MOBY-DIC Final Workshop
Circuit implementations
Marco Storace
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 2
Normal formsPWA generic (PWAG)-) more focused on accuracy of the corresponding digital circuit implementations-) meets the requirements of ‘direct’ synthesis methods-) the architecture requires a Finite State MachineExample of generic PWA functionCorresponding (irregular) domain partition
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 3
PWA Simplicial (PWAS)-) more focused on speed of the corresponding digital circuit implementations-) suitable for both ‘indirect’ and ‘direct’ synthesis methods
x1
x2
Example of PWAS functionCorresponding (simplicial) domain partition
Normal forms
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 4
PWA multi-resolution hyper-rectangular (mPWAR)-) suitable for both ‘indirect’ and ‘direct’ synthesis methods-) even discontinuous PWA functions-) the architecture requires a Finite State Machine
Normal forms
Corresponding domain partitionExample of mPWAR function
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 5
PWA single-resolution hyper-rectangular (sPWAR)-) simpler digital architecture w.r.t. mPWAR, resulting in faster evaluation time-) even discontinuous PWA functions
Normal forms
Corresponding domain partitionExample of sPWAR function
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 6
Point location problem
All normal forms PWA functions = sets of affine functions defined over subregions of a given domain.Computational standpoint: we have to solve 2 problems.1) Point location problem: find the polytope a given input point belongs to. Chosen normal form higher or lower computational effort (e.g., regular partition decreases the required computational effort). Circuit point of view: this problem can be a bottleneck for some normal forms and for large input dimensions.2) Computation of the affine function defined over a given polytope. This require just a memory + products and sums problem trivial from a circuit point of view, but the required memory can become very large for high input dimensions.
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 7
PWAG: Some detailsReference (hyperrectangular) domain scaled to:
SC = {x n: -1 xi < 1, i = 1,…,n}
PWAG function f defined over SC:
f(x) = fj’x + gj for any x cj
SC is partitioned into generic polytopic regions cj (j = 1,...,LG), such that
SC = jLG cj
cj ck = for any j k
cj
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 8
Point location strategy for PWAGMany algorithms proposed to solve this problem (e.g., see works by T.A. Johansen et al.), but not all of them suitable for circuit implementation.Quite efficient algorithm to solve the point location problem and suitable for circuit implementation: based on a binary search tree.Tree computed off-line based on the domain partition: each non-leaf node a partition edge and each leaf node one of the LG polytopes.
Tree explored on-line: the search complexity ( computation time) depends mainly on the maximum depth of the tree, which in turn depend on LG and on the polytopes shapes.
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 9
Also, the tree exploration requires the evaluation of the partition edges corresponding to non-leaf nodes, in order to continue the search in the tree branch containing the leaf node a given input belongs to.Such kind of data structure is circuit implemented through a Finite State Machine.
Main challenges: to minimize the tree depth ( minimize the time required by the on-line tree exploration) through the off-line optimization. Also relevant is keeping the total number of nodes at a minimum, as this would decrease the circuit dimensions.
Point location strategy for PWAG
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 10
Digital architecturesThere are basically 2 architectures:A) mainly serial (simpler, but slower)B) mainly parallel (faster, but more complex)Both of them can have 3 input acquisition methods (with increasing complexity and speed):-) serial bit-wise (at each clock cycle one bit of all input components is read)-) serial component-wise (at each clock cycle a whole input component is read)-) parallel (all components are read together in one clock cycle).Then we have 6 possible combinations, allowing one to choose the best trade-off between speed and size of the circuit.
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 11
Digital architecturesBinary search treeContains
a memory and
either a Multiply
and Accumulate (MAC)
block (serial
architecture) or a bank of
multipliers and
adders (parallel architect
ure)
Three possible acquisition methods
Can add delays to meet the sampling
times
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 12
Latency times
n: dimension of the input (i.e., number of components of the input vector x)m: dimension of the output (i.e., number of components of the PWA function f)d: maximum depth of the binary search treeb: number of bits used to code the input
Input method PWAG(A) serial PWAG(B) parallel
bitwise d(n+2)+m(n+2)+b+2
2d+2m+b+3
comp-wise d(n+2)+m(n+2)+n+2
2d+2m+n+3
parallel d(n+2)+m(n+2)+3
2d+2m+4
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 13
The other normal formsWhen d and/or n become too large, the PWAG circuit solution can be either too slow ( impossible to meet the sampling times) or too complex ( impossible to implement it in a given FPGA board).In this case, we can try to resort to the other normal forms, that can be used to approximate the PWAG function through a PWA controller (PWAS or mPWAR or sPWAR), which is usually faster and/or simpler.
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 14
PWAS: Some detailsReference (hyperrectangular) domain scaled to :
SC = {x n: 0 xi < mi, i = 1,…,n}
For circuit reasons, we choose mi = 2pi - 1, with pi positive integer. Often mi = mS iThe domain is partitioned into
hyperrectangles grid of
vertices. Each hyperrectangle is partitioned in turn into n! non-overlapping simplices.
simplexvertex
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 15
Point location strategy for PWASMain idea: the regular partition of the domain makes the point location problem quite a simple task, owing to the Kuhn lemmas. Drawback: the number of coefficients (i.e., size of the memory) equals the number of vertices curse of dimensionality. The effects of this problem can be reduced by adding a pre-scaler block that allows to have non-uniform simplicial partitions.
Main challenges: to find a uniform or non-uniform simplicial partition to approximate at best a given PWAG function, but keeping the total number of nodes at a minimum, as this would decrease the circuit dimensions.
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 16
Digital architecturesThere is no need of a Finite State Machine to solve the point location problem. The main operation required to this end is sorting in ascending order the decimal parts of the input components.Again, there are basically 2 architectures:A) serial and B) parallel, with the 3 input acquisition methods described in the PWAG case. Then we have 6 possible combinations, allowing one to choose the best trade-off between speed and size of the circuit.The Output block has the only function of waiting for some clock cycles in order to meet the correct sampling times, since the PWAS architectures have latencies depending only on n, m, and b.
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 17
Digital architecturesContains a memory
and either a Multiply
and Accumulate (MAC)
block (serial
architecture) or a bank of
multipliers and
adders (parallel architect
ure)
-) 3 acquisition methods-) contains a sorter-) may contain a pre-scaler ( non-uniform simplicial partition)
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 18
Latency times
n: dimension of the intput (i.e., number of components of the input vector x)m: dimension of the output (i.e., number of components of the PWA function f)b: number of bits used to code the input
Input method PWAS(A) serial PWAS(B) parallel
bitwise m(n+3)+b+1 b+3
comp-wise m(n+3)+n+1 n+3
parallel m(n+3)+2 4
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 19
PWAR: Some detailsReference domain:
SC = {x n: -1 xi < 1, i = 1,…,n}
Single-resolution (sPWAR)Each coordinate axis is divided into mC (= 2r for circuit reasons) subintervals of the same length 2(1-r)
Multi-resolution (mPWAR)r levels of refinement of S = S(0). At first level S(1) each coordinate axis is divided into 2 identical subintervals of unitary length. Then, only some hypercubes are splitted, others not, as opposed to the single-resolution case. Choice of the hypercubes to be further refined: depends on the level of detail required for the PWA function in a certain region of the domain. At level S(r) the subintervals’ length is 2(1-r)
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 20
mPWARsPWAR
PWAR: Some details
r = 3
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 21
Point location strategy for mPWARMain idea: to build offline an orthogonal search tree such that the real-time search complexity is logarithmic with respect to the number of regions.Dimension of the tree: scales with nDepth of the tree ( time required by the on-line exploration): depends on the refinement level r.
Main challenges: to minimize the orthogonal tree depth by tuning the parameter r ( minimize the time required by the on-line tree exploration). Also relevant is keeping the total number of nodes at a minimum, as this would decrease the circuit dimensions.
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 22
Digital architecture
mPWAR: architecture very similar to the PWAG case, the only difference is in the Finite State Machine that addresses the memory
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 23
Digital architecture
sPWAR: there is no need of a binary search tree, the architecture is more similar to the PWAS case (also in this case the point location problem is solved by exploiting the regular partition)
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 24
PWAS and sPWAR: suitable for small-scale problems (higher speed and simpler digital structure). No FSM required. sPWAR: also discontinuous functions.Both heavily affected by “curse of dimensionality” (memory size grows exponentially with input dimension n).
PWAG: implements every generic PWA function. Latency and number of parameters to be stored grow very fast for problems with a highly irregular domain partitioning.
mPWAR: simpler structure (→ shorter computation times) and great memory saving (no information about the edges). Drawback: dimensions of the FSM, mainly for high-dimension problems requiring a deep level of refinement.
Comparisons between architectures
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 25
Comparisons between architecturesArchitecture Latency (# ck
cycles)Memory
sizeMax # of
nodes
PWAG(A) d(n+2)+m(n+2)+3
(E+LG)(n+1)
PWAG(B) 2d+2m+4
PWAS(A) m(n+3)+2 (mS+1)n NO tree
PWAS(B) 4 (mS+1)n(n+1)
NO tree
mPWAR(A) r+n+1 LM(n+1)
mPWAR(B) r+1
sPWAR(A) n+2 (mr)n(n+1) NO tree
sPWAR(B) 2 n: number of input variables (n = dim(x))LG, LM : number of regions (PWAG, mPWAR, resp.)E: number of edges defining the domain partition (PWAG)d, r: maximum depth of the (binary, orthogonal) tree (PWAG, mPWAR, resp.)mS, mr = 2r: number of subintervals per dimension (PWAS, sPWAR)
para
llel in
pu
t m
eth
od
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 26
Comparisons between architectures
Double integratorFunction Max.
errorRel. error
PWAS 0.45 0.022
mPWAR 0.31 0.061
sPWAR 0.29 0.027
Solution of the MPC problem: PWAG function u*(x)Approximation with PWAS and PWAR functions u(x)
2 kinds of error computed:-) maximum error : maxx |u*(x) – u(x)|
-) relative error : Sj |u*(xj) – u(xj)|/Sj |u*(xj)| (computed on a grid of samples)
3D exampleFunction Max.
errorRel. error
PWAS 0.75 0.065
mPWAR 0.30 0.042
sPWAR 0.45 0.074
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 27
Comparisons between architectures
PWAS approximation: mS1 = 31, mS2 = 7, mS3 = 15 ( 19530 simplices & 4096 coefficients)
mPWAR approximation: r = 5, LM = 1548 regions
sPWAR approximation: mr1 = 32, mr2 = 8, mr3 = 16 ( 4096 regions & 16384 coefficients)
Benchmark example: 3D example (Mayne & Rakovic, Int. J. Robust and Nonlinear Control, 2003)
Domain S = {-10 x1,3 10, -5 x2 5}Constraints on the control: -1 u 1Matlab Multi-Parametric tbx PWAG control law u*(x)LG = 256 polytopes E = 249 edges d = 12
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 28
Comparisons between architectures
Latency: obtained as (# of clock cycles needed to perform the PWA computation) 50ns (i.e., clock period @20MHz, frequency suitable for all architectures after the post-synthesis simulation on the FPGA).Some architectures can work at higher frequencies.
Used b = 12 bits to represent the data in all cases.Data obtained with older PWAG and PWAS architectures ( not always with the data reported in previous slides).
Performances on a Xilinx Spartan III FPGA (xc3s200).
Power consumption for all architectures: 60 mW
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 29
Comparisons between architectures
Architecture Occup. Slices Latency [ms] Mem. size [kb]
PWAG 53% 3.25 24.624
PWAS(A) 12% 0.35 49.152
PWAS(B) 12% 0.15 196.608
mPWAR(A) 79% 0.45 74.304
mPWAR(B) 78% 0.3 74.304
sPWAR(A) 2% 0.25 196.608
sPWAR(B) 2% 0.1 196.608
One can choose among the architectures, if any, that fulfill the system constraints (available FPGA board, sampling times, etc.).
MOBY-DIC final workshop --- Noordwijkerhout (NL), August 23, 2012 30
Conclusions
• Many circuit solutions to implement explicit MPC control systems
• Proposed architectures completely reconfigurable and suitable for FPGA implementation ( customisation of the HW at an attractive price even in low quantities!)
• Architectures particularly attractive for fast, small-size and low-power applications
• For large-scale productions ASIC solutions!