141
3) Route 67: Raise a section of SB 67 just s/o Mississippi River
4) Misc. Pavement Improvement Projects (Locations TBD)
I-270 North Corridor
• I-270 North Corridor Improvements (Potential DB)
– $106 M Funded FY19 - $700M total cost est.
– FONSI Issued April 2017
– Needs Commission Action
– MoDOT Project Team
– MoDOT’s Owner Consultant Selected
– Design Build Teams Forming (Consultant Opportunity)
St. Louis County – South West Potential Resource Needs for 2018 -2020
• I-55 Resurface and GR
- Rte. 67 to Rte. 141
• I-44 Bridge Replacement at Big Bend
- Includes Signals / ADA / Grade Adjust
• Rte. 67 Resurface & ADA
- Page to Swan
• Rte. 67 Resurface & ADA
- Big Bend to Barracksview
• Rte. 21 Resurface & ADA
- Rte. 30 to Meramec River
• Rte. 100 Resurface & ADA
- 141 to Ballas
• Rte. 100 Resurface & ADA
- Ballas to Lindbergh
• I-255 JB Bridge
- Overlay and joint replacements
• Rte. 231 Resurface & ADA
- Franru to Stl City Limits
• Rte. 340 Resurface & ADA
- Lea Oak to I-270
• Rte. P Resurface & ADA
- Rte. 366 to Rte. 30
Franklin / Jefferson
Franklin County
• Rte. 50: Improvements - Birch Creek to I-44 • Rte. AD: Replace Bridge - Over Happy Sac Creek • Rte. I-44: Pavement
Improvements - St. Louis County Line to Rte. 30
Jefferson County
• Rte. V: Realign Roadway Segment – Near Hardin Road
• Rte. 61/67: Resurface, Update
Guardrail, and ADA Upgrades • Rte. I-55 OR: Resurface and
Guardrail Upgrades - Rte. M to Rte Z
St. Charles County
Tim Schroeder, P.E.
(314) 453-5049 [email protected]
Future Opportunities:
1) I-70, from St. Charles Convention Center to Cave Springs Blvd (J6I3337)
2) Route 94 (First Capitol) Pavement and ADA Improvements from I-70 to Kingshighway.
3) Misc. Pavement Improvement Projects (Locations TBD)
On-Call Potential
• Roadway Design
– Slide Repairs/Grading
– Pavement Treatments
– Fast turn around projects
• Scoping Future Work
• Surveying
• Utility Engineering
• Geotech
• Traffic Studies
• ITS
• Construction Inspection
Construction Inspection
Mike Castro, P.E. SL District Construction & Materials Engineer (314) 453-1850
• 120 Active Member Firms representing over 8,700 employees
• Bruce Wylie – Executive Director
2017-2018 Chairman Priorities
• Grow ACEC Membership
• Formulize Executive Director Transition Plan
• Meet ACEC State and National PAC Goals
• Develop Relationship with Governor’s Office
• Business Practices
• Partnering
• Client Advocacy
• Legislative Advocacy
QUESTIONS?