87
Page 1 of 87 254 th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 1 of 87 Minutes of the 254 th meeting of the State Level Expert Appraisal Committee held on 09/09/2015 at Committee Room, Gujarat Pollution Control Board, Gandhinagar. The 254 th meeting of the State Level Expert Appraisal Committee (SEAC) was held on 9 th September, 2015 at Committee Room, Gujarat Pollution Control Board, Gandhinagar. Following members attended the meeting: 1. Shri T. P. Singh, Chairman, SEAC. 2. Shri V. C. Soni, Vice Chairman, SEAC. 3. Shri R. J. Shah, Member, SEAC. 4. Dr. V. K. Jain. Member, SEAC. 5. Shri V.N.Patel, Member, SEAC. 6. Shri K. C. Mistry, Secretary, SEAC. The agenda of TOR/Scoping/Category 8 (a) cases and appraisal cases was taken up. Thirteen (13) cases of TOR/Scoping/Category 8 (a),seven (7) appraisal cases, one EC amendment and one TOR amendment case were taken up. The applicants made presentations on the activities to be carried out along with other details furnished in the Form-1 / Form-1A, EIA report and other reports. 1 Maharshi Pharma Chem Pvt. Ltd. Block no.203,Vill.: Alindra, Vaso- Alindra Road, Ta.: Matar, Dist.: Kheda Appraisal Project / Activity No.: 5(f) M/s: Maharshi Pharma Chem (herein after Project Proponent – PP) submitted Application vide their letter dated 04/10/2014. The location of the unit is outside the notified area. As per amendment to EIA Notification, 2006 vide SO 1599 (E) dated 25/06/2014, small units are categorized as Category “B” projects. Small units are defined as with water consumption less than 25 M 3 /day; Fuel consumption less than 25 TPD; and not covered in the category of MAH units as per the Management, Storage, Import of Hazardous Chemical (MSIHC) Rules, 1989. The project was considered for TOR finalization in the meeting of the SEAC held on 16/12/2014. The project proponent along with their expert / consultants attended the meeting on 05/12/2014 before the SEAC, Gujarat. During presentation, PP informed that water requirement is 19.3 KL/day. Fuel requirement is 2 MT/Day (White Coal) and Chemicals to be used are not covered in MAH category. Hence, this project falls under Category B of project activity 5(f) as per the EIA Notification 2006. Request for amendment in TOR regarding correction in list of production was considered in the SEAC meeting dated 16/04/2015. Public hearing of the project was conducted by Gujarat Pollution Control Board on 12/06/2015 at village Alindra. EIA Report prepared by M/s: Ramans Enviro Services pvt. Ltd., Ahmedabad was submitted by project proponent on 02/07/2015. Project status: New Project / Activity Details:

Minutes of the 254 th meeting of the State Level Expert ...seiaa.gujarat.gov.in/SEAC Minutes of the 254th.pdf · The project proponent along with their expert / consultants attended

Embed Size (px)

Citation preview

Page 1 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 1 of 87

Minutes of the 254th meeting of the State Level Expert Appraisal Committee held on 09/09/2015 at Committee Room, Gujarat Pollution Control Board, Gandhinagar.

The 254th meeting of the State Level Expert Appraisal Committee (SEAC) was held on 9th September, 2015 at Committee Room, Gujarat Pollution Control Board, Gandhinagar. Following members attended the meeting:

1. Shri T. P. Singh, Chairman, SEAC.

2. Shri V. C. Soni, Vice Chairman, SEAC.

3. Shri R. J. Shah, Member, SEAC.

4. Dr. V. K. Jain. Member, SEAC.

5. Shri V.N.Patel, Member, SEAC.

6. Shri K. C. Mistry, Secretary, SEAC.

The agenda of TOR/Scoping/Category 8 (a) cases and appraisal cases was taken up. Thirteen (13) cases of TOR/Scoping/Category 8 (a),seven (7) appraisal cases, one EC amendment and one TOR amendment case were taken up. The applicants made presentations on the activities to be carried out along with other details furnished in the Form-1 / Form-1A, EIA report and other reports.

1 Maharshi Pharma Chem Pvt. Ltd. Block no.203,Vill.: Alindra, Vaso-Alindra Road, Ta.: Matar, Dist.: Kheda

Appraisal

Project / Activity No.: 5(f) M/s: Maharshi Pharma Chem (herein after Project Proponent – PP) submitted

Application vide their letter dated 04/10/2014. The location of the unit is outside the notified area. As per amendment to EIA

Notification, 2006 vide SO 1599 (E) dated 25/06/2014, small units are categorized as Category “B” projects. Small units are defined as with water consumption less than 25

M3/day; Fuel consumption less than 25 TPD; and not covered in the category of MAH units as per the Management, Storage, Import of Hazardous Chemical (MSIHC) Rules, 1989.

The project was considered for TOR finalization in the meeting of the SEAC held on 16/12/2014.

The project proponent along with their expert / consultants attended the meeting on 05/12/2014 before the SEAC, Gujarat. During presentation, PP informed that water requirement is 19.3 KL/day. Fuel requirement is 2 MT/Day (White Coal) and Chemicals to be used are not covered in MAH category. Hence, this project falls under Category B of project activity 5(f) as per the EIA Notification 2006.

Request for amendment in TOR regarding correction in list of production was considered in the SEAC meeting dated 16/04/2015.

Public hearing of the project was conducted by Gujarat Pollution Control Board on 12/06/2015 at village Alindra.

EIA Report prepared by M/s: Ramans Enviro Services pvt. Ltd., Ahmedabad was submitted by project proponent on 02/07/2015.

Project status: New Project / Activity Details:

Page 2 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 2 of 87

This unit has proposed to manufacture following synthetic organic chemicals (bulk drugs): Sr. no.

Product Capacity (MT/Month)

Existing Products 1 Nor floxacin 3 Proposed products Group A 1 Betamethasone (BMS)

2

2 Betamethasone Valerate 3 Dexamethasone 4 Deflazcort 5 Ethisterone 6 Hydrocortisone Acetate (HA) 7 Methylprednisolon Acetate (MPA) 8 Prednisolone Acetate (PA) 9 Prednisolone sodium phosphate (PSP) 10 Triamcinolone (TMC) Group B 1 Betamethasone Sodium Phosphate (BSP)

0.8

2 Budesonide 3 Dexamethasone Sodium Phosphate 4 Nandrolone 5 Triamcinolone Acetonide 6 Methylcobalamin (MCB) Group C 1 Betamethasone Dipropionate

0.5 2 Momentasone Furoate(MMF) Group D 1 Betamethasone Dipropionate

0.5 2 Clobetasole Propionate 3 Halobetasole Propionate Group E 1 Clobetasone Butyrate 0.1

The manufacturing of Synthetic Organic Chemicals falls under the project activity 5(f) as per the

schedule of EIA Notification 2006.

The project proponent has applied for manufacturing of Bulk drugs. Total plot area is 9000 sq.

m. The total cost of the proposed expansion is Rs. 5.1 Crores. Total water consumption after

proposed expansion will be 19.3 KL/day (Industrial – 16.8 KL/day + Domestic-2.5 KL/day). As

the condensate (8 KL/day) generated from the evaporator will be reused, fresh water (8 KL/day)

requirement will be 11.3 KL/day, which will be sourced from Bore-well. Total industrial effluent

generation will be 9.5 KL/day (7.7 KL from Process, 1.8 KL/day from utilities). Industrial waste

water will be evaporated and condensate will be reused back. Domestic waste water (1.9

KL/day) will be disposed off into soak pit system. Unit has proposed one Boiler (0.6 TPH) and

one TFH (2 Lac Kcal/hr). Briquettes of white coal/Agro waste (2 MT/day) will be used as fuel.

Cyclone separator is proposed as APCM for Boiler & TFH. No process gas emission is

envisaged. Unit has proposed one DG Set (125 KVA) as stand-by facility for emergency

purpose. Hazardous waste to be generated are ETP Sludge & Residue form evaporator (12.5

MT/Month), Discarded containers / liners (5 MT/Month) and Distillation residue (4 MT/Month).

Page 3 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 3 of 87

EP waste & evaporator residue will be sent to common TSDF site. Solvent residue will be sent

to CHWIF. Discarded barrels / containers / bags / liners will be either reused or returned back to

suppliers or sold only to the authorized vendors. Used oil will be sold only to the registered

recyclers.

Observations/Discussions: Technical presentation during the meeting included the Point wise ToR compliance and issues

raised during public hearing. The baseline environmental quality has been assessed for a

period from October to January 2015 in a study area of 5 km radial distance from the project

site. The predominant winds are from North East direction. Ambient Air Quality Monitoring

(AAQM) was carried out at 6 locations during the study period for PM10, PM2.5, Sulfur Dioxide,

Oxides of Nitrogen, VOC, HC and CO. Results shows that gaseous pollutants and Particulate

matter remain well within the prescribed norms.

The surface water samples and ground water samples have been collected from different bore

wells of various Gram Panchayats within the study area. It shows that the ground water can be

considered fit for drinking purpose in the absence of alternate sources subject to provision of

the adequate disinfection system. Two Sarus carnes which is a vulnerable species were

observed in the shallow water body near Kadiyapura village in the study area. Conservation

measures for Sarus crane have been proposed. Details about the list of rare and endangered

fauna of the study area along with the conservation measures for peacock and conservation

plan for sarus crane are provided in EIA report. At present unit is having no valid CTE-CCA. PP

informed that M/s: Maharshi Pharma Chem Pvt. Ltd. was established in the year 2000 at this

site for manufacturing of Bulk drug namely Norfloxacin after obtaining Consent to operate from

GPCB, however, the company could not commenced production since last twelve years due to

economical non-viability because of the available finance & then market scenario. Applicability

of MAH unit as per MSIHC Rules, lay out plan and surrounding area of the proposed site,

segregation of waste water streams and treatability of the effluent, solvent recovery system etc.

have been discussed in detail. After detailed deliberations the Committee sought following

additional information for further consideration of the proposal:

1. Give comparative list of raw materials/chemicals with threshold limits as per MSIHC Rules tabular format. Ensure that undertaking submitted regarding non-MAH unit is true in letter and spirit.

2. Revised lay out plan as per TOR no. 6 and site plan showing 1 KM radius from the surrounding area.

3. TOR no. 17 regarding qualitative & quantitative analysis of waste water streams and its treatability& feasibility report.

4. Ensure that spent solvent recovery shall not be less than 95 percent. Submit complete details as per TOR no. 32.

5. Summary & Conclusion as per the generic structure given in Appendix III A of the EIA Notification 2006.

2 Toyo Ink India Pvt. Ltd. Plot No.-D-2/23, Vill-Dahej, Ta.: vagra, Dist.: Bharuch

Appraisal

Project / Activity No.: 5(f)

Page 4 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 4 of 87

Project status: Expansion

Chronology of EC Process:

This project proposed by M/s: Toyo Ink India Pvt. Ltd. (herein after Project Proponent – PP) has submitted Application vide their letter dated 30/06/2014.

The project was considered for TOR finalization in the meeting of the SEAC held on 11/09/2014.

Request for amendment in TOR regarding correction in list of production was considered in the SEAC meeting dated 16/04/2015.

EIA Report prepared by M/s: San Envirotech Pvt. Ltd., Ahmedabad was submitted by project proponent on 02/07/2015.

Project / Activity Details: This is an existing unit engaged in manufacturing of Printing Ink (By Mixing only) and now unit

has applied for expansion of the project by increasing existing capacity and by addition of

manufacturing Industrial Resin and Adhesive as tabulated below.

Sr. No.

Products Existing Quantity (MT/Month)

Proposed (MT/Month)

Total after expansion (MT/Month)

1 Printing Ink (by mixing only) 417 -- 417 1 Poly Urethane Urea Resin -- 500 500 2 Adhesives

--

500

500

(A) Non solvent (chemical reaction) (B) Non solvent (non-chemical

reaction) (C) Solvent based adhesive

Total land area of the project 95,372 sq. m. Total green belt area after proposed expansion will

be 11445 sq. m. Existing cost of project is Rs. 93.79 Crores. The expected cost of the proposed

expansion will be around Rs. 30 Crores. Water consumption will be increased from 131 KL/day

to 158.5 KL/day. Total 55 KL/day (32 KL from STP and 23 KL from ETP) will be recycled and

hence fresh water requirement will be 103.5 KL/day. Source of water supply will be GIDC.

Industrial waste water generation will be increased from 23 KL/day to 41 KL/day. Total domestic

waste water 32 KL/day will be treated in proposed STP and treated water will be used for

utilities and greenbelt. Generated industrial waste water will be treated in Primary, Secondary &

Tertiary treatment units. Total 23 KL/day of treated waste water will be reused for green belt

area and remaining 18 KL/day will be disposed in deep sea through GIDC drainage. At present

HSD is used as fuel in 1 TPH Boiler and 1000U TPH. Consumption of HSD is 60 Lit./Hr for

Boiler and 130 Lit./Hr for TFH. At present one DG set (125 KVA) is provided as stand by facility

in case of emergence. Unit has proposed one 1.5 TPH steam boiler and one DG set (300 KVA).

HSD (15 KL/month) will be used as fuel in Steam Boiler. Scrubber is proposed to control

process emissions like PM & VOCs from the process exhaust. Hazardous waste to be

generated are ETP sludge (2.5 + 1.0 = 3.5 MT/month), Discarded containers/ Barrels/ Liners

(Liner 600 Kg/Month + 5000 Nos./Month), Incinerable wastes like Waste ink, with filter, Cotton

Page 5 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 5 of 87

waste with ink/oil, Plastic with ink, Condense oil with varnish, Paper with pigments & Filter

Residue ( 18.4 MT/Month) and Used lubricating oil 0.5 + 0.35 = 0.85 KL/Year). STP sludge (2.5

MT/Month) will be used as manure.

Observations/Discussions: Technical presentation during the meeting included the Point wise ToR compliance and issues

raised during public hearing. The baseline environmental quality has been assessed for a

period from October-2014 to December 2014 in a study area of 5 km radial distance from the

project site. Ambient Air Quality Monitoring (AAQM) was carried out at 6 locations during the

study period for PM10, PM2.5, Sulphur Dioxide (SO2) and Oxides of Nitrogen (NOx) and VOC.

Results shows that gaseous pollutants and Particulate matter remain well within the prescribed

norms. Prediction of GLC values are made by using Industrial Source Complex Short Term

Model Version-3 (ISCST-3) software approved by U.S. Environmental Protection Agency

(USEPA). It is predicted that highest 24–hourly incremental GLC value for SPM, SO2 and NOx

are 2.116 µg/m3, 0.552 µg/m3 and 0.828 µg/m3 respectively. The point of maximum

concentration by unit would be 1.41 km from center of industry in NE direction. The operation of

proposed plant is not likely to cause any significant impact on the ambient air quality of the

study area. Issues raised during public hearing were discussed. During the meeting, Committee

noted that there is a discrepancy in water consumption and waste water generation. On asking,

PP informed that there was a deviation in existing water balance diagram, however they have

applied for amendment to GPCB and they have obtained provisional CTE with amendment in

water and waste water data. On asking about solvent recovery system, PP clarified that the

solvents used as a raw materials are as a diluents only and there will be no generation of used

solvents from the manufacturing process. They have submitted Risk assessment report. They

have carried out consequence analysis for Ethyl Acetate & Isopropyl Alcohol for catastrophic

rupture if any considering storage in tank with maximum storage capacity of 30 ton at a time.

On asking about maximum credible accident scenario of Toluene di Isocyanate, PP informed

that TDI and rest of hazardous chemicals will be stored in Drums with capacity of 190 to 200 kg

only at designated storage area with provision of dyke wall and probable maximum risk will

localize and limited up to dyke wall or up to plant premises. After detailed deliberations the

Committee sought following additional information for further consideration of the proposal:

1. An undertaking by the Project Proponent on the ownership of the EIA report as per the MoEF&CC OM dated 05/10/2011 and an undertaking by the Consultant regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the MoEF&CC OM dated 04/08/2009.

2. Copy of CTE amendment regarding correction in water consumption and waste water generation data.

3. Give complete waste water management during Rainy days. Detailed study report considering Percolation rate of the land available for gardening & plantation. Ensure that land is suitable for plantation & gardening.

3. Alembic Ltd. F.P.No.78, Chhani, Vadodara Appraisal

The project was taken up in the meeting of SEAC held on 10/03/2015 and during the meeting held on 10/03/2015, it was presented that NOC for firefighting installation has been obtained. Traffic survey carried out on the nearby road shows that the Level of Service (LOS) of the

Page 6 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 6 of 87

existing road will remain the same as “D” (i.e poor) in the proposed scenario also. T.P.Scheme map submitted by the project proponent reveals that the project site is covered under the final T.P.Scheme no. 13 of VUDA. The project proponent has also submitted a copy of letter from VMSS asking to pay stationary charges for laying down of water supply line. Out of the total 133 nos. of existing trees, 70 nos. of trees falling under the construction area will be cut. The project proponent was suggested to use treated sewage for flushing as well in addition to its reuse in horticulture & washing. Further they were suggested to increase the parking area provision. After detailed discussion it was decided to further appraise the project only after submission of certain additional details.

The project proponent submitted the above mentioned details vide their letter dated 24/06/2015. During the meeting, the project was further appraised based on the details submitted and the facts presented before the committee.

Details of the proposed project as presented before the committee is tabulated below:

Sr. No.

Particulars Details

1 Proposal is for New Project 2 Type of Project Affordable housing with commercial units 3 Project/Activity

No. (8(a) or 8(b))

8(a) Building and Construction project

4 Name of the Project

Veda Samsara II

5 Name of Developer

Alembic Ltd.

6 Estimated Project Cost (Rs. in Crores)

Approx 250 Crores

7 Whether Construction work has been initiated at Site? If yes, details thereof

No

8 Project Details Plot Area (m2): 30,928.0 Built up Area (m2): 98,104.39 FSI area (m2): 77,025.96

9 Building Details No. of Buildings: Total 14 buildings. 8 - Residential, 4 – residential & commercial and 2 – Commercial.

No. Blocks: 12 (Residential) + 2 (Commercial ) Scope of buildings: 2 buildings – hollow plinth + 11 floors, 10

buildings – ground floor + 12 floors, 2 commercial buildings – 2 level basement + ground floor + 9 floors.

No. & size of residential units: 560 residential units No. & size of commercial units: 92 nos. of commercial units.

10 No. of expected Residents/Users

Residential - approx. 3052 occupants Commercial - approx. 720 users

Page 7 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 7 of 87

11 Water and Waste Water details during Construction Phase

Water requirement (KL/day)– 73.5 Source of water – Vadodara Mahanagar Seva Sadan Waste water generation (KL/day)– 10.8 Mode of disposal – Underground drainage line of VMSS.

12 Water and Waste Water details during Operation Phase

Total water requirement (KL/day): 409.0 Fresh water requirement (KL/day): 291.0 Source of water: Vadodara Mahanagar Seva Sadan (VMSS). Waste water generation quantity (KL/day): 314.0 Mode of disposal: It is proposed that out of the total domestic

waste water to be generated, 122 KL/day will be treated in the proposed STP of 125 KL/day capacity whereas 192 KL/day will be directly discharged into the drainage line of VMSS.

In case of STP provision, capacity of STP: 125.0 Purposes for treated water utilization: Treated sewage 105

KL/day will be reused for flushing and 13 KL/day will be reused for car washing.

Quantity of treated water to be reused: Treated sewage 105 KL/day will be reused for flushing and 13 KL/day will be reused for car washing.

Provision of dual plumbing system (Yes/No): yes. Quantity and type (treated/untreated) of water to be discharged:

192 KL/day of untreated sewage will be discharged into the underground drainage line of VMSS.

Mode of disposal: Discharged in to u/g drainage of VMSS. 13 Status of Water

Supply and Drainage Line

Available at site.

14 Solid Waste Management

Construction Phase Generation

(m3) Quantity to be reused (m3)

Mode of Disposal/ Reuse

Top Soil 1,000 1,000 Reuse in landscaping area

Excavated earth

43,850 43,850 Will be reused for backfilling, development of internal road & other paved areas & remaining will be used for other projects in vicinity

Construction debris

- - Will be reused for backfilling, development of internal road & other paved areas & remaining will be handed over to VUDA/ VMC/ VMSS

Operation Phase Type of waste

Generation Quantity (Kg/day)

Mode of waste collection

Mode of Disposal / Reuse

Page 8 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 8 of 87

Organic & Inorganic waste

1292 Door to door collection system of VMMSS

Disposal at sanitary waste landfill / disposal site

Capacity and no. of community bins to be placed within premises: 65 bins of 45 kg capacity.

Details of segregation if to be done: No. Landfill site where waste will be ultimately disposed by local

authority: Disposal at sanitary waste landfill / disposal site. 15 Parking Details Total parking area requirement for the project as per GDCR:

15,731.03 m2 Parking area requirement for residential units as per GDCR:

7,597.87 m2 Parking area requirement for commercial units as per GDCR:

7,773.16 m2 Total number of CPS requirement for the project as per NBC:

656 CPS Number of CPS requirement for residential units as per NBC:

464 CPS Number of CPS requirement for commercial units as per NBC:

192 CPS Total Parking area provided (m2) & No. of ECS: 20,202.23 m2 &

692 CPS Parking area provided in basement (m2) & No. of ECS:

13,404.92 m2 & 419 CPS Parking area provided in hollow plinth (m2) & No. of ECS:

2,864.94 m2 & 102 CPS. Parking area provided as open surface (m2) & No. of ECS:

3,932.37 m2 & 171 CPS. 16 Traffic

Management Width of adjacent public roads:18 m wide TP road on North side

& 40 m wide road on North-East side Number of Entry & Exit provided on approach road/s: Total 3

gates will be provided (1 for commercial and 2 for residential units).

Minimum width of open path all around the buildings for easy access of fire tender (excluding the width for the plantation): 6 m

Width of Entry & Exit provided on approach road/s: 7.5 m. 17 Details of Green

Building Measures Proposed

Maximum use of natural lighting through architectural design, use of low water consuming fixtures with flow rates, use of energy efficient appliances, use of compact fluorescent lamps and low voltage lighting, use of energy efficient T5 tubes and PL lamps for interior lighting, timers shall be provided for corridors/ car park lighting etc.

18 Energy Requirement, Source and Conservation

Construction phase: Source: MGVCL Requirement: 40 kW

Operation Phase Source: MGVCL Requirement: Residential building- 3000 kvA Commercial building- 750 kW

Energy conservation measures: Light fixtures will be used with energy saving CFL & T5 fluorescent tube with electronic chokes. 10 % of street lights on solar, solar water heaters for the top floors, all utility panels and common area panel contain kWH energy meter for monitoring, all lift motor, domestic water pumps,

Page 9 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 9 of 87

fire fighting pumps will be energy efficient motors, external lighting to be controlled by astronomical timer switches etc.

DG Sets: No. and capacity of the DG sets:1 × 630 KVA Fuel & its quantity: diesel (126 Liter/h)

Note : - D.G. Sets will be used in case of power failure or fire Emergency.

19 Fire and Life Safety Measures

During Construction phase: Building and Other Construction Workers’ Act, 1996 will be implemented through construction contractor as part of his pre-qualification and contractual responsibility, contractor will submit monthly compliance plan of the Act to Alembic Ltd., full time, empowered safety supervisor on all shifts, a vehicle will be secured at all times for emergency evacuation, daily toolbox talks, PPE exhibition will be set up on site, PPE usage ensured through reward system, safety booklet in Gujarati will be issued to all workers, machine guarding, scaffolding safety, safety lanyard will be strictly adhered for building outside plaster/painting jobs

During Operation phase: Fire tanks –an overhead tank of 20 KL and underground fire water tank of 100 KL will be provided for each building, hydrant system, wet riser cum down comer for all buildings, external courtyard hydrant, pumping machinery –hydrant pumps, terrace booster and diesel pump – of adequate capacities, fire extinguisher – portable fire extinguishers ABC type of 5kg. capacity, CO2 type extinguishers in electrical rooms.

20 Details of Staircase

Building Name Building use Floor Area

(Sq.m) Staircase

Width of staircase (m)

Block - A and B Residential 849.62 2 1.52

Block - C TO F Residential

and Commercial

730.00 2 1.52

Block - G and H Residential 849.62 2 1.52 Block - I and J Residential 643.49 2 1.52 Block - K and L Residential 643.49 2 1.52 Commercial Building -1

Commercial 836.2 2 1.52

Commercial Building -2

Commercial 1736.17 3 1.52

21 Rain Water Harvesting

Rainwater Harvesting System – eight recharge pits connected to the storm water drain.

The water harvesting system will make use of the following collection surfaces: Roof top/terrace catchments, surface runoff catchments.

22 Green Area Details

Area covered by trees (m2): 4,040.0 Area covered by shrubs and bushes (m2): Included in lawn

covered area. Lawn covered area (m2): 1,500.0 Total Green Area (m2): 5,540.0 Green Area % of plot area: 17.91 % No. of trees and species to be planted: about 700 nos. of trees

will be planted.

Page 10 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 10 of 87

23 Dust Control Measures

Water sprinkling, covered transportation, covered storage facility for construction material, peripheral barricading etc.

24 Budgetary Allocation for Environmental Management Plan (Rs. in Lacs)

Construction Phase Sr. No.

EMP Aspect

Approx. Cost in Lakhs

1 Barricades/dust barriers all round the site

5.5

2 Sprinkling of water 3.5 3 Labor Management - first aid centre,

safety measures, sanitation, amenities (through Construction Contractors)

30.0

4 Environmental Monitoring - Air, Water, Noise

1.0

Operation Phase Sr. No.

EMP Measures

Capital cost (in Lakhs)

Operation cost (in Lakhs/annum)

1 ETP 75 8.0 2 Greenbelt and

landscape 32.0 15.0

3 Storm Water Drain and Rainwater Harvesting

8.0 0.8

4 Energy conservation measures

40.0 4.0

5 Environmental Monitoring

- 2.0

6 Solid Waste Management

3.5 1.8

25 Details of Eco-friendly Building Material

Use of PPC throughout the project, use of fly ash upto 30 % in all vitrified/cemented materials (paver blocks, tiles, RCC gratings and precast material, etc.) as per MoEF Notification on reuse of fly ash, lead free paints &enamels, RMC for all major castings etc.

26 Amenities to be provided to the construction workers.

Clean drinking water, separate toilet blocks for male & female, rest shelter with dining space & shelves, first aid room etc.

27 Documents related to land possession.

Village form 7/12 shows the non agricultural land admeasuring 36,352 m2 of F.P. No.78 of T.P.S.No. 13 in the name of Alembic Ltd. Zoning certificate obtained from VMSS shows that the project site falls under the commercial zone.

During the meeting, it was observed that against the total domestic waste water generation quantity of 314.0 KL/day, they have proposed to provide STP with capacity of 125 KL/day and to reuse treated sewage for flushing & car washing only. They were suggested to provide full fledge STP for treatment of entire quantity of sewage to be generated during the operation phase of the project and to reuse treated sewage for gardening purpose also in addition to its reuse for flushing & car washing. They have obtained a permission from Vadodara Mahanagar Seva Sadan for cutting total 90 nos. of trees with a condition to plant & grow total 720 nos. of trees. After detailed discussion it was decided to consider the project only after submission of the following:

Page 11 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 11 of 87

1. Details of Sewage Treatment Plant with its capacity considering the total quantity of sewage to be generated during the operation phase of the project, application wise breakup of treated sewage utilization, size of each unit, retention time, revised water balance diagram etc.

4. KLJ Organics Ltd. Plot no.760 GIDC – Jhaghadia, Dist.: Bharuch. Appraisal

Project / Activity No.: 5(f)

Project status: Expansion

Chronology of EC Process: This project proposed by M/s: KLJ Organics Ltd. (herein after Project Proponent – PP)

has submitted Application vide their letter dated 19/05/2014. The project was considered for TOR finalization in the meeting of the SEAC held on

27/08/2014. EIA Report prepared by M/s: Envisage Environment Consultants, Ahmedabad was

submitted by project proponent on 04/07/2015.

Project / Activity Details:

This is an existing unit involved in manufacturing of synthetic organic chemical – Chlorinated

Paraffin Wax (CPW) with production capacity of 4000 MT/Month. Now the unit proposes to

manufacture various synthetic organic chemicals with the total production capacity of 7670

MT/Month as below.

Sr.no. Name of the product Production Capacity in MT/Month

Existing (MT/Month)

Proposed (MT/Month)

Total (MT/Month)

1. Chlorinated Paraffin Wax (CPW)

4,000 -- 4,000

2 Benzyl Chloride (BCL) -- 3000 3000

3 Benzaldehyde (BCHO -- 2000 2000

4 Sodium Benzoate (SB) -- 180 180

5 Benzyle Benzoate (BB) -- 140 140

6 Benzyle Alcohol (BOH) -- 1500 1500

7 Dibenzylether (DBE) -- 150 150

8 Benzyle Acetate (BAC) -- 500 500

9 Cinnamicaldehyde (CNMD) -- 200 200

Inorganic Chemical

10 Calcium Chloride (CCl) – Dry Base

-- 3750 3750

By-Products

1 Benzyle Acetate High Boilers -- 10 10

2 Cinnamic Aldehyde High Boilers

-- 4 4

3 Hydrochloric Acid (30%) 7210 14000 21210

4 Sodium Hypo Solution (8- 10%)

50 260 310

Total 7260 14274 21534

Page 12 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 12 of 87

The proposed expansion falls in the project activity 5(f) as per the schedule of EIA Notification,

2006.

The proposed products will be manufactured within the existing premises. Manufacturing

process will be continuous type, which involves various unit processes like Chlorination,

Hydrolysis, Neutralization etc. and various operations like Drying, Distillation, Separation and

Evaporation etc. No additional land is required. Total plot area of the project site is 29900 sq.m.

Green belt will be expanded up to 10013 sq.m. from the existing 3000 sq.m. This unit has made

capital investment of Rs. 10.86 Crores in the existing plant and the proposed cost of project will

be Rs. 51.30 Crores. Total water requirement after the proposed expansion will be increased

from 178 KL/day to 1713 KL/day which includes industrial -1678 KL (Process, APCM & cooling

make up, Boiler, Washing), Domestic-10 KL/day & Gardening requirement-25 KL/day. Existing

as well as additional fresh water requirement will be met through GIDC water supply. At present

unit maintains Zero effluent discharge as there is no generation of waste water from the

process as well as any ancillary operations of existing activities. There will be no generation of

waste water from the manufacturing process of proposed products. Waste water generated

from Boiler, Cooling and floor washing will be 40 KL/day, which will be treated in ETP comprise

of P+S+T treatment facilities followed by RO plant and MEE to achieve zero discharge. MEE

condensate and RO permeate (total 39 KL/day) will be reused in process. Total domestic waste

water- 8 KL/day will be discharged into septic tank/soak pit system. Hence there will not be any

kind of waste water discharge outside the premises. In addition to existing 0.8 TPH Boiler, unit

will install AFBC type coal fired Boilers (16 TPH each) having fully automatic PLC control based

firing system for the proposed expansion. Multi Cyclone separator is provided with existing 0.8

TPH Boiler and unit has proposed three field ESP for proposed each steam Boilers. Coal

consumption in Boilers after proposed expansion will be increased from 50 MT/Month to 3500

MT/Month. Unit has proposed bag filter as APCM with Coal handling plant. The unit has

installed two DG sets of 250 KVA & 500 KVA which are kept as a stand-by and used in case of

main power failure from DGVCL. The unit uses diesel as a fuel in the DG sets. The unit will also

install DG set (1000 KVA) during proposed expansion for the same purpose. Water scrubbers

followed by common alkali scrubber has been proposed to control the process emission of HCl

& Cl2. There will be generation of by products 30% HCl and 11% Sodium Hypochlorite from the

scrubbing system. Contaminated oily cotton waste ( 0.4 MT/Year), Distillation residue (34

MT/Year), ETP sludge (, Activated carbon (2 MT/Year), Inorganic process waste(2400

MT/Year), Discarded bags & containers (6.6 MT/Year), Used/spent oil (75 ltr./Year) are the

expected hazardous waste to be generated from the proposed project expansion. ETP waste,

Inorganic process waste & Contaminated oily cotton waste will be disposed off at the common

TSDF. Distillation residue and Activated carbon will be disposed off at the common TSDF or

sent for co-processing at Cement manufacturing unit. Unit has obtained membership certificate

from M/S. Bharuch Enviro Infrastructure Limited (BEIL) for TSDF site and CHWIF. Discarded

barrels / containers / bags / liners will be either reused or returned back to suppliers or sold only

to the authorized vendors after decontamination. Used oil will be sold only to the registered

recyclers.

Observations/Discussions: Technical presentation during the meeting included the Point wise ToR compliance. The

Page 13 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 13 of 87

baseline environmental quality has been assessed for a period from December 2014 to

February 2015 in a study area of 10 km radial distance from the project site. Ambient Air Quality

Monitoring (AAQM) was carried out at 5 locations during the study period for PM10, PM2.5,

Sulphur Dioxide (SO2) and Oxides of Nitrogen (NOx), CL2, HCl and VOC. All the parameters

are well within the NAAQS except PM10 and PM2.5 at project site, which might be due to

existence of various industries in nearby area and also due to ground dust blowing away by

wind from the uncovered fallow land and waste land. The maximum 24-hourly average ground

level concentration for pollutants due to proposed expansion calculated using mathematical

model (ISCST3) for PM10, SO2, NOx, HCl and Cl2 is 3.0770 µg/m3, 7.8254 µg/m3, 0.7693 µg/m3,

0.0379 µg/m3 and 0.01263 µg/m3 respectively. The incremental ground level concentration of

various pollutants at all the ambient air monitoring locations is very negligible. During meeting,

issues related to generation and management of Hydrochloric acid was discussed in detail. On

asking about existing management for spent Hydrochloric acid, PP could not reply satisfactorily.

At this committee asked to submit all the details of sale of spent Hydrochloric acid along with

name and address of actual users for last two years. Further committee also emphasized on

management of all by-products and asked to ensure proper handling of these by-products.

Committee noted that unit has not submitted the complete details as asked in TOR.

Occupational health impacts, Risk assessment & prediction of worst case scenario, green belt

area, environmental compliances of existing activities etc have been discussed in detail. After

detailed deliberations the Committee sought following additional information for further

consideration of the proposal:

1. Submit all the details of sale of spent Hydrochloric acid along with name and address of actual users for last two years. Give complete details regarding registration of vehicles used for transportation of Spent HCL, Gate pass, copies of Manifests etc.

2. An undertaking by the Project Proponent on the ownership of the EIA report as per the MoEF&CC OM dated 05/10/2011 and an undertaking by the Consultant regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the MoEF&CC OM dated 04/08/2009.

3. Compliance of TOR no. 47 regarding certified copy of compliance report from the Regional Office of the MoEF.

4. Compliance of TOR no. 5 regarding management plan for By-Products.

5. Status of submission of half-yearly compliance report in respect of the stipulated prior environmental clearance terms and conditions of existing Environmental clearance.

6. Give Hazardous waste generation in MT/Month.

5. Gujarat Alkalies and Chemicals Limited

P.O. Petrochemicals, 638660, Ranoli, Vadodara

Appraisal

Project / Activity No.: 4(d) & 5(f)

Project status: Expansion

Chronology of EC Process:

This project proposed by M/s: Gujarat Alkalies and Chemicals Limited. (herein after

Page 14 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 14 of 87

Project Proponent – PP) has submitted Application vide their letter dated 19/01/2015. The project was considered for TOR finalization in the meeting of the SEAC held on

22/04/2015. EIA Report prepared by M/s: San Envirotech Pvt. Ltd., Ahmedabad was submitted by

project proponent on 07/07/2015.

Project / Activity Details: This is an existing unit and now proposed to undergo expansion in the existing production plant

as shown below :

Sr. No.

Products Existing Production as

per CC&A MT/Month

Proposed production increase,

MT/ Month

Total Proposed

Production, MT/Month

1 Caustic Soda Lye (100 %) 16120 MT 0 16120

2 Hydrochloric Acid (100%) 7418 MT 0 7418

3 Chlorine 16353 MT + 300 16653

4 Hydrogen 413 MT + 87 500

5 Sodium Hypochlorite (100 %) 227 MT 0 227 MT

6 Caustic soda flakes 6500 MT 0 6500 MT

7 Caustic Potash flakes 1800 MT 0 1800 MT

8 Potassium Hydroxide lye (100%)

3100 MT + 620 3720 MT

9 Potassium Carbonate 1350 MT 0 1350 MT

10 Chloromethanes 3410 MT + 2790 6200

11 Hydrogen Peroxide (100 %) 1302 0 1302

12 Dilute Sulfuric Acid (78%) 1000 MT + 375 1375

13 Upgraded Salt 28800 MT 0 28800 MT

14 Scalewins 17 MT 0 17 MT

15 Defowin 10 MT 0 10 MT

16 Biowins 4 MT 0 4 MT

Page 15 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 15 of 87

17 Multipurpose liquid bleach 4 M3 0 4 M3

18 Toilet cleaner 3 M3 0 3 M3

Total 87831 MT + 4172 MT 92,003 MT

The project expansion activities fall under category no. 4(d) & 5(f) of the schedule of the EIA

Notification, 2006.

Plot area is approx.197500 sq.m. Unit has proposed 22000 sq. m area for green belt

development. Estimated cost of proposed expansion is Rs. 90 Crores.

The current production of Chloromethanes is 110 TPD. The product mix consists of Methyl

Chloride, Methylene Chloride, Chloroform and Carbon Tetra Chloride. The current process uses

Methane and Chlorine as the main raw material. The Methane is separated from Natural Gas

using Cryogenic process and Pressure Swing Absorption (PSA). The expansion in the capacity

of CLM Plant is being done by up-gradation of technology and de-bottlenecking. The up-

gradation involves replacing the use of Methane gas with the use of Methanol. This would

substantially reduce the cost of production. Also, it would reduce the consumption of Natural

Gas. Thus, the expansion of CLM Plant will raise the production of CLM from 110 TPD to 200

TPD with reduction in Natural Gas, reduction in power and water consumption, reduction in C3

and C4 (ODS), reduction in cost of production per ton of Chloromethanes.

The raw water requirement will be increased from existing 6168 KL/day to 6245 KL/day (2314

KL for Process, 3050 for Cooling, 341 KL for Boiler, 500 KL for Domestic, 40 KL for Salt

washery unit) due to the proposed expansion. Additional water requirement will be 77 KL/day.

Source of the water supply is JWSS & RIL French well. The effluent generation will be

decreased from existing 2470 KL/day to 2461 KL/day (1064 KL from Process, 1047 KL from

Cooling, 40 KL from Boiler, 280 KL from domestic and 30 KL from Salt washery unit) after the

proposed expansion. Total decrease in waste water generation will be 9 KL/day due to reuse of

24 KL/day wastewater generated from the condensate of caustic evaporation unit into chemical

preparation in the brine system. Domestic waste water (280 KL/day) will be sent to STP for its

further treatment and finally disposed at VECL along with industrial effluent. Hence, total waste

water discharge in to Common channel of VECL will be 2461KL/day. Wastewater generated

from salt washery unit (30 KL/day) will be discharged through tankers at estuary of river Mahi at

J point of VECL.

At present, three boilers are used and one boiler is kept as stand by. Natural gas is used as fuel

in existing boilers (Boiler no. 1 to 4). After expansion, unit proposes to discontinue 3 existing

boilers and to install one new boiler of 30 MT for its proposed activities, where natural gas

(1888 SCM/hr) will be used as fuel. At present, Natural Gas consumption as fuel is 2545

SCM/hr and after the proposed expansion total consumption of Natural gas will be 2395

SCM/hr. At present there are three D.G. sets (625 kVA each) in the premises which will be used

for the proposed expansion also. It will be used in case of power failure/emergency only. HSD (

19 Kgs/hr) will be used as a fuel. At present, process gas emission is from the stack attached to

CS Hypo Plant. Alkaline scrubber is provided to scrub the HCl and Cl2 gases. Also, from HCl

plant, CLM 1 & CLM 2 plant, to which the Water Scrubber is provided to scrub the HCl gas. A

Page 16 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 16 of 87

stack for H2O2 is also provided at the solvent recovery unit where the charcoal bed is provided.

After expansion, no new process stacks will be added. Existing APCM will be used for the

proposed process emissions from the Hypo tower, HCl section of Caustic Soda plant, HCl

section of old CLM plant, HCl section of new CLM plant and Solvent recovery plant. No

additional process gas stack is envisaged.

Total quantity of hazardous waste generation after proposed expansion will be Waste Mixed

Chloromethane (Hi Boilers) (84 MT/Year), Spent catalyst and molecular sieves ( 1.8 MT/Year),

Used oil ( 25.2 MT/Year), Empty contaminated Barrels/containers/ Liners ( 76.8 MT/Year),

Chemical sludge from waste water treatment ( 126 MT/Year), Ash from flue gas cleaning

residues (6 MT/Year), Organic waste from H2O2 plant ( 228 MT/Year), Used heating salt (60

MT/Year) and Activated Charcoal ( 13.2 MT/Year). Other non hazardous solid waste will be

Brine and salt washery sludge, Insulated copper wire scrap/copper with PVC sheathing, Lead

acid battery scrap and other scrap, Discarded lead acid batteries, Activated alumina, Cotton

waste, Light resin bonded mineral wool, Expanded polystyrene slab, Anthracite etc.

Observations/Discussions: Technical presentation during the meeting included the Point wise ToR compliance. The

baseline environmental quality has been assessed in the winter season (March- 2015 to May-

2015) in a study area of 5 km radial distance from the project site. The EIA report includes the

baseline environmental quality in terms of air, water, soil & geological features, noise,

meteorology, land use pattern, biological information & socio-economic status survey etc.,

anticipated environmental impacts & mitigation measures, environmental management plan &

monitoring program and Risk assessment study. The baseline monitoring of ambient air quality

was carried out at 6 locations. Ambient air quality in terms of concentration of PM10, PM2.5, SOx

, NOx ,HCL, CL2, VOCs & HC was found well within the National Ambient Air Quality

standards. On asking about accreditation of the consultant engaged in preparation of EIA for

sector “Chlor-Alkali”, Consultant of the project Mr. Sadaria informed that the proposed

expansion in Chlor-alkali plant is less than 300 TPD and as per the MoEF OM dated

24.12.2013, the proposed expansion in Chlor Alkali plant is categorized as B2. Committee

noted that the proposed expansion in Chlor-Alkali plant is very less and although the consultant

is accredited for category 5(f) and it was observed that they have covered all the valued

environmental components and impact on it due to proposed expansion in EIA report.

Committee suggested to implement all the mitigation measures proposed in EIA report.

Occupational health impacts, Risk assessment & prediction of worst case scenario, green belt

area, environmental compliances of existing activities, CSR activities etc. have been

discussed in detail. The management will spend approx. Rs. 7 crores as recurring cost per

annum on the pollution control measure, green belt development and other environment

management. Unit has committed to spend about Rs. 8.45 crores in 2015-16 towards various

rural up-liftman and community development programs. After detailed discussion, it was

decided to recommend the project to SEIAA, Gujarat for grant of Environmental Clearance.

6. Polyols & Polymers Plot No:D-2/CH/266, 267 & 268,Dahej-II-Notified industrial estate, Jolva, Ta.: Vagra, Dist.: Bharuch

Appraisal

Project / Activity No.: 5(f)

Page 17 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 17 of 87

Project status: New

Chronology of EC Process:

This project proposed by M/s: Polyols & Polymers. (herein after Project Proponent – PP) has submitted Application vide their letter dated 29/10/2013.

The project was considered for TOR finalization in the meeting of the SEAC held on 31/07/2015.

EIA Report prepared by M/s: Siddhi Green Excellence Private Limited, Ankleshwar was submitted by project proponent on 07/07/2015.

Project / Activity Details: This is a new unit proposing to manufacture Synthetic Organic Products (Synthetic Resins) with

production capacity of 5917 MT/Month as tabulated below:

Sr. no.

Product Quantity

MT/month

1 (a) Acrylic resin 60

(b) Acrylic polyols 150

(c) Acrylic emulsion 150

2 Hydrogenated ketonic resin 150

3 Ketonic resin 300

4 Oil based polyester polyols 1500

5 Phenol formaldehyde resin

(a) phenol formaldehyde / alkyl phenol formaldehyde resin-NOVOLACS

750

(b) alkyl phenol formaldehyde resin-Resole 300

6 Polyamide resin

(a) co solvent grade polyamide resin 600

(b) alcohol soluble polyamide resin

(c) Reactive Polyamide Resin

7 Polyester resin saturate/ unsaturated/ polyester polyols 300

8 Rosin based resin

(a) modified phenolic resin 600

(b) maleic resin 600

9 Turpentine 67

10 Styrene maleic anhydride resin 300

Page 18 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 18 of 87

11 Xylene- Formaldehyde Resin 90

TOTAL 5917

The proposed production activity falls in the category-5(f) of the schedule of the EIA

Notification-2006.

Total plot area is 14347 sq. m & unit has proposed 4,735.5 sq. m. area for the green belt

development/Tree plantation.

Total project cost will be Rs 41.94 Crores. Total fresh water consumption will be 125 KLD ( 70

KL-Process, 20 KL-Utility, 10 KL- Washing, 15 KL Domestic & 10 KL Green belt), which will be

sourced from GIDC water supply. Industrial effluent generation will be 138 KLD (118 – Process,

10 KL – Utility & 10 KL – washing). Domestic wastewater generation will be 12 KLD, which will

be disposed off into soak pit via septic tank. Unit has proposed ETP with primary, secondary

and tertiary treatment facilities. Process effluent streams containing refractory CODs and

phenolic compounds shall be given specific treatment such as advanced oxidation, ion

exchange and then mixed with It is proposed that the treated effluent will be discharged into

deep sea through u/g pipeline of GIDC. Two nos. of steam boilers (Cap. 2 TPH & 3 TPH) and

two nos. of Thermic Fluid heaters (Cap.1000U & 1500U) are proposed. Coal-35 MT/day or

Briquettes-45 MT/day or Natural Gas -16000 SCM/day will be used as fuel. Cyclone separator

followed by Bag filters will be provided as Air Pollution Control Measures for Boilers and

Thermopacks. One DG set with capacity 250 KVA is proposed as standby facility for

emergency purpose. Diesel – 40 lit./hr will be used as fuel for DG set. No process gas emission

is envisaged. ETP Sludge (360 MT/Annum), Used oil (400 Liters/Annum), Discarded Containers

(2,000 drums/Annum) & bags/liners (20,000 bags/Annum), Spent Catalyst (5.3 MT/Month),

Resin waste (80 MT/Month) will be generated as hazardous wastes. ETP waste will be

disposed off at the nearby common TSDF. Discarded barrels / containers / bags / liners will be

either reused or returned back to suppliers or sold only to the authorized vendors after

decontamination. Used oil will be sold only to the registered recyclers. Spent catalyst will be

sent to recycler and re-processor. Resin waste will be sent for co-processing or to common

incineration site. Fly ash will be sale out to Brick manufacturer.

Observations/Discussions: Technical presentation during the meeting included the Point wise ToR compliance and issues

raised during public hearing. The baseline environmental quality has been assessed for a

period from October-2014 to December-2014 in a study area of 10 km radial distance from the

project site. Wind roses for the study period indicate the predominant wind direction was NE to

SW during October and November 2014 and North to NNW in the month of December 2014.

Ambient Air Quality Monitoring (AAQM) was carried out at 10 locations during the study period

for PM10, PM2.5, Sulphur Dioxide (SO2), Oxides of Nitrogen (NOx) and VOC. The 98th percentile

values at all the locations are close to NAAQS permissible limits. SO2 and NOX concentrations

(98th percentile) at all the locations were observed within NAAQS permissible limits.

Concentration of BTX was less than 1.1 µg/m3. Concentration of Benzene and Benzo (a)

pyrene were less than 5 µg/m3and 1 ng/m3 respectively and within stipulated standards of

CPCB during the study period. On asking about the solvent recovery, PP informed that solvents

are recovered from reaction mass directly through primary and secondary condensers and

Page 19 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 19 of 87

therefore dedicated solvent recovery system is not required. Risk assessment & prediction of

worst case scenario, treatability of the industrial effluent, APCM etc. have been discussed in

detail. Committee noted that reuse recycle of treated effluent is not properly addressed in the

EIA report. At this, Committee asked to explore the possibility of reuse of waste water to reduce

the fresh water consumption as well as to minimize the waste water disposal into GIDC

pipeline. After detailed deliberations the Committee sought following additional information for

further consideration of the proposal:

1. Explore the possibility of reuse / recycle of waste water and other cleaner production options for reduction of wastes.

2. An undertaking by the Project Proponent on the ownership of the EIA report as per the MoEF&CC OM dated 05/10/2011.

7. Angel Resins S.No.358/P, Kadadara, Dahegam, Gandhinagar

Appraisal

Project / Activity No.: 5(f)

Project status: New

M/s: Angel Resins (herein after Project Proponent – PP) has submitted application to MoEF&CC vide their letter dated 26/05/2014.

It was decided in the 21st Reconstituted Expert Appraisal Committee (Industry) meeting held on 31st July 2014 to sent this proposal to SEIAA/SEAC, Gujarat as per amendment to EIA Notification, 2006 vide SO 1599 (E) dated 25.06.2014 and MoEF&CC, New Delhi has transferred this proposal to SEIAA/SEAC, Gujarat vide letter no. J-11011/214/2014-IA II (I) dated 07/10/2014

Project proponent submitted application with all documents to SEAC, Gujarat vide their letter dated 10/09/2014.

This project was considered in the meeting of the SEAC held on 05/12/2015. Looking to the small scale of the project and low pollution potential, after detailed

deliberation, the project was categorized as B2 and the additional information was sought for appraisal of the project.

PP did not remained present during the SEAC meeting dated 09/02/2015. The project proponent submitted the additional information vide their letter dated

09/042015. This project was considered in the meeting of the SEAC held on 30/06/2015. During this

meeting this case was treated as screening and scoping again due to duplication of files viz. File no. EIA-10-2014-6728 & no. EIA-10-2014-6809. Later on these files have been merged i.e. File no. EIA-10-2014-6809 is merged in File no. EIA-10-2014-6728.

Project status: New

Project / Activity Details:

This is a new unit proposes the manufacturing of following Synthetic Organic Chemicals

(Resins):

Sr. no

List of product Quantity

1 Melamine Formaldehyde Resin 1000 MT/Month

Page 20 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 20 of 87

2 Phenol Formaldehyde Resin 1000 MT/Month

3 Urea Formaldehyde Resin 1210 MT/Month

Melamine Urea Formaldehyde Resin 1000 MT/Month

The location of the unit is outside the notified area. As per amendment to EIA Notification, 2006

vide SO 1599 (E) dated 25.06.2014, small units are categorized as Category “B” projects. Small

units are defined as with water consumption less than 25 M3/day; Fuel consumption less than

25 TPD; and not covered in the category of MAH units as per the Management, Storage, Import

of Hazardous Chemical Rules (MSIHC Rules), 1989. During presentation, PP informed that

water requirement is 20.74 KL/day. Fuel requirement is 1 MT/day (Briqquettes of Bio-Coal) and

Chemicals to be used are not covered in MAH category. Hence, the proposed products of

Resins fall under Category B of project activity 5(f) as per the EIA Notification 2006.

Total plot area is 3550 sq. m. & unit has proposed 1327 sq. m area for tree plantation. Expected

project cost is Rs.2 Crores. Nearest residential area of Vill. Dhanot is @ 1 KM from the

proposed site. Total water requirement will be 20.74 KL/day (Domestic: 2 KL, Industrial: 12.74

KL, Gardening: 6 KL) and it will be met through Bore well. Industrial waste water generation will

be 4.74 KL/day (2.64 KL from process, 0.1 KL from washing & 2 KL from utilities). Unit has

proposed primary treatment plant followed by evaporator with condenser system for treatment

of industrial effluent. Zero discharge will be maintained. Domestic waste water (1.6 KL/day) will

be disposed off in to Soak pit system. Unit has proposed one steam boiler (1.5 TPH) and one

DG set (82.5 KVA). Unit has proposed Coal/Lignite/Saw mill waste as fuel (1 MT/day) and Bag

filter as APCM. ETP sludge & evaporation residue (1 MT/Month), Used Oil (0.05 MT/Month)

and Discarded containers/drum/bags (3020 no.s/Month) are the hazardous waste to be

generated from the proposed production.

Observations & Discussions:

Technical presentation made during the meeting also covered the point wise reply of additional

information sought. Committee asked to use briquettes of Bio-fuel only as fuel and to provide

adequate APCM with steam boiler. Committee observed that, the storage of Formaldehyde is

more than the threshold limit for MAH unit as per the Management, Storage, Import of

Hazardous Chemical Rules (MSIHC Rules), 1989. At this committee felt that, the legal

undertaking submitted regarding non-MAH unit is required to be justified. Committee also asked

to ensure that emissions from the evaporator shall be within the prescribed norms. After

detailed deliberations the Committee sought following additional information for further

consideration of the proposal:

1. Give justification regarding legal undertaking submitted for non-MAH unit as per the Management, Storage, Import of Hazardous Chemical Rules (MSIHC Rules), 1989.

8. Alkyl Amines Chemicals Limited D2/CH/149/2,GIDC Dahej, Phase-II, Dahej, Vagra, Bharuch

ToR Amendment.

Project / Activity No.: 5(f) Project Proponent submitted Application vide their letter dated 14/05/2014 in MoEF&CC,

New Delhi due to then non-constitution of SEIAA/SEAC of Gujarat.

Page 21 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 21 of 87

Now, MoEF&CC, New Delhi has transferred this project proposal to SEIAA, Gujarat vide letter no. J-11011/200/2014-IA II (I) dated 21/10/2014.

The project was considered for TOR finalization in the meeting of the SEAC held on 29/11/2014.

Now project proponent has requested to amend the TOR vide their letter no. NIL dated 26/08/2015 for correction of list of Production as given in the Form-1. PP has submitted Revised Form-1 with relevant details. As per their submission, PP requested to exclude three products from the list of products namely (1) Di methyl amine hydrochloride (DMAHCl) Solution, (2) Mono ethanolamine (MOEA) (Ethoxylates), (3) Choline Chloride.

During meeting, on asking about the change in product list, PP informed that the change in product list is due to change in market demand. Committee noted that there is no increase in pollution potential, rather it is decreased due to proposed change in product list.

After deliberations Committee accepted the amendment sought by the project proponent as mentioned in their revised Form-1 and now project details shall be read as under.

Project / Activity Details: This is a new unit proposes manufacturing of Synthetic Organic Chemicals as tabulated below:

Sr. no.

Name of Product Quantity MT/Annum

1 Methylamines (Mono, Di & Tri) 49500

2 Dimethylaminopropylamine (DMAPA)

4950

3 Tertiaryamine 4950 4 N-Methyl Pyrollidone (NMP) 9900 5 N- Ethyl Pyrollidone (NEP) 9900 6 Acetonitrile 16500 7 Sodium acetate 6105

A plot of 99966.945 m2 area has been acquired for this new project. Total cost of the project is

Rs. 375.15 Crores. Total water consumption for the proposed project will be 994 KL/day which

will be sourced from GIDC water supply. Unit has adopted water conservation measures viz.

Condensate recovery, Air cooled condenser instead of water cooled condenser, reuse of

treated waste water from STP, drip irrigation system for green belt etc. Total industrial waste

water generation will be 451 KL/day, which will be treated in ETP (P + S + T) and treated water

will be discharged to GIDC drain. Generation of domestic waste water 17 KLPD will be treated

in proposed STP. Treated sewage will be recycled for gardening purpose. Flue gas generation

will be from Two Boilers (30 TPH each), 2 TFH (20 Lacs Kcal/Hr each) and one DG set (1000

KVA). Coal (5450 Kg/hr x 2) & FO (260 kgs/Hr x 2) will be used for Boilers and TFHs. Separate

stacks provided for all the Boilers & TFHs. Unit has proposed ESP as APCM for each Boiler &

TFH. HSD (208 ltr/hr) will be used for DG set. Unit has proposed 4 water scrubbers for control

of Ammonia & total amines to be emitted from different plants. Hazardous waste generated

from the manufacturing activity will be Spent Carbon, Distillation Residue, Spent Organic

Solvent, Used / spent oil, Discarded Containers, ETP Sludge.

The draft EIA report as per the TOR prescribed during the SEAC meeting 29/11/2014 shall be

Page 22 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 22 of 87

submitted to the Gujarat Pollution Control Board for conducting the public consultation process

as per the provisions of the EIA Notification, 2006. The project shall be appraised on receipt of

the final EIA report.

9. True Value Nirman Pvt. Ltd. Corporate road, F.P. No.317,318, T.P.S.No.26,Makarba, Ahmedabad

EC amendment case

The SEIAA, Gujarat has accorded environmental clearance to M/s True Value Nirman Pvt. Ltd. for the commercial building construction project at F.P.No.317,318, T.P.S.No.26 (Makarba), Dist: Ahmedabad vide order no. SEIAA/GUJ/EC/8(a)/110/2015 dated 04/03/2015 for the built up area of 48,620.7 m2.

Now, the project proponent in the name of M/s True Value Business Bay, vide their letter dated 26/06/2015 requested for amendment of Environmental Clearance order dated 04/03/2015. It was mentioned in the letter that they want to scale down the project by changing the planning and scope of the project.

The request for amendment in terms of proposed changes was considered during the meeting. The project proponent presented the previous and the revised project details which are tabulated below:

Description As per Environment Clearance

Expansion and Modification

Name of the project Commercial project West Gate Business Bay Plot area (sq. M.) 6,898.05 6,897.0 Ground Coverage (sq. M.) 2,412.66 2,844.53 Built – up area (sq. M. ) 48,620.7 38,030.88 FSI area (sq.m.) 23,854.05 20,059.80 Basement area (sq. M.) 10,639.42 10,931.92 Number of buildings 2 buildings comprising of 3

blocks (A, B1 & B2) 2 buildings comprising of 3 blocks (A, B1 & B2)

Number of Units 422 commercial units (30 shops & 392 offices)

200 commercial units + 141 hotel rooms.

No. of floors 2 level basement + ground floor + 21 floors

Blocks B1 & B2 – 2 level basement + ground floor + 14 floors. Block A – 2 level basement + ground floor + 12 floors.

Maximum height (m) 70 45 Parking requirement as per NBC

477 CPS 324 CPS

Parking requirement as per GDR

11,927.02 10,029.9

Parking area provided (m2) Total Area – 17,059.13 m2 [10,639.42 m2 in basement + 1,100.0 m2 as open surface parking + 5,319.17 m2 as mechanical parking] Total – 545 CPS

Total Area – 11,381.92 m2 [10,531.92 m2 in basement + 850.0 m2 as open surface parking] Total – 365 CPS

Provision of D.G. Sets. 1 × 125 KVA 2 × 125 KVA Fire fighting facilities Fire extinguishers, hose

reel, wet riser, yard hydrant, manually operated electric fire alarm system, automatic

Fire extinguishers, hose reel, wet riser, yard hydrant, automatic sprinkler system in basement, manually operated electric fire alarm system,

Page 23 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 23 of 87

sprinkler system, terrace tank – 40 KL capacity, underground tank-300 KL capacity for firefighting purpose only, skip floor (10th and 18th Floor) in A block, automatic detection and alarm system, refuge area will be provided (7th , 11th , 15th and 19th Floor) in A block and (4th, 7th and 11th Floor) in B block etc.

automatic detection & alarm system, terrace tank – 60 KL total capacity, underground tanks-150 KL × 2 nos., pump near underground static water storage tank – one diesel pump of capacity – 2,280 L/min and one electric pump of capacity 180 L/min.

During the meeting, it was discussed that the proposed scaling down of the project will not

result in the increased resource requirement, parking area requirement, waste generation etc.

and it was decided to consider the project only after submission of the following:

1. Justification for proposed changes along with the supporting documents.

2. Documentary evidences showing the change in project developers and NOC from M/s. True Value Nirman Pvt. Ltd. for transferring the Environmental clearance in the name of M/s True Value Business Bay.

3. Full size project plans showing building/block wise & floor wise built up area, FSI area & floor area table.

4. Details of the exits and staircases on each floor in high rise buildings for evacuation from the top level to the street level along with the distances between two such staircases in each building. Plan showing emergency exits as well as location of stair cases, lifts and pathways etc. and compliance to the GDCR and NBC in this regard.

10. Aasthaa Opal S.N.397/1/2,397/2,Navavadaj,Ahmedabad. Screening and Scoping

Details of the proposed project, as presented before the committee, is tabulated below:

Sr. No.

Particulars Details

1. Proposal is for New project 2. Type of Project Residential + Commercial 3. Project / Activity

No. [8(a) or 8(b)] 8(a)

4. Name of the project

Aasthaa Opal

5. Name of Developer

Apurva Associates

6. Estimated Project Cost (Rs. In Crores)

23 Crores

7. Whether construction work has been initiated at site? If yes,

No

Page 24 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 24 of 87

details thereof 8. Project Details Land / Plot Area (m2) : 5,402.0

FSI area (m2):15,217.19 Non FSI area (m2):7,872.98 Total BUA (m2):23,090.17

Permissible Proposed FSI Area (m2) 20,078.99 15,217.19 Ground Coverage(m2) 2,543.18 2,543.18 Common Plot Area(m2) 432.16 434.05 Max. Building height(m) -- 23.25

9. Building Details No. of Buildings: 7 No. of Blocks: 7 Scope of buildings/blocks: Basement + Ground floor +7 Floors No.& size of Residential Units: 196 No. & type of Commercial Units: 30 Details of amenities if any: No

10. No. of expected residents / users

904 residents / users

11. Water & waste water details during construction phase

Water requirement (KL/d):30.0 Source of water: AMC water supply system Waste water generation quantity (KL/d):4.0 Mode of disposal: Into soak pit through septic tank. Details of reuse of water, if any: No

12. Water & waste water details during operation phase

Fresh water requirement (KL/d):111.62 Source of water: AMC water supply system Waste water generation quantity (KL/d):87.91 Mode of disposal: Drainage system of AMC.

13. Status of water supply and drainage line

Drainage line & water supply lines are available in the area.

14. Solid waste Management

Construction Phase: Generation

(m3) Quantity to be reused (m3)

Mode of Disposal / Reuse

Top Soil 1,200 1,200 Will be used for green belt development

Other excavated earth

13,300 3,500 Internal roads & other paved areas, back filling.

Construction debris

550 550 Back filling & internal roads development

Steel scrap 10.0 MT -- Sold to venders

Discarded packing materials

210 125 Sold to venders

Operation Phase:

Page 25 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 25 of 87

Type of waste

Generation Quantity (Kg/d)

Mode of waste collection

Mode of Disposal / Reuse

Total waste 437.0 Into bins to be provided within premises.

Through waste collection facility of AMC

Details of segregation if to be done: No Capacity and no. of community bins to be placed within

premises: 25 bins of 80 L capacity will be provided for residential units & 10 bins for commercial units.

Landfill site where waste will be ultimately disposed by local authority: Nearby MSW disposal/dumping site of AMC.

15. Parking Details Total parking area requirement for the project as per GDCR: 2,882.36 m2

Parking area requirement for residential units as per GDCR: 2,360.14 m2

Parking area requirement for Commercial units as per GDCR: 522.22 m2

Total number of CPS requirement for the project as per NBC :119CPS

Number of CPS requirement for residential units as per NBC: 98 CPS

Number of CPS requirement for commercial units as per NBC: 21CPS

Total Parking area provided (m2) & No. of CPS: 7,149.85 m2 &

251 CPS Parking area provided in basement (m2) & No. of CPS:

4,100.62 m2 & 128 CPS. Parking area provided in hollow plinth (m2) & No. of CPS:

1,242.0 m2 & 44 CPS Parking area provided as open surface (m2) & No. of CPS:

1,807.23 m2 & 79 CPS. 16. Traffic

Management Width of adjacent public roads:18 m East Side &12 m North

Side Number of Entry & Exit provided on approach road/s:One gate

will be provided Width of Entry & Exit provided on approach road/s: 7.54 m. Minimum width of open path all around the buildings for easy

access of fire tender (excluding the width for the plantation): 4 m.

Width of all internal roads: 7.50 m 17. Details of Green

Building measures proposed.

LED/LED lights in general area, solar lights in open areas, energy efficient transformers, motors, pumps & electrical appliances etc.

18. Energy Requirement, Source and Conservation

Power supply: Maximum demand: 900 KW Connected load: 1230KW

Source: Torrent Power Ltd DG Sets:

No. and capacity of the DG sets: 1 × 120 KVA Fuel & its quantity: 30 L/hr of HSD

19. Fire and Life Fire extinguishers of DCP & CO2 type , separate underground

Page 26 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 26 of 87

Safety Measures tank of 100 KL capacity for residential & commercial purposes, 20 KL capacity overhead tanks, fire sprinklers, hose reel, manual call point etc.

20. Details on staircase Type & no. of buildings

No. of floors

Floor area No. of staircase

Width of the staircase

Travel distance (m)

A,B,C,D Base. + G +7 Floors

259.71 m2

01 1.52 m. < 30.0 m.

E&F Base. + H.P. + 7Floors

348.03 m2

01 1.52 m. < 30.0 m.

G Base. +G +7Floor

347.25 m2

01 1.52 m. < 30.0 m.

21. Rain Water Harvesting (RWH)

Level of the Ground water table: 40 m No. & dimensions of RWH tank(s): --- No. and depth of percolations wells: 02 Nos. Details on Pre-treatment facilities : Desilting & Filter Chamber

22. Green area details

Tree covered area (m2): 200 Area covered by shrubs and bushes (m2): included in lawn

covered area. Lawn covered area (m2): 234.0 Total Green Area (m2):434 Green Area % of plot area:9.0 % No. of trees and species to be planted: 82 Nos.

23. --

Budgetary allocation for Environmental Management Plan(Rs. In lacs)

6Lacs

24. Proposed dust control measures during the construction phase

Regular water sprinkling, vertical curtails, covered shed for cement unloading, covering the excavated earth with tarpaulin sheet etc.

25. Eco friendly building material usage details.

Fly ash bricks, aerated blocks, fly ash blocks, maximum use of RMC, lead free paints etc.

26. Amenities to be provided to construction workers.

Medical facilities & regular health check up, sanitary facilities, cooking fuel, drinking water, tea & snacks etc.

27. Documents related to land possession.

Copy of subregistrar’s index shows that the agricultural land land is in the name of Amarsagar Co. Op. Ho. So. Ltd. And a copy of development agreement made between Amarsagar Co. Op. Ho. So. Ltd. & M/s Apurva Associates has been submitted. N.A. order for S.No.397/2 is in the name of Amarsagar Co. Op. Ho. So. Ltd.

During the meeting, the project proponent was suggested to provide two separate gates for entry/exit. After detailed discussion, it was decided to consider the project only after submission of the following:

1. Layout plan showing provision of two separate gates for entry / exit.

Page 27 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 27 of 87

2. Copy of permission obtained for non agricultural use of S.No. 397/1/2 or a copy of documents showing the correspondences made in this regard.

11. Koel Colours Pvt. Ltd Plot no. 911, GIDC-Sarigam, Umargam, Valsad.

Screening and Scoping

Project / Activity No.: 5(f) M/s. Koel Colours Pvt. Ltd. (herein after Project Proponent – PP) has submitted

application vide their letter dated 17/06/2015. Project status: Expansion

Project / Activity Details:

This unit is engaged in manufacturing of Ink, Coatings medium and reducers by mixing and

blending process and Colourants of various shades for cosmetics and pharmaceutical

applications by mixing and blending process. Now unit has proposed for expansion by addition

of new products of Lake colours, Acyl amino Acids and Inorganic Pigments as tabulated below:

Sr. No. Products Name Production Capacity (MT/Month)

Existing Proposed Total

1. Ink, Coating Mediums and Reducers by

mixing, blending and packing process 100 -- 100

2. Colourants of various shades for

cosmetics and pharmaceutical

applications by mixing and blending

process

800 -- 800

3. Lake Colours (Ponceau SX, Carmosine,

Acid Orange, Sunset Yellow, Allura Red,

Amaranth, Ponceau 4 R, Acid Fuchine,

Tartrazine, Black PN, Patent Blue V, Fast

Green FCF, Brilliant Blue, Acid Red 52,

Tetra BromoFlurocein, Phloxine B,

erythrosine, Quinoline Yellow WS, Indigo

Carmine)

-- 100 100

4. Acyl amino Acids (Louryl lysine, Lauroyl

Arginine Lysine, Sodium Cocoyl

Glutamate, Sodium Lauroyl Glutamate

etc.)

-- 40 40

5. Pigments ( Manganese violet and

hydrated chrome oxide) --

40 40

Total 900 180 1080

The project falls under Category B of project activity 5(f) as per the schedule of EIA Notification

2006.

Total plot area is 4085 sq. m and unit has proposed 1200 sq. m. area for the green belt

development/Tree plantation. Expected project cost is Rs. 8.00 Crores.

Page 28 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 28 of 87

Total water consumption after proposed expansion will be 166 KL /day [Existing 13 KL (10 KL

for Domestic, 2 KL for Gardening and 1 KL for Cooling) and proposed 153 KL/Day (5 KL for

Domestic, 5 KL for Gardening, 137 KL for Process & Washing, 5 KL for boiler and 1 KL for

Cooling)]. Fresh water will be sourced from GIDC water supply. Total Industrial waste water

generation after proposed expansion will be 91.20 KL/Day [(Existing NIL) and proposed 91.20

(90 KL for Process & Washing, 1 KL for boiler and 0.20 KL for Cooling)]. Industrial waste water

(91.20 KL/Day) will be treated using adequate effluent treatment plant, then will be used for the

plantation or will be disposed off through underground drainage to CETP, Sarigam. Domestic

waste water (12 KL/Day) will be disposed off through adequate soak pit and septic tank.

Treated effluent will be discharged into closed drainage line to CETP. Unit has existing one

Baby Boiler (800 kg/Day) in which CNG (7 SCM/Day) is used as fuel. Unit has Existing DG Set

Capacity of 50 KVA and Proposed DG set capacity of 75 KVA in which HSD (Existing 8 Lit/hr

and Proposed 15 Lit/hr) will be used as fuel. The Dust collector will be attached to pulverizer for

air pollution control measures. Adequate capacity of pulse air jet type bag filter system will be

provided to proposed pulveriser and all the solvents will be handled through closed pipelines.

Hazardous waste generated from the manufacturing activity will be proposed ETP sludge (8

MT/M), Process waste (0.05 MT/Year), Used oil (Lit/Month) and Discarded containers/ bas/

barrels /liners (40 nos./Month).

Observations / Discussion:

Technical presentation made during the meeting by project proponent. While discussing about

performance of the CETP, PP informed that the CETP is performing well. Committee asked to

submit compliance report of CETP with analysis reports of final treated effluent. Committee

suggested reuse/recycle of treated waste water at maximum extent and minimize the effluent

discharge to the CETP. During the meeting, the project proponent requested for categorizing

the project as B2 and to exempt them from carrying out detailed EIA study which was not

considered by the committee and the project proponent was asked to include the following

TORs for the EIA study to be done covering 5 km radial distance from the boundary of the

project.

1. Need for the proposed expansion should be justified in detail.

2. Demarcation of proposed expansion activities in lay out of the existing premises.

3. Exact aerial distance from the CEPI area of Vapi and Inter state boundary from the project premises.

4. Exact details about additional infrastructural facilities, plant machineries etc. required for the proposed expansion.

5. Technical details of all the plants along with details of manufacturing process / operations of each product. Details on strategy for the implementation of cleaner production activities.

6. Chemical name of each product and raw materials along with chemical reactions of unit processes. Detailed manufacturing process of each product along with chemical reactions and mass balance (including reuse-recycle, if any).

7. Assessment of source of the water supply with adequacy of the same to meet with the requirements for the project expansion. Permission obtained for supply of increased quantity of raw water. Undertaking stating that no bore well shall be dug within the

Page 29 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 29 of 87

premises.

8. Water consumption and consumption of each raw material per MT of each product.

9. Water balance diagram (including reuse-recycle, if any) alongwith qualitative and quantitative analysis of the each waste stream to be generated. A detailed treat ability study vis-à-vis the adequacy and efficacy of the treatment facilities proposed for the wastewater to be generated. The characteristic on which treatability is based shall also be stated. Characteristics of untreated and treated wastewater.

10. Quality and quantity of waste water to be generated from the manufacturing process of each product to be manufactured along with mass balance.

11. Stream wise qualitative & quantitative analysis of each waste stream (including process water, cooling tower blow down, boiler blow down, washing effluent etc.) to be generated. Characteristics of untreated and treated wastewater. A detailed effluent treat ability study vis-à-vis the adequacy and efficacy of the treatment facilities proposed for the wastewater to be generated. The characteristic on which treatability is based shall also be stated.

12. Detailed effluent treatment scheme and disposal method. Technical details of the proposed ETP, including size of each unit, retention time etc. including modifications / up gradation to be done in existing ETP to take care of increased effluent quantity along with its adequacy report.

13. Plan for management and disposal of waste streams to be generated from spillage, leakages, occasional reactor washing, and exhausted media from Scrubber etc.

14. Explore the possibility of reuse / recycle and other cleaner production options for reduction of wastes. Details of methods to be adopted for the water conservation.

15. Undertaking stating that a separate electric meter will be provided for the ETP & Incinerator.

16. One season Site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall should be incorporated.

17. Anticipated environmental impacts due to the proposed project/production may be evaluated for significance and based on corresponding likely impacts VECs (Valued Environmental Components) may be identified. Baseline studies may be conducted within the study area of 5 km for all the concerned/identified VECs and likely impacts will have to be assessed for their magnitude in order to identify mitigation measures.

18. One complete season base line ambient air quality data (except monsoon) to be given along with the dates of monitoring. The parameters to be covered shall be in accordance with the revised National Ambient Air Quality Standards as well as project specific parameters. Locations of the monitoring stations should be so decided so as to take into consideration the pre-dominant downwind direction, population zone and sensitive receptors. There should be at least one monitoring station in the upwind direction. There should be at least one monitoring station in the pre dominant downwind direction at a location where maximum ground level concentration is likely to occur.

19. Modelling indicating the likely impact on ambient air quality due to proposed activities. The details of model used and input parameters used for modelling should be provided. The air quality contours may be shown on location map clearly indicating the location of sensitive receptors, if any, and the habitation. The wind rose showing pre-dominant wind direction should also be indicated on the map. Impact due to vehicular movement shall also be included into the prediction using suitable model. Results of Air dispersion modelling should

Page 30 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 30 of 87

be superimposed on google map / geographical area map.

20. Base line status of the noise environment, impact of noise on present environment due to the project and proposed measures for noise reduction including engineering controls.

21. Specific details of (i) Process gas emission from each unit process with its quantification, (ii) Air pollution Control Measures proposed for process gas emission, (iii) Adequacy of the air pollution control measures for process gas emission measures to achieve the GPCB norms (iv) Details of the utilities required (v) Type and quantity of fuel to be used for each utility (vi) Flue gas emission rate emission from each utility (vii) Air Pollution Control Measures proposed to each of the utility along with its adequacy (viii) List the sources of fugitive emission along with its quantification and proposed measures to control it.

22. Name and quantity of each type of solvents to be used for proposed production. Details of solvent recovery system including mass balance, solvent loss, recovery efficiency feasibility of reusing the recovered solvents etc. for each type of solvent.

23. Details on management of the by-products and spent acid to be generated along with copies of MOU / agreements done with actual consumers regarding utilization of by-products & spent acids shall be incorporated.

24. Details of management of the hazardous wastes to be generated from the project stating detail of storage area for each type of waste, its handling, its utilization and disposal etc. How the manual handling of the hazardous wastes will be minimized.

25. Methodology of de-contamination and disposal of discarded containers and its record keeping.

26. Membership of Common Environmental Infrastructure including the TSDF / Common Hazardous Waste Incineration facility along with an assessment to accommodate the additional quantity of wastes to be generated. Explore the possibilities for co-processing of the Hazardous waste prior to disposal into TSDF/CHWIF.

27. Data on air emissions, wastewater generation and solid / hazardous waste generation and management for the existing plant should also be incorporated.

28. Details of measures proposed for the noise pollution abatement and its monitoring.

29. A detailed EMP including the protection and mitigation measures for impact on human health and environment as well as detailed monitoring plan and environmental management cell proposed for implementation and monitoring of EMP. The EMP should also include the concept of waste-minimisation, recycle/reuse/recover techniques, energy conservation, and natural resource conservation. Total capital cost and recurring cost/annum earmarked for environment pollution control measures.

30. Occupational health impacts on the workers and mitigation measures proposed to avoid the human health hazards along with the personal protective equipment to be provided to the workers. Provision of industrial hygienist and monitoring of the occupational injury to workers as well as impact on the workers. Plan for periodic medical check up of the workers exposed. Details of work place ambient air quality monitoring plan as per Gujarat Factories Rules.

31. Details of hazardous characteristics and toxicity of raw materials and products to be handled and the control measures proposed to ensure safety and avoid the human health impact.

Page 31 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 31 of 87

32. Details of quantity of each hazardous chemical to be stored, material of construction of major hazardous chemical storage tanks, threshold storage quantity as per schedules of Manufacture, Storage & Import of Hazardous Chemicals Rules of major hazardous chemicals.

33. Risk assessment including prediction of the worst-case scenario and maximum credible accident scenarios should be carried out. The worst-case scenario should take into account the maximum inventory of storage at site at any point of time. The risk contours should be plotted on the map clearly showing which of the facilities and surrounding units would be affected in case of an accident taking place. Based on the same, proposed safeguard measures including On-Site / Off-Site Emergency Plan should be provided.

34. Permission from PESO, Nagpur for storage of solvents, other toxic chemicals, if any.

35. Details of fire fighting system including provision for flame detectors, temperature actuated heat detectors with alarms, automatic sprinkler system, location of fire water tanks & capacity, separate power system for fire fighting, details of qualified and trained fire personnel & their job specifications, nearest fire station & time required to reach the proposed site. Submit line diagram of the fire hydrant network.

36. Detailed five year greenbelt development program including annual budget, types & number of trees to be planted, area under green belt development [with map], budgetary outlay; along with commitment of the management to carry out the tree plantation activities outside the premises at appropriate places in the nearby areas and elsewhere.

37. Proposal for socio-economic development activities including community welfare program most useful in the project area for the overall improvement of the environment.

38. Copies of Consent to Establish, Consent to Operate orders obtained in past along with point wise compliance status of all the conditions stipulated therein.

39. Copy of Environmental Clearance obtained for the existing project and a certified report of the status of compliance of the conditions stipulated in the environmental clearance for the existing operation of the project by the Regional Office of the MoEF.

40. Records of any legal breach of Environmental laws i.e. details of show- cause notices, closure notices etc. served by the GPCB to the existing unit in last five years and actions taken then after for prevention of pollution.

41. Details of fatal / non-fatal accidents, loss of life or man hours, if any, occurred in the existing unit in last three years and measures proposed to be taken for avoiding reoccurrence of such accidents in future.

42. (a) Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report.(b) Does the Environment Policy prescribe for standard operating process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions ? If so, it may be detailed in the EIA.

43. What is the hierarchical system or administrative order of the company to deal with the environmental issues and for ensuring compliance with the EC conditions. Details of this system may be given.

44. Submit checklist in the form of Do’s & Don’ts of preventive maintenance, strengthening of HSE, manufacturing utility staff for safety related measures.

Page 32 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 32 of 87

45. Does the company have a system of reporting of non compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism should be detailed in the EIA Report.

46. Compliance of the MoEF’s OM dated 04/08/2009 and 05/10/2011 regarding compliance of TOR prescribed & factual correctness of the data submitted in the EIA report, the names of experts associated with / involved in the preparation of the EIA report and the ownership of the EIA report by the Project proponent.

47. Certificate of accreditation issued by the NABET, QCI to the environmental consultant should be incorporated in the EIA Report.

The above mentioned project specific TORs/additional TORs and the model TORs available in

the MoEF’s sector specific EIA Manual for Synthetic Organic Chemical industry shall be

considered as generic TORs for preparation of the EIA report in addition to all the relevant

information as per the generic structure of EIA given in Appendix III in the EIA Notification,

2006. The project shall be appraised on receipt of the final EIA report.

12. Kasha Rivera T.P.S.No.14(PAL),Block, No.343,O.P.No.70,, F.P.No.134,Paikee Sab Plot No.B, At-Pal,Surat

Screening & Scoping

Details of the proposed project as presented before the committee is tabulated below:

Sr. No.

Particulars Details

1. Proposal is for

New Project

2. Type of Project

Residential

3. Project / Activity No. [8(a) or 8(b)]

8(a)

4. Name of the project

“Kasha Rivera”

5. Name of Developer

Mr. Pareshbhai B. Panchani.

6. Estimated Project Cost (Rs. In Crores)

Rs. 90.0 Crore

7. Whether construction work has been initiated at site? If yes, details thereof

--

8. Project Details

Land / Plot Area (m2): 11,883.0 FSI area (m2): 47,353.06 Non FSI area (m2): 50,752.26 Total BUA (m2) : 98,105.32

Page 33 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 33 of 87

Permissible Proposed FSI Area (m2) 47,532.0 47,353.06 Ground Coverage (m2) --- 7,144.99 Common Plot Area (m2) 1,188.30 2,196.0 Max. Building height (m) -- 88.51 m

9. Building Details

No. of Buildings: 03 Nos. No. of Blocks: -- Scope of buildings/blocks: 2 level basement + ground floor, 1st &

2nd floor (parking), 3rd floor (club house) + 4th to 24th floor(residential units)

No. & size of Residential Units: 168 Flats No. & type of Commercial Units: -- Details of amenities if any: club house

10. No. of expected residents / users

Expected residents: 840 Expected shop users: -- Expected visitors: 350

11. Water & waste water details during construction phase

Water requirement (KL/day): 15.0 Source of water: Bore well water Waste water generation quantity (KL/day): 2.70 Mode of disposal: Into soak pit through septic tank. Details of reuse of water, if any: W/W generated from washing of

equipment will be reused for curing after necessary treatment. 12. Water &

waste water details during operation phase

Total water requirement (KL/day): 128.0 Fresh water requirement (KL/day): 86.0 Source of water: Water supply system of Surat Municipal

Corporation. Waste water generation quantity (KL/day): 96.0 Mode of disposal: U/G drainage line of Surat Municipal

Corporation. In case of STP provision, capacity of STP: Yes (Sewage

Treatment Plant – 110 m3) STP Technology: Ozonization Treatment. Purposes for treated sewage utilization: Treated sewage will be

utilized in gardening and toilet flushing. Quantity of treated sewage to be reused: 1. Gardening (KL/day):

9.0. 2. Flushing (KL/day): 34.0 Provision of dual plumbing system (Yes/No): Yes Quantity and type (treated/untreated) of sewage to be discharged:

51.0 KL/day of treated sewage will be discharged into the underground drainage line of Surat Municipal Corporation.

Mode of disposal: U/G drainage line of Surat Municipal Corporation. 13. Status of

water supply and drainage line

The project falls under the sanctioned final T.P. scheme of Surat Municipal Corporation and the water supply as well as drainage connection will be available to the project at the time of getting B.U permission.

14. Solid waste Management

Construction Phase: Generation

(m3) Quantity to be reused (m3)

Mode of Disposal / Reuse

Page 34 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 34 of 87

Top Soil 1,098.0 1,098.0 Reuse for developing garden area

Other excavated earth

60,666.76 2,696.39 m3 will be used to raise the plot area.

Will be disposed / used at other project sites.

Construction debris

1,030 491 Reused as a filler up to plinth level within premises and remaining will be reused in outer road development

Steel scrap 50 -- Sold to local scrap vendors

Discarded packing materials

35 -- Sold to local vendors

Operation Phase: Type of waste

Generation Quantity (Kg/day)

Mode of waste collection

Mode of Disposal / Reuse

Dry waste 304.0 Blue coloured bucket

Through S.M.C.’s door todoor waste collection system.

Wet waste 200.0 Green coloured bucket

Through S.M.C.’s door todoor waste collection system.

STP Sludge 10.0 Converted into manure after

drying.

Reused in gardening as manure within project premises.

Details of segregation if to be done: Separate bins will be provided to collect dry and wet waste.

Capacity and no. of community bins to be placed within premises: 1.0 m3 in each building

Landfill site where waste will be ultimately disposed by local authority: Khajod MSW disposal site of SMC.

15. Parking Details

Total parking area requirement for the project as per GDCR: 7,103.0 m2

Parking area requirement for residential units as per GDCR: 7,103.0 m2

Total number of CPS requirement for the project as per NBC : 168 Number of CPS requirement for residential units as per NBC: 168 Total Parking area provided (m2) & No. of CPS: 30,989.0 m2 &

987 CPS Parking area provided in basement (m2) & No. of CPS: 15,392.0

m2 & 481 CPS Parking area provided in hollow plinth (m2) & No. of CPS: Ground

Floor: 4247.00 m2 & 152 CPS 1st Floor: 5675.00 m2 & 177 CPS

Page 35 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 35 of 87

2nd Floor: 5675.00 m2 & 177 CPS Total: 15,597.00 m2 & 506 CPS.

16. Traffic Management

Width of adjacent public roads: 9.0 m & 60.0 m wide roads Number of Entry & Exit provided on approach road/s: Three gates

will be provided. Width of Entry & Exit provided on approach road/s: 7.0 m Minimum width of open path all around the buildings for easy

access of fire tender (excluding the width for the plantation): 7.0 m Width of all internal roads: 7.0 m.

17. Details of Green Building measures proposed.

Use of Fly ash based material, provision of flush tank instead of direct flushing in toilet, provision of rain water harvesting & ground water recharge scheme, provision of foam type aerated cock for water usage etc.

18. Energy

Requirement, Source and Conservation

Power supply Maximum demand: 1500 KVA Source: D.G.V.C.L Energy saving measures: Use of LED light in common area

lighting, solar lights for landscape lighting, maximum use of natural light, reflective /white tiles on terrace etc.

DG Sets No. and capacity of the DG sets: 03 x 63 KVA Fuel & its quantity: HSD & quantity – 25 L/h in each.

19. Fire and Life Safety Measures

Fire extinguishers, hose reel, wet riser, automatic sprinkler system (basement), manually operated electric fire alarm system, underground static water storage tank of 100 KL capacity, terrace water tank of 25 KL capacity, provision of two electric & one diesel pump of capacity 2280 L/min. & one electric pump of capacity 180 L/min. having pressure 3.5 kg/cm2 at terrace level.

20. Details on staircase Bldg. No.

Floor No. Floor Area (m2)

No. of Staircase

Width of Staircase (m)

Maximum Travel Distance up to the Staircase (< 30 m)

A G(H.P)+2

4 919.62 02 1.83 26.15

B G(H.P)+2

4 899.96

01 1.52 22.12

01 1.83

C G(H.P)+2

4 762.11 02 1.83 24.22

21. Rain Water Harvesting (RWH)

Level of the Ground water table: 20.0 m No. & dimensions of RWH tank(s) : 06 no. of RWH tanks; Size: 4

m x 3 m x 3 m, 350 mm dia., size of pipe: 150 mm dia. No. and depth of percolations wells: 06 nos. of percolating wells. Details on Pre-treatment facilities: A de-silting chamber will be

provided to de-silt and remove floating material through bar screen.

Page 36 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 36 of 87

22. Green area details

Tree covered area (m2) : 448.0 Area covered by shrubs and bushes (m2): -- Lawn covered area (m2): 1,748.0 Total Green Area (m2): 2,196.0 Green Area % of plot area: 18.48 % No. of trees and species to be planted: total 75 nos. of trees of

local species like Asopalav, Neem tree, Coconut palm tree, Gulmohar etc.

23.

Budgetary allocation for Environmental Management Plan (Rs. In lacs)

Capital cost of Rs. 13.0 lacs and recurring cost of Rs. 8.25 lacs has been proposed to allocate towards purposes like rain water harvesting & ground water recharge, greenbelt development, environment monitoring & management, waste management etc.

24. Proposed dust control measures.

Barricading the project site, water sprinkling, covered shed for cement unloading activity, tarpaulin cover on excavated earth & construction material etc.

25. Use of Eco – friendly building materials.

Use of fly ash bricks & aerated blocks for water partition, paving blocks for parking areas & walk ways, Portland Pozzolona Cement for RCC structure, plaster & flooring etc.

26. Details on amenities to be provided to construction workers

Drinking water & tap water, sanitation facilities, lunch space, first aid box, free medicines, doctor service, PPEs etc.

During the meeting, after detailed discussion, it was decided to further appraise the project only after submission of the following:

1. Details on the permissible & proposed ground coverage for the proposed project.

2. Details on refuge area / skip floor to be provided in the proposed high rise buildings as per requirement of NBC and GDCR in this regard.

3. Land possession documents showing the ownership of land by the applicant, list of partners & directors of the company, copy of permission obtained for non agricultural use of the project site or a copy of documents showing the correspondences made in this regard and copy of agreement made between the land owners & developers (if any).

4. Details of provisions to make the project energy efficient and adoption of modes of alternative eco friendly sources of energy, solar water heater, solar street lighting, LED lighting. Details along with back up calculation showing how the additional energy consumption in such type of high rise buildings will be compensated with the proposed energy conservation measures.

5. Details of seismic zone of the project and design aspects required to be adhered to as per national standards for buildings to make it earthquake proof.

6. A certificate from structural engineer showing the adherence of the relevant norms/ codes for the proposed 24 storied buildings considering the capacity of terrace water tanks, seismic zone, close vicinity of river, wind velocity, maximum intensity of the earthquake recorded in the past etc.

7. Details on provision of ventilation, lighting arrangements, CO sensors & their functioning etc.

Page 37 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 37 of 87

in basement.

8. Details on the nearest fire station, availability of fire tender/s capable of reaching up to 24th floor, time required by a fire tender to reach the proposed site etc.

13. Sachin Dyestuff Pvt Ltd. Plot No.487, GIDC Estate, Sachin, Choryasi, Surat

Screening & Scoping

Project / Activity No.: 5(f) M/s. Sachin Dyestuff Pvt. Ltd. (herein after Project Proponent – PP) has submitted

application vide their letter dated 20/06/2015.

Project status: New

Project / Activity Details:

This is a new project proposes the manufacturing of following Synthetic Organic Chemicals.

Sr. No.

Name of Product Proposed Capacity

(MT/Month) 1 Ortho Benzaldehyde Sulfonic Acid 15 2 Benzaldehyde 2,4 Disulfonic Acid 25 3 Gamma Acid 10 4 Acid Blue 1 3 5 Acid Blue 7 5 6 Acid Red 52 10 7 Direct Red 239 25 8 Bronner's acid 10 9 Direct Red 239 Liq. 50

10 Acid Blue 15 20 11 Acid Violet 17 20 12 Acid Violet 49 20 13 Acid Black 194 20 14 Reactive Black 5 25

Total 258

The project falls under Category B of project activity 5(f) as per the schedule of EIA Notification

2006.

Total plot area is 800 sq. m & unit has proposed 150 sq. m. area for the green belt

development/Tree plantation. Expected project cost is Rs. 2 Crores. Total water consumption

for proposed project will be 58 KL/day (5.0 KL/Day for Domestic, 1.0 KL/Day for Gardening,

37.0 KL/Day for Process, 4.0 KL/Day for Washing/Scrubber, 6.0 KL/Day for Boiler, 5.0 KL for

Cooling) which will be sourced from GIDC water supply. Industrial waste water generation will

be 28.2 KL/day ( 20.5 KL/Day from process, 0.5 KL/Day from Boiler, 0.2 KL/Day from Cooling

and 2.0 KL/Day from Washing/Scrubber), which will be sent to common spray dryer of M/s.

MEPPL, Sachin for final disposal. Domestic waste water (5 KL/day) will be disposed off into

Septic tank/soak pit system. It is proposed to install one Steam Boiler (700 kg/hr), one TFH

(200 U) and two no.s of D. G. set (125 KVA). Natural Gas (2000 SCM/day) will be used as a

fuel in Boiler and TFH unit and LDO (24 Liters/Hr) will be used as fuel in D.G.Set. Unit has

proposed caustic and water scrubber for control of gaseous emission. Hazardous waste

generated from the manufacturing activity will be ETP sludge (6 MT/Month), Used oil (50

Page 38 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 38 of 87

Lit/Year), Discarded barrels/containers/liners (10 Nos./Month), MEE salt (7.5 MT/Month).

Industry is a member of TSDF site of M/S. BEIL, Ankleshwar for suitable treatment and disposal

of hazardous waste.

Observations/Discussion: Technical presentation made during the meeting by project proponent. Safety aspects of

various hazardous chemicals have been discussed. The committee desired to have MSDS of

materials to be handled, information on storage of each hazardous chemical and safety

measures thereof. While discussing about the spent acid generation, PP informed that the

spent acid will be generated from the manufacturing of Acid Red 52, Acid blue 7 and Acid Blue

1 with very low concentration with no economical value, hence, they have considered this acidic

stream as effluent. After detailed discussion, the following additional Terms of Reference were

prescribed for the EIA study to be done covering 5 Km radial distance from the project

boundary.

1. Copy of plot holding certificate obtained from GIDC Sachin.

2. Present land use pattern of the study area shall be given based on satellite imagery.

3. Layout plan of the factory premises. Provision of separate entry & exit and adequate margin all round the periphery for unobstructed easy movement of the emergency vehicle / fire tenders without reversing back. Mark the same in the plant layout.

4. Details of manufacturing process / operations of each product along with chemical reactions, mass balance, consumption of raw materials etc. Details on strategy for the implementation of cleaner production activities. (Give specific details about source of effluent generation).

5. Chemical name of each proposed product to be manufactured. Details on end use of each product.

6. Detailed mass balance and water balance (including reuse-recycle, if any) along with qualitative and quantitative analysis of the each waste stream from the processes.

7. Assessment of source of the water supply with adequacy of the same to meet with the requirements for the project. Permission obtained from the GIDC for supply of raw water. Undertaking stating that no bore well shall be dug within the premises.

8. Explore the possibility of reuse / recycle and other cleaner production options for reduction of wastes. Details of methods to be adopted for the water conservation.

9. Quality and quantity of waste water to be generated from the manufacturing process of each product to be manufactured along with mass balance.

10. Segregation of waste streams and details on specific treatment and disposal of each stream.

11. Stream wise qualitative & quantitative analysis of each waste stream (including process water, cooling tower blow down, boiler blow down, washing effluent etc.) to be generated. Characteristics of untreated and treated wastewater. A detailed effluent treat ability study vis-à-vis the adequacy and efficacy of the treatment facilities proposed for the wastewater to be generated. The characteristic on which treatability is based shall also be stated.

12. Details of the ETP units including its capacity, size of each unit, retention time and other technical parameters. Details regarding provision of online continuous pH meter, TOC

Page 39 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 39 of 87

analyser and flow meter at the final outlet of the ETP.

13. Details of provisions to be made for Spray drying of industrial effluent stream. Technical details of Spray drying system including capacity, fuel required for spray drying etc. Techno-economical viability of the spray drying system. Details of Air pollution control system.

14. Details of Common facility (Spray Dryer) of MEPPL(1) Total capacity of the Common Spray Dryer (2) Actual load at present (Qualitative and Quantitative - per day) (3) Common Spray Dryer Up gradation scheme, if any (4) Spare capacity of Common Spray Dryer with treatability and feasibility report.

15. Plans for management, collection and disposal of waste streams to be generated from spillage, leakages, vessel washing, used container washing etc. Measures proposed for preventing effluent discharge during unforeseen circumstances.

16. One season Site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall should be incorporated.

17. Anticipated environmental impacts due to the proposed project/production may be evaluated for significance and based on corresponding likely impacts VECs (Valued Environmental Components) may be identified. Baseline studies may be conducted within the study area of 5 km for all the concerned/identified VECs and likely impacts will have to be assessed for their magnitude in order to identify mitigation measures.

18. One complete season base line ambient air quality data (except monsoon) to be given along with the dates of monitoring. The parameters to be covered shall be in accordance with the revised National Ambient Air Quality Standards as well as project specific parameters. Locations of the monitoring stations should be so decided so as to take into consideration the pre-dominant downwind direction, population zone and sensitive receptors. There should be at least one monitoring station in the upwind direction. There should be at least one monitoring station in the pre dominant downwind direction at a location where maximum ground level concentration is likely to occur.

19. Modelling indicating the likely impact on ambient air quality due to proposed activities. The details of model used and input parameters used for modelling should be provided. The air quality contours may be shown on location map clearly indicating the location of sensitive receptors, if any, and the habitation. The wind rose showing pre-dominant wind direction should also be indicated on the map. Impact due to vehicular movement shall also be included into the prediction using suitable model. Results of Air dispersion modelling should be superimposed on satellite image / geographical area map.

20. Base line status of the noise environment, impact of noise on present environment due to the project and proposed measures for noise reduction including engineering controls.

21. Specific details of (i) Process gas emission from each unit process with its quantification, (ii) Air pollution Control Measures proposed for process gas emission, (iii) Adequacy of the air pollution control measures for process gas emission, measures to achieve the GPCB norms (iv) Details of the utilities required (v) Type and quantity of fuel to be used for each utility (vi) Flue gas emission rate from each utility (vii) Air Pollution Control Measures proposed to each of the utility along with its adequacy (viii) List the sources of fugitive emission along with its quantification and proposed measures to control it.

22. Technical details of APCM along with its adequacy, details of its operational controls with DCS, system for online monitoring of the pollutants from the stack etc. Details of provisions to be kept in APCM to ensure that in any case the air emission does not cross the GPCB

Page 40 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 40 of 87

norms, preventive maintenance, failure / tripping control system, guarantee from the APCM supplier, alternative arrangements in case of the failure of the APCM etc.

23. Fly ash management plan and copies of MOU / agreements done with actual consumers regarding utilization of fly ash & bottom ash etc. should also be incorporated.

24. Details on management of the hazardous wastes to be generated from the project stating detail of storage area for each type of waste, its handling, its utilization and disposal etc. How the manual handling of the hazardous wastes will be minimized. Methodology of de-contamination and disposal of discarded containers and its record keeping.

25. Membership of Common Environmental Infrastructure including CETP, TSDF, Common Hazardous Waste Incineration Facility (CHWIF). (Whichever is applicable)

26. Complete Management plan for By-products/Spent acids to be generated, (if any) from the project including their quantity, quality, characteristics, end use etc. along with the name and address of end consumers to whom the by-product will be sold. Copies of agreement / MoU / letter of intent from them, showing their willingness to purchase said by-product from the proposed project. Also give characteristics of the by products and feasibility of their actual use in respective products as a raw material.

27. Name and quantity of each type of solvents to be used for proposed production. Details of solvent recovery system including mass balance, solvent loss, recovery efficiency feasibility of reusing the recovered solvents etc. for each type of solvent.

28. A detailed EMP including the protection and mitigation measures for impact on human health and environment as well as detailed monitoring plan and environmental management cell proposed for implementation and monitoring of EMP. The EMP should also include the concept of waste-minimization, recycle/reuse/recover techniques, energy conservation, and natural resource conservation. Total capital cost and recurring cost/Year earmarked for environment pollution control measures.

29. Permission from PESO, Nagpur for storage of solvents, other toxic chemicals, if any.

30. Occupational health impacts on the workers and mitigation measures proposed to avoid the human health hazards along with the personal protective equipment to be provided. Provision of industrial hygienist and monitoring of the occupational injury to workers as well as impact on the workers. Plan for periodic medical checkup of the workers exposed. Details of work place ambient air quality monitoring plan as per Gujarat Factories Rules.

31. Risk assessment including prediction of the worst-case scenario and maximum credible accident scenarios should be carried out. The worst-case scenario should take into account the maximum inventory of storage at site at any point of time. The risk contours should be plotted on the plant layout map clearly showing which of the facilities would be affected in case of an accident taking place. Based on the same, proposed safeguard measures including On-Site / Off-Site Emergency Plan should be provided.

32. MSDS of all the products and raw materials.

33. Details of hazardous characteristics and toxicity of raw materials and products to be handled and the control measures proposed to ensure safety and avoid the human health impacts. This shall include the details of Antidotes also.

34. Details of quantity of each hazardous chemical (including solvents) to be stored, Material of Construction of major hazardous chemical storage tanks, dyke details, threshold storage quantity as per schedules of the Manufacture, Storage & Import of Hazardous Chemicals

Page 41 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 41 of 87

Rules of major hazardous chemicals, size of the biggest storage tank to be provided for each raw material & product etc. How the manual handling of the hazardous chemicals will be minimized?

35. Details of the separate isolated storage area for flammable chemicals. Details of flame proof electrical fittings, DCP extinguishers and other safety measures proposed. Detailed fire control plan for flammable substances and processes showing hydrant pipeline network, provision of DG Sets, fire pumps, jockey pump, toxic gas detectors etc.

36. Submit checklist in the form of Do’s & Don’ts of preventive maintenance, strengthening of HSE, manufacturing utility staff for safety related measures.

37. Detailed five year greenbelt development program including annual budget, types & number of trees to be planted, area under green belt development [with map], budgetary outlay; along with commitment of the management to carry out the tree plantation activities outside the premises at appropriate places in the nearby areas and elsewhere.

38. Detailed socio-economic development measures including community welfare program most useful in the project area for the overall improvement of the environment. Submit a detailed plan for social corporate responsibilities, with appropriate budgetary provisions for the next five years and activities proposed to be carried out; specific to the current demographic status of the area.

39. (a) Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report.(b). Does the Environment Policy prescribe for standard operating process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions ? If so, it may be detailed in the EIA.

40. What is the hierarchical system or administrative order of the company to deal with the environmental issues and for ensuring compliance with the EC conditions? Details of this system may be given.

41. Does the company have a system of reporting of non compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism should be detailed in the EIA Report.

42. An undertaking by the Project Proponent on the ownership of the EIA report as per the MoEF&CC OM dated 05/10/2011 and an undertaking by the Consultant regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the MoEF&CC OM dated 04/08/2009.

43. Certificate of accreditation issued by the NABET, QCI to the environmental consultant should be incorporated in the EIA Report.

44. A tabular chart with index for point-wise compliance of above TORs.

The above mentioned project specific TORs/additional TORs and the model TORs available on

the MoEF&CC’s website for Synthetic Organic Chemical industry shall be considered as

generic TORs for preparation of the EIA report in addition to all the relevant information as per

the generic structure of EIA given in Appendix III in the EIA Notification, 2006. The project shall

be appraised on receipt of the final EIA report.

14. Technip India Limited Plot No.D-2/3/2, GIDC-Dahej II, Village.: Suva, Ta.: Vagra,Suva,vagra, Bharuch.

Screening & Scoping

Page 42 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 42 of 87

Project / Activity No.: 5(f) M/s. Technip India Limited (herein after Project Proponent – PP) has submitted

application vide their letter dated 22/06/2015. Project status: New Project / Activity Details: This is a new project proposes Cargo handling as tabulated below:

Sr. No. Name of Product Proposed Capacity 1 Modular Plants

Cargo handling 6000 MT/Annum

or 500 MT/Month

2 Modular and Skid Modular Plants 3 Reformers/Heaters 4 Package Units 5 Proprietary Technology Equipment 6 Piping Spool Fabrication 7 Steel Structure 8 Offshore modules for topsides for platforms

Cargo handling activity (<5 million TPA of cargo handling capacity and/or ports/ harbors

≥10,000 TPA of fish handling capacity) falls under Category B of project activity 7(e) as per the

schedule of EIA Notification 2006.

The project requires a water front facility along with necessary marine infrastructure for loading

out heavy and oversized equipments/structures for transportation by Sea. Total plot area is

125114.65 sq. m & unit has proposed 21000 sq. m. area for the green belt development & open

area. Expected project cost is Rs. 70 Crores. Total water consumption for proposed project will

be 75 KL/Day (50 KL/Day for Domestic and 25 KL/Day for Industrial use) which will be sourced

from GIDC water supply. Industrial waste water generation will be 15 KL/Day, which will be

treated in ETP and treated effluent will be diverted to STP for further treatment. Domestic

sewage (45 KL/Day) will be treated in STP and after treatment treated sewage will be utilized

for gardening purpose. It is proposed to install one D. G. Set of 500 KVA capacity and HSD

(2000 L/Day) will be used as a fuel in D.G.Set. Hazardous waste generated from the

manufacturing activity will be ETP sludge (600Kg/Month), Used oil (200 Lit/Month), Discarded

containers (20 Nos./Month) and waste paint (500 Lit/Month). Solid waste generation from the

manufacturing activity will be STP Sludge (1 MT/Month) and Metal Scrap (15 MT/Month). ETP

sludge and waste paint will be disposed off at the nearby common TSDF. Discarded barrels /

containers / bags / liners will be either reused or returned back to suppliers or sold only to the

authorized vendors after decontamination. Used oil will be sold only to the registered recyclers.

STP sludge will be used as manure. Metal scrap will be collected in scrap yard.

Observations/Discussion:

Technical presentation during the meeting also included the details like general information

regarding the project, location of the project & lay out map, details of products & raw materials,

waste generation, hazards & controls, ETP, Risk estimation, Proposed ToR etc. The project

proponent presented that they have already started baseline environmental monitoring from 1st

March 2015 and requested to allow them to use the same for the preparation of the

Environment Impact Assessment report which was agreed to by the committee. During

meeting, on asking about the mangrove patch in the proposed site, PP informed that there is no

mangrove in the proposed site and vicinity of the site. However, Committee asked to carry out

careful field survey and to identify Valued Environmental Components and likely impacts due to

Page 43 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 43 of 87

proposed project. During the presentation, the project proponent was asked to prepare

comprehensive EIA report and to go through public consultation process. The project proponent

was asked to include the following TOR in the comprehensive EIA report [3 seasons] for the

study to be done covering 10 km radius from the project boundary.

1. Present land use pattern within 10 km radius from the project boundary based on satellite imagery.

2. A map showing distance of the nearest fishing port, fishermen hutments, village, salt pans, mangrove patch, migratory corridors of birds, National Parks/Sanctuaries/Bio sphere Reserves, sand dune areas etc. from the project boundary.

3. Distance of the jetty from the Low Tide Line. Authenticated details on High Tide height, time duration of high tide availability etc.

4. Phase wise project implementation details in terms of site development, infrastructure provision, EMS implementation etc. Phase wise project implementation schedule with bar chart including resources, manpower and time frame etc.

5. Details of the activities to be undertaken in the CRZ area and their impact on marine ecosystems and mitigation measures proposed in this regard.

6. Copy of CRZ map or map prepared by one of the authorized agencies authorized by the MoEF for carrying out the CRZ demarcation, on which the project boundary / facilities are superimposed and clearly indicating the proposed project location.

7. Status of application for CRZ clearance. Recommendation from the Gujarat Coastal Zone Management Authority under the CRZ Notification.

8. Assessment of source of the water supply with adequacy of the same to meet with the requirements for the project. Copy of permission obtained from the concerned authority for water supply.

9. Detailed mass balance and water balance (including reuse-recycle, if any).

10. Details of the proposed ETP and stream wise analysis of the waste water likely to be generated as well as the stream wise treatment proposed with ETP adequacy and efficacy report. Details of segregation of the wastewater stream to be carried out and plans for management and disposal of concentrated streams to be generated from spillage, leakages etc. A detailed treatability study for untreated effluent & treated effluent vis-à-vis adequacy of the treatment facilities proposed for the wastewater likely to be generated. The characteristic on which treatability is based shall also be stated.

11. Explore the possibility of reuse / recycle and other cleaner production options for reduction of wastes. Details of water conservation measures including reuse, recycle, use of low water consuming devices. Explore reuse of total treated waste water if possible.

12. Specific measures proposed to conserve water and plans for the future in this regard.

13. Exact cargo handling capacity for the proposed project. Scope of the project in terms of types of equipment to be fabricated along with bifurcation of tonnage of each category based on maximum/ peak rated capacity of the project in terms of cargo handling, technology, equipment, manpower, resource use, etc.

14. Finalization of the exact scope of the off shore / waterfront facilities out of various options i.e. access bund / RO-RO ramp / Jetty / Basin and technical details of the same.

Page 44 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 44 of 87

15. Details of the berthing facility if any to be provided along with class of vessels envisaged. Ship simulation to be done in respect of stability. Details of handling of each cargo, its impact and management plan.

16. Detailed study for shore protection works. Details of proposed reclamation and / or dredging for protection of the water front and/or maintaining the channel depth. Details regarding dredging depth, dredge material characteristics as well as the dredged quantity, its disposal & and reclamation. The chances of erosion / accretion due to proposed dredging and/or reclamation and mitigation measures should be incorporated.

17. Measures to prevent further deterioration of the estuarine river water quality and coastal ecology due to the proposed project. Cumulative impact taking into consideration other project activities in the vicinity.

18. Whether any blockage of creek is envisaged due to the proposed project and if so, remedial measures. Impact on the natural drainage system if any. It shall be ensured that free flow of water from the catchment area is not hampered due to the proposed project.

19. Hydro-dynamics of estuary / creek from shoreline erosion perspective. The hydro-dynamic studies shall be undertaken for assessing whether the proposed activities shall have any significant impact to the shoreline abutting the project as well as significant impact on the ecologically sensitive areas along the stretch or not.

20. Whether project activities will lead to any shoreline changes. Hydrodynamics of the coast abutting the project site from shoreline erosion perspective. The hydrodynamic studies for assessing whether the proposed activities shall have any significant impact on the shoreline abutting the project along the stretch or not. Details of precautions to be taken to ensure that there will be no adverse impact on the drainage of the area.

21. Comprehensive modeling study of accretion, erosion / deterioration on nearby coastline & elsewhere due to the proposed project and its mitigation measures. Submit details of stability analysis of coast. The study shall be got vetted by CWPRS.

22. Details of the sand dune areas and ecologically sensitive areas in the vicinity.

23. Anticipated environmental impacts and mitigation measures due to the ship traffic including discharges from vessels and cargo operations.

24. Details of existing sea vessel traffic management and predicted increase in vessel traffic due to the proposed project along with its impacts.

25. Details of vessel traffic management system framed for the proposed project considering the guidelines and provisions of Vessel Traffic Management System devised for Gulf of Cambay. Measures proposed to ensure that there will be no any hindrance to the movement of fishing vessels or fishermen.

26. Impact of project construction/operation on the noise and vibration due to construction equipment, cargo handling equipment and road traffic. Mitigation measures for the same.

27. Impact on marine life and fishing activities in the surrounding region.

28. Impacts of the proposed activities on fishing in the surrounding region as well as on livelihood of fishermen, saltpan workers, farmers, villagers etc. How it would be ensured that fishing area will not be affected due to the project activities.

29. Commitment from the management for extensive mangrove plantation as well as mangrove associated species in the area with year wise plan. Explore co-ordination with

Page 45 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 45 of 87

ecology commission / social forestry division for the same.

30. Details of hazardous characteristics of raw materials and products to be handled and the control measures proposed to ensure safety and avoid the human health impact.

31. Details on quantity of each hazardous chemical to be stored, material of construction of storage tanks, threshold storage quantity as per schedules of Manufacture, Storage & Import of Hazardous Chemicals Rules.

32. Details of hazardous processes and their engineering controls.

33. Details of possibility of occupational health hazard from the proposed manufacturing activities and proposed measures to prevent it.

34. Measures proposed to arrest the micronized fine particles generated during the painting process. Disposal of waste paint / paint residue.

35. Details for the use of lead free paints in the proposed project. Undertaking for use of only lead free paints in the project.

36. Submit the details of storage yard and dust suppression measures.

37. The details with respect to number of fishermen (including the pagarias) living and / or fishing within the study area along with the exact distance of their habitation from the proposed facilities. Details of fish production in the region in last five years as per the records of fisheries department. Impacts of the proposed activities on the fishery in the region. How, it would be ensured that fishing area will not be affected due to the project activities.

38. Anticipated environmental impacts due to the proposed project/production may be evaluated for significance and based on corresponding likely impacts VECs (Valued Environmental Components) may be identified. Baseline studies may be conducted within the study area of 10 km for all the concerned/identified VECs and likely impacts will have to be assessed for their magnitude in order to identify mitigation measures.

39. Site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall should be incorporated.

40. Base line ambient air quality data (except monsoon) to be given along with the dates of monitoring. The parameters to be covered shall be in accordance with the revised National Ambient Air Quality Standards as well as project specific parameters. Locations of the monitoring stations should be so decided so as to take into consideration the pre-dominant downwind direction, population zone and sensitive receptors. There should be at least one monitoring station in the upwind direction. There should be at least one monitoring station in the pre dominant downwind direction at a location where maximum ground level concentration is likely to occur.

41. Modelling indicating the likely impact on ambient air quality due to proposed activities. The details of model used and input parameters used for modelling should be provided. The air quality contours may be shown on location map clearly indicating the location of sensitive receptors, if any, and the habitation. The wind rose showing pre-dominant wind direction should also be indicated on the map. Impact due to vehicular movement shall also be included into the prediction using suitable model. Results of Air dispersion modelling should be superimposed on google map / geographical area map.

42. Apart from terrestrial EIA study, marine EIA study should be conducted through reputed

Page 46 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 46 of 87

institute in order to assess impacts of the proposed activities on the marine environment as well as fishery and according to the same, mitigation measures shall be planned.

43. Baseline status of flora, fauna and marine biodiversity including that of phytoplankton and zooplankton in the study area shall be elaborated. Impact of the proposed activities on the marine biodiversity shall be elaborated. In case of any scheduled fauna, conservation plan should be provided.

44. Actual field survey shall be carried out for ascertaining base line status of coastal and marine flora, fauna, including that of phytoplankton and zooplankton. Impacts of the proposed activities on the marine flora, fauna; especially on endangered and rare species shall be elaborated.

45. Include coastal geo-morphology in the EIA study report.

46. Impact on the proposed project due to the Kalpasar project and vice-versa.

47. Base line status of the noise environment, impact of noise on present environment due to the project and proposed measures for noise reduction including engineering controls.

48. Specific details of (i) Process gas emission from each unit process with its quantification, (ii) Air pollution Control Measures proposed for process gas emission, (iii) Adequacy of the air pollution control measures for process gas emission measures to achieve the GPCB norms (iv) Details of the utilities required (v) Type and quantity of fuel to be used for each utility (vi) Flue gas emission rate emission from each utility (vii) Air Pollution Control Measures proposed to each of the utility along with its adequacy (viii) List the sources of fugitive emission along with its quantification and proposed measures to control it. (iv) Air pollution due to the sand /grit blasting operation.

49. Details of mangrove along with its species in the jetty area & fabrication plant area.

50. Measures proposed to be taken for the work area ambient air quality monitoring as per Gujarat Factories Rules.

51. Detailed greenbelt development program including annual budget, types & number of trees to be planted, area under green belt development [with map]; along with commitment of the management to carry out the tree plantation activities outside the premises at appropriate places in the nearby area and elsewhere.

52. Copy of membership certificate of Common Environmental Infrastructure like TSDF, if any taken, should be incorporated. Copies of MOU / agreements done with actual consumers regarding utilization of fly ash, bottom ash etc. should also be incorporated.

53. A detailed EMP including the protection and mitigation measures for the impacts on human health and environment as well as detailed environmental monitoring plan with respect to various parameters, environmental management cell proposed for implementation & monitoring of EMP as well as person responsible for the same. The EMP should also include the concept of waste-minimisation, energy conservation, and natural resource conservation. Plan to ensure that the existing environmental condition is not deteriorated due to discharges from the vessels / boats, disposal of sewage, etc.

54. Factory lay out showing open unobstructed peripheral margin, green belt, separate gates for entry and exit, parking area for tankers / trucks / visitors etc.

55. Detail risk assessment report including prediction of the worst-case scenario and maximum credible accident scenario, catastrophic failure along with damage distances

Page 47 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 47 of 87

and preparedness plan to combat such situation and risk mitigation measures. This shall also include hazardous area classification & vulnerable zone demarcation. Detailed fire control plan for flammable substances and processes. Environment Management Plan and On-Site / Off-Site emergency plan for proposed plant.

56. Details of management of the solid waste and hazardous wastes to be generated from the project stating detail of storage area for each type of waste, its handling and its disposal. How the manual handling of the hazardous wastes shall be minimized.

57. Methodology of de-contamination and disposal of discarded containers and its record keeping.

58. Specific safety details /provisions for various solvents to be used in the process including onsite / offsite emergency plan.

59. Detailed odor management plan.

60. To explore the use of renewable energy to the maximum extent possible.

61. Submit checklist in the form of Do’s & Don’ts of preventive maintenance, strengthening of HSE, mfg utility staff for safety related measures.

62. Details of likely heat stress to the workers. Radiation heat level in & around the furnace, monitoring and mitigation measures for the same.

63. Specific safety details / precautionary measures proposed for VOC’s in the plant / storage yard / warehouse/ including ventilation aligned in the natural wind direction.

64. Provision of industrial hygienist and monitoring of the occupational injury to workers as well as impact on the workers.

65. Details of existing traffic density on main road as well as secondary road in the vicinity, prediction of impact of additional traffic from the project on those roads along with carrying capacity of the said roads.

66. Details of flood data considered to avoid flooding at the proposed site & preventive measures envisaged for the same.

67. Details of monitoring / supervision cell to monitor environmental aspects during construction and operational phases. Appointment of Construction Safety Officer during the construction phase as well as a detailed environment management plan.

68. Details of provisions to make the project energy-efficient through of energy efficient devices and adoption of modes of alternative eco friendly sources of energy, solar water heater, solar lighting etc. Measures proposed to comply with the ECBC norms and other measures proposed for energy conservation.

69. Details of dust suppression measures proposed during the construction period. Noise mitigation measures during construction activity from the proposed activity.

70. Details of the seismic design aspects to be adhered to in the project.

71. Details on use of eco-friendly building materials including fly ash bricks, fly ash paving blocks, RMC etc.

72. Details of disaster management plan / emergency management systems during operational phase of the project should also include scenario of natural catastrophe like earth quake, floods and tsunami in addition to other disasters. The plan should include the details of (i) Emergency evacuation (ii) Emergency lighting system (iii) Details of power

Page 48 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 48 of 87

back up system in the case of emergency (iv) Fire fighting arrangements (v) First aid arrangement (vi) Training and Mock drill (vii) Emergency announcement or public address system (viii)Signage’s including fluorescent pathways/ exit marker signs (ix)Location of emergency pathways and glow light signs. (x) Emergency response procedures.

73. Details of fire fighting system at the jetty as well as fabrication unit including provision for flame detectors, temperature actuated heat detectors, location of fire water tanks & capacity, separate power system for fire fighting, automatic sprinkler system, fire detection system with alarms & automatic fire extinguishers, location of fire lift and fire retardant staircases, details of qualified and trained fire personnel & their job specifications, nearest fire station & time required to reach the proposed site, etc. Submit line diagram of the fire hydrant line passing through the plant premises. Fire control plan for flammable substances and processes based on the flammable area classification.

74. Details of first aid, fire fighting system and other emergency services to be provided during operation phase including the training to be provided to the staff of the project as first aid facility providers, fire fighters etc. Tie up with emergency services like local fire station, provision of emergency van etc. to be made during the operational phase.

75. Details of the D.G. sets with location, fuel consumption & storage and details of the acoustic measures to abate noise pollution.

76. Details of the debris management plan along with the use/disposal of excavated soil during construction phase and top soil conservation plan.

77. The details of the basic amenities and welfare facilities to be provided to the construction workers to ensure that they do not ruin the existing environment.

78. Undertaking from the management regarding maximum employment to the local people.

79. Submit a detailed plan for social corporate responsibilities, with appropriate budgetary provisions.

80. Distance of the nearest mangrove patches from the project site. Details of mangrove along with its species in the jetty area & approach road area.

81. Details of five year greenbelt development program. Commitment from the management for extensive mangrove plantation as well as mangrove associated species in the area with year wise plan.

82. Details of use of eco-friendly building material including fly ash bricks, fly ash paving blocks. Use of RMC in the project.

83. The details of the basic amenities and welfare facilities to be provided to the construction workers to ensure that they do not ruin the existing environment.

84. Details of registration and provisions to be made by the project proponent to follow Building and other Construction Workers Acts and Rules and undertaking for the same.

85. An action plan showing list of socio-economic upliftment activities based on socio-economic profile of the surrounding villages and need base field assessment along with the fund allocation for the five years, shall be incorporated in the EMP.

86. A tabular chart for the issues raised and addressed during public hearing/consultation and commitment of the project proponent on the same should be provided. An action plan to address the issues raised during public hearing and the necessary allocation of funds for

Page 49 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 49 of 87

the same should be provided.

87. (a) Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report.

88. (b). Does the Environment Policy prescribe for standard operating process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions ? If so, it may be detailed in the EIA.

89. What is the hierarchical system or administrative order of the company to deal with the environmental issues and for ensuring compliance with the EC conditions. Details of this system may be given.

90. Does the company have a system of reporting of non compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism should be detailed in the EIA Report.

91. Certificate of accreditation issued by the NABET, QCI to the environmental consultant should be incorporated in the EIA Report.

92. A tabular chart with index for point-wise compliance of above TORs.

The above mentioned project specific TORs/additional TORs and the model TORs available in

the MoEF’s sector specific EIA Manual for “Ports, Harbours” shall be considered as generic

TORs for preparation of the EIA report in addition to all the relevant information as per the

generic structure of EIA given in Appendix III in the EIA Notification, 2006. The draft EIA report

shall be submitted to the Gujarat Pollution Control Board for conducting the public consultation

process as per the provisions of the EIA Notification, 2006. The project shall be appraised on

receipt of the final EIA report.

15. Sagar Veneer Industries.

Block No.1781,1782 P-3, Vansda Road, Nr.Bhavin Construction, Vill.Alipore Ta.Chikhali, Dist.: Navsari.

Screening & Scoping

Project / Activity No.: 5(f) M/s. Sagar Veneer Industries (herein after Project Proponent – PP) has submitted

application vide their letter dated 30/06/2015.

Project status: Expansion

Project / Activity Details:

This is a Proposed Expansion project to manufacturing of following Synthetic Organic

Chemicals.

Sr. No.

Name of Products

Production quantity

Existing (Sq.M./Month)

Proposed (MT/Month)

1 Plywood 1,15,000 00

2 Flush door 25,000 00

3 Block Board 25,000 00

4 Phenol Formaldehyde Resin 00 20

5 Melamine Urea Formaldehyde 00 70

Page 50 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 50 of 87

Resin

6 Urea Formaldehyde Resin 00 50

Total 1,65,000 140

The location of the unit is outside the notified area. As per amendment to EIA Notification, 2006

vide SO 1599 (E) dated 25.06.2014, small units are categorized as Category “B” projects. Small

units are defined as with water consumption less than 25 M3/day; Fuel consumption less than

25 TPD; and not covered in the category of MAH units as per the Management, Storage, Import

of Hazardous Chemical Rules (MSIHC Rules), 1989. During presentation, PP informed that

water requirement is 14.3 KL/day. Fuel requirement is 2 MT/day and Chemicals to be used are

not covered in MAH category. Hence, the proposed products of Resins fall under Category B of

project activity 5(f) as per the EIA Notification 2006.

Total plot area is 14588 sq. m & unit has proposed 4800 sq. m. area for the green belt

development/Tree plantation. Total Expected project cost for proposed expansion will 29.5

Crores. After Expansion total water consumption will be 14.3 KL/Day [Existing water

consumption is 3.55 KL/Day and proposed water consumption will be 10.75 KL/Day (3.65 KL

for Domestic, 2.25 KL for industrial and 8.4 KL for Gardening)]. The source of water will be

Bore-well. The industrial waste water generation will be 0.3 KL/Day, which will be evaporated in

proposed evaporated. Domestic waste water generation will be 3.4 KL/Day, which will be

discharged into soak pit. It is proposed to install two TFH (4 Lac Kcal/hr) and proposed to install

one D.G. set (65 KVA). Wood waste / Briquettes (2 MT/Day) will be used as fuel for TFH and

HSD (11 L/hr) will be used as a fuel for D.G.set. Bag filter & multi cyclone dust collector is

proposed as APCM for flue gas emission control. Hazardous waste generated from the

manufacturing activity will be ETP sludge (300 Kg/Month), Used Oil (2.0 Kg/Month) and

Discarded Plastic bags (65.7 Kg/Month).

Observations & Discussions: Technical presentation made during the meeting by project proponent. Committee asked to not

use wood waste as fuel and to use briquettes of Agro waste or Bio-fuel only and also asked to

provide adequate air pollution control system. After detailed discussion on various aspects, the

request for categorizing the project as B2 was considered by the committee and the following

additional information was sought for appraisal of the project.

1. Land Possession Documents of the proposed site.

2. Need for the proposed expansion should be justified in detail.

3. Demarcation of proposed expansion activities in lay out of the existing premises.

4. Exact details about additional infrastructural facilities, plant machineries etc. required for the proposed expansion.

5. Project site specific details such as distance of the project site from the nearest (1) Village-Nearest residential area (2) Water Body: Creek / Nallah / Lake / Pond / Reservoir / Canal (3) National Highway (4) State Highway (5) Railway line (6) Heritage site (7) National Park / Wild Life Sanctuary (8) Aanganwadi/School/College/Institute etc. and likely impact on them due to the proposed project along with the mitigation measures proposed to minimize the likely impact. Give satellite image of 5 KM radius.

Page 51 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 51 of 87

6. Legal Undertaking stating that unit is complying the three conditions [i.e. water

consumption less than 25 M3/day; Fuel consumption less than 25 TPD; and not covered in the category of MAH units as per the Management, Storage, Import of Hazardous Chemical Rules (MSIHC Rules), 1989] as per the amendment to EIA Notification, 2006 vide SO 1599 (E) dated 25.06.2014.

7. Layout plan of the factory premises. Provision of separate entry & exit and adequate margin all round the periphery for unobstructed easy movement of the emergency vehicle / fire tenders without reversing back. Mark the same in the plant layout.

8. Proposed monthly production of each grade of resin and product wise monthly consumption of each raw material.

9. Manufacturing process along with chemical reactions, mass balance for each product.

10. Assessment of source of the water supply with adequacy of the same to meet with the requirements for the project. Copy of permission letter obtained from the CGWA or concern authority for drawl of raw water.

11. Water balance diagram (including reuse-recycle, if any) along with qualitative and quantitative analysis of each waste stream to be generated.

12. Plans for management and disposal of waste streams to be generated from spillage, leakages, vessel washing, used container washing etc. Measures proposed for preventing effluent discharge during unforeseen circumstances.

13. Details of the ETP including size of each unit, retention time, other technical parameters etc. and its adequacy and efficacy report. Treatment of phenol in the effluent, if any. Action plan for ‘Zero’ discharge of effluent shall be included.

14. Explore the possibility of reuse / recycle and other cleaner production options for reduction of wastes and to conserve fresh water.

15. Details of provisions to be made for evaporation of industrial effluent. Technical details of effluent evaporation system including evaporation capacity, steam required for evaporation, adequacy of the boilers to supply steam for evaporation in addition to the steam required for the process etc. Techno-economical viability of the evaporation system. Effective evaporation system shall be designed in such a way to strip or absorb the VOCs and effective stack height shall be provided to the evaporation system.

16. Details of possibility of chemical seepage & consequent soil contamination & mitigation measure proposed for the same for the proposed project.

17. Specific details of (i) Details of the utilities required (ii) Type and quantity of fuel to be used for each utility (iii) Flue gas emission rate from each utility (iv) Air Pollution Control Measures proposed to each of the utility along with its adequacy (v) List the sources of fugitive emission along with its quantification and proposed measures to control it.

18. Specific details of fugitive emission from the unit along with its quantification and proposed measures to control it along with measures proposed to monitor VOC within work area. Details of ventilation system proposed in the work area. Measures proposed to keep the work area environment as per the norms of GFR.

19. Details of measures proposed for noise pollution abatement & its monitoring.

20. Details of management of the hazardous wastes to be generated from the project stating detail of storage area for each type of waste, its handling and its disposal. How the

Page 52 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 52 of 87

manual handling of the hazardous wastes will be minimized?

21. Methodology of de-contamination and disposal of discarded containers and its record keeping.

22. Measures proposed to be taken for the work area ambient air quality monitoring as per Gujarat Factories Rules.

23. A detailed EMP including the protection and mitigation measures for preventing impacts on human health and environment as well as detailed monitoring plan with respect to various parameters and responsible head for the environmental management cell and environmental management cell proposed for implementation and monitoring of EMP.

24. Detailed socio-economic development measures including community welfare program most useful in the project area for the overall improvement of the environment.

25. A detailed Green Belt Development Program including annual budget, types & number of trees to be planted, area under green belt development [with map]; along with commitment of the management to carry out the tree plantation activities outside the premises at appropriate places in the GIDC area and elsewhere.

26. Details of hazardous characteristics and toxicity of raw materials and products to be handled and the control measures proposed to ensure safety and avoid the human health impacts. This shall include the details of Antidotes also.

27. Details of quantity of each hazardous chemical to be stored, Material of Construction of major hazardous chemical storage tanks, threshold storage quantity as per schedules of the Manufacture, Storage & Import of Hazardous Chemicals Rules of major hazardous chemicals. How the manual handling of the hazardous chemicals will be minimized?

28. Details of the separate isolated storage area for chemicals. Details of fire extinguishers, flame proof electrical fittings, DCP extinguishers and other safety measures proposed.

29. Specific safety details / provisions for various hazardous chemicals and detailed fire control plan for flammable substances.

30. Details of possibilities of occupational health hazards from the proposed manufacturing activities and proposed measures to prevent them.

31. Detailed risk assessment report including prediction of the worst-case scenario and maximum credible accident scenario along with damage distances and preparedness plan to combat such situation and risk mitigation measures. Vulnerable zone demarcation.

32. Submit checklist in the form of Do’s & Don’ts of preventive maintenance, strengthening of HSE, mfg utility staff for safety related measures.

33. Consent to Establish, Consent to Operate orders obtained in past along with point wise compliance status of all the conditions stipulated therein.

34. Records of any legal breach of Environmental laws i.e. details of show- cause notices, closure notices etc. served by the GPCB to the existing unit in last five years and actions taken then after for prevention of pollution.

35. Details of fatal / non-fatal accidents, loss of life or man hours, if any, occurred in the existing unit in last three years and measures proposed to be taken for avoiding reoccurrence of such accidents in future.

36. A tabular chart with index for point-wise compliance of above details.

Page 53 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 53 of 87

The project shall be appraised on satisfactory submission of the above. 16. M/s. A.P. Process Block No.413 Paiki, Jornang-Jamnapur

Road, At.Jornang, Po. Ambaliyasan, Ta.: & Dist.: Mehsana

Screening & Scoping

Project / Activity No.: 5(f) M/s. A P Process (herein after Project Proponent – PP) has submitted application vide

their letter dated 30/06/2015.

Project status: New

Project / Activity Details:

This is a new project proposes the manufacturing of following Synthetic Organic Chemicals.

Sr. No.

Name of Products

Proposed Quantity MT/Month

1 Phenol Formaldehyde Resin 25

2 Melamine Urea Formaldehyde Resin 45

3 Urea Formaldehyde Resin 15

Total 80

The location of the unit is outside the notified area. As per amendment to EIA Notification, 2006

vide SO 1599 (E) dated 25.06.2014, small units are categorized as Category “B” projects. Small

units are defined as with water consumption less than 25 M3/day; Fuel consumption less than

25 TPD; and not covered in the category of MAH units as per the Management, Storage, Import

of Hazardous Chemical Rules (MSIHC Rules), 1989. During presentation, PP informed that

water requirement is 19.4 KL/day. Fuel requirement is 4.61 MT/day and Chemicals to be used

are not covered in MAH category. Hence, the proposed products of Resins fall under Category

B of project activity 5(f) as per the EIA Notification 2006.

Observations & Discussions:

Technical presentation made during the meeting by project proponent. While discussing about

the MAH unit, committee noted that the total use of Formaldehyde is 270 KL/Month and storage

capacity of the Formaldehyde is only 5 KL. On asking, PP informed that they have come with

Revised Form-1 with PFR. As per revised data requirement of Formaldehyde will be 42.3

MT/Month and storage of Formaldehyde will be less than 5 KL. However, committee noted that

fresh water requirement, waste water generation, hazardous waste generation, fuel

consumption data etc. remain same as per the previous data. At this committee decided to not

accept the Revised Form-1. After detailed deliberations the Committee sought following

additional information for further consideration of the proposal:

1. Land Possession documents and NA permission letter. Copy of rent agreement with owner of the Land.

2. Revised Form-1 and PFR with all relevant details.

3. Legal Undertaking stating that unit is complying the three conditions [i.e. water

consumption less than 25 M3/day; Fuel consumption less than 25 TPD; and not covered

Page 54 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 54 of 87

in the category of MAH units as per the Management, Storage, Import of Hazardous Chemical Rules (MSIHC Rules), 1989] as per the amendment to EIA Notification, 2006 vide SO 1599 (E) dated 25.06.2014.

17. Kroma Paints Sn.582,Vill.Dhamatwan, Dascroi, Dist.: Ahmedabad.

Screening & Scoping

Project / Activity No.: 5(f), Category:- B M/s Kroma Paints (herein after Project Proponent – PP) has submitted application vide

their letter dated 23/06/2015.

Project status: New

Project / Activity Details:

This is a Proposed project to manufacturing of following items of Integrated Paint Industries.

Sr. No. Name of Products Quantity MT/Month

Existing

1 Decorative Paints & Industrial Paints (By Ball Mill)

2500 KL/Month

Proposed

1 Quick Drying Alkyd

550 2 Alkyd for Decorative Product

3 Poly Urethane Resin

4 Epoxy Resin 50

Total 600

The project falls under Category B of project activity 5(h) as per the schedule of EIA Notification

2006.

During the meeting, it was presented that the project site is located near to GIDC Vatva. There is no clarity about the exact distance of proposed site from the Critically Polluted area of Vatva during presentation. Considering the applicability of the General Condition, the project proponent was asked to submit the exact aerial distance of the proposed project site from the nearest boundary of the Vatva CEPI area along with the satellite image (Give Latitude & Longitude) reflecting the same. On asking about the paint manufacturing process, PP informed that they will manufacture paint items by formulation only and they have obtained CTE from GPCB. However, PP could not furnish the copy of CTE during presentation. After detailed deliberations, It was decided to consider the project only after submission of the above following:

1. Exact aerial distance of project site from the boundary of the Critically Polluted area of Vatva GIDC. Give latitude and longitude with satellite image.

2. Project site specific details such as distance of the project site from the nearest (1) Village-Nearest residential area (2) Water Body: Creek / Nallah / Lake / Pond / Reservoir / Canal (3) National Highway (4) State Highway (5) Railway line (6) Heritage site (7) National Park / Wild Life Sanctuary (8) Aanganwadi/School/College/Institute etc. and likely impact on them due to the proposed project along with the mitigation measures proposed to minimize the likely impact. Give satellite image of 5 KM radius.

Page 55 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 55 of 87

3. Copy of CTE obtained from GPCB for formulation of Paint items.

18. M/s.Hani Drugs Pvt Ltd. Plot No.1901/1901A, GiDC,Sarigam, Umargam,Valsad.

Screening & Scoping

Project / Activity No.: 5(f) M/s: Hani Drugs Pvt. Ltd. (herein after Project Proponent – PP) has submitted

application vide their letter dated 02/07/2015.

Project status: Expansion

Project / Activity Details:

This unit is engaged in manufacturing of Continuous Distillation of crude ethyl Ole ate and

Metallic Salts and now proposed for expansion by adding new products like “Esters, organic

intermediates, Aromatic metal compounds, Extracts and Oils as tabulated below:

Sr. No.

Name of Products

Production Capacity (MT/Annum)

Existing Proposed Total

1 Continuous distillation 300 00.00 300.00

2 Metal salt 900 00.00 900.00

3 Esters 00.00 250.00 250.00

4 Organics Intermediates 00.00 45.00 45.00

5 Aromatic Metal Compounds 00.00 100.00 100.00

6 Extracts and Oils 00.00 20.00 20.00

Total 1200.00 415.00 1615.00

The project falls underCategory B of project activity 5(f) asper the schedule of EIA Notification

2006.

Total plot area is 6700 sq. m & unit has proposed 2000 sq. m. area for the green belt

development/Tree plantation. Expected project cost for proposed expansion will be 4.10 Crores.

Total water consumption for project will be 33 KL /day [Existing 7 KL (2 KL for Domestic, 1 KL

for Gardening, 1 KL for Process & Washing, 1 KL for Boiler and 2 KL for Cooling) and Total

proposed water requirement will be 26 KL/Day (2 KL for Domestic, 1 KL for Gardening, 6 KL for

Process & Washing, 9 KL for boiler and 8 KL for Cooling)]. Fresh water will be sourced from

GIDC water supply. Total Industrial waste water generation will be 7.20 KL/Day [( Existing 1 KL

(0.90 KL for Process & Washing, 0.05 KL for boiler and 0.05 KL for Cooling) and Total

proposed 6.20 KL/Day (6.10 KL for Process & Washing, 0.05 KL for boiler and 0.05 KL for

Cooling)], Which will be treated using adequate ETP then will be used for the plantation within

the premises or will be disposed off through underground drainage to CETP, Sarigam.

Domestic waste water (3.50 KL/day) will be disposed off through soak pit and septic tank. It is

proposed to install one Boiler (2 TPH), D.G. Set (40 KVA) and one Thermo pack (1000 U).

Natural Gas (30 SCM/hr) will be used as fuel in boiler. HSD (100 Lit/Month) will be used as fuel

Page 56 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 56 of 87

in D.G. Set. Total Hazardous waste generated from the manufacturing activity will be used oil

(Existing 0.012 MT/Month and Proposed 100 Lit/Month), ETP waste (Existing 1.25 MT/Month

and Proposed 5 MT/Month), Discarded containers/barrels/liners (Existing 0.04 MT/Month and

Proposed 0.50 MT/Month)], Saturated Carbon (Existing NIL and Proposed 5.5 MT/Month).

Observations / Discussion:

Technical presentation made during the meeting by project proponent. Committee concern

about the use of Mercury metal as a raw material. Committee noted that the mercury is the

extremely toxic and care must be taken during its storage and handling. At this, committee

suggested to explore the possibility of substitute products and processes containing or using

mercury with non-mercury (Mercury free) alternatives. While discussing about performance of

the CETP, PP informed that the CETP is performing well at present and they have obtained

permission to discharge the effluent. Committee asked to submit compliance report of CETP

with analysis reports of final treated effluent. Committee suggested reuse/recycle of treated

waste water at maximum extent and minimize the effluent discharge to the CETP. After detailed

discussion, the following additional Terms of Reference were prescribed for the EIA study to be

done covering 5 Km radial distance from the project boundary.

1. Need for the proposed expansion should be justified in detail.

2. Explore the possibility of substitute products and processes containing or using mercury with non-mercury (Mercury free) alternatives.

3. Ensure that the various regulations for use, storage and transportation of Mercury metal/Compounds will be complied in letter and spirit. Give legal undertaking in this regard.

4. Demarcation of proposed expansion activities in lay out of the existing premises.

5. Exact aerial distance from the CEPI area of Vapi and Inter state boundary from the project premises.

6. Exact details about additional infrastructural facilities, plant machineries etc. required for the proposed expansion.

7. Technical details of all the plants along with details of manufacturing process / operations of each product. Details on strategy for the implementation of cleaner production activities.

8. Chemical name of each product and raw materials along with chemical reactions of unit processes. Detailed manufacturing process of each product along with chemical reactions and mass balance (including reuse-recycle, if any).

9. Assessment of source of the water supply with adequacy of the same to meet with the requirements for the project expansion. Permission obtained for supply of increased quantity of raw water. Undertaking stating that no bore well shall be dug within the premises.

10. Water consumption and consumption of each raw material per MT of each product.

11. Water balance diagram (including reuse-recycle, if any) alongwith qualitative and quantitative analysis of the each waste stream to be generated. A detailed treat ability study vis-à-vis the adequacy and efficacy of the treatment facilities proposed for the wastewater to be generated. The characteristic on which treatability is based shall also be

Page 57 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 57 of 87

stated. Characteristics of untreated and treated wastewater.

12. Quality and quantity of waste water to be generated from the manufacturing process of each product to be manufactured along with mass balance.

13. Stream wise qualitative & quantitative analysis of each waste stream (including process water, cooling tower blow down, boiler blow down, washing effluent etc.) to be generated. Characteristics of untreated and treated wastewater. A detailed effluent treat ability study vis-à-vis the adequacy and efficacy of the treatment facilities proposed for the wastewater to be generated. The characteristic on which treatability is based shall also be stated.

14. Detailed effluent treatment scheme and disposal method. Technical details of the proposed ETP, including size of each unit, retention time etc. including modifications / up gradation to be done in existing ETP to take care of increased effluent quantity along with its adequacy report.

15. Technical details of specific treatment for Mercury in effluent.

16. Details of CETP- Sarigam including (1) Total capacity of the CETP (2) Total booked capacity and actual load received at present (Qualitative and Quantitative) (3) CETP Up gradation scheme, if any (4) Last 2 years analysis reports of GPCB for Inlet and outlet of CETP (5) Spare capacity of CETP with treatability and feasibility report. (6) Recommendations and suggestions of the last two Environment Audit reports of CETP- Sarigam and its compliance report.

17. Plan for management and disposal of waste streams to be generated from spillage, leakages, occasional reactor washing, and exhausted media from Scrubber etc.

18. Explore the possibility of reuse / recycle and other cleaner production options for reduction of wastes. Details of methods to be adopted for the water conservation.

19. Undertaking stating that a separate electric meter will be provided for the ETP.

20. One season Site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall should be incorporated.

21. Anticipated environmental impacts due to the proposed project/production may be evaluated for significance and based on corresponding likely impacts VECs (Valued Environmental Components) may be identified. Baseline studies may be conducted within the study area of 5 km for all the concerned/identified VECs and likely impacts will have to be assessed for their magnitude in order to identify mitigation measures.

22. One complete season base line ambient air quality data (except monsoon) to be given along with the dates of monitoring. The parameters to be covered shall be in accordance with the revised National Ambient Air Quality Standards as well as project specific parameters. Locations of the monitoring stations should be so decided so as to take into consideration the pre-dominant downwind direction, population zone and sensitive receptors. There should be at least one monitoring station in the upwind direction. There should be at least one monitoring station in the pre dominant downwind direction at a location where maximum ground level concentration is likely to occur.

23. Modelling indicating the likely impact on ambient air quality due to proposed activities. The details of model used and input parameters used for modelling should be provided. The air quality contours may be shown on location map clearly indicating the location of sensitive receptors, if any, and the habitation. The wind rose showing pre-dominant wind direction should also be indicated on the map. Impact due to vehicular movement shall

Page 58 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 58 of 87

also be included into the prediction using suitable model. Results of Air dispersion modelling should be superimposed on google map / geographical area map.

24. Base line status of the noise environment, impact of noise on present environment due to the project and proposed measures for noise reduction including engineering controls.

25. Specific details of (i) Process gas emission from each unit process with its quantification, (ii) Air pollution Control Measures proposed for process gas emission, (iii) Adequacy of the air pollution control measures for process gas emission measures to achieve the GPCB norms (iv) Details of the utilities required (v) Type and quantity of fuel to be used for each utility (vi) Flue gas emission rate emission from each utility (vii) Air Pollution Control Measures proposed to each of the utility along with its adequacy (viii) List the sources of fugitive emission along with its quantification and proposed measures to control it.

26. Name and quantity of each type of solvents to be used for proposed production. Details of solvent recovery system including mass balance, solvent loss, recovery efficiency feasibility of reusing the recovered solvents etc. for each type of solvent.

27. Details on management of the by-products and spent acid to be generated along with copies of MOU / agreements done with actual consumers regarding utilization of by-products & spent acids shall be incorporated.

28. Details of management of the hazardous wastes to be generated from the project stating detail of storage area for each type of waste, its handling, its utilization and disposal etc. How the manual handling of the hazardous wastes will be minimized.

29. Methodology of de-contamination and disposal of discarded containers and its record keeping.

30. Membership of Common Environmental Infrastructure including the TSDF / Common Hazardous Waste Incineration facility along with an assessment to accommodate the additional quantity of wastes to be generated. Explore the possibilities for co-processing of the Hazardous waste prior to disposal into TSDF/CHWIF.

31. Data on air emissions, wastewater generation and solid / hazardous waste generation and management for the existing plant should also be incorporated.

32. Details of measures proposed for the noise pollution abatement and its monitoring.

33. A detailed EMP including the protection and mitigation measures for impact on human health and environment as well as detailed monitoring plan and environmental management cell proposed for implementation and monitoring of EMP. The EMP should also include the concept of waste-minimisation, recycle/reuse/recover techniques, energy conservation, and natural resource conservation. Total capital cost and recurring cost/annum earmarked for environment pollution control measures.

34. Occupational health impacts on the workers and mitigation measures proposed to avoid the human health hazards along with the personal protective equipment to be provided to the workers. Provision of industrial hygienist and monitoring of the occupational injury to workers as well as impact on the workers. Plan for periodic medical check up of the workers exposed. Details of work place ambient air quality monitoring plan as per Gujarat Factories Rules.

35. Details of hazardous characteristics and toxicity of raw materials and products to be handled and the control measures proposed to ensure safety and avoid the human health

Page 59 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 59 of 87

impact.

36. Details of quantity of each hazardous chemical to be stored, material of construction of major hazardous chemical storage tanks, threshold storage quantity as per schedules of Manufacture, Storage & Import of Hazardous Chemicals Rules of major hazardous chemicals.

37. Risk assessment including prediction of the worst-case scenario and maximum credible accident scenarios should be carried out. The worst-case scenario should take into account the maximum inventory of storage at site at any point of time. The risk contours should be plotted on the map clearly showing which of the facilities and surrounding units would be affected in case of an accident taking place. Based on the same, proposed safeguard measures including On-Site / Off-Site Emergency Plan should be provided.

38. Permission from PESO, Nagpur for storage of solvents, other toxic chemicals, if any.

39. Details of fire fighting system including provision for flame detectors, temperature actuated heat detectors with alarms, automatic sprinkler system, location of fire water tanks & capacity, separate power system for fire fighting, details of qualified and trained fire personnel & their job specifications, nearest fire station & time required to reach the proposed site. Submit line diagram of the fire hydrant network.

40. Detailed five year greenbelt development program including annual budget, types & number of trees to be planted, area under green belt development [with map], budgetary outlay; along with commitment of the management to carry out the tree plantation activities outside the premises at appropriate places in the nearby areas and elsewhere.

41. Proposal for socio-economic development activities including community welfare program most useful in the project area for the overall improvement of the environment.

42. Copies of Consent to Establish, Consent to Operate orders obtained in past along with point wise compliance status of all the conditions stipulated therein.

43. Copy of Environmental Clearance obtained for the existing project and a certified report of the status of compliance of the conditions stipulated in the environmental clearance for the existing operation of the project by the Regional Office of the MoEF.

44. Records of any legal breach of Environmental laws i.e. details of show- cause notices, closure notices etc. served by the GPCB to the existing unit in last five years and actions taken then after for prevention of pollution.

45. Details of fatal / non-fatal accidents, loss of life or man hours, if any, occurred in the existing unit in last three years and measures proposed to be taken for avoiding reoccurrence of such accidents in future.

46. (a) Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report.(b) Does the Environment Policy prescribe for standard operating process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions ? If so, it may be detailed in the EIA.

47. What is the hierarchical system or administrative order of the company to deal with the environmental issues and for ensuring compliance with the EC conditions. Details of this system may be given.

48. Submit checklist in the form of Do’s & Don’ts of preventive maintenance, strengthening of

Page 60 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 60 of 87

HSE, manufacturing utility staff for safety related measures.

49. Does the company have a system of reporting of non compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism should be detailed in the EIA Report.

50. Compliance of the MoEF’s OM dated 04/08/2009 and 05/10/2011 regarding compliance of TOR prescribed & factual correctness of the data submitted in the EIA report, the names of experts associated with / involved in the preparation of the EIA report and the ownership of the EIA report by the Project proponent.

51. Certificate of accreditation issued by the NABET, QCI to the environmental consultant should be incorporated in the EIA Report.

The above mentioned project specific TORs/additional TORs and the model TORs available in

the MoEF’s sector specific EIA Manual for Synthetic Organic Chemical industry shall be

considered as generic TORs for preparation of the EIA report in addition to all the relevant

information as per the generic structure of EIA given in Appendix III in the EIA Notification,

2006. The project shall be appraised on receipt of the final EIA report.

19. Shivanta Palace F.P.No.21, Sab Plot No.B, O.P.No.21,

Block No.62, T.P.S.No.21, Simada, Choryasi, Surat.

Screening & Scoping

Details of the proposed project, as presented before the committee, is tabulated below:

Sr. No. Particulars Details 1. Proposal is

for New Project

2. Type of Project

Residential

3. Project / Activity No. [8(a) or 8(b)]

8(a)

4. Name of the project

Shivanta Palace

5. Name of Developer

Mr. Ravjibhai Premjibhai Patel

6. Estimated Project Cost (Rs. In Crores)

Rs. 90 crores

7. Whether construction work has been initiated at site? If yes, details thereof

No

Page 61 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 61 of 87

8. Project Details

Land / Plot Area (m2): 9,381.0 FSI area (m2): 20,918.90 Non FSI area (m2): 14,500.53 Total BUA (m2): 35,419.43 Permissible Proposed FSI Area (m2) 20,966.53 20,918.90 Ground Coverage (m2) 2,673.58 2,326.08 Common Plot Area (m2) 938 938 Max. Building height (m) 65 m 45.4 m

9. Building Details

No. of Buildings:4 No. of Blocks:4 Scope of buildings/blocks: Basement + hollow plinth + 12 floors. No.& size of Residential Units:192 units No. & type of Commercial Units:--- Details of amenities if any: Club house and jogging track

10. No. of expected residents / users

864

11. Water & waste water details during construction phase

Water requirement (KL/day): 15.0 Source of water: Water supply from Surat Municipal Corporation

(SMC). Waste water generation quantity (KL/day): 2.1 Mode of disposal: Into drainage line of SMC.

12. Water & waste water details during operation phase

Fresh water requirement (KL/day): 125.0 Source of water: Water supply from SMC. Waste water generation quantity (KL/day): 97.0 Mode of disposal: Into drainage line of SMC.

13. Status of water supply and drainage line

Both drainage and water supply lines exist at site

14. Solid waste Management

Construction Phase: Generation

(m3) Quantity to be reused (m3)

Mode of Disposal / Reuse

Top Soil 2,812

2,812

800 m3 of top soil will be used for greenbelt development

Remaining quantity of top soil will be utilized for back filling

Page 62 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 62 of 87

Other excavated earth

18,843.75

3,977.5

3,977.5 m3 of excavated Soil will be utilized for back filling within premises while excess soil of -14,866.25 m3 will be utilized at other project site after obtaining necessary permission, if any

Construction debris

15kg/day Nil Sold off to recyclers

Steel scrap 15kg/day Discarded packing materials

6kg/day

Operation Phase: Type of waste

Generation Quantity (Kg/day)

Mode of waste collection

Mode of Disposal / Reuse

Dry waste 300 kg/day Will be collected in the separate bins to be provided within premises

Door to door waste collection facility of SMC.

Wet waste 218 kg/day

Details of segregation if to be done: Separate bins will be provided for dry and wet waste to each unit.

Capacity and no. of community bins to be placed within premises: 4 nos of bins having capacity of 75 kg each for dry waste and 4 nos of 60 kg for wet waste will be provided.

Landfill site where waste will be ultimately disposed by local authority: Khajod Disposal Site

15. Parking Details

Total parking area requirement for the project as per GDCR: 3,144.98 m2.

Parking area requirement for residential units as per GDCR: 3,144.98 m2.

Total number of CPS requirement for the project as per NBC :192

Number of CPS requirement for residential units as per NBC: 192

Total Parking area provided (m2) & No. of CPS: 6,659.96 m² and 215 CPS.

Parking area provided in basement (m2) & No. of CPS: 4,899.64 m2 and 153 CPS

Parking area provided in hollow plinth (m2) & No. of CPS: 1,760.32 m2 and 62 CPS

16. Traffic Management

Width of adjacent public roads:18 m wide TP road Number of Entry & Exit provided on approach road/s: Two gates

will be provided Width of Entry & Exit provided on approach road/s: 8 m

Page 63 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 63 of 87

Minimum width of open path all around the buildings for easy access of fire tender (excluding the width forthe plantation):8.0 m

Width of all internal roads: 8.0 m. 17. Details of

Green Building measures proposed.

Provision to install aerated coke (foam type) in wash basins, kitchen, low flush water closets in toilet and pressure reducing valves in water pipeline, rain water harvesting ground water recharge.

18. Energy Requirement, Source and Conservation

Power supply: Maximum demand: 960 KW Connected load: 1100 KW Source: Torrent Power Ltd.

Energy saving measures: Maximum utilization of natural light, roof-top thermal insulation, CFL lighting fixtures in the common areas, appropriate design to shut out excess heat and gain loss, use of solar energy in external lighting (landscape lighting), use of aerated blocks etc.

DG Sets: No. and capacity of the DG sets:2 × 60 KVA Fuel & its quantity: diesel (10 Liter/h) Note : - D.G. Sets will be used in case of power failure or fire emergency

19. Fire and Life Safety Measures

During the construction phase: Fire extinguishers at various locations and easily accessible, to keep printed board showing important telephone number of fire, ambulance, hospital etc. training to the workers on safety aspects, first aid box at identified places within premises, doctor & ambulance services, provision of PPE’S like helmet, gumboot/safety shoes, safety net, safety goggles etc.

During the operation phase: Fire extinguishers (portable & mobile) at each floor, hose reel, wet riser opening at each floor, manually operated electric fire alarm system, terrace water storage tank of 20 KL, underground fire water storage tank of 100 KL capacity, smoke detectors etc.

Nearest fire station: Varachha fire station. Distance from project site: 4 km.

20. Details on staircase Type & no. of buildings

No. of floors

Floor area

No. of staircase

Width of the staircase

Travel distance (m)

A 12 579.48 2 2.07 m < 15 m B1 12 420.91 1 2.10 m < 15 m B2 12 420.91 1 2.10 m < 15 m

B3 12 420.91 1 2.10 m < 15 m

21. Rain Water Harvesting (RWH)

Level of the Ground water table: 14 m No. & dimensions of RWH tank(s) :- No. and depth of percolations wells :3 nos. Details on Pre-treatment facilities :only roof top rainwater

harvesting is proposed 22. Green area

details Tree covered area (m2) :500 Area covered by shrubs and bushes (m2): Lawn covered area (m2): 500

Page 64 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 64 of 87

Total Green Area (m2): 1,000 Green Area % of plot area: 10.65% No. of trees and species to be planted: 250

23.

Budgetary allocation for Environmental Management Plan (Rs. In lacs)

Green belt development : 60 Lacs Drainage and rain water harvesting: 50 lacs Solar and energy saving: 30lacs Total: 140Lacs

24. Proposed dust control measures during the construction phase

Loading & transportation in covered trucks, covered shed provided for cement unloading activity, temporarily wind screen around project site, sprinkling of water on roads and in vicinity of storage area.

25. Eco friendly building material usage details.

Fly ash brick, aerated blocks, paving blocks, RMC, lead free paints etc.

26. Amenities to be provided to construction workers.

Drinking water & tap water, sanitation facilities, first aid box, free medicines, doctor service, PPEs etc.

27. Documents related to land possession.

N.A order for residential use in the name of applicant Mr. Ravjibhai Premjibhai Patel.

During the meeting, after detailed deliberation on various aspects of the project, it was decided to recommend the project to SEIAA Gujarat for grant of Environmental Clearance.

20. Suryadarshan (M/s. Haridarshan Developers)

Block no. 287, Moje- Kamrej, Surat. Screening & Scoping

Details of the proposed project, as presented before the committee, is tabulated below:

Sr. No.

Particulars Details

1. Proposal is for New Project 2. Type of Project Residential 3. Project / Activity

No. [8(a) or 8(b)] 8(a)

4. Name of the project

Suryadarshan

5. Name of Developer

M/s. Haridarshan Developers

6. Estimated Project Cost (Rs. In Crores)

25 Crores

7. Whether construction work has been initiated at site? If yes, details

No

Page 65 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 65 of 87

thereof 8. Project Details Land / Plot Area : 74,085.0

FSI area: 48,229.20 Non FSI area: Nil Total BUA: 48,229.20

Permissible Proposed FSI Area (m2) 78,198.99 48,229.20 Ground Coverage (m2) 26,066.33 21,908.51 Common Plot Area (m2)

7,408.50 7,867.43

Row house height (m) - 6.60 9. Building Details No. Blocks: 426 nos. of raw houses

Scope of /blocks: Raw houses of ground floor + 1 floor. No. & size of Residential Units: 426 nos. of raw houses.

10. No. of expected residents / users

1917 nos. residential users

11. Water & waste water details during construction phase

Water requirement (KL/d): 16.85 Source of water: Gram panchayat / water tankers. Waste water generation quantity (KL/d): 1.8

Mode of disposal: Dispose off through onsite septic tank and soak pit.

Details of reuse of water, if any: washing water of construction equipments will be reused for curing.

12. Water & waste water details during operation phase

Fresh water requirement (KL/d): 279 .0 Source of water: Gram Panchayat Waste water generation quantity (KL/d): 211.0 Mode of disposal: The waste water will be discharged into

underground drainage network. 13. Status of water

supply and drainage line

Water supply & drainage system will be provided by Kamrej Gram Panchayat.

14. Solid waste Management

Construction Phase: Generation

(m3) Quantity to be reused (m3)

Mode of Disposal / Reuse

Top Soil 1,500 1,500 Excavated surplus earth and construction debris will be refilled at low lying areas in the project premises and top soil will be used for development of greenbelt.

Other excavated earth

Construction debris

40 40

Steel scrap 3.1 MT 2.65 MT Sold to vendors / recyclers.

Discarded packing materials

1 MT -- Sold to vendors.

Operation Phase:

Page 66 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 66 of 87

Type of waste

Generation Quantity (Kg/d)

Mode of waste collection

Mode of Disposal / Reuse

Dry waste & Wet waste

1150.2 Into waste collection bins to be provided within the premises.

Recyclable waste will be sold to vendors and biodegradable waste will be used as manure after composting.

Details of segregation if to be done: The solid wastes generated will be segregated into biodegradable and non-biodegradable wastes and collected in separate bins.

Capacity and no. of community bins to be placed within premises: 140 L each; 30 nos. of bins;

Disposal: Landfill site where waste will be ultimately disposed by local authority: ----

15. Traffic Management

Width of adjacent public roads: 7.5 m wide road Number of Entry & Exit provided on approach road/s: 2 nos. Width of Entry & Exit provided on approach road/s: 10.50, 9 &

7.5 meter Minimum width of open path all around the buildings for easy

access of fire tender (excluding the width for the plantation): 3 m

Width of all internal roads: 10.50, 9 & 7.5 m. 16. Details of Green

Building measures proposed.

Construction material viz. fly ash based bricks, aerated blocks, paving blocks, Ready Mix Concrete and A.C.C blocks for roads and structures, lead free paints will be used for painting the building structure from inside as well as outside.

17. Energy Requirement, Source and Conservation

Power supply Maximum demand: 1500 KW Connected load: --

Source: D.G.V.C.L Energy saving measures: Maximum utilization of natural light,

LED lighting fixtures in the common areas, use of solar energy in external lighting (landscape lighting), aerated block [cement + fly ash + air mixture] will be used to reduce heat stress inside building.

18. Fire and Life Safety Measures

Fire extinguisher will be proposed for fire safety

19. Details on staircase Name

of Buildin

g

floors type

blocks

House No. of staircase

Width of the staircase(m)

Travel distance

(m)

A to J type

G + 1 426 - -- -

20. Rain Water Harvesting (RWH)

Level of the Ground water table: 15 – 30 m No. & dimensions of RWH tank(s) : -- No. and depth of percolations wells : 19 nos., 40 m Details on Pre-treatment facilities : Gravity filter.

Page 67 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 67 of 87

21. Green area details

Area covered by trees (m2): 3,915.64 Area covered by shrubs and bushes (m2): Included in lawn

covered area. Lawn covered area (m2): 3,951.79 Total Green Area (m2): 7,867.43 Green Area % of plot area: 10 %

No. of trees and species to be planted: 300 nos. of trees like Asopalav, Gulamhor, Palm, Badam etc.

22.

Budgetary allocation for Environmental Management Plan (Rs. In lacs)

Budget allocation of Rs. 85.25 lacs is proposed for landscaping, solar energy utilization, solid waste management etc.

23. Proposed dust control measures during the construction phase

Vertical curtails & water sprinkling, covering the building materials with the tarpaulin, covered shed for cement unloading activity

24. Eco friendly building material usage details.

Conventional construction material viz. Fly ash based bricks, aerated blocks, paving blocks, Ready Mix Concrete and A.C.C blocks for roads and structures,lead free paints will be used for painting the building structure from inside as well as outside.

25. Details on amenities to be provided to construction workers

Drinking water & tap water, sanitation facilities, domestic waste water disposal facility, first aid box, free medicines, doctor & ambulance service, PPEs etc.

26. Documents related to land possession.

Village form no. 7 & 12 shows that the N.A land for residential use is in the name of Haridarshan Developers (a partnership firm) through its partner Mr. Rameshbhai C. Hirpara i.e the applicant.

During the meeting, after detailed discussion, it was decided to further appraise the project only after submission of the following:

1. Exact source of water supply during the operation phase and construction phase of the

project and status of availability of water supply to the project with supporting documents.

Copy of permission from the concerned authority for water supply as per the requirement of

the proposed project.

2. Details on the availability of the drainage facility to the proposed project with supporting

documents and permission from the concerned authority in this regard.

3. Complete municipal solid waste management plan including its collection, storage, disposal,

treatment etc. Details of composting facility and location of the proposed composting facility

on the layout plan.

4. Details on parking space to be provided in each individual type of raw house which should

include total plot area of each type of raw house, ground coverage, open plot area & parking

area available etc.

5. Documents showing the ownership of the applicant Mr. Anilbhai C. Modi for the proposed

project site.

Page 68 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 68 of 87

21. Chandra Darshan Block No.320/1, Moje- Kamrej, Surat. Screening & Scoping

Details of the proposed project, as presented before the committee, is tabulated below:

Sr. No.

Particulars Details

1. Proposal is for New Project 2. Type of Project Residential 3. Project / Activity

No. [8(a) or 8(b)] 8(a)

4. Name of the project

“Chandra Darshan”

5. Name of Developer

Mr. Hiralal Gopalbhai

6. Estimated Project Cost (Rs. In Crores)

20 Crores

7. Whether construction work has been initiated at site? If yes, details thereof

No

8. Project Details Land / Plot Area (m2): 39,242.0 FSI area (m2): 24,451.48 Non FSI area (m2): 3,643.84 Total BUA (m2): 28,095.32

Permissible Proposed FSI Area (m2) 41,908.08 24,451.48 Ground Coverage (m2) 13,969.36 12,225.74 Common Plot Area (m2)

3,924.20 3,925.06

Row house height (m) - 6.60 9. Building Details No. of Blocks: 472 Nos. of raw houses

Scope of buildings / blocks: G + 1 No. & size of Residential Units: 472 Nos.

10. No. of expected residents / users

2124 nos. residential users

11. Water & waste water details during construction phase

Water requirement (KL/d): 16.85 Source of water: gram panchayat / water tankers. Waste water generation quantity (KL/d): 1.8 Mode of disposal: Dispose off through onsite septic tank and

soak pit. Details of reuse of water, if any: Washing water of construction

equipment will be reused for curing purpose. 12. Water & waste

water details during operation phase

Fresh water requirement (KL/d): 299.0 Source of water: Gram Panchayat Waste water generation quantity (KL/d): 233.0 Mode of disposal: The waste water will be discharged into

underground drainage network. 13. Status of water

supply and drainage line

Water supply & drainage system will be provided by Kamrej Gram Panchayat.

Page 69 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 69 of 87

14. Solid waste Management

Construction Phase: Generation

(m3) Quantity to be reused (m3)

Mode of Disposal / Reuse

Top Soil 1,000 1,000 Excavated surplus earth and construction debris will be refilled at low lying areas in the project premises and top soil will used for development of greenbelt.

Other excavated earth

Construction debris

25 25

Steel scrap 2.5 MT Sold to vendors / recyclers.

Discarded packing materials

1 MT -- Sold to vendors.

Operation Phase: Type of waste

Generation Quantity (Kg/d)

Mode of waste collection

Mode of Disposal / Reuse

Dry waste & Wet waste

1,274.4 Into waste collection bins to be provided within the premises.

Recyclable waste will be sold to vendors and biodegradable waste will be used as manure after composting.

Details of segregation if to be done: The solid wastes generated will be segregated into biodegradable and non-biodegradable wastes and collected in separate bins.

Capacity and no. of community bins to be placed within premises: 140 L each; 30 nos. of bins;

Disposal: Landfill site where waste will be ultimately disposed by local authority: ---

15. Traffic Management

Width of adjacent public roads: 12 m wide T.P. Road Number of Entry & Exit provided on approach road/s: One

gate will be provided. Width of Entry & Exit provided on approach road/s: 9.15 m Minimum width of open path all around the buildings for easy

access of fire tender (excluding the width for the plantation): 3 m

Width of all internal roads: 7.62 m & 9.15 m.

Page 70 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 70 of 87

16. Details of Green Building measures proposed.

Construction material viz. fly ash based bricks, aerated blocks, paving blocks, Ready Mix Concrete and A.C.C blocks for roads and structures, lead free paints will be used for painting the building structure from inside as well as outside.

17. Energy Requirement, Source and Conservation

Power supply: Maximum demand: 1500 KW Connected load: --

Source: D.G.V.C.L Energy saving measures: Maximum utilization of natural light,

LED lighting fixtures in the common areas, use of solar energy in external lighting (landscape lighting), aerated block [cement + fly ash + air mixture] will be used to reduce heat stress inside building.

18. Fire and Life Safety Measures

Fire extinguisher will be proposed for fire safety.

19. Details on staircase Name

of Building

floors type

blocks

House No. of staircase

Width of the staircase(m)

Travel distance (m)

A to G type

G + 1 472 - - -

20. Rain Water Harvesting (RWH)

Level of the Ground water table: 15-30 m No. & dimensions of RWH tank(s) : -- No. and depth of percolations wells : 10 nos. Details on Pre-treatment facilities : Gravity filter

21. Green area details Area covered by trees (m2): 1,917.05 Area covered by shrubs and bushes (m2): Included in lawn

covered area. Lawn covered area (m2): 2,008.01 Total Green Area (m2): 3,925.06 Green Area % of plot area: 10 % No. of trees and species to be planted: 350 nos. of trees like

Asopalav, Gulamhor, Palm, Badam etc.

22.

Budgetary allocation for Environmental Management Plan (Rs. In lacs)

Budget allocation of Rs. 88.25 lacs is proposed for landscaping, solar energy utilization, solid waste management etc.

23. Proposed dust control measures during the construction phase

Vertical curtails & water sprinkling, covering the building materials with the tarpaulin, covered shed for cement unloading activity

24. Eco friendly building material usage details.

Conventional construction material viz. Fly ash based bricks, aerated blocks, paving blocks, Ready Mix Concrete and A.C.C blocks for roads and structures,lead free paints will be used for painting the building structure from inside as well as outside.

Page 71 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 71 of 87

25. Details on amenities to be provided to construction workers

Drinking water & tap water, sanitation facilities, domestic waste water disposal facility, first aid box, free medicines, doctor & ambulance service, PPEs etc.

26. Documents related to land possession.

N.A order for residential use is in the name of Mr. Hiralal Gopalbhai.

During the meeting, after detailed discussion, it was decided to further appraise the project only after submission of the following: 1. Exact source of water supply during the operation phase and construction phase of the

project and status of availability of water supply to the project with supporting documents.

Copy of permission from the concerned authority for water supply as per the requirement of

the proposed project.

2. Details on the availability of the drainage facility to the proposed project with supporting

documents and permission from the concerned authority in this regard.

3. Complete municipal solid waste management plan including its collection, storage, disposal,

treatment etc. Details of composting facility and location of the proposed composting facility

on the layout plan.

4. Details on parking space to be provided in each individual type of raw house which should

include total plot area of each type of raw house, ground coverage, open plot area & parking

area available etc.

5. Documents showing the ownership of the applicant Mr. Anilbhai C. Modi for the proposed

project site.

22..

Bharatbhai V. Jivani (Pirah Developers)

Block No.368, Moje Kamrej, Surat. Screening & Scoping

Details of the proposed project, as presented before the committee, is tabulated below:

Sr. No.

Particulars Details

1. Proposal is for New Project 2. Type of Project Residential 3. Project /

Activity No. [8(a) or 8(b)]

8(a)

4. Name of the project

Bharatbhai V. Jivani

5. Name of Developer

M/s. Pirah Developers

6. Estimated Project Cost (Rs. In Crores)

22 Crore

7. Whether construction work has been initiated at site? If yes, details thereof

No

Page 72 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 72 of 87

8. Project Details Land / Plot Area (m2): 61,123.0 FSI area (m2): 33,532.94 Non FSI area (m2): Nil Total BUA (m2): 33,658.42

Permissible Proposed FSI Area (m2) 64,236.37 33,532.94 Ground Coverage (m2) 21,412.12 14,604.87 Common Plot Area (m2) 6,112.30 6,140.08 Row house height (m) - 6.60

9. Building Details

No. of Blocks: 561 Nos. of raw houses. Scope of /blocks: Raw houses of ground floor + 1 floor. No. & size of Residential Units: 561 Nos. of raw houses.

10. No. of expected residents / users

2525 nos. residential users

11. Water & waste water details during construction phase

Water requirement (KL/d): 16.85 Source of water: Gram panchayat / water tankers. Waste water generation quantity (KL/d): 1.8 Mode of disposal: Dispose off through onsite septic tank and soak

pit. Details of reuse of water, if any: washing water of construction

equipments will be reused for curing. 12. Water & waste

water details during operation phase

Fresh water requirement (KL/d): 356 .0 Source of water: Gram Panchayat Waste water generation quantity (KL/d): 276.0 Mode of disposal: The waste water will be discharged into

underground drainage network. 13. Status of water

supply and drainage line

Water supply & drainage system will be provided by Kamrej Gram Panchayat.

14. Solid waste Management

Construction Phase: Generation

(m3) Quantity to be reused (m3)

Mode of Disposal / Reuse

Top Soil 2,573 2,573 Excavated surplus earth and construction debris will be refilled at low lying areas in the project premises and top soil will be used for development of greenbelt.

Other excavated earth

Construction debris

70 70

Steel scrap 6.2 MT 6.2 MT Sold to vendors / recyclers.

Page 73 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 73 of 87

Discarded packing materials

1 MT -- Sold to vendors.

Operation Phase: Type of waste

Generation Quantity (Kg/d)

Mode of waste collection

Mode of Disposal / Reuse

Dry waste & Wet waste

1,514.7 Into waste collection bins to be provided within the premises.

Recyclable waste will be sold to vendors and biodegradable waste will be used as manure after composting.

Details of segregation if to be done: The solid wastes generated

will be segregated into biodegradable and non-biodegradable wastes and collected in separate bins.

Capacity and no. of community bins to be placed within premises: 140 L each; 30 nos. of bins;

Disposal: Landfill site where waste will be ultimately disposed by local authority: ----

15. Traffic Management

Width of adjacent public roads: 24 m wide road Number of Entry & Exit provided on approach road/s: One gate

will be provided. Width of Entry & Exit provided on approach road/s: 9.0 m Minimum width of open path all around the buildings for easy

access of fire tender (excluding the width for the plantation): 3 m Width of all internal roads: 6.10 m, 7.5 m & 9.0 m.

16. Details of Green Building measures proposed.

Construction material viz. fly ash based bricks, aerated blocks, paving blocks, Ready Mix Concrete and A.C.C blocks for roads and structures, lead free paints will be used for painting the building structure from inside as well as outside.

17. Energy Requirement, Source and Conservation

Power supply Maximum demand: 1500 KW Connected load: --

Source: D.G.V.C.L Energy saving measures: Maximum utilization of natural light, LED

lighting fixtures in the common areas, use of solar energy in external lighting (landscape lighting), aerated block [cement + fly ash + air mixture] will be used to reduce heat stress inside building.

18. Fire and Life Safety Measures

Fire Extinguisher will be proposed for Fire Safety

Page 74 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 74 of 87

19. Details on staircase Name

of Building

floors type

blocks

House No. of staircase

Width of the

staircase(m)

Travel distance (m)

A to I type

G + 1 561 - - -

20. Rain Water Harvesting (RWH)

Level of the Ground water table: 50-100 ft No. & dimensions of RWH tank(s) : --- No. and depth of percolations wells : 16 nos., 40 m Details on Pre-treatment facilities : Gravity filter, MOC: PE

21. Green area details

Area covered by trees (m2): 3,353.48 Area covered by shrubs and bushes (m2): Included in lawn

covered area. Lawn covered area (m2): 2,786.60 Total Green Area (m2): 6,140.08 Green Area % of plot area: 10 % No. of trees and species to be planted: 420 nos. of trees like

Asopalav, Gulamhor, Palm, Badam etc. 22.

Budgetary allocation for Environmental Management Plan (Rs. in lacs)

Budget allocation of Rs. 85.25 lacs is proposed for landscaping, solar energy utilization, solid waste management etc.

23. Proposed dust control measures during the construction phase

Vertical curtails & water sprinkling, covering the building materials with the tarpaulin, covered shed for cement unloading activity.

24. Eco friendly building material usage details.

Conventional construction material viz. Fly ash based bricks, aerated blocks, paving blocks, Ready Mix Concrete and A.C.C blocks for roads and structures,lead free paints will be used for painting the building structure from inside as well as outside.

25. Details on amenities to be provided to construction workers

Drinking water & tap water, sanitation facilities, domestic waste water disposal facility, first aid box, free medicines, doctor & ambulance service, PPEs etc.

26. Documents related to land possession.

N.A permission obtained for residential use. Index of Sub-registrar’s office shows the land in the name of M/s Pirah Developers through its partners including Mr. Bharatbhai V. Jivani.

During the meeting, after detailed discussion, it was decided to further appraise the project only after submission of the following:

1. Exact source of water supply during the operation phase and construction phase of the

project and status of availability of water supply to the project with supporting documents.

Copy of permission from the concerned authority for water supply as per the requirement of

the proposed project.

2. Details on the availability of the drainage facility to the proposed project with supporting

Page 75 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 75 of 87

documents and permission from the concerned authority in this regard.

3. Complete municipal solid waste management plan including its collection, storage, disposal,

treatment etc. Details of composting facility and location of the proposed composting facility

on the layout plan.

4. Details on parking space to be provided in each individual type of raw house which should

include total plot area of each type of raw house, ground coverage, open plot area & parking

area available etc.

The following proponents did not remain present during the meeting:

1. Hasmukh Dhaduk Block No:208, O.P.No. 86,F.P.No.118, T.P.S.No.9(Palanpore- Bhesan), Palanpore, Surat.

2. RNA Devlopers, TP-5(Athwa-Umara),C.S. No.248-251 & 253-260, O.P.No.84, F.P.No.84/A/P+84/B/P,Parlr Point, Athwa-Umara, Choryasi, Surat.

3. Mukhya mantri Gruh Yojna, Taleti Road, Rear Somnath Mahadev Mandir,Opp. Sidharath School, Mahesana.

4. Baid Industries Pvt. Ltd.Plot No:8, Panoli, Ankleshwar, Bharuch.

5. Meganabhai M. Jinjala ,Block No.59/P/1, F.P.No. 37, O.P.No. 27/1, T.P.S.No. 19,At. Pavat, Ta-Udhna,Dist-Surat

6. M/s. CRL Terminals Pvt Ltd. (A Royal Vopak Company), Gandhidham, Kutch

It was decided to call them in one of the upcoming meetings of SEAC.

The following project proponent attended the meeting but the committee found that the project

proponent has violated the provisions of EIA Notification-2006 by carrying out construction

activity/ starting the production activity without obtaining prior EC and hence decided not to

consider the project at this stage. Further it was decided to inform Gujarat Pollution Control

Board to initiate credible action on the violation by invoking powers under Section 19 of the

Environment (Protection) Act, 1986 for taking necessary legal action under Section 15 of the

Act and to send the proposal to SEIAA Gujarat for further guidance & necessary action in this

regard.

1. Kalpvan Green, S.No.59/1P1/P1, PlotNo.1, Kangsiyali, Lodhika, Rajkot.

2. Keshar Emulsion Pvt. Ltd., S.No.159/2,Opp.Katwad Patiya, N.H.no.8, At Dalpur, Pratij, Dist.: Sabarkantha.

3. Swapna Villa, Block No.343,344, Moje: Kamrej Surat

FINALIZATION OF STANDARD CONDITIONS FOR GRANTING OF ENVIRONMENTAL CLEARANCE TO THE BUILDING CONSTRUCITON PROJECTS FALLING UNDER PROJECT ACTIVITY NO. 8(a) AS PER THE SCHEDULE OF THE EIA NOTIFICATION 2006.

Draft standard conditions to recommend the proposals of building construction projects falling under the project activity no. 8(a) as per the schedule of the EIA Notification 2006 for granting environmental clearance were circulated among the members during the meeting and after detailed deliberation, the following standard conditions were finalized for recommending the proposals of building construction projects falling under the project activity no. 8(a) as per the

Page 76 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 76 of 87

schedule of the EIA Notification 2006 for grant of Environmental Clearance to SEIAA.

PRE –CONSTRUCTION AND CONSTRUCTION PHASE:

1. Environment Management Cell shall be formed, which shall supervise and monitor the environment related aspects of the project during construction and operational phases in addition to observance of Gujarat Building and other Construction Workers’(Regulation of Employment & Conditions of Service) Rules 2003.

2. Prior permission from the competent authority shall be obtained for cutting of the existing trees before site preparation work is commenced.

3. Water demand during construction shall be reduced by use of curing agents, super plasticizers and other best construction practices.

4. Temporary wind shield shall be done to prevent dust emission spreading outside the project premises. Barricade of adequate height shall be provided on the periphery of the construction site with adequate signages. Individual building within the project site shall also be provided with barricades.

5. Regular water sprinkling shall be done in vulnerable areas for controlling fugitive emission.

6. Material shall be covered during transportation to avoid the fugitive emission.

7. Uniform piling and proper storage of sand to avoid fugitive emissions shall be ensured.

8. Structural design of the project shall strictly adhere to the seismic zone norms for earthquake resistant structures.

9. The planning, designs and construction of all buildings shall be such as to ensure safety from fire.

10. The project proponent shall ensure maximum employment to the local people.

11. All required sanitary and hygienic measures shall be provided before starting the construction activities and to be maintained throughout the construction phase.

12. Provision shall be made for housing of construction labor within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, safe drinking water, medical healthcare, crèches, electricity & ventilation, canteen, rest rooms, safe disposal system for garbage, first aid, medical and emergency facilities etc. to ensure that they do no ruin the existing environmental condition. The housing may be in the form of temporary structures to be removed after completion of the project.

13. Adequate personal protective equipments shall be provided to the construction workers to ensure their safety and the project proponent shall ensure its usage by the labors.

14. First Aid Box shall be made readily available in adequate quantity at all the times.

15. Training shall be given to all workers on construction safety aspects.

16. The project proponent shall strictly comply with the Building and other Construction Workers’(Regulation of Employment & Conditions of Service) Act 1996 and Gujarat rules made there under and their subsequent amendments.

Page 77 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 77 of 87

17. The overall noise level in and around the project area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation, hoods, silencers, enclosures vibration dampers etc. on all sources of noise generation.

18. Ambient noise levels shall conform to residential standards both during day and night. Incremental pollution load on the ambient air and noise quality shall be closely monitored during construction phase

19. The noise generating equipments, machinery and vehicles shall not be operated during the night hours and shall be maintained properly to avoid generation of high noise due to wear and tear.

20. Use of diesel generator sets during construction phase shall be strictly with acoustic enclosure and shall conform to the EPA Rules for air and noise emission standards.

21. Safe disposal of wastewater and municipal solid wastes generated during the construction phase shall be ensured.

22. All topsoil excavated during construction activity shall be used in horticultural / landscape development within the project site.

23. Construction materials and debris shall be properly stored and handled to avoid negative impacts such as air pollution and public nuisances by blocking the roads and public passages.

24. Construction debris shall be reused in construction of roads, leveling the site etc. Waste packaging material (like used cement bags, waste paper, cardboard packing material), metal scraps etc. shall be sold to recyclers or shall be sent to the nearest municipal solid waste landfill site.

25. Excavated earth to be generated during the construction phase shall be utilized within the premises to the maximum extent possible and balance quantity of excavated earth shall be disposed off with the approval of the competent authority after taking the necessary precautions for general safety and health aspects. Disposal of the excavated earth during construction phase shall not create adverse effect on neighboring communities.

26. Vehicles hired for bringing construction material at the site shall be in good conditions and conform to applicable air and noise emission standards and shall be operated only during day time and non-peak hours.

27. Project proponent shall ensure use of eco-friendly building materials including fly ash bricks, fly ash paver blocks, Ready Mix Concrete [RMC] and lead free paints in the project.

28. Fly ash shall be used in construction wherever applicable as per provisions of Fly Ash Notification under the E.P. Act, 1986 and its subsequent amendments from time to time.

29. Use of glass shall be minimal and only low emissive glass shall be used in the project to reduce the electricity consumption and load on air conditioning.

OPERATION PHASE AND LIFE TIME:

30. Low water consuming devices shall be provided. Fixtures for showers, toilet, flushing and drinking shall be of low flow either by use of aerators/ diffusers or pressure reducing

Page 78 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 78 of 87

devices etc.

31. A water meter shall be installed on rain water harvesting & ground water recharge well system & compliance report of the same shall be submitted to concerned authorities.

32. Used oil shall be sold only to the registered recycler.

33. Requisite fire fighting facilities as per the requirement of NBC and Gujarat Fire Prevention and Life Safety Measures Act-2013 & rules made there under shall be provided

34. Underground fire water storage tanks and terrace water storage tanks of adequate capacity shall be provided as proposed. Adequate provision shall be made to ensure that water from the Fire Water Tank shall not be used for any other purpose.

35. Dedicated power back up system shall be provided in the case of power failure & emergency of fire water pumps.

36. First Aid Box shall be made readily available in adequate quantity at all the times.

37. Main entry and exit shall be separate and clearly marked in the facility

38. Necessary emergency lighting system along with emergency power back up system shall be provided. Further, necessary auto glow signage at all appropriate places shall be provided to guide the people towards exits and assembly points during emergency.

39. Sufficient peripheral open passage shall be kept in the margin area for free movement of fire tender/ emergency vehicle around the premises.

40. The overall noise level in and around the project area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation, hoods, silencers, enclosures vibrations dampers etc. on all sources of noise generation including D.G.Sets. The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules.

41. The area earmarked for the parking shall be used for parking only. No other activity shall be permitted in this area.

42. Traffic congestion near the entry and exit points from the roads adjoining the proposed project site shall be avoided. No public space including the service road shall be used or blocked for the parking.

43. The project proponent shall install energy efficient devices, appliances, motors, and pumps conforming to the Bureau of Energy Efficiency norms.

44. The transformers and motors shall have minimum efficiency of 85%.

45. Only variable frequency motor drives shall be used in project.

46. Application of solar energy shall be incorporated for illumination of common areas, lighting for gardens and street lighting in addition the provision for solar water heating system shall also be provided.

47. Use of glass shall be minimal to reduce the heat island effect as well as to reduce the

Page 79 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 79 of 87

electricity consumption.

48. The area earmarked as green area shall be used only for plantation and shall not be altered for any other purpose.

49. Drip irrigation/low volume, low angle sprinkler system shall be used for the lawns and other green area including tree plantation.

50. The project proponent shall inform to SEAC / SEIAA regarding the transfer of management responsibility to the Society / Association to be formed for the proposed project with all the supporting documents. The Society / Association formed for further management of the proposed project shall be responsible for compliance of all the conditions stipulated in the Environmental Clearance order.

51. Environmental Clearance granted for the project on the basis of documents related to land possession submitted shall become invalid in case the actual land for the project site turns out to be different from the land considered at the time of appraisal of the project and mentioned in the EC.

52. All other statutory clearances such as N.A. permission, approvals for storage of diesel from PESO, Fire Department, Airports Authority of India etc., if applicable, shall be obtained by the project proponent from the competent authorities.

53. All the conditions as may be stipulated in the N.A. order, Development permission, Building Use permission, NOC obtained from Fire Department etc. shall be strictly complied with.

54. The project management shall also comply with all the environment protection measures, risk mitigation measures and safeguards proposed by them.

55. All the commitments / undertakings given to the SEAC during the appraisal process for the purpose of environmental protection and management shall be strictly adhered to.

56. The project proponent shall also comply with any additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose for the environmental protection and management.

57. The project proponent shall strictly comply with the Gujarat Building and other Construction Workers’(Regulation of Employment & Conditions of Service) Rules 2003 as well as Gujarat Lifts & Escalators Rules as amended from time to time.

58. No further expansion or modifications in the project likely to cause environmental impacts shall be carried out without obtaining prior Environment Clearance from the concerned authority.

59. The above conditions shall be enforced, inter-alia under the provisions of the water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981, the Environment (Protection) Act 1986 and the Hazardous Wastes (Management Handling and Tran boundary) Rules, 2008, Building and Other Construction Workers’ (Regulation of Employment & Conditions of Service) Act-1996, The Gujarat Lifts and Escalators Act-2000 along with their amendments and rules.

FINALIZATION OF STANDARD CONDITIONS FOR GRANTING OF ENVIRONMENTAL CLEARANCE TO THE TOWNSHIP AND AREA DEVELOPMENT

Page 80 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 80 of 87

PROJECTS COVERED UNDER PROJECT ACTIVITY NO. 8(b) AS PER THE SCHEDULE OF THE EIA NOTIFICATION 2006.

Draft standard conditions to recommend the proposals of the Township & Area Development projects covered under the project activity no. 8(b) as per the schedule of the EIA Notification 2006 for granting environmental clearance were circulated among the members during the meeting and after detailed deliberation, the following standard conditions were finalized for recommending the proposals of the Township & Area Development projects covered under the project activity no. 8(b) as per the schedule of the EIA Notification 2006 for grant of Environmental Clearance to SEIAA.

PRE –CONSTRUCTION AND CONSTRUCTION PHASE:

1. Environment Management Cell shall be formed, which shall supervise and monitor the environment related aspects of the project during construction and operational phases in addition to observance of Gujarat Building and other Construction Workers’(Regulation of Employment & Conditions of Service) Rules 2003.

2. Prior permission from the competent authority shall be obtained for cutting of the existing trees, if any, before site preparation work is commenced.

3. Water demand during construction shall be reduced by use of curing agents, super plasticizers and other best construction practices.

4. Temporary wind shield shall be done to prevent dust emission spreading outside the project premises. Barricade of adequate height shall be provided on the periphery of the construction site with adequate signages. Individual building within the project site shall also be provided with barricades.

5. Regular water sprinkling shall be done in vulnerable areas for controlling fugitive emission.

6. The roads inside the project area and roads connected to the main road shall be paved or shall be water sprinkled to avoid the fugitive emissions during vehicular movement.

7. Material shall be covered during transportation to avoid the fugitive emission.

8. Uniform piling and proper storage of sand to avoid fugitive emissions shall be ensured.

9. Structural design of the project shall strictly adhere to the seismic zone norms for earthquake resistant structures.

10. The planning, designs and construction of all buildings shall be such as to ensure safety from fire.

11. The project proponent shall ensure maximum employment to the local people.

12. All required sanitary and hygienic measures shall be provided before starting the construction activities and to be maintained throughout the construction phase.

13. Provision shall be made for housing of construction labor within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, safe drinking water, medical healthcare, crèches, electricity & ventilation, canteen, rest rooms, safe disposal system for garbage, first aid, medical and emergency facilities etc. to ensure that they do no ruin the existing environmental condition. The housing may be in the form

Page 81 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 81 of 87

of temporary structures to be removed after completion of the project.

14. First Aid Box shall be made readily available in adequate quantity at all the times.

15. Training shall be given to all workers on construction safety aspects.

16. Adequate personal protective equipments shall be provided to the construction workers to ensure their safety and the project proponent shall ensure its usage by the labors.

17. The project proponent shall strictly comply with the Building and other Construction Workers’(Regulation of Employment & Conditions of Service) Act 1996 and Gujarat rules made there under and their subsequent amendments.

18. The overall noise level in and around the project area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation, hoods, silencers, enclosures vibration dampers etc. on all sources of noise generation.

19. Ambient noise levels shall conform to residential standards both during day and night. Incremental pollution load on the ambient air and noise quality shall be closely monitored during construction phase

20. The noise generating equipments, machinery and vehicles shall not be operated during the night hours and shall be maintained properly to avoid generation of high noise due to wear and tear.

21. Use of diesel generator sets during construction phase shall be strictly with acoustic enclosure and shall conform to the EPA Rules for air and noise emission standards.

22. Safe disposal of wastewater and municipal solid wastes generated during the construction phase shall be ensured.

23. All topsoil excavated during construction activity shall be used in horticultural / landscape development within the project site.

24. Construction materials and debris shall be properly stored and handled to avoid negative impacts such as air pollution and public nuisances by blocking the roads and public passages.

25. Construction debris shall be reused in construction of roads, leveling the site etc. Waste packaging material (like used cement bags, waste paper, cardboard packing material), metal scraps etc. shall be sold to recyclers or shall be sent to the nearest municipal solid waste landfill site.

26. Excavated earth to be generated during the construction phase shall be utilized within the premises to the maximum extent possible and balance quantity of excavated earth shall be disposed off with the approval of the competent authority after taking the necessary precautions for general safety and health aspects. Disposal of the excavated earth during construction phase shall not create adverse effect on neighbouring communities.

27. Vehicles hired for bringing construction material at the site shall be in good conditions and conform to applicable air and noise emission standards and shall be operated only during day time and non-peak hours.

Page 82 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 82 of 87

28. Project proponent shall ensure use of eco-friendly building materials including fly ash bricks, fly ash paver blocks, Ready Mix Concrete [RMC] and lead free paints in the project.

29. Use of glass shall be minimal and only low emissive glass shall be used in the project to reduce the electricity consumption and load on air conditioning.

30. Fly ash shall be used in construction wherever applicable as per provisions of Fly Ash Notification under the E.P. Act, 1986 and its subsequent amendments from time to time.

OPERATION PHASE AND LIFE TIME:

31. Low water consuming devices shall be provided. Fixtures for showers, toilet, flushing and drinking shall be of low flow either by use of aerators/ diffusers or pressure reducing devices etc.

32. A water meter shall be installed on rain water harvesting & ground water recharge well system & compliance report of the same shall be submitted to concerned authorities.

33. Used oil shall be sold only to the registered recycler.

34. Requisite fire fighting facilities as per the requirement of NBC and Gujarat Fire Prevention and Life Safety Measures Act-2013 & rules made there under shall be provided.

35. Underground fire water storage tanks and terrace water storage tanks of adequate capacity shall be provided as proposed. Adequate provision shall be made to ensure that water from the Fire Water Tank shall not be used for any other purpose.

36. Dedicated power back up system shall be provided in the case of power failure & emergency of fire water pumps.

37. First Aid Box shall be made readily available in adequate quantity at all the times.

38. Main entry and exit shall be separate and clearly marked in the facility

39. Necessary emergency lighting system along with emergency power back up system shall be provided. Further, necessary auto glow signage at all appropriate places shall be provided to guide the people towards exits and assembly points during emergency.

40. Compulsory training for the first aid and fire fighting along with regular mock drill shall be imparted to the Security personnel, STP operators and wireman cum D.G. Operator.

41. Sufficient peripheral open passage shall be kept in the margin area for free movement of fire tender/ emergency vehicle around the premises.

42. The overall noise level in and around the project area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation, hoods, silencers, enclosures vibrations dampers etc. on all sources of noise generation including D.G.Sets. The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules.

43. The area earmarked for the parking shall be used for parking only. No other activity shall be permitted in this area.

44. Traffic congestion near the entry and exit points from the roads adjoining the proposed

Page 83 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 83 of 87

project site shall be avoided. No public space including the service road shall be used or blocked for the parking.

45. The project proponent shall install energy efficient devices, appliances, motors, and pumps conforming to the Bureau of Energy Efficiency norms.

46. The transformers and motors shall have minimum efficiency of 85%.

47. Only variable frequency motor drives shall be used in project.

48. Application of solar energy shall be incorporated for illumination of common areas, lighting for gardens and street lighting in addition the provision for solar water heating system shall also be provided.

49. Use of glass shall be minimal to reduce the heat island effect as well as to reduce the electricity consumption.

50. The area earmarked as green area shall be used only for plantation and shall not be altered for any other purpose.

51. Drip irrigation/low volume, low angle sprinkler system shall be used for the lawns and other green area including tree plantation.

52. The project proponent shall inform to SEAC / SEIAA regarding the transfer of management responsibility to the Society / Association to be formed for the proposed project with all the supporting documents. The Society / Association formed for further management of the proposed project shall be responsible for compliance of all the conditions stipulated in the Environmental Clearance order.

53. Environmental Clearance granted for the project on the basis of documents related to land possession submitted shall become invalid in case the actual land for the project site turns out to be different from the land considered at the time of appraisal of the project and mentioned in the EC.

54. All the commitments / undertakings given to the SEAC during the appraisal process for the purpose of environmental protection and management shall be strictly adhered to.

55. All the recommendations and mitigation measures suggested in the EIA report shall be implemented and fulfilled in true spirit.

56. All other statutory clearances such as N.A. permission, approvals for storage of diesel from PESO, Fire Department, Airports Authority of India etc., if applicable, shall be obtained by the project proponent from the competent authorities.

57. All the conditions as may be stipulated in the N.A. order, Development permission, Building Use permission, NOC obtained from Fire Department etc. shall be strictly complied with.

58. The project management shall also comply with all the environment protection measures, risk mitigation measures and safeguards proposed by them.

59. Environment Management Cell shall be formed during operation phase which will supervise and monitor the environment related aspects of the project including performance of the Sewage Treatment Plant, incremental pollution loads on the ambient air quality, noise and

Page 84 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 84 of 87

water quality periodically.

60. The project proponent shall strictly comply with the Gujarat Building and other Construction Workers’(Regulation of Employment & Conditions of Service) Rules 2003 as well as Gujarat Lifts & Escalators Rules as amended from time to time.

61. The project proponent shall also comply with any additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose for the environmental protection and management.

62. No further expansion or modifications in the project likely to cause environmental impacts shall be carried out without obtaining prior Environment Clearance from the concerned authority.

The above conditions shall be enforced, inter-alia under the provisions of the water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981, the Environment (Protection) Act 1986 and the Hazardous Wastes (Management Handling and Tran boundary) Rules, 2008, Building and Other Construction Workers’ (Regulation of Employment & Conditions of Service) Act-1996, The Gujarat Lifts and Escalators Act-2000 along with their amendments and rules.

Letters received from the proponents of the following projects were also discussed during the meeting. 1. Empire Business Hub, a Commercial Building Construction Project at F.P.No104,

O.P.No.104, S.No.458/1, 458/2, T.P.S.No.42, Sola- Science City Road, Ahmedabad Proposed by M/s. EBH Buildcon.

The project proponent vide their letter dated 15/06/2015 requested to amend the Environmental Clearance order No. SEIAA/GUJ/EC/8(a)/1705/2015 dated 19/05/2015 stating that the O.P.No. mentioned as “3104” is actually O.P.No.104 as per the land possession documents submitted by them and the building height should be 45 m instead of 40 m. The matter was discussed and it was decided to recommend the SEIAA Gujarat to amend the Environmental Clearance order dated 15/06/2015 in following respect: O.P.No. to be substituted as “O.P.No.104” instead of “O.P.No.3104” and building height as “45 m” instead of “40 m”.

2. Laxmi Nivas at Survey No. 597/2, 606, 618, F.P. No. 45/1, 53, 58/2, T.P.S.No. 80, at Narol, Dist: Ahmedabad proposed by M/s Laxmi Infrastructure.

Project proponent vide their letter dated 01/06/2015 stated that while submitting the additional project details vide their letter dated 26/11/2015, they have mentioned that the built up area of the project will be 68,405.40 m2 but somehow it could not be considered while granting the Environmental Clearance. They have requested to amend the Environmental Clearance order No. SEIAA/GUJ/EC/8(a)/1685/2015 dated 19/05/2015 for the built up area of 68,405.40 m2 instead of 68,050.71 m2. After discussing the matter the committee decided to recommend the SEIAA Gujarat to amend the Environmental Clearance order No. SEIAA/GUJ/EC/8(a)/1685/2015 dated 19/05/2015 for the built up area of 68,405.40 m2 instead of 68,050.71 m2.

3. Iscon Platinum at Survey No : 298 (A+B) , 299, 302, 307, 308/C, 458,459 O.P./ F.P.No: 28,31,155(1+2) T.P.S. No : 3, Vill : Bopal, Dist : Ahmedabad, proposed by M/s. J. P. Iscon Ltd.

Page 85 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 85 of 87

The Project Proponent vide their letter 10/08/2015 stated that mistakenly they have forgotten to mention the survey numbers while applying for obtaining Environmental Clearance and the same was reflected it the intimation letter for recommendation as well as in the Environmental Clearance granted to them. They have requested to amend the Environmental Clearance order no. SEIAA/GUJ/EC/8(b)/3354/2015 dated 24/08/2015 by adding the “S.Nos. 301/A, 457/B and 482/A/Paiki/2”. During the meeting, It was observed that the project plans submitted by them during the appraisal of the project reflects the “S.Nos. 301/A, 457/B and 482/A/Paiki/2” and the location of the project remains the same as proposed earlier. After discussing the matter, it was decided to recommend the SEIAA Gujarat to amend the Environmental Clearance order no. SEIAA/GUJ/EC/8(b)/3354/2015 dated 24/08/2015 by adding the “S.Nos. 301/A, 457/B and 482/A/Paiki/2”.

The additional information received from the project proponents, which was sought during

various SEAC meetings, were considered by the committee during the meeting and as it was

found satisfactory, the committee decided to recommend the following projects for grant of

environmental clearance.

1. M/s: Dhiren Chemical Industries, Plot no:124/36 B, GIDC-Nandesari, Dist.: Vadodara.

2. M/s: Radha Madhav Surfactants Pvt. Ltd., Plot no:6138, Road no.61,GIDC-Sachin, Dist.: Surat.

3. M/s: J. Korin Spinning Pvt. Ltd., Plot no. Plot no:121,122 & 123,Ancillary Zone, Apparel Park,GIDC Vanz, Sachin, Dist.: Surat.

4. “Orchid Divine” at S.No.469/p, F.P.No.143/p, T.P.S.No.3 Bopal, Daskroi Ahmedabad proposed by M/s. Orchid Divine Developers.

5. Residential Building Construction Project at City S.No.39-3, 39-5,89, T.P.S.No:111, F.No.79/p & 111/p, Nikol, Ahmedabad proposed by M/s Nilkanth (Nikol) Residential Co. Op. Soc. Ltd.

6. “Karnavati Enclave” at S.No.590/1, F.P.No.56/1, T.P.S. No.107, Ramol, Ahmedabad proposed by M/s. Karnavati Developers.

7. “Akash Parisar” at S.No.143, 146, O.P.No.104, F.P.No: S.P.No.2 of F.P.No.104 + S.P.No.1(A) of F.P.No.106, T.P.S.No.18, Ghatlodiya, Ahmedabad proposed by Mr. Pradeepbhai Rambhai Patel.

8. “Relife” at O.P.No.9, F.P.No.7, T.P.S.No.1(Lal Darwaja), Surat proposed by Mr. Dayarambhai Khushalbhai Patel.

9. Building Construction Project at B.No:18,19 (Consolidate 19,21,22,23,33,41/2),B.No:40 (Consolidate 40 & 48/B), Ankhol, Vadodara proposed by Mr. Prakash Manubhai Patel

10. “Dev Atelier” R.S.No. 1275 , F.P. No. 199 , Final T.P.S .No. 3, Vejalpur, Ahmedabad proposed by M/s. Relic Property Development Pvt. Ltd.

11. Residential Building Construction Project at S.No.69,70,71,72, Block No.61/1, Vill: Hanumanpura, Ta: Waghodiya, Dist: Vadodara proposed by M/s. Umiya Ashish Co Housing Society.

12. “Upvan” at S.No.332, F.P.No.83, T.P.S.No.69 (Chandkheda-Tragad-Jundal), Vill. Chandkheda, Tal. Daskroi, Dist.Ahmedabad proposed by M/s. Sambhavnath Developers. The submission of the project proponent was considered by the committee in the meeting. The matter was discussed during the meeting and considering that it is an affordable

Page 86 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 86 of 87

housing scheme for low income group people as well as availability of drainage line of AMC, the request of exempting them from providing STP was agreed to by the committee. After detailed discussion, it was decided to recommend the project for granting the Environmental Clearance to the SEIAA with the proposed expansion in supersession of the earlier Environmental Clearance order No. SEIAA/GUJ/EC/8(a)/345/2012 dated 26/11/2012.

13. M/s Aakash Empire at T.P.No.2, R.S. No.89, O.P.No.55, F.P.No.175, Vesu-Bharthana, Canal road, Choryasi, Surat. The submission of the project proponent was considered by the committee in the meeting and as it was found satisfactory, it was decided to recommend to SEIAA Gujarat to amend the EC order no. SEIAA/GUJ/EC/8(a)/339/2012 dated 22/11/2012 in following respect:

14. Building Construction Project at S.No.463+474+475+476+477/A+476 +477/B+487+490+ 492+493+494+ 495/P+496+497+499+468+468/1+469/P+ 472/A + 472/C, O.P.No. 142, 144,158, F.P. No.142/3+ 158/3+144/2, T.P.S.No.3 Bopal, Daskroi, Ahmedabad proposed by M/s. Manav Builders. The submission of the project proponent was considered by the committee in the meeting and as it was found satisfactory, after detailed discussion, it was decided to recommend the project for granting the Environmental Clearance to the SEIAA with the proposed expansion in supersession of the earlier Environmental Clearance order No. SEIAA/GUJ/EC/8(a)/142/2013 dated 09/07/2013.

15. Building Construction Project at T.P.S.No.113, F.P.No.22, Sur. No.9/7, Ahmedabad proposed by M/s. Nar Narayan Corporation. The submission of the project proponent was considered by the committee in the meeting and committee was of the view that as more than 80% of the total residential units are of 1 BHK where the probability of owning a car by the residents is very less, the parking area provision as per the GDCR norms will suffice the purpose. After discussing the matter in detail, it was decided to recommend the project to SEIAA Gujarat for grant of Environmental Clearance.

16. “Rio Colina” at S.No.788, 816, Moje: Ghala, Ta: Kamrej, Dist: Surat proposed by M/s. MKB Corporation.

17. Building Construction Project at F.P. No.80,83, T.P.S.No.4, Prerna Tirth Derasar Road, besides Sharnam-5, Vill : Vejalpur, Dist : Ahmedabad proposed by M/s. Nishant Constructions Pvt. Ltd. The submission of the project proponent was considered by the committee in the meeting and as it was found satisfactory, after detailed discussion, it was decided to recommend the project for granting the Environmental Clearance to the SEIAA with the proposed expansion in supersession of the earlier Environmental Clearance order No. SEIAA/GUJ/ EC/8(a)/235/2011 dated 21/10/2011

Meeting ended with thanks to the Chair and the Members.

--------------------------------

Minutes approved by:

Page 87 of 87

254th meeting of SEAC-Gujarat, Dated 09.09.2015) Page 87 of 87

1. Shri T. P. Singh, Chairman, SEAC.

2. Shri V. C. Soni, Vice Chairman, SEAC.

3. Shri R. J. Shah, Member, SEAC.

4. Dr. V. K. Jain. Member, SEAC.

5 Shri V.N.Patel, Member, SEAC.

6 Shri K. C. Mistry, Secretary, SEAC.