© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved. Mitsubishi's upgraded 50 Hz F class Gas turbine for high efficiency D.Sundaravadivel Yukimasa Nakamoto Takashi Kishine Toshishige Ai P. Pradeep MITSUBISHI POWER SYSTEMS INDIA PVT,LTD. 1/22

Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

Embed Size (px)

DESCRIPTION

...

Citation preview

Page 1: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Mitsubishi's upgraded 50 Hz F class Gas turbine for high efficiency

D.Sundaravadivel

Yukimasa Nakamoto

Takashi Kishine

Toshishige Ai

P. Pradeep

MITSUBISHI POWER SYSTEMS INDIA

PVT,LTD.1/22

Page 2: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Mitsubishi Gas Turbine Line upMitsubishi Gas Turbine Line up

470 MW

2 /22

Page 3: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

U.K. 13U.K. 13U.K. 13U.K. 13

Total : 585 unitsTotal : Total : 585585 unitsunits

India 10India 10India 10India 10

Chile 2Chile 2Chile 2Chile 2

Netherlands 4Netherlands 4Netherlands 4Netherlands 4

Japan 181Japan 181Japan 181Japan 181

Bangladesh 5Bangladesh 5Bangladesh 5Bangladesh 5

Thailand 26Thailand 26Thailand 26Thailand 26

Syria 4Syria 4Syria 4Syria 4

Indonesia 25Indonesia 25Indonesia 25Indonesia 25

Turkey 7Turkey 7Turkey 7Turkey 7

Italy 5Italy 5Italy 5Italy 5

Mexico Mexico Mexico Mexico 21212121

Philippines 7Philippines 7Philippines 7Philippines 7

Vietnam 3Vietnam 3Vietnam 3Vietnam 3

Algeria 6Algeria 6Algeria 6Algeria 6

Honduras 1Honduras 1Honduras 1Honduras 1

Hong Kong 7Hong Kong 7Hong Kong 7Hong Kong 7

Iran 11Iran 11Iran 11Iran 11

Kuwait 4Kuwait 4Kuwait 4Kuwait 4

MacaMacaMacaMacauuuu 3333

Nigeria 2Nigeria 2Nigeria 2Nigeria 2

Pakistan 1Pakistan 1Pakistan 1Pakistan 1

Peru 3Peru 3Peru 3Peru 3

Qatar 14Qatar 14Qatar 14Qatar 14

Saudi Arabia 3Saudi Arabia 3Saudi Arabia 3Saudi Arabia 35555

Singapore 6Singapore 6Singapore 6Singapore 6

Slovakia 2Slovakia 2Slovakia 2Slovakia 2

Spain 7Spain 7Spain 7Spain 7

U.A.E. 6U.A.E. 6U.A.E. 6U.A.E. 6

Australia Australia Australia Australia 6666

Dominica 1Dominica 1Dominica 1Dominica 1

Azerbaijan 2Azerbaijan 2Azerbaijan 2Azerbaijan 2

Taiwan 22Taiwan 22Taiwan 22Taiwan 22

Malaysia 3Malaysia 3Malaysia 3Malaysia 3

Egypt Egypt Egypt Egypt 6666

China 2China 2China 2China 27777

New Zealand 1New Zealand 1New Zealand 1New Zealand 1

Korea 24Korea 24Korea 24Korea 24

Ireland 2Ireland 2Ireland 2Ireland 2

Ukraine Ukraine Ukraine Ukraine 5555

ArgentinArgentinArgentinArgentin

a 5 a 5 a 5 a 5

As of Feb./2012

Russia 1Russia 1Russia 1Russia 1

U.S.A. U.S.A. U.S.A. U.S.A. 55553333

Japan 186

Asia 171

Middle East Africa 97

Americas 90

Europe 39

Oceania 7

Japan Japan 186186

Asia Asia 171171

Middle East Africa Middle East Africa 9797

Americas Americas 9090

Europe Europe 3939

Oceania Oceania 77

Canada 4Canada 4Canada 4Canada 4

Uzbekistan 1Uzbekistan 1Uzbekistan 1Uzbekistan 1

World Wide Experiences of Mitsubishi Gas TurbineWorld Wide Experiences of Mitsubishi Gas TurbineWorld Wide Experiences of Mitsubishi Gas TurbineWorld Wide Experiences of Mitsubishi Gas Turbine

Israel 1Israel 1Israel 1Israel 1

M501F×××× 73M701F××××116

Total:189units

M501FM501F×××××××× 7373

M701FM701F××××××××111166

Total:Total:118899unitsunits

M501D××××25M701D××××91

Total:116units

M501DM501D××××××××2255

M701DM701D××××××××9191

Total:Total:111166unitsunits

M501G××××61M701G××××11

Total:72units

M501GM501G××××××××6161

M701GM701G××××××××1111

Total:Total:7272unitsunitsM501J××××17M701J××××2

Total:19units

M501JM501J××××××××1717

M701JM701J××××××××22

Total:Total:1919unitsunits

3 /22

Page 4: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Evolution of Mitsubishi Gas turbineEvolution of Mitsubishi Gas turbine

4 /22

Page 5: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Gas TurbineGas Turbine

5 /22

Page 6: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Design Feature of Mitsubishi Gas TurbineDesign Feature of Mitsubishi Gas Turbine

PROVEN FEATURES

6 /22

Page 7: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Proven Design FeaturesProven Design Features

7 /22

Page 8: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

270

398

213

Gas Turbine and C/C Gas Turbine and C/C

Power OutputPower Output

335

200

100

300

400

600

Po

wer

Ou

tpu

t (M

W)

F F

SeriesSeries

G G

SeriesSeries

144

D D

SeriesSeries

C/C

G/T

334

498

Combined Cycle Combined Cycle

Gross EfficiencyGross Efficiency

M701F3M701F3

1100 1200 1300 1400 1500

Turbine Inlet Temperature (deg.C)

50

55

60

C/C

Eff

icie

nc

y (

LH

V%

)Performance Enhancement (50 Hz)Performance Enhancement (50 Hz)

M701DAM701DA

M701F3M701F3

M701G2M701G2

M701DAM701DA

M701F4M701F4M701G2M701G2

478

324

M701F4M701F4

1600

F Series

G Series

D Series

J Series

M701JM701J

500

700

J J

SeriesSeries

470

680

M701JM701J

525

M701F5M701F5

359

M701F5M701F5

8 /22

Page 9: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

General InformationGeneral InformationGeneral InformationGeneral Information

AirAirAirAir

<5900<5900<5900<5900(>61%)(>61%)(>61%)(>61%)

525525525525

<9000<9000<9000<9000(>40%)(>40%)(>40%)(>40%)

359359359359

M701F5M701F5M701F5M701F5

6071607160716071(59.3%)(59.3%)(59.3%)(59.3%)

6060606000000000((((60.060.060.060.0%)%)%)%)

6240624062406240(57.7%)(57.7%)(57.7%)(57.7%)

CC Heat RateCC Heat RateCC Heat RateCC Heat Rate[LHV, kJ/kWh][LHV, kJ/kWh][LHV, kJ/kWh][LHV, kJ/kWh]

SteamSteamSteamSteamAirAirAirAirAirAirAirAirCombustor Cooling TypeCombustor Cooling TypeCombustor Cooling TypeCombustor Cooling Type

498498498498

9110911091109110(39.5%)(39.5%)(39.5%)(39.5%)

334334334334

M701G2M701G2M701G2M701G2

398398398398

9422942294229422(38.2%)(38.2%)(38.2%)(38.2%)

222270707070

M701F3M701F3M701F3M701F3

444478787878CC Power Output [MW]CC Power Output [MW]CC Power Output [MW]CC Power Output [MW]

9999027027027027(39.(39.(39.(39.9999%)%)%)%)

GT Heat Rate GT Heat Rate GT Heat Rate GT Heat Rate [LHV, kJ/kWh][LHV, kJ/kWh][LHV, kJ/kWh][LHV, kJ/kWh]

324324324324GT Power Output [MW]GT Power Output [MW]GT Power Output [MW]GT Power Output [MW]

M701F4M701F4M701F4M701F4Gas Turbine FrameGas Turbine FrameGas Turbine FrameGas Turbine Frame

ISO Standard (1 on 1)

9 /22

Page 10: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

� Banking on the successful commercial operating experience of the

M701F4, Mitsubishi upgraded M701F5 which can achieve over 61%

of Combined Cycle Plant efficiency.

� M701F5 allows operation at a “Turbine Inlet Temperature” of

1,500 °C.

� M701F5 comprises of “F4” compressor, “GAC” air cooled

combustor and “J” turbine.

� F4 Compressor has been Verified in “F4” engine at Sendai 4 and

Bandirma.

� GAC Combustor is running successfully in GAC engine.

� State of Art “J” turbine verified at Mitsubishi’s T Point in 2011

� M701F5 has Increased GT Power Output.

Special Features of M701F5Special Features of M701F5Special Features of M701F5Special Features of M701F5

10 /22

Page 11: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

GGGG

Mitsubishi M701F5 Gas Turbine Evolution.Mitsubishi M701F5 Gas Turbine Evolution.Mitsubishi M701F5 Gas Turbine Evolution.Mitsubishi M701F5 Gas Turbine Evolution.

GACGACGACGAC

Technology Development� Combustor

� Turbine Aerodynamics

� Compressor Aerodynamics

� Advanced Cooling

� Advanced TBC

�Material

G Series(1500ºC)

National Project (1700ºC)

FFFF

F4(50Hz)F4(50Hz)F4(50Hz)F4(50Hz)

F Series (1400ºC)

F3F3F3F3

G1(60Hz)G1(60Hz)G1(60Hz)G1(60Hz)

G2(50Hz)G2(50Hz)G2(50Hz)G2(50Hz)

J Series(1600ºC)

� >61%

� H technology compressor (23:1)

� Steam Cooled Combustor

� Advanced TBC and Cooling Air

� Improved Turbine Aerodynamics

>8,100,000 AOH

>1, 400,000 AOH

M701F5M701F5M701F5M701F5� > 61% C/C Efficiency

� F4 Compressor

F4 Air Flow / Flow Path

� GAC Combustor

Air Cooled. GAC Firing Temp

� J Turbine

with 100ºC Lower Temp

J TurbineJ TurbineJ TurbineJ Turbine

Steam Cooled Comb.Steam Cooled Comb.Steam Cooled Comb.Steam Cooled Comb.

Air Cooled Comb.Air Cooled Comb.Air Cooled Comb.Air Cooled Comb.

GAC CombGAC CombGAC CombGAC Comb

F4 Comp

F4 Comp

F4 Comp

F4 Comp

M701F5 Gas TurbineM701F5 Gas TurbineM701F5 Gas TurbineM701F5 Gas Turbine

11 /22

Page 12: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

� 1st and 2nd Stage

- Same design concept as M501J (optimized

cooling holes for 100ºC LOWER gas temp)

- Advanced TBC and Films Holes applied same

as GAC and J

�3rd and 4th stage

- Same design concept as GAC

- Non-Cooled Row 4 Blade

�Material

Same as GAC

M701F5 Design Concept (F4 + GAC + J)M701F5 Design Concept (F4 + GAC + J)M701F5 Design Concept (F4 + GAC + J)M701F5 Design Concept (F4 + GAC + J)

F4 Technology

GAC Technology J Technology

� Same inlet flow as F4

� Same flow path as F4

�Mid to Rear stage profile

improved (NACA65C => CDA)

Compressor (F4)Compressor (F4)Compressor (F4)Compressor (F4)

� Same firing temp as GAC

� Same Nozzle and Comb

basket as GAC, successfully

verified at T Point

� Air cooled transition piece

without Bypass Valve

Combustor (GAC)Combustor (GAC)Combustor (GAC)Combustor (GAC) Turbine (J)Turbine (J)Turbine (J)Turbine (J)

CDACDAMCA/C

DA

F5

CDANACAMCA/C

DA

F4

17/OGV7-161-6Stag

e

12 /22

Page 13: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Fabrication and Transportation of M701F4 Fabrication and Transportation of M701F4

February 2009: Turbine Assembling at Takasago Works

April 2009: Turbine On-baseMarch 2009: Loading on ocean vessel

13 /22

Page 14: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Commissioning Phase (1)Commissioning Phase (1)

Year 2010

March 24: Initial synchronization

April 26: 100% load achievement

June 21: 100% Load Rejection Test achieved.

The Day of Taken Over

- 29th July 2010

14 /22

Page 15: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Japan/ Japan/ Tohoku Electric Power CO.Tohoku Electric Power CO.

Unit NO.4,Unit NO.4, Sendai Thermal Power StationSendai Thermal Power Station

Successful operational records

6200 AOH (Actual Operation Hours) as on 1-Mar-2012

� Daily start and stop operation has been applied

� No trip has been occurred

� Plant is stopped when Tohoku Earthquake/ Tsunami hit Japan on 11-Mar-11

� Sendai has been restarted since 16-Dec-11. Now it is under commissioning

Power Output

Gas Turbine 297 MW

Steam Turbine 149 MW

Total 446 MW

Configuration

Single-Shaft Configuration

1 GT + 1 HRSG + 1 ST

Commercial Operation

29 July 2010

15 /22

Page 16: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Facade of Sendai Power StationFacade of Sendai Power Station

16 /22

Page 17: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Turkey/Enerjisa Bandirma Combined Cycle Power PlantTurkey/Enerjisa Bandirma Combined Cycle Power Plant

Power Output

Gas Turbine 304 MWx2

Steam Turbine 328 MW

Total 936 MW

Configuration

Multi-Shaft configuration

2 GT + 2 HRSG + 1 ST

Commercial Operation

4Q.2010

� Initial firing on June 30,2010 (#1)/ July 26, 2010 (#2)

� Synchronization on July 21, 2010

� Reach 100% load on October 6, 2010

� Opening Ceremony on October 23, 2010

� Operating data as on 09-Mar-12 #1GT: 10059 hrs/ 112 starts

#2GT: 9591 hrs/ 115 starts17 /22

Page 18: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Best gasBest gas--fired plant in 2010fired plant in 2010

In December 2010 M701F4 GTCC plant recognized the

Project of the Year by Power Engineering magazine.

“Best Gas-fired Projects Project of the Year. Sendai thermal power station replacement projects,

Shichigahama Town, Japan”

Tohoku-Electric Power Co. wins the Project of the Year for best gas fired project with its 446 MW Sendai

No.4 combined-cycle plant. This plant, located in Shichigahama Town, Japan, replaced three existing 175 MW

coal fired plants that started commercial operation more than 50 years ago. The new and cleaner single

shaft combined cycle plant burns natural gas with 60 percent CO2 emissions reduction and considerable

NOx emissions reductions.

The new plant operating mode is based on a Daily Start and Stop (DSS) duty cycle to compensate the

load variability in the area.

The plant is one of the first applications of the Mitsubishi M701F4, Mitsubishi Heavy Industries’ (MHI’s)

most recent 50Hz class gas turbine upgrade. This machine incorporates changes to six compressor stages

to increase air flow by 6 percent..”

Source: www.powergenworldwide.com

http://www.powergenworldwide.com/index/display/articledisplay/6810815262/articles/powergenworldwide/Business/contracts-and-projects/2010/12/projects-of-the-year.html

18 /22

Page 19: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Update of J Class Gas Turbine

� Delivery started in 2011Delivery for 2,900MW (M501J××××6units)

Kansai Electric Power Company- first commercial operation in 2013 -

� Verification Test CompleteSuccessfully finished “J” class

gas turbine at “T-point”

Ready to propose “J” class GTCC

19 /22

Page 20: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

Design Features of “J”

“J” Target : C/C efficiency : > 61% (M501J:470MW / M701J: 680MW

� High Pressure Ratio Compressor Experience from H Engine

� Steam Cooled Combustor Experience from G Engine

� Turbine Technologies from National Project

� Commissioning Completed and now Commercial Operation at T Point

Validated H CompressorValidated H CompressorValidated H CompressorValidated H Compressor

- 23:1 pressure ratio

- 3D profile

- Improved inlet duct

CompressorCompressorCompressorCompressor

Proven G CombustorProven G CombustorProven G CombustorProven G Combustor

- Well experienced ULN combustor

- Steam cooled liner

CombustorCombustorCombustorCombustor

Proven G Turbine Proven G Turbine Proven G Turbine Proven G Turbine

+ National Project technologies + National Project technologies + National Project technologies + National Project technologies

- Advanced TBC + Cooling

- High efficient aerodynamic technology

- Cooled row4 blade

TurbineTurbineTurbineTurbine

20 /22

Page 21: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency

© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.

J Class Gas Turbine To the Market

2009 2010 2011 2012 2013 2014 2015 2016 2017

T pointT pointT pointT point

M 501JM 501JM 501JM 501J

First unit for First unit for First unit for First unit for

K ansai E lectricK ansai E lectricK ansai E lectricK ansai E lectric

P ow er C om panyP ow er C om panyP ow er C om panyP ow er C om pany

M 701JM 701JM 701JM 701J

First unit forFirst unit forFirst unit forFirst unit for

D om estic P JD om estic P JD om estic P JD om estic P J

Manufacturing

Manufacturing

Installation

Operation starts

Commissioning

Commercial Operation

Manufacturing

Installation

Operation starts

M501J GTCC X 6units

21 /22

Page 22: Mitsubishi's Upgraded 50 Hz F Class Gas Turbine for High Efficiency