37
MISSION CONSOLIDATED ISD Technology Plan 2011 - 2014 DR. CORNELIO GONZALEZ SUPERINTENDENT Page 1 of 37 MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014 10/25/2010 https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

MISSION CONSOLIDATED ISD Technology Plan

2011 - 2014

DR. CORNELIO GONZALEZ SUPERINTENDENT

Page 1 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 2: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

DISTRICT PROFILE

ESC Region 1City, State Zip MISSION, TX 78572-4399Phone (956) 323-5505Fax (956) 323-5634County District Number 108908

Number of Campuses 22Total Student Enrollment 15597District Size 10,000 - 24,999Percent Econ. Disadvantaged 82.59%

Technology Expenditures $15,056,030.00Technology budgets reported in plan by category

Teaching and Learning Budget $2,572,682.00Educator Preparation and Development Budget $525,000.00Leadership, Administration and Support Budget $2,829,689.00Infrastructure for Technology Budget $9,128,659.00Total: $15,056,030.00

Technology Expenditure Per Pupil

$965.32

Number of Campuses with Direct Connection to Internet

22

Percentage of Campuses with Direct Connection to Internet

100.00%

Number of Classrooms with Direct Connection to Internet

1427

Percentage of Classrooms with Direct Connection to Internet

100.00%

Computer/Student Ratio 4 student(s) for every computerComputer/Teacher Ratio 1 teacher(s) for every computerNumber of campuses that need to complete the Texas Campus STaR Chart

21

Percentage of campuses that have completed the Texas Campus STaR Chart

100.00 %

Page 2 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 3: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

Plan Introduction

Plan Last Edited 10/25/2010

Plan status: not submitted Years Included in the Plan: 2011 - 2014 Number of years covered by the plan: 3

Technology Planning Committee Dr.Cornelio Gonzalez, Superintendent; Mario Solis, Assistant Superintendent for Human Resources and Student Services; James Olivarez,Board President; Lucio Mendoza,Assistant Superintendent for Finance and Operations; Aurora Delgado, Assistant Superintendent for Curriculum & Instruction; Maria Carmen Garcia,Executive Directory for Secondary Education; Dr.Dalinda Solis, Executive Director for State & Federal Programs; Sara Paz, Elementary Principal; Sylvia Garcia, Secondary Principal; Michelle Rodriguez,Elementary Principal; Melinda De La Rosa, Teacher; Laura Flores, Teacher; Miguel Alanis, Teacher Vacancy,Coordinator for Purchasing; Robert Sanchez, Director for Technology Systems; Jorge Martinez, Network Specialist; Dr. Alex Garcia, Coordinator for Instructional Technology; Jorge Cavazos, Coordinator for PEIMS; Leonila Pena, E-Rate Manager/Network Specialist; Malena Rosa, Coordinator for Library Services; Sergio Pena, Director for Career and Technical Education; Nelda Rios, Director for Testing and Evaluation; Demian Morquin, Campus Technology Specialist; Terri Benavides, Campus Librarian; Jesse Alaniz, District Technology Strategist; Fred Gutierrez, Campus Technician; Craig Verley, Director for Public Relations and Marketing; Rene Flores, Coordinator for Fixed Assets and Warehouse; Dr.Rebecca Morrison, Director for Human Resources; Rick Rivera, Executive Director for Maintenance/Facilities/Construction; Fernando Cornejo,Programmer-Business Department;

Page 3 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 4: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

Executive Summary The technology goals for Mission Consolidated ISD are presented in the four major areas established by the State Long-Range Plan for Technology and outlined in the Texas STaR Chart: Teaching and Learning (TL), Educator Preparation and Development (EP), Administration and Support Services (AS) and Infrastructure for Technology (IT). In general, the Educator Preparation (EP) strategies call for assessments and surveys to establish levels of proficiency and areas of need, and reporting of information on the Texas STaR Chart; implementation of the Technology Applications TEKS Grades K-8, as required, and support of the secondary Technology Applications courses; as well as, support of other technologies for departments, classrooms and libraries. The EP strategies also mandate for methods of documenting the proficiency levels of both students and staff to address the required standards. Professional development is a major focus of the entire plan predicated on the shared belief that to increase the technology skill level of the students, it is necessary to increase the technology proficiency of the classroom teacher; and, to encourage the classroom teacher, it will be necessary to also increase the administrative level of proficiency. All the suggested staff development activities require the establishment, maintenance and support from the district through careful management of resources. Review and analysis of the Campus STaR chart, reporting of campus status on the Campus STaR chart, and 100% participation by all teachers and administrators are significant goals of the plan. Strategies for Educator Preparation continue to address the need to provide training for all educators and support staff by all available means, including online and face-to-face sessions. Incentives, stipends and other rewards support the efforts of individuals who participate. This strand also addresses the need to document levels of proficiency and use of technology for support of the new Professional Development and Appraisal System (PDAS). The expected walk-through from Campus Principals and Central Office personnel initiative will be used for documentation levels of proficiency, an online staff development initiative in conjunction with the Career and Technology program to provide students and staff opportunities to receive three levels of industry certification. MCISD will continue to provide staff development through distance education to maximize classroom time for teachers. Training that may lead to certification, for campus technicians, secretaries and clerks will be provided to increase the skill levels of these critical positions. Teaching and Learning (TL)objectives and strategies address the needs to increase the technology proficiencies of both students and educators, to integrate technology into all areas of teaching and learning, to ensure accessibility for all students, to investigate use of all technologies as a means of providing learning opportunities and to provide for community use. Career and Technical Education students will be able to demonstrate and enhance their technology skills by participating in our campus career fairs as well as participate in regional and state competition through their club/organizations. Strategies for Leadership, Administration and Support Services call for planning for technology from all district, campus and classroom committees. This strand also addresses the need for integration of technology into instructional management and administration. It documents the establishment of district policies that focus on issues of access and use by all groups. As a means of increasing parental involvement, an increased emphasis on the creation and maintenance of the teacher web pages is a significant objective. Mission CISD has over 2000 educators and staff who require professional development and training. Although the levels of technology proficiency average to Advanced Tech, much still needs to be done to reach Target Tech. Recognizing the Local and State funding sources may not be sufficient for the District's needs; the Infrastructure strand includes seeking other funding sources and partnerships with public and private entities. Mission CISD voters showed their support for the local schools and passed a $57 million dollar bond election. Some of the money was used to establish the network infrastructure and properly equip two new campuses, Escobar Rios Elementary and R.Cantu Jr. High School and two new fine arts centers. Some of the funding was used for renovations of existing campuses. Establishing the infrastructure at all campuses and providing appropriate student and teacher workstations is an action area that has seen great improvement. Technology money from local, state and federal funding sources has been used to create a very robust infrastructure. To maintain the current level and progress to Target Tech will require continued commitment from all parties. In recognition of the needs of the district that require high levels of funding, other sources (state and federal grants, Universal Service Fund Discounts, collaborative projects, etc.) have been sought. Construction of new facilities is planned and will be supported through money from an approved Bond election, through ERate funding and other funding sources.

Page 4 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 5: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

Needs Assessment Assessment Process: Mission CISD uses a variety of methods to determine district and campus technology needs. Parts of the planning process have been in place since the first Technology Long-range Plan was written in 1976. The current Long-Range Planning Committee (LRPC), composed of administrators, campus principals, classroom teachers, and support staff, is charged with yearly review of the Technology Plan. The District Technology Advisory Committee, a subcommittee of the LRPC, and Campus Technology Planning Committees serve as resources for the gathering of information and technology needs assessment. On-line surveys and paper surveys are currently used to assess needs for professional development and skill levels of staff. Online staff development through "Atomic Learning.com", assists in the development of the technology skill levels of staff. Using an initiative that began in 2006, Mission CISD continues to assess and improve the technology skill levels of all staff members through prescriptive pre-tests, assigned online training and post-tests. Interviews with campus principals and department chairs are also conducted to determine technology training, software and hardware needs. Progress toward mastery of the SBEC Technology Applications Standards for all Educators will be reported on the Campus STaR Charts. The curriculum coordinators provide information on program needs for their respective programs; including the core curriculum areas, Bilingual education, Migrant education and Special education. Departments that provide student support services and human resources are surveyed annually to determine their needs. Other committees involved in the process of needs assessment are the District Educational Improvement Council, the Facilities Committee, and the Technology Advisory Committee. These committees meet at least twice yearly to review the district goals, STaR Chart data and Long-range Plan for Technology, and to identify district needs. The Technology Advisory Committee also addresses the technology goals of the DEIC District Improvement Plan to ensure that they are included in the District Long-range Plan for Technology. Network and infrastructure needs are determined through an assessment of program requirements by the appropriate support departments.

Existing Conditions: All Mission campuses complete the Texas STaR Charts yearly, as required. Analysis of the data for this plan reveals the Mission CISD remains above the state and region in many areas; but; has not reached Target Tech in any category. Every category has potential for growth; however, Educator Preparation and Teaching and Learning indicate the greatest need. Through funding from many sources, a robust infrastructure is in place on all campuses. Procedures for replacement and for repositioning equipment have been established. Computer hardware is typically repositioned every 3 years; while older hardware is discarded every 6 years. A varied staff development program is on-going. Mission CISD is providing cellular services for district employees. An initiative to provide a combination of push to talk and cellular services to different departments has been implemented. These departments include; Transporation Department (Bus drivers), Maintenance Department, Fixed Assets, Technology Department, and key Central Office and campus administrators. Currently, Mission CISD has 22 schools with 18 high speed fiber connections terminating at our central facility, the Professional Development Center (PDC). We have a (235 Mbs) DS3 Telecommunication line going out from the core (PDC) to the ISP. Three non-instructional sites are connected by wireless connections; the rest connect to the PDC by fiber. Services that run through our network infrastructure are listed below. * A/C Controls * Internet Access * District Time Clocks * Food Service Point-of-Sale Stations * Student Information Systems * Network Management * Telephone * Video Conferencing * Security System Surveillance Cameras/DVR System * Region One Services * Cellular Services Each of the 22 schools has a Main Distribution Frame (MDF) which is equipped with a Cisco Catalyst core switch (Model #6000, 6509 or 4507). Each school also has from 3 to 12 intermediate distribution Facilities (IDFs). The hardware varies in the IDFs (Cisco Catalyst 2948, 3548, 3524, 4003, 4006 and 4507). All classrooms have Internet access. Most classrooms have up to 8 computers for student use. All campuses have computer

Page 5 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 6: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

labs. All offices have Internet access. All teachers and administrators have email accounts. All campuses, and the Newcomers Academy, now have a Smart Lab that is equipped with a video projector, digital whiteboard, digital tablets and large plasma screen. The teachers are becoming well-prepared for the use of technology.Over 350 teachers had participated in the Intel Teach to the Future Staff Development initiative. In an average year, the district offered from 75 to 150 hours of technology staff development at the Professional Development Center (PDC). Approximately 107 hours of staff development occurred at the PDC. Most of these sessions were taught by district staff. Other sessions were led by consultants. The current staff development program includes a series of online courses that will provide training in the basic skills (Internet Computer Core Competencies, Microsoft Office skills, and Integrating Technology in the Classroom.) Teachers who complete the training will be certified by the district as having met the SBEC Standards for Educators. At least 700 teachers and administrators will participate in this opportunity to receive training on-line this year. The goal is to have all teachers and administrators participate in the program within the next three years. Additional training sessions will be offered at the Professional Development Center and documented online. Mission continues to participate in every opportunity to assess student progress online. The Office of Assessment and the Information Systems Department have provided and are continuing to provide staff development on data analysis for improving student success. To further assist campuses in the management and analysis of student data, the position of Testing Strategist has been added to each campus personnel roster. Mission CISD is actively participating in a curriculum development initiative with Region One. All administrators and teachers have been trained to create and submit lesson plans online through a program supported by 10 Regional Service Centers. The resources developed are also being used for benchmark testing. Mission has adopted the Technology Applications curriculum offered by Learning.com to assess and address the Technology Applications skills for students. This will be used for students in Kindergarten through Grade 8. Technology Applications courses and Career and Technology courses are offered at all secondary campuses. Both high school campuses offer at least four Technology Applications courses for students. Gaining Early Awareness and Readiness for Undergraduate Programs (GEAR-UP) are supported at both high schools. This year, Mission has partnered with both Region One Educational Service Center and the University of Texas Pan American to provide these services to students. The Career and Technology department offers dual-enrollment classes in partnership with South Texas College The Gifted and Talented program also offers dual-enrollment classes in partnership the University of Texas Pan American. Many of our campuses participate in virtual field trips and other video conferencing events. There is also a video conferencing project with the University of Houston Health Science Center that provides a clinic located at Cantu Elementary. This serves our community by providing access to health care providers that might not be available otherwise. These partnerships will continue to be supported. Staff development for all departments is occasionally offered through the video conferencing system. Connection to TETN conferences and other opportunities through Region One Educational Service Center are provided at our Professional Development center or at campus sites. Staff development from our Professional Development Center is also offered to the campuses by district departments and consultants. Campuses use the video conferencing equipment to participate in distance learning events, TETN Conferences, and support of the University of Houston Health Science Center's partnership. Mission CISD has a very aggressive plan to build and maintain an infrastructure and provide connectivity service to all campuses and sites. As a result of the 2006 Bond initiative, the district built two new schools, two fine arts centers at the existing high schools and to renovate several existing campuses. Construction for these facilities is slated to be completed by December 2008. In addition the 2008 Bond initiative will add one more elementary school and renovations/additions to several existing campuses. These initiatives will require additions to the existing network infrastructure to provide connectivity, expansion of services, and upgrades for the future. The proposed services are outlined below.

Technology Needs: The following district initiatives have been established by the Site-Based Decision Making Committee for the 2010-2011 school year: review of the district Long-range Plan for Technology to address and support the District's administrative and instructional needs; provision for additional personnel to support curriculum integration, improved technical assistance, networking, programming, maintenance and repair, and Intranet/Internet services; implementation of district technology initiatives through bond, state technology, e-rate, Federal Stimulus Funds and other funding sources; additional activities to encourage curriculum integration and support technology staff development. This year, the Mission CISD Board of Trustees reviewed the projected growth of the district and the current state of the campuses to determine if the district should take advantage to the Instructional Facilities Allotment funding program. Mission voters showed their support for growth in the district by passing a 2008 bond election for $58 million dollars. This comming

Page 6 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 7: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

year administration and preperations have been made for the use of Federal Stimuls Funds for Mission CISD. Through Erate funding, the Infrastructure, Telecommunications, Internet Access and Internal Connections for any new sites will be provided. Additionally, Erate funding will be requested to provide for the remodeling and updating of the infrastructure at other campuses: Alton Elementary, Veterans Memorial High School, Salinas Elemtary, Mims Elementary, Mission Jr. High, Roosevelt Alternative School, Byran Elementary, Castro Elementary, Marcell Elementary and Pearson Elementary. E-rate funding for Telecommunications and Internet access will requested for all eligible entities district wide. These projects will also require updating the central site, MCISD Professional Development Center, to support the new facilities to be constructed including renovations. Included in the updates for the central stie are: core routers, edge router, core switches, servers using VMware, video conferencing points, cabling and exchange 2010 e-mail servers. All campuses, as required, submit their STaR Chart survey data on-line every year. An analysis of the aggregate data reveals the following continuing needs: -- Teachers need additional training to increase their comfort-level with technology. -- Campuses need to continue addressing the integration of technology in the classrooms. -- Students need to continue improving their skills. -- Secondary Campuses need to continue to provide for the new Technology Applications courses. -- Departments need to provide for acquisition of equipment and software to address the needs of their programs. -- Additional support personnel are needed at campus and district levels. -- The District needs to increase community access to district technology resources.

Page 7 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 8: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

Goals, Objectives, and Strategies GOAL 1: Increase the technology proficiencies of administrators and educators by providing staff development by a variety of methods. (Educator Preparation and Development)

OBJECTIVE 1.1:

Evaluate the Impact of Technology on Teacher Role and Collaborative Learning to meet the SBEC Technology Standards for All Educators.

Budget Amount $5,000.00 LRPT category: Educator Preparation and Development

E-Rate Correlates: ER02 NCLB Correlates: 01, 02, 03, 04a, 04b, 07, 08, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

1.1.1: Conduct a needs assessment of the district and campus levels of technology proficiency. Report the findings on the Campus STaR Charts.

LEA LRPT Correlates: EP05, LAS01, LAS04, TL04

State: Original

Status: In Progress

Yearly, September and October, 2011-2014

Curriculum & Instruction Department, Technology Systems Department, and Coordinator for Instructional Technology

Rosters of Meetings, Selection of programs, Data reports STar Chart Levels of Progress

1.1.2: Review Campus STaR Charts to evaluate ability of staff to incorporate technology usage into classroom instruction. Plan staff development activities to provide opportunities for all educators to master the SBEC Educator Standards I -V.

Comments: This is an on-going process.

LEA LRPT Correlates: EP04, EP05

State: Original

Status: In Progress

2011-2014 Campus Principals, Technology Systems Department, Campus Technology Advisory Committee Members, District Librarians, Coordinator for Instructional Technology

Records of committee meetings, STaR Chart data.

1.1.3: Provide disaggregated local assessment data and Campus STaR Chart data to campuses for analysis by campus teams and curriculum departments.

LEA LRPT Correlates: EP03, EP04, TL04, TL07

State: Original

Status: In Progress

2011-2014 Curriculum & Instruction Department Coordinators, Technology Systems, Instructional Technology Department, Coordinator for Instructional Technology

Customized Reports

1.1.4: Review campus and district use of libraries, various media types and technology resources, i.e., video libraries, video distribution equipment, digital cameras, document cameras and camcorders,

State: Original

Status: In Progress

2011-2014 Technology Systems Department, District Library Coordinator, Campus librarians

Equipment Inventories, Purchase orders and campus usage reports.

Page 8 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 9: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

digital whiteboards, online research databases, video conferencing equipment and other peripherals.

LEA LRPT Correlates: EP02, EP04, I05, I09, LAS03, TL09, TL11

1.1.5: Collect information on alternative means of offering staff development opportunities through television, satellite download, distance learning,webinars, distributed learning, CD-Rom, and others. Integrate resources identified to satisfy curricular needs. Review all budgets for funding opportunities.

LEA LRPT Correlates: EP04, EP08, LAS02, LAS06

State: Original

Status: In Progress

July 2011 - June 2014

Curriculum & Instruction Department, Campus Technology Committees, Coordinator for Instructional Technology

Pre-registration documents, Records of participation, class rosters.

1.1.6: Align district and campus staff development opportunities to address SBEC proficiencies for all educators.

LEA LRPT Correlates: EP02, EP03

State: Original

Status: In Progress

2011-2014 Technology Systems Department, Curriculum & Instructions Department, Campus Instructional Technologists, District Trainers, Project Coordinators

Staff development records, STARgate participation, Summary report of yearly staff development opportunities

1.1.7: Encourage each campus to develop a list of technology users to support classroom efforts by serving as coaches, mentors and/or model teachers in technology integration.

LEA LRPT Correlates: EP01, EP09, TL12

State: Original

Status: Planned

Yearly, August and September,2011-2014

Campus Principals, Academic Strategists, Executive Directors for K-12 Education

Participant lists; Lesson plans; Walk-through observations

OBJECTIVE 1.2:

All teachers will be provided opportunities to increase integration of technology into curriculum areas to address the foundation subject area TEKS.

Budget Amount $450,000.00 LRPT category: Educator Preparation and Development

E-Rate Correlates: ER01 NCLB Correlates: 01, 02, 04a, 04b

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

1.2.1: Provide staff development on use of district technology resources for curriculum integration, including the following

State: Original

Status: In Progress

July 2011-June 2014

Technology Systems Department, Instructional Technology Division, Campus Principals, District and

Session Schedules, Records of staff development, course descriptions and rosters.

Page 9 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 10: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

online resources: netTrekker, Britannica Online, EBSCO,Discovery Learning, Learning.com, Facts on File, Follett Destiny, online testing and any additional applications as needed.

Comments: This is part of the on-going staff development.

LEA LRPT Correlates: EP01, EP04, I02, I09, LAS01, LAS03, LAS06, TL08, TL14

Campus Librarians, Campus Technology Support Personnel; Testing and Evaluation Department

1.2.2: Provide staff development on use of district technology resources for curriculum integration, including the following peripherals: digital cameras, camcorders, digital tablets, document cameras, data projectors, digital tablets, classroom response systems and video conferencing equipment.

LEA LRPT Correlates: EP01, EP04, EP05, TL05

State: Original

Status: In Progress

July 2011-June 2014

Coordinator for Instructional Technology, District Trainer, Campus Principals, Campus Trainers, Coordinator for Library Services and Campus Librarians; High School Campus Technologists

STaR Chart responses, Staff Development documentation

1.2.3: Provide on-site training on the adopted curriculum for Technology Applications to enable teachers pre-K through 8 to address the TEKS. Report campus progress on the STaR Chart.

Comments: The district adopted curriculum is Easy Tech from Learning.com. Teachers have the opportunity to take the courses themselves. By so doing, they are addressing the SBEC Standards for Educators.

LEA LRPT Correlates: EP01, TL01, TL03

State: Original

Status: In Progress

July 2011 - June 2014

Instructional Technology Division, Technology Systems Department, Campus Instructional Technologists, Campus Technology Advisors, Technology Applications Textbook Committee

System reports of registration of students and staff; Reports of student participation and progress.

1.2.4: Provide online training Online Professional Development for staff to minimize time away from the classroom. All staff members are expected to complete the Basic Skills and Technology

State: Original

Status: In Progress

July 2011 - June 2014

Campus Principals, Technology Systems Department, Campus Technology Advisory Committee Members, District Librarians, Coordinator for Instructional Technology

Records of participation in Staff Development Activities, Course rosters and reports.

Page 10 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 11: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

Integration Training Strands to achieve the SBEC Technology Application Standards I - IV

Comments: This will be an on-going process of staff development. Teachers have access to online training through Online Professional Development and district developed courses through Global Classroom.

LEA LRPT Correlates: EP01, EP02, EP04, EP05, EP08, I05

1.2.5: Provide incentives to encourage staff and campus participation in the staff development program addressing the SBEC proficiencies.

Comments: Comments: This is an ongoing initiative to achieve 100% participation. Examples of incentives include: USB Flash drives for personal use, classroom performance systems for classrooms, data projectors for classroom use and digital tablets for campus use.

LEA LRPT Correlates: EP02, EP04, TL08

State: Original

Status: In Progress

July 2011 - June 2014.

Campus Principals, Coordinator for Instructional Technology, Technology Systems Department

Records of staff development; Attendance/participation reports.

1.2.6: Provide a variety of training modes and options for educators in support of technology integration, including Onsite training at campuses, Channel 17 broadcasts, Region One Academies, Global Classroom Online, Online Professional Development , video conferencing and other online opportunities.

LEA LRPT Correlates: EP01, EP08

State: Revised

Status: In Progress

July 2011 - June 2014

Technology Systems Department, Coordinator for Instructional Technology, Coordinator for Library Services and Campus technologists

Workshop records, enrollment in TACP, MAT and STARgate programs, video conferences, Region One Records

1.2.7: Increase staff development in the integration of technology into the curriculum for principals, assistant

State: Original

Status: In Progress

July 2011 - June 2014

Technology Systems Department, Coordinator for Instructional Technology, Content Area

Workshop completion reports; Increased skills of administrators and support staff

Page 11 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 12: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

principals, supervisors, teachers and paraprofessionals through the Online Professional Development courses and other distance learning opportunities to increase level of support for classroom teachers.

LEA LRPT Correlates: EP01, EP09, TL05, TL08

Coordinators;Campus technologists

1.2.8: Provide opportunities for teachers to participate in staff development for Technology Applications Courses as identified in Technology Applications Educator Standards VI - XI that may lead to Technology Applications Certifications for the required courses and/or Master Teacher certifications in Technology.

Comments: At this time Mission CISD has 20 individuals who have completed certification as Technology Applications teachers K - 12, five individuals who have completed Master Technology Teacher certification, and three who received a Masters of Science in Computer Education and Cognitive Systems from the University of North Texas.

LEA LRPT Correlates: EP06, EP07, LAS12, LAS13, TL02

State: Original

Status: In Progress

July 2011 - June 2014

Campus Principals; Coordinator for Instructional Technology;Campus technologists

Registration/Certificate of Completion; SBEC Certifications

1.2.9: Provide opportunities for district/campus personnel to attend appropriate technology conferences and/or observe model teaching practices.

LEA LRPT Correlates: EP01, EP03, EP06, LAS03, LAS06

State: Original

Status: In Progress

July 2011 - June 2014

Campus principals, Technology Systems Department, other programs

Campus Principals, Technology Systems Department

1.2.10: Coordinate all staff development activities using the Workshop On-line and the district on-line calendars. Report progress on Campus STaR Charts.

State: Original

Status: In Progress

July 2011 - June 2014

Coordinator for Instructional Technology, Campus Staff Development Coordinators, Curriculum & Instruction Department

Workshop Records

Page 12 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 13: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

LEA LRPT Correlates: EP05

1.2.11: Maintain a comprehensive database of skilled teachers and administrators who have mastered the SBEC Technology Applications Standards to provide support for new teachers and teachers with minimal skills.

LEA LRPT Correlates: EP09, TL06, TL08

State: Original

Status: In Progress

July 2011 - June 2014

Technology Systems Department, Campus Principals

Schedule of course completion, Records of participation in online courses, Library records of use of peripherals

OBJECTIVE 1.3:

All Mission educators will integrate technology effectively in classroom activities and library services.

Budget Amount $70,000.00 LRPT category: Educator Preparation and Development

E-Rate Correlates: ER02 NCLB Correlates: 02, 04a, 09

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

1.3.1: Maximize use of Curriculum resources available in classrooms and computer labs district-wide. Provide training to classroom teachers and CAI lab proctors on how to individualize student lessons.

LEA LRPT Correlates: EP03, LAS05

State: Revised

Status: In Progress

June 2011 - May 2014

Campus Principals, Curriculum & Instruction Department, Director of Federal Programs, Trainer/Pearson Digital, District Technology Strategist

Documentation of staff development activities. Student performance data from Pearson.

1.3.2: Provide resources for teachers to create personal websites to communicate with parents and student. Continue to provide training for all staff to implement the School Center/Share Point project district-wide.

Comments: Comments: District online grade book is currently being explored along with a Parental Portal. LEA LRPT Correlates: I08, TL07, TL12

LEA LRPT Correlates: I08, TL07, TL12

State: Revised

Status: In Progress

July 2011-June 2014

Technology Systems Department, Coordinator for Instructional Technology,Campus staff

Teacher created web pages online.

1.3.3: Establish a minimum set of teacher productivity tools (software) to be provided for all teachers.

State: Revised

Status: In

July 2011 - June 2014

Technology Systems Department, Curriculum & Instruction, Campus Technology Committees,

Software Inventory Reports, Purchase Records

Page 13 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 14: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

This will include, but is not limited to: MS Office Suite, Inspiration and Kidspiration, TEMS, and appropriate browser plug-ins. Provide and implement campus-based staff development for teacher tools such as Plasma TVs,Wireless Mobile Devices etc. Conduct evaluation of LCD vs. Plasma TVs. Title II Part D Funds will be used for new instructional technology hardware and online professionl development.

LEA LRPT Correlates: EP03, EP09, LAS03, LAS05, TL08

Progress District and Campus Technicians

1.3.4: Provide opportunities for teachers to attend Regional, State, National and International Technology Conferences to increase knowledge of new technologies and new/effective implementation strategies.

Comments: Mission educators have participated in Regional, State, National and International conferences.

LEA LRPT Correlates: EP06, LAS06

State: Original

Status: Planned

Yearly, 2011-2014

Campus Principals Staff participation and conference attendance; Travel forms

1.3.5: Encourage classroom teachers to participate in distance learning opportunities by providing information about programs and other video conferencing events. Review and prepare proposals for Video Conference needs.

LEA LRPT Correlates: TL10, TL12

State: Revised

Status: Planned

August - May, Yearly, 2011-2014

Campus Principals, Coordinator for Instructional Technology

Records of participation

Page 14 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 15: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

GOAL 2: Provide opportunities for students to develop technology skills for the work place, for information processing and for habits of learning that will serve them for a lifetime. (Teaching and Learning).

OBJECTIVE 2.1:

Assess Current Levels of Understanding and Patterns of Use of Instructional Technology

Budget Amount $250,000.00 LRPT category: Teaching and Learning

E-Rate Correlates: ER02 NCLB Correlates: 01, 02, 03, 04b, 06, 07, 09, 10

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

2.1.1: Collect needs assessment data from representative populations in the district. Review technology applications benchmarks tests at grades 2, 5, and 8. Conduct analysis of data and plan training sessions based upon the results. (DIP Goal 6.4.4)

LEA LRPT Correlates: LAS02, TL02, TL05, TL06

State: Original

Status: In Progress

July 2011 - June 2014

Curriculum & Instruction Coordinators, Campus Committees, Campus Technology Technologists

Benchmark results from Learning.com. Results presented to appropriate department and committees

2.1.2: Expand use of the Staff Development Database to include the community. Coordinate offerings with Parental Involvement Coordinator and Migrant Service Coordinator to provide records for Adult Literacy Programs.

LEA LRPT Correlates: I09

State: Original

Status: In Progress

July 2011 - June 2014

Technology Systems Department, Coordinator for Parental Involvement, Coordinator for Migrant Services.

Eduphoria Workshop Attendance Records and Course Offerings

2.1.3: Increase student technology skills at the elementary level by requiring teachers to document activities in lesson plans. Provide onsite training for teachers pre-K through 8 on the adopted curriculum for Technology Applications to address the TEKS.

Comments: The district's adopted curriculum is Easy Tech from Learning.com. Teachers have the opportunity to take the courses themselves. By so doing, they are addressing the SBEC Standards for Educators.

LEA LRPT Correlates: TL01

State: Original

Status: In Progress

July 2011 - June 2014

Instructional Technology Division, Technology Systems Department, Campus Instructional Technologists, Campus Technology Advisors, Technology Applications Textbook Committee

System reports of registration of students and staff; Reports of student participation and progress.

2.1.4: Conduct campus walk- State: Yearly, Campus Principals; Academic Records of

Page 15 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 16: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

throughs to observe classroom teachers at all levels. Require documentation of student technology use in teacher lesson plan documents. Report campus progress on the Campus STaR Chart.

LEA LRPT Correlates: LAS12, TL06, TL16

Original

Status: Planned

September through May , 2011-2014

Strategists; Coordinator for Instructional Technology

Observations, Lesson Plan Documentation

OBJECTIVE 2.2:

Continue to develop, adopt, purchase and /or modify suitable materials directed to the integration of technology into teaching and learning.

Budget Amount $1,165,425.00 LRPT category: Teaching and Learning

E-Rate Correlates: ER01 NCLB Correlates: 02, 03, 04a, 08, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

2.2.1: Support continued instruction of required Technology Applications courses at all levels by providing appropriate software, hardware and other curriculum resources to encourage student participation.

LEA LRPT Correlates: LAS15, TL09, TL13

State: Revised

Status: In Progress

July 2011 - June 2014

Technology Systems Department,Coordinator for Instructional Technology

Workshop Records, TACP Project, MAT Project

2.2.2: Support continued instruction of required Career and Technology courses at all levels by providing appropriate software, hardware and other curriculum resources to encourage student participation

LEA LRPT Correlates: LAS15, TL02, TL09

State: Original

Status: Planned

July 2011 - June 2014

Coordinator for Career and Technology Education;

Course offerings

2.2.3: Review District Acceptable Use Policy with all users, students, parents and staff members to ensure understanding and compliance with policy and procedures. All users are required to sign a form signifying that the policy has been read.

LEA LRPT Correlates: TL14

State: Original

Status: In Progress

Yearly, 2011-2014

Campus Principals; Director for Technology Systems

Signature forms

2.2.4: Continue to investigate online resources to address TEKS in core content areas:

State: Original

August 2011 - September

Curriculum and Instruction Department Coordinators; Classroom Teachers; Principal

Software Installation

Page 16 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 17: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

i.e., Maps 101, netTrekker d.i., HotMath, Learning.com, Britanica Online, Ebsco and others.

LEA LRPT Correlates: TL06, TL10

Status: In Progress

2014

2.2.5: Provide an email system for student, teacher and parent communication.

LEA LRPT Correlates: I01, I03, I08, LAS11, TL15

State: Original

Status: Planned

2011-2014 Technology Systems Department; Executive Director for K-12 Curriculum; Coordinator for Instructional Technology

Network infrastructure in place

OBJECTIVE 2.3:

All students will be given opportunity to increase technology skills to meet grade level TEKS.

Budget Amount $500,000.00 LRPT category: Teaching and Learning

E-Rate Correlates: ER02 NCLB Correlates: 02, 03, 04a, 07, 08, 11

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

2.3.1: Use the Technology Applications adopted program to identify current technology proficiencies for all students. Report information on STaR Chart.

LEA LRPT Correlates: LAS05, TL01, TL03, TL05, TL06

State: Original

Status: In Progress

2011-2014 Technology Systems Department Online Survey/Results on file

2.3.2: Review and modify current course timelines and lesson planning documents to assess the extent of alignment with the Technology Applications TEKS at all grade levels and to incorporate use of technology in planning and teaching. (DIP Goal 6.4.1)

Comments: This is an ongoing process that is modified every year and will continue to be part of the Plan. Technology Applications Texts adopted in 2004 will provide a mechanism for this planning and implementation.

LEA LRPT Correlates: TL01, TL06

State: Original

Status: In Progress

2011- 2014 Curriculum & Instruction Systems Department, Technology Systems Department

Records of meetings scheduled: agendas and rosters. Timelines and Scope and Sequence of Skills prepared.

2.3.3: Provide opportunities for students to use appropriate technologies in the classrooms, libraries, including: digital cameras,

State: Revised

Status:

July 2011 - June 2014

Classroom teachers, Campus Librarians

Documentation in lesson plans; Observation records

Page 17 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 18: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

digital tablets, classroom performance systems, and other available devices. Conduct yearly evaluatio of software and hardware to ensure cost effectiveness.

Comments: LEA LRPT Correlates: TL08

LEA LRPT Correlates: TL08

Planned

2.3.4: Promote student participation in technology contests sponsored by Region One, TCEA, Teen Tech Week, Texas Library Association Media and other educational technology groups.

Comments: LEA LRPT Correlates: TL09, TL10, TL15

LEA LRPT Correlates: TL09, TL10, TL15

State: Original

Status: Planned

August 2011 - May 2014

Coordinator for Instructional Technology, Classroom Teachers, Campus Principals, Campus Librarians

Student participation

2.3.5: Provide opportunities for students to interact with other students around the world using the campus videoconferencing systems. Provide information to all campuses about Region One Distance Learning Opportunities.

LEA LRPT Correlates: TL11, TL12, TL15

State: Original

Status: Planned

July 2011 - June 2014

Technology Systems Department; Coordinator for Instructional Technology; Campus Principals; Librarians

Records of student participation; Teacher lesson plans; Records of use of the Multicasting Unit

OBJECTIVE 2.4:

Promote increased integration of technology in the curricula by providing opportunities to observe model teaching practices and innovative programs.

Budget Amount $657,257.00 LRPT category: Teaching and Learning

E-Rate Correlates: ER02 NCLB Correlates: 04a, 04b, 07, 08, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

2.4.1: Provide opportunities for teachers and administrators to make appropriate site visits and /or attend meaningful In-service sessions on the use to technology for administrative and classroom management.

LEA LRPT Correlates: EP03, EP06, TL02

State: Revised

Status: In Progress

2011-2014 Curriculum & Instruction Coordinators, Technology Systems Department, Campus Principals

Workshop Online records of attendance and schedules of events

Page 18 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 19: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

2.4.2: Continue to support the Renaissance Learning web-based application in all classrooms at all campuses. Provide training for all librarians to support the revised application.

Comments: This is a proven successful on-going program.

LEA LRPT Correlates: TL04, TL11

State: Original

Status: In Progress

July 2011 - June 2014

Campus Librarians, Classroom Teachers, Technology Systems Department

Classroom program implemented at all campuses.

2.4.3: Provide information about available resources to all staff and students through use of email, publication on the MCISD website, broadcast on MCISD-TV and other district publications.

LEA LRPT Correlates: EP05, TL07

State: Revised

Status: In Progress

July 2011 - June 2014

Technology Systems Department, Campus Technology Advisors, Public Relations Department, Coordinator for Library Services

Resources available on web site, email messages to appropriate groups, publications

2.4.4: Encourage campus/class participation in distance learning video conferencing events; i.e., "Read Across America" and others. Support these activities with appropriate technologies.

LEA LRPT Correlates: LAS10, LAS13, TL10, TL12

State: Original

Status: Planned

2011-2014 Classroom Teachers; Media & Technology Department, Coordinator for Instructional Technology Coordinator for Library Services

Registrations for events

2.4.5: Provide training support for the Texas Early Education Model ECircle Online Workshop, sponsored by the Texas Migrant Council and the State Center for Early Childhood Development.

LEA LRPT Correlates: LAS13, TL15

State: Original

Status: Completed

August 2011 - May 2014

Media & Technology Department Records of meetings and participant rosters

2.4.6: Provide training opportunites for both teachers and students on Internet Safety (for example iSafe America curriculum).

LEA LRPT Correlates: EP01, LAS06, LAS10, LAS13, TL03, TL14

State: Original

Status: Planned

August 2011-May 2014

Coordinator for Instructional Technology; Campus Librarians,Principals,Teachers

Lesson Plans, Workshop Sign in Sheets, Learning.com reports

Page 19 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 20: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

GOAL 3: Support and plan for acquisition, maintenance and replacement of technology to address the need for integration of technology into instructional management and administration. (Leadership, Administration and Support)

OBJECTIVE 3.1:

Align Campus Technology Plans with Texas Long-range Plan for Technology, Schools and Library Division eRate requirements, No Child Left Behind requirements, the District Improvement Plan and implementation of the Technology Applications TEKS.

Budget Amount $6,000.00 LRPT category: Leadership, Administration and Support

E-Rate Correlates: ER01 NCLB Correlates: 02, 03, 06, 12

Strategies State/Status: Timeline: Person(s) Responsible:

Evidence:

3.1.1: Convene the District Technology Advisory Committee and Campus Technology Committees to assist with and evaluate the technology planning process.

LEA LRPT Correlates: LAS01, LAS02, LAS05

State: Original

Status: In Progress

Yearly in October and February, 2011-2014

Superintendent, Assistant Superintendent for Business Operations, Assistant Superintendent for Personnel/Student Services, Technology Systems Department

Committee Roster, Agenda of Meetings, Records of Attendance

3.1.2: Update current five-year enrollment projections to address requirements for technology and instructional resources. Review all budgets.

LEA LRPT Correlates: LAS05

State: Revised

Status: In Progress

February - March, Yearly,2011-2014

Information Systems Department

Reports of enrollment projections

3.1.3: Review overall budget planning process to include technology projections determined by district planning and projected growth.

LEA LRPT Correlates: I01, I03, I08, LAS02, LAS04

State: Original

Status: In Progress

July 2011 - June 2014 Technology Systems Department, Facilities Committee, Business Operations

Agendas, Committee Reports, Records of Attendance

3.1.4: Review the District Improvement Plans and Campus Improvement Plans to ensure alignment with the District Long-range Plan for Technology.

LEA LRPT Correlates: I01, LAS01, TL05

State: Original

Status: Planned

Yearly, March, 2011-2014

Assist. Superintendenfor K12 Education; Director for Technology Systems;Members of the Technology Advisory Committee

Records of review. Objectives as recorded in the respective plans

OBJECTIVE 3.2:

Provide an Appropriate Level of Technical Support to ensure successful and effective use of technology by all staff members.

Budget Amount $577,326.00 LRPT category: Leadership, Administration and Support

Page 20 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 21: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

E-Rate Correlates: ER01 NCLB Correlates: 03, 05, 12

Strategies State/Status: Timeline: Person(s) Responsible:

Evidence:

3.2.1: Employ an appropriate number of District/Campus personnel to address the needs created by extensive technology growth, network infrastructure and curriculum integration mandated by the Technology Applications TEKS (DIP Goal 6.2.1). To include: Network Specialist (District), Instructional Technology Trainer(s) (Campus-shared), Additional Campus Instructional Technologists (Full-Time), Campus Support Technicians (Full-time), District Webmaster (Full-time), Programmer/PEIMS personnel and Instructional Technology Secretary/Clerk.

Comments: As the district grows, staff must also grow to maintain the existing level of service. LEA LRPT Correlates:LAS02

LEA LRPT Correlates: LAS02

State: Original

Status: Planned

July 2011 - June 2014 Human Resources Department, Technology Systems Department

Employment records, Staff positions filled

3.2.2: Develop a plan and identify budgets for training and effective utilization of Technology Support Personnel.

LEA LRPT Correlates: I01, LAS02, LAS06, LAS10

State: Revised

Status: In Progress

July 2011 - June 2014 Technology Systems Department & Instructional Technology Division

Staff Development Calendar, Attendance Rosters, Yearly Summary of Staff Development

3.2.3: Provide additional presentation stations, Classroom Performance Systems, multimedia labs and other multimedia equipment for presentation of student projects to address the Technology Applications TEKS and the district timeline for technology skill development.

Comments: This is an on-going project. As technology progresses, additional equipment will need to be purchased.

LEA LRPT Correlates: LAS15, TL01, TL08

State: Original

Status: Planned

July 2011 - June 2014 Campus Principals, SBDM Committees, Grant Project Directors

Equipment inventory, student presentations documented in teacher lesson plans and by principal observations.

3.2.4: Provide information for State: July 2011 - June 2014 Coordinator of Applications on file.

Page 21 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 22: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

teachers to apply for technology mini-grants to implement innovative projects. Review budgets and grant applications to address funding.

LEA LRPT Correlates: LAS15

Original

Status: In Progress

Instructional Technology

Projects completed

3.2.5: Provide training for campus personnel charged with support of district databases: i.e., Destiny, Learning.com; Facts On File, Pearson Digital, Renaissance Place, Online Calendars, Textbook Inventory Program, netTrekker, Britannica Online, Ebsco and others.

Comments: LEA LRPT Correlates: LAS03, LAS06, LAS08, TL08, ER04

LEA LRPT Correlates: LAS03, LAS06, LAS08, TL08

State: Original

Status: In Progress

July 2010 - June 2014 Coordinator for Instructional Technology, Campus Principals, Campus Librarians, Coordinator for Library Services

Workshop Records of sessions offered and participant rosters

3.2.6: Update policy and procedures manuals for all technology departments for disaster recovery and/or personnel replacement.

LEA LRPT Correlates: LAS01, LAS02, LAS14

State: Original

Status: In Progress

2011-2014 Department Chairpersons

Policy and Procedures Manuals

OBJECTIVE 3.3:

Integrate technology into the District's community outreach and parental involvement programs.

Budget Amount $258,363.00 LRPT category: Leadership, Administration and Support

E-Rate Correlates: ER01 NCLB Correlates: 09, 12

Strategies State/Status: Timeline: Person(s) Responsible:

Evidence:

3.3.1: Provide appropriate software and training to staff for video production, graphic arts, layout and design, audio production, and other applications that will be used for electronic communication.

LEA LRPT Correlates: I08, LAS03, LAS06, LAS10

State: Original

Status: In Progress

July 2011 - June 2014 High School Technology Applications Teachers, DLRC/ TV Studio operator

Documentation of Training, Software licenses

3.3.2: Continue to develop appropriate e-newsletters to inform parents and community of district's news, issues and events.

State: Original

Status: In Progress

July 2011 - June 2014 Director for Public Relations

Published e-newsletters

Page 22 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 23: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

LEA LRPT Correlates: LAS08, LAS10

3.3.3: Continue to explore emerging e-communications tools such as podcasting and social media for community outreach and parental involvement. Utilize tools such as TEMs Gradebook Parent Portal, School Messenger and Renaissance Place to communicate with parents.

LEA LRPT Correlates: LAS08, LAS13, TL08, TL09

State: Original

Status: In Progress

July 2011 - June 2014 Director for Public Relations

Podcast archive

3.3.4: Continue to educate parents about the electronic communications tools available to them.

LEA LRPT Correlates: I03, I08, LAS07, LAS10, LAS13

State: Original

Status: Planned

July 2011 - June 2014 Public Relations Department

Publication and announcements

3.3.5: Survey parents to determine accessibility to MCISD-TV on Time Warner Cable.

LEA LRPT Correlates: I03

State: Original

Status: Planned

July 2011 - June 2014 Public Relations Department, Coordinator for Library Services

Survey documents

3.3.6: Provide appropriate funding to equip the district to make the most effective use of MCISD-TV as a community education tool.

LEA LRPT Correlates: TL10

State: Original

Status: Planned

July 2011 - June 2014 Public Relations Department, Coordinator for Library Services

Budget items

3.3.7: Review staffing needs relating to the creation of and maintenance of the district's Internet presence. Identify budgets and secure funding to support identified personnel.

LEA LRPT Correlates: LAS02, LAS07, LAS09, LAS11

State: Original

Status: Planned

July 2011 - June 2014 Public Relations Department; Human Resources Department;Director Technology Systems

Additional staff positions created; meeting agenda;

OBJECTIVE 3.4:

Examine the Budget for Technology Yearly and Seek Funding from All Available Sources

Budget Amount $1,188,000.00 LRPT category: Leadership, Administration and Support

E-Rate Correlates: ER01 NCLB Correlates: 02, 05, 06, 08, 11, 12

Strategies State/Status: Timeline: Person(s) Responsible:

Evidence:

3.4.1: Investigate alternative funding sources for providing additional multimedia equipment, wireless labs and video conferencing equipment for all campuses. Coordinate

State: Original

Status: In Progress

Yearly, Ongoing:As RFAs are posted, 2011-2014

Instructional Technology Division

Records of meeting, Notification of Grant/Funding Awards

Page 23 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 24: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

activities with the district grant writer.

LEA LRPT Correlates: LAS02, LAS10

3.4.2: Establish District and Campus committees to seek partnerships with public and private entities to support projects and programs.

LEA LRPT Correlates: I02, I09, LAS01, LAS05, LAS07, LAS08

State: Revised

Status: In Progress

Yearly,Ongoing, 2011-2014

Instructional Technology Division, Library Services, SBDM Committees, Campus Principals

Schedule of meetings/activities, Project Records

3.4.3: Seek technology funding through grant opportunities presented by state and federal agencies and include partnerships so that the district continues to provide the best technology to students and staff (DIP Goal 6.3.2.)

LEA LRPT Correlates: I01, LAS01, LAS07, TL06

State: Original

Status: In Progress

Yearly,Ongoing, 2011-2014

Technology Systems Department, Curriculum & Instrution, Federal Programs, Campus Principals, Grant Writer

Notice of Grant Award, Records of Activities

3.4.4: Coordinate with campus principals, content area coordinators and staff to review budgets for technology professional development for curriculum integration.

LEA LRPT Correlates: LAS01, LAS06

State: Original

Status: In Progress

Yearly,Ongoing,2011-2014

Campus principals, Content Area Coordinators, Media & Technology Staff

Budget review documentation, Meeting schedules and agendas

3.4.5: Develop a planned response to opportunities for use of at least 30% of the technology allotment and other funding to provide high quality professional development for teachers and paraprofessionals related to the use of technology.

LEA LRPT Correlates: LAS03, LAS06

State: Original

Status: In Progress

2011-2014 Technology Systems Department, Coordinator for Instructional Technology

Staff Development Records, Summary report of yearly staff development opportunities

3.4.6: Participate in collaborative opportunities with Region One and other districts provided by TARGET grants, TIP grants, and other initiatives.

LEA LRPT Correlates: EP06, LAS13, LAS15

State: Original

Status: In Progress

Yearly, Ongoing, 2011-2014

Instructional Technology Division, Federal Programs Division, Principals and Staff of participant campuses

Grant Applications and Notices of Award, Records of Grant Activities

OBJECTIVE 3.5:

Support and plan for acquisition, maintenance and replacement of technology for management of student data.

Budget Amount $800,000.00 LRPT category: Leadership, Administration and Support

Page 24 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 25: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

E-Rate Correlates: ER01 NCLB Correlates: 05

Strategies State/Status: Timeline: Person(s) Responsible:

Evidence:

3.5.1: Implement the upgrade/replacement of student management system and maintian student management system (TEMS).

LEA LRPT Correlates: LAS02, LAS11, LAS14

State: Original

Status: Planned

2011-2014 Information Systems, Curriculum and Instruction Department, Chief Financial Officer

Rosters of meetings; Selection and installation of system

3.5.2: Investigate system for calling parents on student absences and/or tardies.

LEA LRPT Correlates: LAS05, LAS09, LAS11

State: Original

Status: Planned

2011-2014 Information Systems, Curriculum & Instruction Department, Chief Financial Officer

Roster of Meetings; Selection of System

3.5.3: Investigate online system for data backup.

LEA LRPT Correlates: LAS08, LAS14

State: Original

Status: Planned

2011-2014 Information Systems Department, Chief Financial Officer

Rosters of meetings, Selection of System.

3.5.4: Provide secure, web-based student-data access for students and parents.

LEA LRPT Correlates: LAS08, LAS11, TL15

State: Original

Status: Planned

2011-2014 Information Systems, Curriculum and Instruction Department, Chief Financial Officer

Roster of meeting, Selection of System.

3.5.5: Investigate PDA applications for student management use.

LEA LRPT Correlates: LAS05, LAS09, LAS10, LAS15

State: Original

Status: In Progress

2011-2014 Information Systems, Chief Financial Officer

Rosters of Meetings, Selection of Systema

3.5.6: Investigate options to integrate the district's different database operations.

LEA LRPT Correlates: LAS08, LAS09, LAS10, LAS11

State: Original

Status: Planned

2011-2014 Imformation Systems, Media & Technology, Curriculum & Instruction

Information systems, Media & Technology, Curriculum & Instruction Department, Chief Financial Officer

3.5.7: Utilize the Online Teacher gradebook with a Parent Portal

LEA LRPT Correlates: LAS08, LAS11

State: Original

Status: Planned

2011-2014 Information Systems and Media & Technology departments

Price Quotes, brochures, vendor demonstrations

3.5.8: Utilize the Online Employee Portal to applications

LEA LRPT Correlates: I03, I05, I08, I09

State: Original

Status: Planned

2011-2014 Information Systems, Media & Technology departments

Price Quotes, Brochures, Vendor Demonstrations

3.5.9: Evaluate the Automated Absence Reporting System. (DIP Goal 6.1.2)

Comments: This is a request

State: Revised

Status: In Progress

2011-2014 Technology Systems, Human Resources Department

Meeting schedule, Rosters of Attendance, Agendas

Page 25 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 26: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

from the campus principals.

LEA LRPT Correlates: I01, I08, I09

Page 26 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 27: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

GOAL 4: Ensure that all students and teachers (100%) have access to technology to meet the goals of the instructional program. (Infrastructure)

OBJECTIVE 4.1:

Provide a robust Infrastructure to meet the goals of the instructional program.

Budget Amount $2,100,000.00 LRPT category: Infrastructure for Technology

E-Rate Correlates: ER01 NCLB Correlates: 02, 06, 08, 09, 12

Strategies State/Status: Timeline: Person(s) Responsible:

Evidence:

4.1.1: Continue to plan with administration, campus committees and technical support staff for campus network infrastructure among campuses, central office, instructional support sites and district operations.

LEA LRPT Correlates: I01, I09, LAS01, LAS06, LAS07

State: Original

Status: In Progress

2011-2014 Technology Systems Department, Committee Members, Campus Principals

Lists of Meetings, Attendance Rosters

4.1.2: Continue to provide for readiness of staff through implementation of training plan for staff and individuals who will maintain network infrastructure and services. Plan for Certification plus continuing education for the Tech Support Staff.

LEA LRPT Correlates: EP09, I08, LAS10, TL16

State: Revised

Status: In Progress

2011-2014 Technology Systems Department, Technology Advisory Committee Members, Campus Principals

Workshop Registration Schedules for participant groups, PDAS Documentation

4.1.3: Continue to review and revise, as needed, district policies for implementation, installation and maintenance of infrastructure and allied technology equipment.

LEA LRPT Correlates: I01, I02, I08, LAS01, LAS06

State: Original

Status: Planned

Yearly,Ongoing,2011-2014

Technology Systems Department, Technology Advisory Committee Members, Campus Principals

Needs Survey, Policy Handbook, Maintenance Records

4.1.4: Continue to increase building infrastructure by addition of network cables, routers, switches, servers, and other peripherals necessary to provide network access to each classroom, instructional, administrative,central Site,Bryan Elementary, Castro Elementary, Pearson Elementary, Marcell Elementary and Roosevelt Alternative-Options Program and support site. This includes improvements to the

State: Revised

Status: In Progress

Yearly,Ongoing,2011-2014

Technology Systems Department, Campus Principals

Records of network installations, eRate Funding Committments

Page 27 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 28: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

telecommunications: DS3 Transport, T-1 Transport, PRI Data, PRI Smart Trunk, PBX,Basics Phone services, 1000MB Fiber WAN services, and Cellular Services.(As identified in the Needs Assessment Section 3.3). Standarize infrastructre in a uniform manner.

LEA LRPT Correlates: I01, I02, LAS02, LAS04

4.1.5: Continue to provide robust Internet access for students and teachers. Implement the School Center/Share Point Project and Stoneware Portal across the district to provide increased access for parents and community. All teachers and departments will publish classroom web pages. Implemenation of a web portal to provide service for parents.

LEA LRPT Correlates: TL12, TL15, TL16

State: Revised

Status: In Progress

2011-2014 Technology Systems Department, Coordinator for Instructional Technology, Campus Instructional Technologists, Campus Technology Advisors, Classroom Teachers

Network infrastructure completed, School Center Server installation completed, Teacher Websites available for student, parent and community use.

4.1.6: Implement additional infrastructure to support student a e-mail system.

LEA LRPT Correlates: I01, I02, I03, I05, I08, I09, TL09, TL12, TL14, TL16

State: Original

Status: Planned

June 2011-June 2014 Director for Technology Systems

Student e-mail messages,hardware

OBJECTIVE 4.2:

Review all campus inventories to determine equipment needs.

Budget Amount $60,000.00 LRPT category: Infrastructure for Technology

E-Rate Correlates: ER01 NCLB Correlates: 03, 05, 11, 12

Strategies State/Status: Timeline: Person(s) Responsible:

Evidence:

4.2.1: Review the schedule for repositioning/replacement of technology equipment with appropriate budget provisions to equitably implement a target ratio of 3:1 student-to-workstation and allied equipment (DIP Goal 6.3.7)

LEA LRPT Correlates: I04, LAS01, LAS04, LAS05

State: Original

Status: In Progress

Yearly,Ongoing,2011-2014

Assistant Superintendent for Business Operations, Campus Principals, Technology Systems Department, Fixed Assets Department

Review documents on file, Fixed Assets Inventory Reports, Minutes of Committee Meetings

4.2.2: Develop Campus and Department schedules for the repositioning and/or replacement of technology

State: Original

Status: In

Yearly,Ongoing,2011-2014

Assistant Superintendent for Business Operations, Campus

Schedule of purchasing and repositioning,Records of purchase,

Page 28 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 29: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

equipment with appropriate budget provisions to accommodate these schedules. Target ratio for repositioning: 1/3 per campus per year. Target ratio for purchasing: 1/5 per year. (DIP Goal 6.3.6)

LEA LRPT Correlates: I01, LAS01, LAS02, LAS04

Progress Principals, Technology Systems Department, Fixed Assets Department

Minutes/rosters of Meetings, Vendor price lists, Fixed Assets Inventory Reports

4.2.3: Continue to collect and tabulate needs data to identify currently existing status on student-to-workstation ratio (SWR) and teacher-to-workstation (TWR) by campus and by district.

LEA LRPT Correlates: I04, I05, I07

State: Revised

Status: In Progress

Yearly,Ongoing,2010-2014

Fixed Assets Department, Technology Systems Department, Campus Principals

Needs assessment surveys on file

4.2.4: Maintain a comprehensive database of computers and other technology holdings with date of acquisition and maintenance history.

LEA LRPT Correlates: I04, I06, I07, I08

State: Original

Status: In Progress

Yearly, Ongoing,20111-2014

Fixed Assets Department, Campus Principals

Schedule of purchasing and repositioning, Records of Purchase Orders, Fixed Assets Inventory

4.2.5: Continue to use the PDC Help Desk and other sources of feedback from staff to alert Technology Department concerning network capacity and equipment in need of repositioning and replacement.

LEA LRPT Correlates: I01, I06, I08, LAS07

State: Original

Status: In Progress

Yearly,Ongoing,2011-2014

Director for Technology Systems, Campus and District Technicians

Technology Help Desk, Maintenance Reports

OBJECTIVE 4.3:

Integrate technology into all new construction projects throughout the District

Budget Amount $4,815,900.00 LRPT category: Infrastructure for Technology

E-Rate Correlates: ER01 NCLB Correlates: 03, 05, 12

Strategies State/Status: Timeline: Person(s) Responsible:

Evidence:

4.3.1: In order to upgrade and bring up to code the campus infrastructure, Additions/Renovations at Alton Elementary will take place. The office and older part of the campus will be renovated. The construction will impact approximately 20 classrooms and MDF. All

State: Original

Status: In Progress

2011-2014 Board of Trustees Facilities Committee, Superintendent, CFO, District Architect, and Technology Systems Director

Contracts with design professionals are being negotiated; IFA funding has been approved

Page 29 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 30: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

required infrastructure for technology will either be replaced or upgraded

Comments: Will be completed August 2010 $600,000

LEA LRPT Correlates: I01, I05, I06, I07, LAS02, TL10

4.3.2: In order to support student growth, Additions/Renovations at Veterans Memorial High School will take place. An additional Science wing will be added at North West side of the Administration wing. It will contain all required infrastructure for technology.

Comments: $80,000

LEA LRPT Correlates: I01, I05, LAS02, TL10

State: Original

Status: In Progress

2011-2014 Board of Trustees Facilities Committee, Superintendent, CFO, District Architect, and Technology Systems Director

Contracts with design professionals are being negotiated; IFA funding has been approved

4.3.3: In order to upgrade and bring up to code the campus infrastructure, Renovations at Mission HS will take place. Portions of the campus will be renovated to meet current building codes and standards. All required infrastructure for technology will either be replaced or upgraded within the scope of work.

Comments: $1,400,000

LEA LRPT Correlates: I01, I05, I06, LAS02, LAS04, TL10

State: Original

Status: In Progress

2011-2014 Board of Trustees Facilities Committee, Superintendent, CFO,District Architect, Technology Systems Director

Contracts with design professionals are being negotiated; IFA funding has been approved

OBJECTIVE 4.4:

Continue to address needs for other technologies. (District Improvement Plan Goal 6.3)

Budget Amount $1,403,874.00 LRPT category: Infrastructure for Technology

E-Rate Correlates: ER01 NCLB Correlates: 02, 03, 05, 06, 09, 12

Strategies State/Status: Timeline: Person(s) Responsible:

Evidence:

4.4.1: Collect and tabulate needs data to identify currently existing status of classroom technology equipment and usage.

Comments: $50,000

LEA LRPT Correlates: LAS01

State: Original

Status: In Progress

Yearly,Ongoing,2011-2014

Campus Advisors, Campus Instructional Technologists, Campus Librarians, Coordinator for Instructional Technology

Survey(s)Record(s), Raw data collection, Data summary, District Fixed Assets Inventory, Yearly Campus Inventory

4.4.2: Address the directive to reach State: Yearly,Ongoing,2011- Campus Principals, Campus Inventory of

Page 30 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 31: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

Target Level technologies. Suggested equipment list includes the following: digital projectors, digital cameras, digital camcorders, programmable calculators for every student, telephones in classrooms, scanners, document cameras, classroom data projectors, plasma/LCD TVs and digital tablets. Add Student RFID (radio frequency identifiers) for student tracking.

Comments: $1,500,000

LEA LRPT Correlates: LAS01, LAS02, LAS05, LAS12, TL06, TL10

Revised

Status: In Progress

2014 Curriculum & Instruction, Information Systems, Fixed Assets, Transporation Department

equipment, Fixed Assets Inventory, Survey data, Transporation Department, Media & Technology Department (DIP 6.3.4)

4.4.3: Identify existing technology that will provide students and staff VPN access, to ensure equitable access to technology at home and at school via a web portal(DIP Goal 6.5).

Comments: $70,000.00

LEA LRPT Correlates: I09

State: Revised

Status: In Progress

2011-2014 Director of Technology Systems

Teacher web pages and student usage. Project documentation.

4.4.4: Continue efforts to expand use and content on MCISD-TV.

Comments: $20,000.00

LEA LRPT Correlates: I03, I08

State: Original

Status: In Progress

2011 - 2014 Director for Public Relations, Coordinator for Library Services, MHS and VMHS, Technology Staff

Expanded use of MCISD-TV

OBJECTIVE 4.5:

Provide opportunities for Distance Learning for students and staff to improve student achievement and teacher effectiveness.

Budget Amount $708,885.00 LRPT category: Infrastructure for Technology

E-Rate Correlates: ER01, ER02 NCLB Correlates: 01, 08, 12

Strategies State/Status: Timeline: Person(s) Responsible:

Evidence:

4.5.1: Implement web-based/online learning for staff. Support the Online Professional Development Initiative to provide online professional development for all staff to address the SBEC competencies.

Comments: $20,000

State: Original

Status: In Progress

2011-2014 Coordinator for Instructional Technology,Director of Technology Systems

Eduphoria Workshop Registration, Rosters of Participants

Page 31 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 32: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

LEA LRPT Correlates: EP08, I08, LAS03, TL05, TL09, TL16

4.5.2: Implement satellite-based learning available at the campus level.

LEA LRPT Correlates: I02, I08, TL16

State: Original

Status: In Progress

2011-2014 Coordinator for Instructional Technology, Curriculum & Instruction Department, Director for Technology Systems, Campus Principals, Counselors

Rosters of participants, Records of courses completed

4.5.3: Continue to improve use of two-way interactive video for distance learning and the infrastructure to support it. Provide training for librarians and other campus support personnel.

Comments: $50,000

LEA LRPT Correlates: EP09, I01, I02, I08, TL08

State: Original

Status: In Progress

Yearly,Ongoing,2011-2014

Coordinator for Instructional Technology, Coordinator for Library Services, Campus Librarians, Campus Technology Advisors

Rosters of participants, Records of courses completed

4.5.4: Training will be offered on the use of the School Center/Share Point webpages to communicate information with parents and the community.

Comments: $50,000

LEA LRPT Correlates: TL09, TL12, TL16

State: Original

Status: In Progress

2011-2014 Coordinator for Instructional Technology, Campus Trainers, Campus Principals

Attendance rosters, Workshop reports, and websites.

4.5.5: Implement web-based/online learning for Technology Applications and Career and Technology courses as requested. Students will be given opportunities to prepare for certifications: IC3, MOS, and A+.

LEA LRPT Correlates: EP08

State: Original

Status: Completed

2011-2014 Coordinator for Instructional Technology, Coordinator for Career and Technology Program, Career and Technology Teachers, Campus Trainers, Campus Principals

Enrollment reports; Certifications by students and staff

OBJECTIVE 4.6:

Maintain a robust LAN/WAN/WLAN Infrastructure.

Budget Amount $40,000.00 LRPT category: Infrastructure for Technology

E-Rate Correlates: ER01 NCLB Correlates: 05, 06, 12

Strategies State/Status: Timeline: Person(s) Responsible:

Evidence:

4.6.1: Continue to provide Target Level LAN/WAN/WLAN and Telecommunications infrastructure for all sites. This

State: Original

2011-2014 Director for Technology Systems

Network Infrastructure Operations

Page 32 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 33: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

includes basic maintenance and technical support for the network infrastructure, servers, phone PBX, web servers and distance learning.(As identified in the Needs Assessment Section 3.3).

LEA LRPT Correlates: I01, I02, I06, LAS11

Status: In Progress

4.6.2: Continue to provide access to appropriately configured workstations for students and staff in campus libraries, school and district offices, and other work areas ensuring accessibility for disabled students and staff.

LEA LRPT Correlates: I04, I07

State: Revised

Status: In Progress

Yearly, ongoing, 2011-2014

Administrator for Federal Programs, Coordinator for Career and Technology, Director for Technology Systems, Curriculum & Instruction Department, Principals, Program Directors

Needs survey(s) on file, Purchase orders and fixed assets inventories, Records of site visits

Page 33 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 34: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

Budget Total amount of Title II, Part D formula funds received for the current year of this plan: $0.00

Method of application for formula funds: Local Application

Budget year 2011 Budget item Cost Funding Sources with amount per source

Staff Development $177,436.00 Local ($79,100); Title I-C Migrant($1,000);Title II - D ($26,931); Title I-A ($19,300);Title II-A ($10,715); State Comp ($1,550); State Technology ($19,000); Gifted/Talented ($800); Library ($1,000); Other ($18,040).

Telecommunications & Internet Access

$509,500.00 Local($475,000);Title II-C ($1,000); State Technology ($33,500);

Materials & Supplies $364,585.00 Local ($4,675);Title II-D ($13,100); Other sources($38,678); Title I-A ($174,025); Title I-C ($9,900); Title III-A ($22,600); State Comp (81,807); state Vocational ($4,500); IDEA B ($5000); Special Education ($10,300)

Equipment $6,298,732.00 Local ($807,679); Title II-D ($5,400); Other sources ($14,766); Title I-A ($190.651); Title II-A ($3,494); Title III-A ($42,500); State Comp ($174,535); State Technology ($242,307); Gifted & Talented ($1,500); ERate Year 12($4,815,900)

Maintenance $635,561.00 Local ($199,440); State Technology ($86,121); Erate Year 12 ($350,000)

Miscellaneous Expenses $476,628.00 Local ($91,378); Title II-D ($9,800); Other sources ($118,512); Title I-A ($3000); Title I-C($3000); Title IV-A($600); State Technology ($41,231); IDEA B ($26,000); Gifted and Talented ($6,300); Special Education ($103,519); Library Funds ($73,288)

Total $8,462,442.00

Budget year 2012 Budget item Cost Funding Sources with amount per source

Staff Development $177,436.00 Local ($79,100; Title I-C Migrant($1,000);Title II - D ($26,931); Title I-A ($19,300);Title II-A ($10,715); State Comp ($1,550); State Technology ($19,000); Gifted/Talented ($800); Library ($1,000); Other ($18,040).

Telecommunications & Internet Access

$510,000.00 Local($475,500);Title II-C ($1,000); State Technology ($33,500);

Materials & Supplies $364,585.00 Local ($4,675);Title II-D ($13,100); Other sources($38,678); Title I-A ($174,025); Title I-C ($9,900); Title III-A ($22,600); State Comp (81,807); state Vocational ($4,500); IDEA B ($5000); Special Education ($10,300)

Equipment $1,282,832.00 Local ($607,679); Title II-D ($5,400); Other sources ($14,766); Title I-A ($190.651); Title II-A ($3,494); Title III-A ($42,500); State Comp ($174,535); State Technology ($242,307); Gifted & Talented ($1,500); ERate Year 13

Maintenance $635,563.00 Local ($199,442); State Technology ($86,121); Erate Year 13 ($350,000)

Miscellaneous Expenses $476,628.00 Local ($91,378); Title II-D ($9,800); Other sources ($118,512); Title I-A ($3000); Title I-C($3000); Title IV-A($600); State Technology ($41,231); IDEA B ($26,000); Gifted and Talented ($6,300); Special Education ($103,519); Library Funds ($73,288)

Total $3,447,044.00

Budget year 2013

Page 34 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 35: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

Budget item Cost Funding Sources with amount per source

Staff Development $177,436.00 Local ($79,100; Title I-C Migrant($1,000);Title II - D ($26,931); Title I-A ($19,300);Title II-A ($10,715); State Comp ($1,550); State Technology ($19,000); Gifted/Talented ($800); Library ($1,000); Other ($18,040).

Telecommunications & Internet Access

$509,500.00 Local ($475,000 );Title II-C ($1,000); State Technology ($33,500)

Materials & Supplies $364,585.00 Local ($4,675);Title II-D ($13,100); Other sources($38,678); Title I-A ($174,025); Title I-C ($9,900); Title III-A ($22,600); State Comp (81,807); state Vocational ($4,500); IDEA B ($5000); Special Education ($10,300)

Equipment $982,832.00 Local ($307,679); Title II-D ($5,400); Other sources ($14,766); Title I-A ($190.651); Title II-A ($3,494); Title III-A ($42,500); State Comp ($174,535); State Technology ($242,307); Gifted & Talented ($1,500); ERate Year 12

Maintenance $635,563.00 Local ($199,442); State Technology ($86,121); Erate Year 13 ($350,000)

Miscellaneous Expenses $476,628.00 Local ($91,378); Title II-D ($9,800); Other sources ($118,512); Title I-A ($3000); Title I-C($3000); Title IV-A($600); State Technology ($41,231); IDEA B ($26,000); Gifted and Talented ($6,300); Special Education ($103,519); Library Funds ($73,288)

Total $3,146,544.00

Page 35 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 36: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

Evaluation Evaluation Process: The District Technology Advisory Committee established evaluation criteria to measure whether the strategies in this plan are meeting the District's goals and objectives. Each campus selects a representative to serve on the Advisory Committee. Additional members are selected from Administration and the community of Mission. The committee conducts an annual review process to ensure that the prior year's accomplishments are evaluated, future projects are reviewed, and the existing implementation schedule is modified and extended. Individuals, departments and program responsibilities, as well as methods of evaluation and documentation for the goals and strategies, are identified in the ePlan document. This document will be used by all campuses and departments for planning purposes and to create the individual Campus Long-range Plans for Technology. It is reviewed by the District Educational Improvement Council, the Campus Technology Committees and the Site-based Decision Making Committees. The completed Long-range Plan is presented to the Board of Trustees at a reqular meeting of the Board. ERate projects are reviewed as required by the Schools and Libraries Division. Purchasing procedures are closely monitored by the Purchasing department to ensure that all policies are addressed.

Evaluation Method: Evaluation methods are listed in the Goals and Objectives. These evaluation procedures include, but are not limited to the following: • Inventory records of district hardware and network infrastructure • Survey instruments for needs assessments including Teacher and Campus STaR Charts, and Campus Technology Plans • Documentation of technology proficiencies for students as reported by Learning.com • Documentation of technology proficiencies for teachers as reported by How To Master • Documentation of staff development plans and the variety of sessions offered to all staff reported by the Electronic Registrar Online • Support of the human infrastructure for implementation of technology initiatives • Innovative incentive programs to recognize and encourage classroom integration and teacher skill development • Evaluation and purchase of appropriate software and hardware to support teaching and learning for all subjects • Plans for and records of replacing and repositioning obsolete equipment • Implementation timelines and completion schedules for installations of new infrastructure as buildings are constructed • Instructional timelines and resources evaluated by the curriculum coordinators for the core content areas • Acquiring and deploying appropriate technologies for enrichment subjects and special programs is monitored by the appropriate department.

Page 36 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...

Page 37: MISSION CONSOLIDATED ISD Technology Plan...DISTRICT PROFILE ESC Region 1 City, State Zip MISSION, TX 78572-4399 Phone (956) 323-5505 Fax (956) 323-5634 County District Number 108908

Appendix Attachment item A: Mission Consolidated Independent School District website

Web site: http://www.mcisd.net

MISSION CONSOLIDATED ISD does not discriminate on the basis of sex, disability, race, color, age, or national origin in its educational programs, activities, or employment as required by Title IX, Section 504 and Title VI.

Page 37 of 37MISSION CONSOLIDATED ISD Technology Plan: 2011 - 2014

10/25/2010https://www.sedl.org/cgi-bin/mysql/eplan/eplan.cgi?l=reportoption_composite&editplani...