Mission: To promote adequate, safe and well maintained
Works and Transport Infrastructure and Services for So-
cial Economic Development of Uganda
Ministry of Works & Transport
The Republic of Uganda
STRATEGIC PLAN
(2011/12—2015/16)
February 2012
The Republic of Uganda
MINISTRY OF WORKS AND TRANSPORT
STRATEGIC PLAN
2011/12-2015/16
Ministry of Works and Transport,
P.O. Box 10, Entebbe
Telephone: 256-41-320101/9
Telex: 61313 WORKS UGA:
Fax: 256-41-320135
E-Mail: [email protected]:
Website: www. works.go .ug
April 2012
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
i
FOREWORD ................................................................................................................................... i LIST OF ACRONYMS .................................................................................................................... iii
LIST OF TABLES ............................................................................................................................ v EXECUTIVE SUMMARY ........................................................................................................... vi CHAPTER ONE ............................................................................................................................. 1 1.0 INTRODUCTION ............................................................................................................... 1 1.1 Overview .............................................................................................................................. 1
1.5 Structure of the Strategic Plan ............................................................................................. 2 1.2 Significance and Purpose of the Strategic Plan ................................................................... 2 1.3 Process of Developing a Strategic Plan .............................................................................. 2
1.2 Mandate, Vision and Mission of the Ministry ..................................................................... 3 1.2.1 Mandate ............................................................................................................................ 3
1.2.2 Vision............................................................................................................................ 3
1.2.3 Mission ......................................................................................................................... 3 1.3 Key Functions of the Ministry ............................................................................................. 3 1.4 Values and Principles ........................................................................................................... 4
CHAPTER TWO ............................................................................................................................ 6 2.0 CONTEXTUAL ANALYSIS ....................................................................................... 6
2.1 Works and Transport Sector Agencies ................................................................................ 6 2.1.1 Uganda National Roads Authority ................................................................................... 6 2.1.2 Civil Aviation Authority .................................................................................................. 7
2.1.3 Uganda Road Fund ................................................................................................................ 7
2.1.4 Uganda Railways Cooperation .............................................................................................. 7 2.1.5 Transport Licensing Board (TLB) ......................................................................................... 7 2.1.6 National Road Safety Council (NRSC) ............................................................................ 8
2.1.7 Engineers Registration Board (ERB) ..................................................................................... 8 2.1.8 Uganda Institution of Professional Engineers (UIPE) ........................................................... 8
2.2 The Works/Construction Industry........................................................................................ 8 2.3 Transport Modes .................................................................................................................. 8 2.3.1 Road Transport ................................................................................................................. 9 2.3.2 Rail Transport ................................................................................................................. 10 2.3.3 Inland Water Transport .................................................................................................. 11
2.3.4 Pipeline Transport .......................................................................................................... 12 2.3.5 Air Transport ........................................................................................................................ 12 2.4 Policies and Legislations.................................................................................................... 13
2.5 Strength, Weaknesses, Opportunities and Threats Analysis .............................................. 14 2.8 Staffing Levels ................................................................................................................... 18 3.0 OBJECTIVES, OUTPUTS, IMPLEMENTATION STRATEGY AND FINANCING .... 19 3.1 Sector Objectives ............................................................................................................... 19
3.2 Key Outputs of the Ministry .............................................................................................. 19 3.3 Implementation Strategy .................................................................................................... 20
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
ii
3.4 Financing............................................................................................................................ 20 CHAPTER FOUR ......................................................................................................................... 22 4.0 MONITORING, EVALUATION AND RISK ANALYSIS ............................................. 22 4.1 Monitoring and Evaluation ................................................................................................ 22 4.2 Key Performance Indicators .............................................................................................. 22
4.3 Risk Analysis .......................................................................................................................... 29 Annex 1: Annual Outputs and Budget .......................................................................................... 32
Annex 2: CLIENT CHARTER ................................................................................................. 98 1.0 INTRODUCTION ............................................................................................................. 98
Vision ........................................................................................................................................ 98
Mission ...................................................................................................................................... 98
2.0 VALUES AND PRINCIPLES ........................................................................................... 98
3.0 KEY RESULT AREAS AND COMMITMENTS .......................................................... 100 3.1 Key Results Areas ........................................................................................................ 100
3.2. Commitments ............................................................................................................... 100 4.0 CLIENT RIGHTS, EXPECTATIONS AND OBLIGATIONS....................................... 105
4.1 The Clients ................................................................................................................... 105 4.2 Client Rights ................................................................................................................. 105 4.3 Client Expectations ...................................................................................................... 106
4.4 Client Obligations ........................................................................................................ 106 5.0 FEEDBACK AND COMPLAINTS PROCEDURES ..................................................... 107
5.1 Feedback Mechanisms ................................................................................................. 107 5.2 Complaints Procedures ................................................................................................. 107
5.3 Appeal Mechanism ....................................................................................................... 108 6.0 ACCOUNTABILITY FRAMEWORK ........................................................................... 109
6.1 Performance Reporting ................................................................................................ 109 6.2 Performance Improvement ........................................................................................... 109
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
i
FOREWORD
The Ministry of Works and Transport (MoWT) has formulated a Strategic Plan to address
medium term planning for the Ministry as the driver of the Transport Sector. Formerly, planning
was done through preparation of Sectoral Long-term Plans for example the 10-year Road Sector
Development Plan and the 15-year National Transport Master Plan. The Budget Framework
Paper and the Ministerial Policy Statement and the Three Year Medium Term Expenditure
Framework (MTEF) rolled over every year was the overarching Budgeting Framework. In the
process, attempts have been made to incorporate and finance programmes from the National
Transport Master Plan and Transport Master Plan for the Greater Kampala Metropolitan Area.
The MoWT has now formulated a well-envisioned Five-year Strategic Plan (2011/12 -2015/16).
This ushers in a medium term plan encompassing both the Works and Transport Sub Sectors.
The Plan is in line with the reforms in the Sector which led to the creation of two new Agencies
that is, Uganda National Roads Authority (UNRA) in charge of the national road network and
the Uganda Road Fund (URF) responsible for financing road maintenance. Air transport is
managed by Civil Aviation Authority whereas Uganda Railways Corporation is charged with
railway and partly water transport. The Strategic Plan was formulated pursuant to the Sector
mandate which is to:-
a) Plan, develop and maintain an economic, efficient and effective transport infrastructure;
b) Plan, develop and maintain economic, efficient and effective transport services by road,
rail, water, air and pipeline;
c) Manage Public works including government structures and;
d) Promote good standards in the construction industry
Formulation of the Strategic Plan started way back in 2010 and was finally accomplished at the
end of 2011. The Plan is a result of wide consultations with stakeholders particularly the Staff of
the MoWT through departmental meetings, workshops and selected Task Team discussions. Key
among the consultations was on the departmental outputs vis-à-vis the mandate of the Ministry
and the adequacy of the MTEF ceilings provided by the Ministry of Finance Planning and
Economic Development to deliver the Ministry’s mandate.
The Plan sets out a framework which signals where the Ministry is heading to in the next five
years and how it will get there. The framework is consistent with the country’s Works and
Transport Sector objectives as outlined in the National Development Plan (2010/11-2014/15). It
includes the capital outlays for five years to finance the implementation strategy. It is intended to
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
ii
convey and guide the Ministry as a Sector leader and also be used as a guide to inform the annual
budgeting process.
I commend the Staff of the MoWT for the efforts deployed towards finalizing the Plan. I
acknowledge all those who have worked so much to bring the Plan to the final result. Genuine
appreciation of the effort of the framers only be through successful implementation of the Plan
and consequently improving the performance of the Works and Transport Sector.
It is my pleasure to launch this Strategic Plan and flag off its Implementation.
John Byabagambi
MINISTER OF STATE FOR WORKS AND TRANSPORT (WORKS)
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
iii
LIST OF ACRONYMS
ARB Architects Registration Board
CAA Civil Aviation Authority
CMAP Change Management Action Plan
CMT Change Management Team
CSR Corporate Social Responsibility
DEW Director of Engineering and Works
DFA Department of Finance and Administration
DPP Department of Policy and Planning
DOT Director of Transport
DUCAR District, Urban and Community Access Roads
EAC East Africa Community
ERB Engineers Registration Board
FUCO Federation of Uganda Consulting Organizations
IAU Internal Audit Unit
ISU Institution of Surveyors of Uganda
LG Local Government
MEACA Ministry of East African Community Affairs
MDAs Ministries, Departments and Agencies
MDGs Millennium Development Goals
MELTC Mt. Elgon Labour-based Training & Centre
MFPED Ministry of Finance, Planning and Economic Development
MLHUD Ministry of Lands, Housing and Urban Development
MoLG Ministry of Local Government
MoPS Ministry of Public Service
MoU Memorandum of Understanding
MoWT Ministry of Works and Transport
MWE Ministry of Water and Environment
NCI National Construction Industry
NCIP National Construction Industry Policy
NDP National Development Plan
NRSC National Road Safety Council
NRSA National Road Safety Authority
NTMP National Transport Master Plan
PPDA Public Procurement and Assets Disposal Act
PS Permanent Secretary
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
iv
PSV Public Service Vehicle
RC Resource Centre
SRB Surveyors Registration Board
SWG Sector Working Group
TLB Transport Licensing Board
TMT Top Management Team
TSIMS Transport Sector Information Management System
TSWG Transport Sector Working Group
UACE Uganda Association of Consulting Engineers
UBOA Uganda Bus Owners Association
UCICO Uganda Construction Industry Commission
UCTA Uganda Commercial Transporters Association
UIPE Uganda Institute of Professional Engineers
UIPP Uganda Institute of Physical Planners
UPTA Uganda Pick-Up Truckers Association
UNABCEC Uganda National Association of Building and Civil Engineering Contractors
UNRA Uganda National Roads Authority
URC Uganda railways Corporation
URF Uganda Road Fund
US Under Secretary
UTODA Uganda Taxi Operators Association
WTS Works and Transport Sector
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
v
LIST OF TABLES
Table 1: Rail Sub-Sector Performance
Table 2: Medium-Term Expenditure Framework (MTEF) 2011/12-2015/6
Table3: Ministry Budget Estimates (UGX.Bn) 2011/12-20`5/16
Table 4: Transport Sector Performance Indicators
Table 5: Alignment of Golden Indicators with NDP Objectives
Table 6: Risk Analysis
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
vi
EXECUTIVE SUMMARY
The Strategic Plan sets out a roadmap for executing the functions of the Ministry in the next Five
years (2011-2016). The Plan aims to competitively meet the expectations of the diverse
stakeholders, build capacity of the selected sector players, inform the annual budgeting process
and foster strategic alliance and partnerships to attract funding to the Sector.
The Strategic Plan presents the mandate, vision, and mission of the Ministry. It includes the
organizational structure of the Ministry, the Situation Analysis, Staffing Levels, Transport
Agencies, Key Functions and Modes of Transport, status of the existing Policies and Legislation
governing the Works and Transport Sector. The Plan presents the Sector Strategic Objectives,
Key Outputs, the Implementation Strategy, Financing Plan and the Monitoring and Evaluation
Strategy.
To achieve the mission, the Ministry has well trained human resource, physical assets, staff
development plan, essential sector policies and a clear mandate. On the other hand, there are
issues which constrain effective service delivery such as limited teamwork, low levels of
confidence among the staff, scattered offices and inadequate contract management skills. The
Ministry benefits from a team of committed Development Partners, prioritization of the sector by
government, functional Transport Agencies and East African Community initiatives in the
Transport Sector as avenues which can be used to improve service delivery. Conversely, there
are few threats which affect the Ministry in pursuance of its mandate. These include staff turn-
over, unplanned/emergency intervention on the road network ravaged by rains/floods, frequent
external audits and procurement reviews.
The Strategic Plan was premised on the National Development Plan and the National Transport
Master Plan including the Master Plan for GKMA. In line with the Ministry and departmental
mandates, Interventions, strategies and outputs to address the Sector objectives were developed.
The Ministry will require input of other Sector players in the fulfillment of the seven strategic
objectives. Departmental budgets to make up the total budget that covers five years were
developed. Equally, the overall budget was guided by MTEF ceilings.
Monitoring and Evaluation of the Plan was based on the Indicators earmarked in the Sector
Monitoring and Evaluation Framework. The indicators will measure the progress of the
interventions and outputs. The indicators measure the sector-wide performance aimed at
informing overall strategic management including review sector policies.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
vii
The key assumptions made in the Strategic Plan are that; Ministry will retain its structure and
mandate, the GoU budget and donor support will be sufficiently maintained to finance the
departmental activities and top management assumes ownership of the Plan. The Plan identifies
key possible risks and these include unpredictable funding, budget cuts, declining Donor
confidence, poor collaboration among sector agencies, attracting committed and competent staff
turnover, staff indiscipline, weak and unprofessional private sector.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
1
CHAPTER ONE
1.0 INTRODUCTION
1.1 Overview
The Strategic Plan of the Ministry of Works and Transport was formulated to determine the
direction and destination of the Ministry for the next five years and how it is going to get there.
The Plan sets out an implementation framework for undertaking the key functions of the
Ministry for the period 2011-2016. The Strategic Plan was formulated in line with the National
Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which
includes a Transport Master Plan for Greater Kampala Metropolitan Area (TMP/GKMA) (2008-
2023).
The Plan is a product of a Change Management Process undertaken to re-focus the Ministry after
a restructuring process carried out in 2008. The restructuring and reforms in the Sector resulted
into:
a) Creation of the Uganda National Roads Authority (UNRA), entrusted with responsibility
of planning, constructing and maintening of national roads;
b) Creation of the Uganda Road Fund (URF), entrusted with responsibility of determining,
receiving, and directly transferring the fuel levy and other road user taxes directly to
UNRA and Local Governments for road maintenance.
c) A downsizing and transforming the functions of the Ministry of Works and Transport.
The restructuring was meant to spin off and devolve the Ministry functions that were inconsistent
with its role, such as road construction and maintenance, road development, plant management,
ferry services management, axle load control management etc. These functions were included in
the portfolio of the Uganda National Roads Authority which is an implementing agency.
Likewise, other modes of transport such as air and railway transport are shouldered by the Civil
Aviation Authority and Uganda Railways Corporation/Rift Valley Railways respectively. The
Ministry of Works and Transport retained the key functions of policy formulation, planning,
Regulation, Setting Standards, Advocacy Monitoring and Evaluation. The Ministry is the Sector
leader with the overall responsibility of determining the strategic direction for the development
of the Transport Sector.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
2
1.5 Structure of the Strategic Plan
The plan is comprised of four Chapters; Chapter One presents the overview, mandate, vision and
mission, key functions and Values/Principles. Chapter two presents the contextual analysis,
Sector Agencies and modes of transport and lastly an analysis of the SWOT (Strength,
Weaknesses, Opportunities and Threats); Chapter Three covers objectives, outputs, Key
assumptions implementation strategy and financingthe Plan and Chapter Four presents the
monitoring and evaluation plus the risk analysis. Departmental action plans and activity budgets
are annexes at the end.
1.2 Significance and Purpose of the Strategic Plan
The Strategic Plan for the MoWT charts out strategies towards attainment of the vision.
Specifically, the plan aims to position the Ministry effectively to;
a) Meet the expectations of diverse stakeholders
b) Be a one stop reference for the activities to deliver the Ministry’s mandate
c) Build capacity for the Ministry and selected sector players
d) Inform the annual budgeting process
e) Strengthen professionalism in the Sector
f) Forge strategic alliances and partnerships so as to attract funding to develop the Sector.
1.3 Process of Developing a Strategic Plan
The Strategic Plan was developed through a consultative and participatory process within the
Ministry and with key transport stakeholders. Towards the end of 2010, the Senior Management
Team of MoWT engaged in a brain-storming session in Jinja and carried out a SWOT analysis of
the Ministry taking cognizance of the restructuring and the revision of the Ministry’s mandate. A
Task Team was formed to engage departments to formulate action plans and cost the Strategic
Plan. A workshop for Senior Officers to discuss the first Draft Strategic Plan was held in July
2011, A Senior Management meeting was held in December to review the second draft and the
Strategic Plan was finally approved by the Top Management Team of the Ministry in February
2012. The involvement of the different stakeholders was important in order to ensure ownership of the
plan.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
3
1.2 Mandate, Vision and Mission of the Ministry
1.2.1 Mandate
The Ministry’s Mandate is to:
a) Plan, develop and maintain an economic, efficient and effective transport
infrastructure;
b) Plan, develop and maintain economic, efficient and effective transport services by
road, rail, water, air and pipeline;
c) Manage Public works including government structures and;
d) Promote good standards in the construction industry
1.2.2 Vision
To provide reliable and safe works, transport infrastructure and services.
1.2.3 Mission
To promote adequate, safe and well maintained Works and Transport Infrastructure and
Services for Social Economic Development of Uganda.
1.3 Key Functions of the Ministry
a) Initiate, formulate and develop National Policies, Plans and Programmes for safe
and efficient Public Transport Infrastructure and Services.
b) Monitor and Evaluate the Implementation of National Policies, Plans and
Programmes for safe and efficient Works, Public Transport Physical
Infrastructure and Services.
c) Initiate new and review existing Laws and Regulations on Works and Transport
Infrastructure and Services.
d) Set standards for the construction industry, transport infrastructure and services.
e) Enforce compliance to national policies, laws regulations and guidelines on works
transport ways infrastructure and services.
f) Monitoring and Evaluation of the performance of Transport Agencies.
g) Inspect and license Public Transport Vehicles (PSVs).
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
4
h) Provide technical support for contract works, including construction and
maintenance undertaken by other Government Ministries, Departments and
Agencies (MDAs).
i) Initiate and formulate plans and policies for management of public buildings.
j) Set and monitor national standards on public buildings.
k) Carry out research and develop local materials and technology for construction
industry.
1.4 Values and Principles
The values and principles that guide and consign the staff and Political leadership of the
Ministry of Works and Transport to the above Mandate, Vision and Mission in providing
services are enlisted below:
a) Professionalism: adherence to the defined rules, standards and guidelines of the
respective disciplines, exhibiting professionalism, competence and honesty.
b) Integrity: highest standards of integrity, MoWT shall not place its self under any
financial or other obligations to individuals or organizations that might seek to
compromise our professional behavior in performance of our duties.
c) Quality Assurance: We shall put in place measures and mechanisms that will
ensure our clients deliver/receive quality services and works within budget and
time.
d) Selflessness: We shall put public interest above personal interest without
consideration of any financial or material benefit and gain.
e) Objectivity: We shall make decisions based on merit, researched information,
professional codes and other codes of good practice.
f) Customer/Client focus: We shall put the interests of our customers/clients as our
first priority. We shall always seek to meet our customers’ needs and expectations.
g) Partnership: We shall engage our partners in planning, designing, implementing,
monitoring and evaluating our programmes and Projects.
h) Optimal use of resources: We shall optimally use resources in the attainment of
the Ministry objectives and targets.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
5
i) Transparency and Accountability: We shall be transparent and accountable for
our decisions, actions and inactions.
j) Responsiveness: We shall respond to our clients effectively and efficiently when
called upon.
k) Impartiality: We shall provide services to all clients without discrimination on the
basis of gender, race, colour and religion or creed or ideological orientation or
social status.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
6
CHAPTER TWO
2.0 CONTEXTUAL ANALYSIS
The Strategic Plan was developed in line with the National Development Plan (NDP). This
chapter presents the environment in which the Ministry operates. It specifically presents the
Transport and Works Sector Agencies, Modes of Transport, Policies and Legislations, the
Situational Analysis, the Organization Structure and Staffing Levels.
The National Development Plan
The National Development Plan (NDP), a new development framework for the GoU for the
period 2009/10-2013/14, highlights the strategic agenda for development and further details
priority interventions in all sectors of the economy including health nutrition. The overall goal of
the NDP is to accelerate economic growth to reduce poverty. The NDP seeks to achieve 7
development objectives as follows:
• Increasing household incomes;
• Enhancing the quality and availability of gainful employment;
• Improving the stock and quality of economic and trade infrastructure;
• Increasing availability and access to quality social services;
• Promoting innovation and competitive industries;
• Harnessing natural resources and the environment for sustainable development; and
• Strengthening good governance and improving human security
The NDP therefore acknowledges that development of the Works and Transport Sector is a
critical component of economic development.
2.1 Works and Transport Sector Agencies
2.1.1 Uganda National Roads Authority
UNRA was established by the Uganda National Roads Authority Act, 2006, to manage, maintain
and develop the national road network. The Authority became operational in July 2008. The
Authority is gradually building its capacity to deliver its mandate to construct and maintain
national roads. The Ministry exercises its policy guidance and oversight over UNRA based on an
annual Performance Agreement.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
7
2.1.2 Civil Aviation Authority
CAA exercises both regulatory and operational authority over Entebbe international airport and
the other airfields located around the country. CAA also designates domestic and international
air carriers.
The Authority monitors air safety regulations and standards management in collaboration with
the Civil Aviation Safety and Security Oversight Agency (CASSOA) that was recently
established by the EAC Partner States. The Ministry exercises its policy guidance and oversight
over CAA based on a Memorandum of Understanding.
2.1.3 Uganda Road Fund
URF was established in 2008 by an Act of Parliament to carry out the following functions:
a) To finance the routine and periodic maintenance of public roads in Uganda
b) To ensure that public roads are maintained at all times; and
c) To advise the Minister on:-
i. Preparation and effective implementation of the Annual Road Maintenance
Program; and
ii. Control of overloading of vehicles on public roads.
The Ministry, in collaboration with the Ministry of Finance, Planning and Economic
Development, exercises its policy guidance and oversight responsibility to URF based on a
Performance Agreement.
2.1.4 Uganda Railways Cooperation
The Government strategy for the rail sub-sector is through long-term concessioning of
infrastructure maintenance and rail services to the private sector while retaining responsibility for
regulation. URC, however, remains responsible for regulation and oversight of the rail sub-sector
as well as management of railway stock and assets that are excluded from the concession. The
Corporation is also responsible for management of the Inland Water Ports. The Ministry
exercises its policy guidance and oversight responsibility for railway operations based on a
memorandum of understanding.
2.1.5 Transport Licensing Board (TLB)
Transport Licensing Board (TLB) is a Statutory Body established by an Act of Parliament, under
the Traffic and Road Safety Act, 1998. The main functions of the Board are to regulate the use of
public Transport vehicles; private omnibuses; goods transport vehicles throughout Uganda in
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
8
accordance with the provisions of the traffic and Road Safety Act, (1998) through granting
routes for bus operations inspect and licensing Inland Water Transport Vessels.
2.1.6 National Road Safety Council (NRSC)
The National roads Safety Council promotes road safety education and conducts public
awareness campaigns to ensure safety on the road network.
2.1.7 Engineers Registration Board (ERB)
ERB was established by an Act of Parliament, under the Engineers’ registration Act 1969
(Chapter 271). The board regulates and controls Engineers and their activities within Uganda and
to advise the Government in relation to those functions.
2.1.8 Uganda Institution of Professional Engineers (UIPE)
The UIPE was established as an Association of Professional Engineers of Uganda in 1972, as a
successor to the defunct East Africa Institution of Engineers (EAIE) which had started in 1945.
The objectives and purposes of the Uganda Institution of Professional Engineers are to promote
the general advancement of the science and practice of engineering and its applications, and to
facilitate the exchange of information and ideas on those subjects amongst the members of the
Institution.
2.2 The Works/Construction Industry
Government adopted a Policy for Development and Strengthening the National Construction
Industry (NCIP). The main objective of the NCI Policy is to improve regulation and
development of the NCI thereby addressing the constraints associated with the Industry. The
Policy notes that the National Construction Industry (NCI), comprising both the building and
civil engineering sub sectors, performs an indispensable role in building the economy. The NCI
delivers the physical infrastructure that is central to the country’s economic development. Its
activities create business to suppliers, manufacturers and offer employment to professionals,
skilled and unskilled labour. It transforms private and public plans for capital formation.
2.3 Transport Modes
The sector is composed of five transport modes, namely: road, railway, inland water transport,
air and pipeline transport.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
9
2.3.1 Road Transport
Road transport in Uganda is by far the most dominant mode. It plays an essential role in
facilitating the realization of economic and social development programmes. Over 95 percent of
the country's passenger and freight traffic is transported by Road, and provides almost all the
access to rural communities.
The road network is categorized as follows:
a) National roads that connect major urban and/or major regional commercial and
administrative centers;
b) District roads that connect the rural population to District administration headquarters,
major towns and trading centers; and major social amenities like hospitals and schools in
the rural areas;
c) Urban roads that lie within the boundaries of urban authorities connecting the urban
population to various facilities within the urban area; and
d) Community Access roads which provide rural communities with access to administrative
and social services, economic activities; and finally link them to the District road network
The road network is interfaced with some ferry landing sites that link roads, on opposite sides of
water-ways. Uganda is part of the northern and central transport corridors that convey both
exports and imports, via the coastal neighbors, Kenya and Tanzania respectively. The country’s
road network also provides transit corridors for the other more landlocked neighbours namely,
Rwanda, Burundi, eastern Democratic Republic of Congo (DRC) and Southern Sudan. The road
network serves national, regional and international economies. The strategic importance of
maintaining and developing the road network in good condition cannot therefore be over-
emphasized.
The Uganda road network totals 81,329km. Of this 20,000km, are categorized as National
Roads, of which 3000km are paved and the remaining 17,800km are gravel.
District Roads total to 22,750km and are virtually all unpaved, 3,579km, of the total are urban
roads, and 35,000km is Community Access roads; which are all earth.
The motorized vehicle fleet in 2008, including motorcycles, is estimated at 470,488 vehicles.
The total fleet, excluding motorcycles, is 234,036 vehicles; and of this, 60% are passenger
vehicles (buses, minibuses and cars), 25% light goods vehicles (pickup vans and 4-wheel drives),
and 12% are heavy vehicles.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
10
2.3.2 Rail Transport
The operation of railways in Uganda was up to 2006 under the management of Uganda Railways
Corporation, a Government statutory body. In line with the Government Policy of divestiture,
management of the railways was from 2006 concessioned to a private company, Rift Valley
Railways (RVR). The adjoining Kenya Railways was also jointly concessioned to RVR; thus
having an integral railway operation from Kampala to the sea port of Mombasa, Kenya. The
railway network in Uganda totals to 1,244.4km, of which only 258.6km (21%) are operational.
Passenger services have since been withdrawn. The routes largely offer freight services for
imports and exports. The operational routes are:
Kampala – Jinja- Tororo 249 km
Kampala – Port Bell 9.6 km
Total 258.6 km
URC progressively withdrew its services from a number of routes culminating into a total of
985.8km, 79% of the network, being closed. The non-operational routes are:
Kampala – Kasese (western extension) 333 km
Jinja – Mbulamuti - Busembatia (Busoga loop) 146 km
Tororo – Mbale– Soroti–Lira– Gulu– Pakwach (northern line) 506.8 km
Total 985.8 km
Within Uganda RVR operates services from Kampala to Tororo/Malaba (border with Kenya) and
a spur line from Kampala to Port Bell pier on Lake Victoria. From Tororo/Malaba, the Kenya
railway network joins the Uganda network connecting to the Port of Mombasa. The railway
service in Uganda is also responsible for wagon ferries and ferry routes across Lake Victoria.
From the Port Bell pier, wagon-ferries connect to the Tanzania railway network at Mwanza on
Lake Victoria; and onward to Dar-es-Salaam. The wagon ferries also join the Kenya railway
network at Kisumu and proceed to Mombasa seaport.
Uganda’s hitherto fleet of 3 wagon ferries is currently non-functional; with two wagon ferries
having collided, and one of them sunk as a result. The remaining two are grounded pending
possible repair.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
11
Table 1 shows value addition for Uganda Railways Corporation (URC). With the exception of
the year 2003/4 when it achieved a value addition growth rate of 2.7%, the rail sub-sector
performance declined throughout the period 2002/03 to 2006/07.
Table 1: Rail Sub-Sector Performance
Variable 2002/03 2003/04 2004/05 2005/06 2006/07
Rail Sub-sector value Addition (Million
Ushs) at constant 1997/98 prices
13,600 14,020 13,098 11,601 11,266
Rail Sub-sector Value Addition Percentage
Growth
-1.6 2.8 -6.6 -11.4 -2.9
Source: UBOS Statistical Abstract 2007 and Background to the Budget
The sub-sector had substantial negative value addition growth rates of -1.6%,-6.6%. -11.4% and
-2.9% in 2002/03, 2004/05, 2005/06 and 2006/07 respectively. This is a reflection of the decline
in the role of railway in the haulage of heavy bulk traffic, especially imports and exports. Most
of the traffic is taken on by road, increasing the number of Equivalent Standard Axles (ESAs) on
the roads and hence the rate of pavement deterioration.
2.3.3 Inland Water Transport
Uganda is endowed with an expanse of water resources in the form of lakes and rivers. Inland
Water Transport has great potential. It plays an important role in the provision of low-cost access
to remote islands and shoreline locations on the lakes and connecting desired destinations along
banks of navigable rivers. It further enhances agricultural production and the fast-growing
fishing industry by facilitating movement of agricultural produce and fish to markets and
processing facilities.
Short distance ferry services that are essentially road bridges are provided between two road
systems separated by water. The ferry services currently in operation are:
Bukakata (Masaka) – Luuku (Ssese Islands) on Lake Victoria;
Kiyindi (Mukono) – Kirongo (Buvuma Island) on Lake Victoria;
Nakiwogo (Mpigi) – Kyanvumbu (Mpigi) on Lake Victoria;
Wanseko (Masindi) – Panyimur (Nebbi) on Lake Albert;
Masindi Port (Masindi) – Kungu (Apac) on Victoria Nile;
Umi (Adjumani) – Laropi (Moyo) on Albert Nile; and
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
12
Murchison Falls National Park (the Uganda Wildlife Authority (UWA) operates commercial
ferry services at Paraa on Victoria Nile).
With the exception of the recently acquired Kalangala Ship, plying between the mainland and
Kalangala islands, the inland water transport in Uganda is characterized by obsolete water
vessels which are in a state of disrepair; poor landing infrastructure and facilities, disjointed laws
and regulations; and inadequate planning and monitoring.
In addition, private operators provide informal services on waterways, mainly using open canoes
with onboard or outboard engines. The canoes carry passengers, goods and livestock. The vessels
are often overloaded, with the attendant risk of capsizing. As a result of the above situation,
inland water transport continues to experience frequent accidents.
2.3.4 Pipeline Transport
The bulk of the country’s white oil products are transported by pipeline from Mombasa oil
refinery to Eldoret and Kisumu, in Kenya. From Eldoret and Kisumu the oil products are
transported to Kampala by road through Malaba or Busia or by rail through Malaba or rail wagon
ferry from Kisumu to Port Bell. The governments of Kenya and Uganda agreed to extend the
Mombasa-Eldoret pipeline by 320 km to Kampala. As per the National Transport Master Plan
2009, construction of the pipeline that is expected to take 12 months, is about to start.
Meanwhile, the on-going Oil exploration along Lake Albert indicates that Uganda is set to
produce commercial quantities of Oil.
This may call for construction of an Oil pipeline to transport either the crude or refined oil,
depending on the decisions that will be taken in regard to the location of the refinery.
2.3.5 Air Transport
The aviation industry in Uganda is regulated by the Civil Aviation Authority (CAA), an
autonomous statutory body established in 1994. Uganda has one International Airport at Entebbe
and airfields distributed across the country namely: Kidepo (private), Arua, Gulu, Moroto,
Pakuba, Lira, Soroti, Masindi, Tororo, Jinja, Kasese, Mbarara, and Kisoro. Entebbe
International Airport is Uganda’s main gateway for passengers and cargo; as well as a domestic
hub for the upcountry airfields.
Uganda being a land-locked country, an efficient air transport system is of immense strategic
value for the movement of international passengers, perishable exports such as vegetables, fish,
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
13
fruits and flowers and evacuations of emergency nature. There has been considerable increase in
international passenger traffic, growing by 149,722 passengers (an increase of 87.2%) from
171,656 in 2000 to 321,378 in 2006. The country has no national carrier and continues to be
served by various international carriers.
2.4 Policies and Legislations
The existing policies, laws and bilateral agreements governing the Sector and the new ones being
formulated/amended in the Sector are discussed below.
Existing Policies, Laws and Bilateral Agreements
a) The Roads Act, 1964 and Access to Roads Act, 1964 are being amended to include
changes in the development, maintenance and management of roads;
b) Traffic and Road Safety Act, 1998 provides for establishment of the National Road
Safety Council and the Transport Licensing Board. The Act also prescribes revised
penalties in relation to road traffic offences and for other purposes connected with road
traffic and road safety;
c) The Uganda National Roads Authority Act, 2006 provides for establishment and
operation of the Uganda National Roads Authority (UNRA) and managing the provision
and maintenance of the national roads network;
d) The Uganda railway freight services were concessioned to the Rift Valley Railways
consortium (RVR) for a term of 25 years with effect from November 1, 2006;
e) The Uganda Road Fund Act, 2008 provides for establishment the Uganda Road Fund to
fund routine and periodic maintenance of public roads;
f) Kenya and Uganda signed a bilateral agreement for the joint development and operation
of the Mombasa-Kampala standard gauge railway, 2009;
g) The National Construction Industry (NCI) Policy, 2010, to improve coordination,
regulation and development of the construction industry and establish a Uganda
Construction Industry Commission (UCICO);
h) Re-introduction of Force Account for rehabilitation and maintenance of district roads,
2010;
i) National Transport Master Plan / Greater Kampala Metropolitan Area provides a
comprehensive 15-year sector investment plan, covering roads, railways, air, water,
pipeline including urban transport in GKMA and non-motorized transport (NMT), 2010;
j) Kenya and Uganda signed a bilateral agreement for the joint development and operation
of a One Stop Boarder Post at Malaba and Busia border crossing.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
14
2.4.1 Key regional policies currently shaping the aviation industry:
a) The Yamoussoukro Decision spearheaded by the African Union (AU), the East African
Community Air Transport liberalization Programme under the East African Community
(EAC);
b) Common Market for Eastern and Southern Africa (COMESA) Legal Notice No. 2 on
Liberalization of Air Transport; and
c) The Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) Master
Plan.
2.4.2 Policies and Laws in Formulation:
The Policies, strategies and laws being drafted are:
a) Communication strategy to develop programmes that will help the ministry to build and
maintain a good corporate image.
b) Road Safety Policy to improve road safety in the country and establish a National Road
Safety Agency to manage road safety;
c) Inland water transport policy;
d) National Air Transport Policy yet to be harmonized with those of other States at the
continental level;
e) Building Control Bill to provide for consolidation, harmonization and amendment of the law
relating to the erection of buildings;
f) Building standards; and establishment of a National Building Review Board and Building
Committees;
g) DUCAR Agency to enhance the status and performance of the Divisions of District and
Community Access and Urban Roads;
h) Axle Load Control Policy to regulate the overloading of vehicles on roads; and
i) Non Motorized Transport Policy in Urban Centers
j) The National Transport Policy and Strategy
k) The Uganda Railways Bill, 2007.
2.5 Strength, Weaknesses, Opportunities and Threats Analysis
The section presents the Strength, Weaknesses, Opportunities and Threats (SWOT) analysis for
the Ministry of Works and Transport.
2.5.1 Strength:
a) The Ministry has physical assets i.e. equipment, buildings and plant that are essential in
Service delivery.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
15
b) Human Resource (Professional and qualified personnel) to implement the Ministry
mandate.
c) Transport is regarded as one of the priority sectors by Government.
d) The Ministry has a Staff Development Plan to improve the skill of Officers and
professionalize staff.
e) Has a National Transport Master Plan and Strategic Plan to guide the Sector in long and
medium term planning.
f) The National Construction Industry Policy aimed promoting an effective, efficient and
sustainable construction industry.
2.5.2 Weaknesses:
a) Limited team work amongst staff and departments hence negatively impacting the
overall productivity and responsibility of outcomes.
b) Lack of confidence amongst staff thus leading to indecisiveness in decision making.
c) Scattered offices leading to poor coordination and time wastage.
d) Lack of a staff succession plan that promotes promotional predictability.
e) Inadequate contract management skills leading projects overruns among others.
f) Nonexistent communication system both internally and externally that subsequently
depicts Ministry negative image before the public
g) Unfilled organizational structure leading to untimely completion of assignments.
h) Lack of clear mechanisms for monitoring the Transport Agencies within the Ministry.
2.5.3 Opportunities:
a) Donor support (WB, EU, DANIDA etc) to compliment Government efforts in the
financing of the Sector activities.
b) Transport infrastructure and services is a key feature in the economic development of
Uganda. This makes the Sector one of the core priorities for the Country.
c) Functional Transport Agencies able to execute Sector mandate.
d) East African Community initiative enables regional planning of transport infrastructure
and facilities.
2.5.4 Threats:
a) Prolonged rains/floods which destroy roads and drainage structures.
b) Frequent restructuring of the Ministry disrupts long-term planning.
c) Staff turnover compounding the problem of understaffing
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
16
d) Mandate grabbing by other MDAs.
2.6 Strategies to address the Weakness and Threats
a) Motivation of Staff through retooling /training and provision of work facilities/tools.
b) Construction of MoWT headquarters to reduce on the wastage of time commuting and
moving around physically as a result of scattered offices.
c) Development of a Communication strategy to improve internal and external
communication systems.
d) Signing of Performance Agreements /Memorandum of Understanding with the Transport
Agencies (UNRA, URF, CAA and URC) to facilitate performance assessment monitoring
of their work.
e) Implementation of the Staff Development Plan to enable professionalization of the Staff.
f) Formulation of project proposals to attract funding from GoU and Development Partners.
g) Capacity assessment for MoWT including strategic options for improving capacity.
h) Development of a system of performance indicators (as supplement to the Golden
Indicators) aimed at monitoring the implementing agencies.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
17
2.7 Structure of the Ministry of Works and Transport
OFFICE OF THE
MINISTER
PERMANENT
SECRETARY
Directorate of
Transport
Directorate of
Engineering and Works
Policy and
Planning Finance and
Administration
Transport
Regulation Construction
Standards & Quality
Roads and
Bridges
Public
Structures
Mechanical
Services Transport Services
and Infrastructure
-Internal Audit Unit
-Procurement &
Disposal Unit
East African Civil Aviation
Academy Civil Aviation Authority
Uganda Railways Corporation
National Roads Safety Council
Engineers Registration Board Transport Licensing Board
Uganda National Roads Authority
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
18
2.8 Staffing Levels
The Ministry is headed by the Minister and deputized by two (2) Ministers; the Minister of State
for Works and the Minister of State for Transport. The Permanent Secretary/ Accounting Officer
is responsible for the overall administration of the Ministry. The Ministry has two Directorates
(Transport, and Engineering & Works) with eight departments as shown below:
No. Department Approved Staffing
Level
Unfilled Vacancies
1 Transport Regulation 46 21
2 Transport Services and Infrastructure 25 10
3 Construction Standards & Quality 103 57
4 Roads and Bridges 71 21
5 Public Structures 37 09
6 Mechanical Services 167 43
7 Policy and Planning 28 05
8 Finance and Administration 96 08
The approved staff structure is 582 positions. The current staffing position is at 499 filled while
192 are vacant. The current staffing position is more than the establishment because a number of
secretarial staff are yet to be re-designated.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
19
CHAPTER THREE
3.0 OBJECTIVES, OUTPUTS, IMPLEMENTATION STRATEGY AND FINANCING
The Strategic Plan is guided by the NTMP/GKMA and the NDP. The Sector objectives in the
NDP form a basis for the Ministry’s Action Plans.
3.1 Sector Objectives
a) Improve the stock and quality of road infrastructure
b) Improve traffic flow within Greater Kampala Metropolitan Area
c) Increase volume of passenger and freight cargo conveyed on rail network
d) Increase volume of passenger and cargo traffic by air transport
e) Increase volume of passenger traffic and cargo freight by marine transport
f) Increase efficiency and improve effectiveness in service delivery of transport
infrastructure and provision of transport services.
g) Strengthen the National Construction Industry.
3.2 Key Outputs of the Ministry
a) Appropriate works and Transport Services and Infrastructure policies initiated, developed
and implemented
b) Research for improvement and development of Works and Transport infrastructure and
services undertaken
c) Works and Transport infrastructure and services polices, plans, designs developed and
standards set in the construction industry including Public buildings
d) Usage of highways, water ways and aerodromes monitored, evaluated and regulated for
the safe use by the service consumers
e) Collaboration mechanisms and working linkages with other institutions that are charged
with similar responsibilities promoted
f) Develop the MOWT capacity to effectively achieve its objectives.
3.3 Key Assumptions
During the implementation of the Strategic Plan, things may happen that can affect the
successful implementation of the Plan itself. For the outputs to be met, a number of
assumptions were made. These include:
a) The Ministry will retain its mandate
b) Continued political stability.
c) Continued political support at national level
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
20
d) Continued economic growth and consequently an increase in Government allocation
to the Ministry
e) Prudent financial management, accountability and transparency shall be key in order
to attract financial and other resources to the Ministry.
f) Availability of an effective legal and policy environment
g) The general budget and donor support will be sufficient to execute the strategic plan
h) Departments and top Management to own the plan
3.3 Implementation Strategy
The Implementation Strategy was guided by sector objectives, departmental interventions, a five-
year activity schedule and budget estimates were developed. The Works and Transport Sector
has seven objectives in the NDP. To contribute towards the achievement of the objectives,
appropriate interventions and outputs were designed by departments. See Annex 1.
3.4 Financing
The Ministry of Works and Transport will be funded by the Government of Uganda and
Development Partners. Development partner assistance is likely to be required to support high
level technical/feasibility studies and designs involving improvement of works and transport
infrastructure. GOU funding will be adequately required to support development of policy and
legal instruments, capacity building and acquisition of working tools and facilities.
The resource projection as per the current MTEF are shown in the table below.
Table 2: Medium Term Expenditure Framework (MTEF) 2011/12-2015/16 (UGX. bn)
Budget Item 2011/12 2012/13 2013/14 2014/15 2015/16
Wage 4.26 4.26 4.94 5.81 6.86
Non Wage Recurrent 15.01 15.01 16.67 18.33 23.01
Domestic Development 75.57 75.57 83.12 91.44 109.72
Donor Project 25.5 - - - -
Total Excl. Donor Project 94.84 94.84 104.73 115.58 139.59
Total Incl. Donor Project 120.34 94.84 104.73 115.58 139.59
Source: MoFPED Budget Call Circular November, 2011
The Ministry will explore possibilities of mobilizing additional resources from non traditional
sources.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
21
Table 3: Ministry Budget Estimates (UGX. Bn) 2011/12-2015/16
S/No Department 2011/12 2012/13 2013/14 2014/15 2015/16
1 Transport Regulation 1.280 12.93 11.470 10.520 11.170
2 Transport Services and
Infrastructure
9.0 100.44 81.04 62.79 64.345
3 Construction Standards and Quality
Management
10.080 9.404 9.382 6.391 6.182
4 Roads and Bridges 34.255 78.260 103.360 99.760 100.760
5 Mechanical Engineering Services 6.805 22.604 25.335 28.792 29.665
6 Finance and Administration 10.576 13.165 13.447 13.308 13.085
7 Policy and Planning 6.95 8.25 6.95 6.5 6.35
8 Public Structures 3.3 3.65 3.67 3.7 3.7
Total 82.246 248.703 254.654 231.761 235.257
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
22
CHAPTER FOUR
4.0 MONITORING, EVALUATION AND RISK ANALYSIS
4.1 Monitoring and Evaluation
Monitoring and Evaluation is a prerequisite for measuring performance. A mid-term review will
be carried out after two and a half (2.5) years of plan implementation. This will be done to ensure
that resources allocated towards the implementation of the plan are translated into a long-term
impact in the Sector. A set of Key Performance Indicators developed in the Sector Monitoring
and Evaluation framework will be largely used to measure attainment of the objectives.
A mid-term review will be undertaken in the FY 2013/14 and the final evaluation at the end of
the implementation period. Key lessons learnt will be documented and these will form a basis for
future improvement.
Evaluation will be conducted under two categories;
a) Departmental assessments on the basis of the work plans as indicated in Annexes 1.
b) The Ministry will be evaluated on the basis of the overall performance under the 17
Golden indicators contained in the sector M&E framework.
4.2 Key Performance Indicators
Monitoring and Evaluation will be undertaken to ensure successful implementation of the Plan.
An M&E Framework was formulated. It consists of 17 key sector performance indicators- the
Golden Indicators. These summarize the transport situation in the road, rail, air and water
transport sub-sectors, thereby enabling results-based management of the Sector. The Golden
Indicators are related to the mandate and functions of the Ministry and its Agencies. The
indicators complement other sets of indicators, notably those used in the Annual Government
Performance Report and the JAF.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
23
Table 4: Transport Sector Performance - Golden Indicators
No Indicator Unit Included
in JAF 3
1 Road network Condition
- National roads (paved) – fair to good %
- National roads (unpaved) – fair to good %
- District roads – fair to good (Note 1) % Yes
- Urban roads (paved) – fair to good (Note 1) %
- Urban roads (unpaved) – fair to good (Note 1) %
2 Paved road network
- National roads Km
- Urban roads Km
3 Road safety
- Fatalities per 10,000 vehicles No.
- Total fatalities No.
- Total registered vehicles (Note 2) No.
4 Road service level – travel time (Note 3)
- On national roads Minutes/ km
- On district roads Minutes/ km
- In Kampala Minutes/ km
5 Road construction/ maintenance cost (Note 4)
- National roads – New construction USD/km
- National roads – Re-construction USD/km
- National roads – Rehabilitation USD/km
- National roads – Periodic maintenance USD/km
- National roads – Mechanized routine
maintenance USD/km
- District roads – Rehabilitation USD/km
- District roads - Periodic maintenance USD/km
- District roads - Routine maintenance USD/km
- Urban roads – Rehabilitation USD/km
- Urban roads - Periodic maintenance USD/km
- Urban roads - Routine maintenance USD/km
- Community Access Roads - Routine USD/km
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
24
No Indicator Unit Included
in JAF 3
maintenance
6 Rural accessibility
- Rural population living within 2 km of all
weather road
(Note 5)
% Yes
- All year motorable Community Access Road
network Km
7 Road maintenance needs met
Maintenance budget relative to requirement
- National roads % Yes
- District roads %
- Urban roads %
Maintenance spending relative to release
- National roads %
- District roads %
- Urban roads %
- Community Access Roads %
8 Compliance with axle load regulation
- Overloaded vehicles % Yes
- Average overload per axle Tons
- Number of weighed vehicles No.
- Number of overloaded vehicles No.
9 Rail freight volume
Total freight carried Tonne-km
10 Rail modal share at Malaba and Port Bell border
points
- Total freight crossing the two borders Million tones
- % freight that crosses the two borders by rail %
11 Rail modal share on Lake Victoria ferries
- % freight transported on ferries by rail,
registered at Port Bell. (For total freight
registered at Port Bell refer Indicator 16)
%
Rail efficiency
12 Locomotive productivity Km/ loco/ day
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
25
No Indicator Unit Included
in JAF 3
13 Wagon utilization
- Wagon transit time Days
- Wagon turn-round time Days
14 International aircraft movements
- - Commercial No.
- - Non commercial No.
15 Passenger traffic
International passengers
- Embarking No. (´000)
- Disembarking No. (´000)
- Transit No. (´000)
Domestic passengers
- Embarking No. (´000)
- Disembarking No. (´000)
16 Freight on Lake Victoria
- Total freight on ferries (as registered at Port Bell
border post) Million tones
17 Passenger traffic (Note 6)
- Entebbe - Kalangala No, (´000)
- Port Bell - Mwanza No. (´000)
- Jinja-Muzoma No. (´000)
Notes:
Measurements will have effect at the end of the FY.
USD Exchange Rate at the end of the FY to be recorded
1. Reliability of data to be defined.
2. Includes motorcycles. Reliability of data to be defined.
3. UNRA will identify suitable system for annual implementation, starting 2012 with data
available August 2012 and following years.
4. Definition of work categories required.
5. UBOS has been requested to include relevant question in 2011/12 (and following years’)
survey. Computed data will be ready as from August 2013. Usefulness of computed data to
be evaluated before use as indicator.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
26
6. MOWT Transport Services and Infrastructure Department will identify suitable survey
system for annual implementation, starting next year with data available for reporting August
2012 and following years. 3 initial routes have been identified as representing total.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
27
Table 5: Alignment of Golden Indicators with Works and Transport Sector Objectives in the NDP
The seven transport sector objectives of
the NDP
Golden indicator
No. Measures directly aligned Indirect measures
Improve the stock and quality of road
infrastructure
2 Paved road stock
1 Road condition
6 Rural accessibility
7 Road maintenance needs met
4 Road service level: Travel time
8 Compliance with axle load regulation
Improve the traffic flow within the Greater
Kampala Metropolitan Area
4 Road service level: Travel time
Increase the volume of passengers and
freight conveyed on the rail network
8 Compliance with axle load
regulation
9 Rail freight volume
10 Rail modal share at Malaba and Port
Bell
11 Rail modal share at Lake Victoria
12 Locomotive productivity
13 Wagon utilization
Increase the volume of passenger and cargo
traffic by air transport
14 Aircraft movements
15 Passenger traffic
Increase the volume of passenger traffic and
freight by marine transport
16 Freight on ferries
17 Passenger traffic
Increase efficiency and improve 7 Road maintenance needs met: 1)
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
28
effectiveness in service delivery of transport
infrastructure and provision of transport
services
approved budget to need, and 2)
expenditure to approved budget
12 Locomotive productivity
13 Wagon utilization
5 Road construction/ maintenance cost
3 Road safety: Fatalities
Strengthen the national construction industry 5 Road construction/ maintenance cost
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
29
4.3 Risk Analysis
The risk analysis is summarized in the table below:
Table 6: Risk Analysis
Risk
No.
Risk Mitigation Measure
Risk A
Funding:
i. Late release of funds
ii. Budget cuts
iii. Low Absorption Capacity
iv. Unplanned activity
Prioritize our activities
Procure early
Strengthen Contract Management
Improve Ministry Efficiency
Ensure sufficient manpower
Risk B
Declining Donor confidence in the
performance of the Sector
Improved reporting and timely
accountability
Conduct regular integrity surveys.
Pursue result oriented performance
Talk shows on radios and television
stations
Risk C
Poor collaboration among the
various Sector Agencies (UNRA,
URF, CAA, URC, KCCA)
Prepare clear MoUs between the
Agencies.
Agreements, laws and regulations
should be put clearly in place.
Set up joint REGULAR meetings, and
share plans, budgets and reports with
line Agencies.
Risk D
Attracting committed and
competent staff
Implement inbuilt public service
motivational incentives
Develop and implement a Ministry
proactive communication strategy
Risk E
Staff Turnover
Lobby MoPS to increase performance
incentives
Provide relevant training
Ministry should implement Human
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
30
Risk
No.
Risk Mitigation Measure
Resource Development Plan
Implementing the schedule of duties
Team building
Risk F
Adjust and adopt to new MoWT
restructuring demands and
obligations
Setting up change management team to
champion the change. Management
system
Staff Re-Orientation retreat
Team building retreat
Refresher courses
Promote/reward innovation/research
Risk F
Adjust and adopt to new MoWT
restructuring demands and
obligations
Setting up change management team to
champion the change. Management
system
Staff Re-Orientation retreat
Team building retreat
Refresher courses
Promote/reward innovation/research
Risk G
Insufficient knowledge regarding
Procurement laws and regulations
Conduct regular/continuous
procurement training and mentoring
Pursue the accreditation of the form of
contract by PPDA
Administrative measures taken
especially on those that have intentional
reasons
Risk H
Indiscipline and slowness of staff
performance
Conduct refresher trainings on discipline
and disciplinary procedures in the Public
Service including the appeal
mechanisms.
General training of staff on the relevant
laws and regulations governing the
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
___________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
31
Risk
No.
Risk Mitigation Measure
service(Public Service Standing Orders,
Code of Ethics etc
Conduct periodic staff performance
appraisals and take appropriate action
Risk I
Lack of confidence, decision
making
Empowerment
Mentoring and training
Proper delegation
Risk J
Weak unprofessional private sector
Identify weaknesses
Develop guidelines
Training and mentoring
Operationalize and strengthen the
regulating bodies (ERB, UIPE,
Proposed UCICO etc)
Risk K
Continuous restructuring of the
Ministry/Ministries
Keep reviewing the Ministry Structure
Setting up change management team to
champion the change. Management
system
Staff Orientation retreat
Team building retreat
Refresher courses
Promote/reward/innovation/research.
32 | P a g e
Annex 1: Annual Outputs and Budget
Transport Regulations
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Improve the
stock and
quality of road
infrastructure
Monitor
compliance and
carry out an
inventory of road
signs on the paved
National roads.
Inventory of road
signs on national
roads carried out
- 0.4 0.44 0.48 0.52
- Report on the
3200km of Km
of paved roads
covered
Report on the
3200km of Km
of paved roads
covered
Report on the
3200km of Km
of paved roads
covered
Report on the
3200km of Km
of paved roads
covered
Disseminate road
furniture
standards to
Contractors and
other stakeholders
40 stakeholder
sensitization
workshops
conducted
0.03 0.04 0.05 0.06 0.06
Report for 8
workshops
produced
Report for 8
workshops held
produced
Report for 8
workshops held
produced
Report for 8
workshops held
produced
Report for 8
workshops held
produced
Improve the
traffic flow
within the
Greater
Kampala
Metropolitan
Area
Initiate qualitative
economic
regulation of
passenger
transport
Qualitative
economic
regulations
developed
- 0.2 0.2 0.2 0.2
- Copy of
regulations
developed
Copy of
regulations
developed
Copy of
regulations
developed
Copy of
regulations
developed
Campaigns on
passenger
transport
regulation and
safety carried out
- - 0.4 0.45 0.50
- - Report on the
eight campaigns
conducted
produced
Report on the
eight campaigns
conducted
produced
Report on the
eight campaigns
conducted
produced
Develop
regulations to
govern Bus Rapid
Transport system
along other
transport modes
A set of
regulations
developed
- 0.5 0.3 - -
- Draft Copy of
regulations
developed
Final Draft copy
of regulations
presented to
Parliament
- -
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
33
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Increase the
volume of
passenger and
freight cargo
conveyed on
the rail
network
Review and
update policies,
laws and
regulations
regarding rail
transport
Policies, laws and
regulations
governing railway
transport reviewed
and disseminated
- 0.5 0.6 0.2 0.2
- Draft copy of
the up-to-date
policies, laws
and regulations
Draft copy of the
up-to-date
policies, laws
and regulations
Report on
dissemination
workshop
produced
Report on
dissemination
workshop
produced
Develop safety
standards for
railway transport
A set of safety
standards
formulated
- - 0.3 0.35 -
- - Draft copy for
safety standards
formulated
A set of safety
standards
produced
-
Disseminate the
policy, laws,
regulations and
safety standards
for railways
- 0.5 0.5 0.6 0.65
- 8 workshops
conducted and
report produced
8 workshops
conducted and
report produced
8 workshops
conducted and
report produced
8 workshops
conducted and
report produced
Monitor
compliance to the
railway transport
safety standards
Locomotives,
rolling stock and
railway line
monitored
- 0.5 0.55 0.6 0.65
90% of
locomotives,
rolling stock
and 1032Km of
railway line
monitored.
90% of
locomotives,
rolling stock and
1032Km of
railway line
monitored.
90% of
locomotives,
rolling stock and
1032Km of
railway line
monitored.
90% of
locomotives,
rolling stock and
1032Km of
railway line
monitored.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
34
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Capacity Building
CB) carried out for
the railway
transport
- 0.2 0.2 0.2 0.2
Reports on CB
Carried out
produced
Reports on CB
Carried out
produced
Reports on CB
Carried out
produced
Reports on CB
Carried out
produced
Increase the
volume of
passenger and
cargo traffic by
air transport
Review the
existing BASA’s
annually
All existing
BASA’s reviewed.
- 0.3 0.4 0.4 0.4
- 40 BASA’s
reviewed and
quarterly reports
produced.
40 BASA’s
reviewed and
quarterly reports
produced.
40 BASA’s
reviewed and
quarterly reports
produced.
40 BASA’s
reviewed and
quarterly reports
produced.
Operationalise
Aviation Accident
Investigation
Body
Activities of the
Aviation Accident
Investigation Body
operationalised.
- 0.2 0.2 0.2 0.25
- 10 activities
carried out.
10 activities
carried out.
10 activities
carried out.
10 activities
carried out.
Operationalise the
National search
and rescue body
National Search
and Rescue
institution
operationalised
- 0.10 0.25 0. 28 0.28
10 activities
carried out and
reports prepared
10 activities
carried out and
reports prepared
10 activities
carried out and
reports prepared
10 activities
carried out and
reports prepared
Improve
coordination of
EAC and National
Air transport
facilitation
programmes
Programmes
effectively
coordinated and
facilitation
meetings held
- 0.30 0.35 0.30 0.30
- 12 coordination
programs and
facilitation
meetings held
12 coordination
programs and
facilitation
meetings held
12 coordination
programs and
facilitation
meetings held
12 coordination
programs and
facilitation
meetings held
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
35
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Develop a policy
on Entebbe
International
airport as a
regional hub
Policy on Entebbe
as a regional hub
developed
- 0.20 0.30 - -
- Draft policy in
place
Approved policy - -
Develop a policy
to re- establish
national Airline
Policy for a
National Airline
developed
- 0.2 0.3 - -
Draft policy in
place
Approved policy - -
Increase the
volume of
passenger and
cargo traffic by
marine
transport
Formulate a
policy for inland
water transport
and
Review the laws
and regulations of
inland water
transport
Consultants to
formulate a policy,
review the laws
and regulations of
Inland Water
Transport (IWT)
engaged.
- 0.5 0.5 0.2 0.2
- IWT draft
policy
-up-to-date
IWT laws &
regulations
- IWT draft
policy
-up-to-date IWT
laws &
regulations
Reports for
dissemination of
Policy, laws and
regulations
prepared
Reports for
dissemination of
Policy, laws and
regulations
prepared
Stock of IWT
vessels and
landing sites on all
navigable water
bodies undertaken
- 0.25 0.25 - -
Inventory report Inventory report - -
Concessioner for - 0.010 0.01 0.3 0.3
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
36
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
privatizing IWT
survey and
inspection
procured.
- Concessioner
procured.
Concessioner
procured.
Vessels
Inspection
reports
Vessels
Inspection
reports
Capacity Building
(CB) for IWT
carried out
- 0.2 0.2 0.2 0.2
- Reports on CB
Carried out
produced
Reports on CB
Carried out
produced
Reports on CB
Carried out
produced
Reports on CB
Carried out
produced
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
37
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Disseminate the
policy, laws and
regulations of inland
water transport
Eight
dissemination
workshops held
per year
- 0.5 0.5 0.6 0.7
- 8 workshops
conducted.
8 workshops
conducted.
8 workshops
conducted.
8 workshops
conducted.
Develop safety
standards for inland
water transport
Inland water
transport safety
standards
formulated
- 0.7 0.7 0.75 0.86
- A set of inland
water transport
safety standards
formulated
A set of inland
water transport
safety standards
formulated
Inland water
transport safety
standards
disseminated.
Inland water
transport safety
standards
disseminated.
Monitor safety
compliance of ports,
landing sites and
vessels.
Two Ports and 20
landing sites
monitored
0.1 0.15 0.15 0.15 0.15
Monitoring
reports
produced
Monitoring
reports
produced
Monitoring
reports produced
Monitoring
reports produced
Monitoring
reports
produced
Enhancement of
inland water transport
safety
Inland water
transport vessels
inspected and
licensed.
Sensitization
campaigns carried
out.
0.05 0.4 0.5 0.6 0.75
400 vessels
inspected
and licensed.
Report on
the eight
sensitization
campaigns
carried out.
400 vessels
inspected and
licensed.
Report on the
eight
sensitization
campaigns
carried out..
400 vessels
inspected and
licensed.
Report on the
eight
sensitization
campaigns
carried out..
400 vessels
inspected and
licensed.
Report on the
eight
sensitization
campaigns
carried out.
400 vessels
inspected and
licensed.
Report on the
eight
sensitization
campaigns
carried out..
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
38
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Increase
efficiency and
improve
effectiveness in
the service
delivery of
transport
infrastructure and
provision of
transport services.
Develop a road
safety policy
Concessioner for
Privatizing motor
vehicle inspection
procured.
0.1 0.4 - - -
Concessioner
procured.
Concessioner
procured.
- - -
Vehicle Master
Testing Center
established
- 0.5 1.0 - -
- Setting up a
Vehicle Master
Testing Center
Commenced
Vehicle Master
Testing Center
established
- -
Private Vehicle
inspection Centers
Monitored
- - 0.2 0.3 0.4
- - Quarterly
monitoring
reports prepared
Quarterly
monitoring
reports prepared
Quarterly
monitoring
reports prepared
Establish National
Road Safety
Authority (NRSA)
established
- 0.48 - - -
- NRSA
established
- - -
Crash Data base
established
- 0.8 0.8 0.8 0.8
- Crash Data base
established
Updated the data
base in place.
Updated the data
base in place.
Updated the data
base in place.
Driving
schools/instructors
licensed and
- 0.25 0.25 0.25 0.25
- 50 Driving
Schools and 100
50 Driving
Schools and 100
50 Driving
Schools and 100
50 Driving
Schools and 100
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
39
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
monitored Instructors
licensed and
monitored.
Instructors
licensed and
monitored
Instructors
licensed and
monitored
Instructors
licensed and
monitored
Regulations for
Traffic and Road
Safety Act 1998
reviewed, updated
and formulated.
- 0.4 - - -
- Regulations for
Traffic and
Road Safety Act
1998 reviewed,
updated and
formulated.
- - -
MTRA
established.
- 0.65 - - -
- MTRA
established.
- - -
Performance of
Authorities formed
and concessioned
monitored
- - 0.3 0.3 0.4
- - Monitoring
reports compiled
Monitoring
reports compiled
Monitoring
reports compiled
Widen the legal
and regulatory
framework
Laws and
regulations on
Pipeline transport
reviewed and
updated
- 0.1 0.12 - -
- Draft up-to-date
laws and
regulations for
pipeline
transport
Up-to-date laws
and regulations
for pipeline
transport
- -
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
40
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Develop an
Axle load
Policy
Draft Axle Load
Policy in
formulated
- 0.5 0.3 0.3 0.3
- A draft Axle
Load Policy
submitted to
cabinet.
Policy approved
by Parliament
Reports on
policy
implementation
Reports on
policy
implementation
Procurement of
Monitoring
equipment
Monitoring
equipment
procured.
- 0.6 0.2 0.25 0.3
- A set of
equipment
procured and
maintained.
Monitoring
reports
Monitoring
reports
Monitoring
reports
Enhancement
of Inspection
and Licensing
of PSVs.
Inspection and
licensing of PSVs
enhanced
1.0 1.1 1.2 1.3 1.4
18000 No. of
PSVs
inspected
and licensed.
19000 No. of
PSVs inspected
and licensed.
20000 No. of
PSVs inspected
and licensed.
21000 No. of
PSVs inspected
and licensed.
22000 No. of
PSVs inspected
and licensed.
National Road
Safety
awareness
programmes
conduction.
National Road
Safety awareness
programmes
Conducted.
- 0.3 0.3 0.3 0.3
- 8 awareness
campaigns done
and reports
produced
8 awareness
campaigns done
and reports
produced
8 awareness
campaigns done
and reports
produced
8 awareness
campaigns done
and reports
produced
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
41
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Transport Services and Infrastructure
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Improve the stock
and quality of
road infrastructure
Carry out socio-
economic studies to
assess the Impact of
the rehabilitated
National roads
Reports on
socio-economic
assessment
studies
compiled
0.8 0.8 0.8 0.8 0.8
Reports on four
Socio-economic
impact studies
compiled
Reports on four
Socio-economic
impact studies
compiled
Reports on four
Socio-economic
impact studies
compiled
Reports on
four Socio-
economic
impact studies
compiled
Reports on
four Socio-
economic
impact studies
compiled
Design and
Implementation of
OSBP strategy at
national entry points
Land
compensated
1 - - -
Katuna,
Mutukula and
Mirama hills
- - -
OSBP designed
and constructed
at border posts
0.8 20 20 0.01 0.015
Busia and
Malaba border
posts designed
and constructed
Busia and
Malaba border
posts
constructed
Busia and
Malaba border
posts
constructed
Reports on
OSBP
operations
Reports on
OSBP
operations
0.58 10 10 0.01 0.015
Mutukula
border post
designed
Mutukula
border post
constructed
Mutukula
border post
constructed
Reports on
OSBP
operations
Reports on
OSBP
operations
Katuna and
Mirama hills
border posts
Katuna and
Mirama hills
border posts
Katuna and
Mirama hills
border posts
Reports on
OSBP
operations
Reports on
OSBP
operations
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
42
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
designed constructed constructed
- - 1.5 1.5 1.5
- - Arua border
post designed
and constructed
Mpondwe
border post
designed and
constructed
Koboko border
post designed
and
constructed
Carry out route
strategy study for
different national
roads network
6 route studies
conducted.
- 0.5 0.5 0.2 0.2
- Report on two
route strategy
studies
compiled
(Kampala-Jinja
and Kampala -
Masaka road.)
Report on two
route strategy
studies
compiled
(Kampala-
Karuma and
Kampala–
Hoima)
Report on a
route strategy
study
compiled
(Busega-
Mityana)
Report on a
route strategy
study compiled
(Kampla-
Gayaza-
Zirobwe)
Carry out Socio-
economic studies on
the impact of the
rehabilitated
DUCAR roads.
Socio-economic
impact
assessment
study reports
compiled
- 0.6 0.6 0.6 0.6
- Report on
socio-economic
impact
assessment
compiled
Report on socio-
economic
impact
assessment
compiled
Report on
socio-
economic
impact
assessment
compiled
Report on
socio-
economic
impact
assessment
compiled
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
43
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Improve the
traffic flow
within the Greater
Kampala
Metropolitan Area
Implement selected
Transport Master
Plan
recommendations
Create a
separate Agency
to manage
Transport in
GKMA
- 0.7 0.2 0.5 0.3
- MATA bill
prepared
MATA bill
submitted to
cabinet
MATA
established
MATA
established
BRT Feasibility
and design
report prepared
- 9 2 10 5
- BRT Feasibility
study and
design report
compiled
Land
compassion to
the affected
areas
BRT Pilot
terminals
constructed
BRT Pilot
roads
constructed
Carry out feasibility
studies for
establishment of
alternative airports
in GKMA.
Feasibility study
carried out
- 0.8 1.0 - -
- Kajansi
feasibility study
report compiled
Namanve
feasibility study
report compiled
- -
Carry out feasibility
study for
establishment of
general parking
areas in the GKMA
Feasibility study
carried out
- 0.15 1.0 - -
- Feasibility study
report compiled
Detailed design
report for
parking areas
- -
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
44
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Implementation of
Non Motorized
Transport (NMT)
Policy
recommendation
NMT Policy
implemented.
0.1 0.5 1.0 1.0 1.5
Policy for
NMT
developed
Detailed design
report on NMT
within GKMA
Implement
NMT on
selected GKMA
Roads
Implement
NMT on
selected
GKMA Roads
Implement
NMT on
selected
GKMA Roads
Study to improve
transport services
and infrastructure in
GKMA
Research study
undertaken
- 0.2 0.2 - -
- Draft research
study report
Research study
report
- -
Feasibility study for
improvement of
public water
transport from
Entebbe to
Kampala.
Feasibility study
report submitted
- 0.05 0.7 1.0 1.0
- TORs drafted Feasibility study
report
completed
Selected study
recommendati
ons
Implemented
Selected study
recommendatio
ns
Implemented
Carry out feasibility
study to revive
railway passenger
transport in the
GKMA
Feasibility study
report submitted
- 0.7 1.0 1.0 1.0
- Feasibility study
report prepared
Implementation
report on study
recommendation
compiled
Implementatio
n report on
study
recommendati
on compiled
Implementatio
n report on
study
recommendatio
n compiled
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
45
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Feasibility study for
establishing a rapid
radial Railway
transit system from
Kyengera, Mukono,
Entebbe and
Nansana to central
station
Feasibility study
and design
report submitted
- - 1.8 6.0 -
- - Feasibility study
report prepared
Design
prepared
-
Increase the
volume of
passenger and
freight cargo
conveyed on the
rail network
Carry out
preliminary and
detailed design to
Standard gauge of
Kampala - Malaba
Railway Line
(250km)
Preliminary and
detailed design
report prepared
- 8.4
1.0 0.5 -
Feasibility
study and
design
commenced
Feasibility study
and design
report compiled
Report on
dissemination of
feasibility study
design findings
compiled
Land for the
affected areas
compensated
Land for the
affected areas
compensated
Carry out
preliminary and
detailed design of
Kampala –
Kasese Railway line
(333km)
Preliminary and
detailed design
report submitted
- 8.0 1.7 6.0 -
Final draft
report
completed
Draft
preliminary
design report
prepared
Detailed design
report prepared
Land
compensated
-
20% of the
railway line
upgraded
- - - - 1.8
- - - - 20% of the
railway line
upgraded
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
46
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Carry out
preliminary and
detailed design of
Tororo-Pakwach
Railway line
(501km)
Preliminary and
detailed design
report submitted
- 5.0 2.0 - -
- Preliminary
design report
prepared
Detailed design
report prepared
- -
- - - 6.0 12
- - - Land
compensated
20% of the
railway line
upgraded
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
47
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Feasibility Study to
construct Gulu-
Atiak-Nimule
railway line
Feasibility study
report prepared
- 2.8 - - -
- Feasibility
Study Report
prepared
- - -
Feasibility study to
link Pakwach-Kaiso
Tonya – Kasese
railway line
(400km)
Feasibility study
report prepared
- 2.8 - - -
- Feasibility study
report prepared
- - -
Carry out feasibility
study for extension
of Kasese-
Kabatoro-Bwera to
Kisangani Railway
Feasibility study
report prepared
- - 2.9 - -
- - Feasibility study
report prepared
- -
Carry out feasibility
study for extension
of Bihanga-Kigali
Railway line
Feasibility study
report prepared
- - 2.9 - -
- - Feasibility study
report prepared
- -
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
48
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Feasibility study for
extension of railway
line from Mityana-
to oil fields
Feasibility study
report prepared
- - 2.0 - -
- - Feasibility study
report prepared
- -
Carry out feasibility
study to construct
Nimule-Juba
railway line
(300km)
Feasibility study
report prepared
- - 2.5 - -
- - Feasibility study
report prepared
- -
Carryout studies to
assess the socio-
economic impact of
rehabilitated railway
lines (as basis for
future projects)
Socio-economic
impact
assessment
study reports
submitted
0.02 0.8 0.8 0.8 0.8
Socio-economic
study reports
prepared
Socio-economic
study reports
prepared
Socio-economic
study reports
prepared
Socio-
economic
study reports
prepared
Socio-
economic
study reports
prepared
Monitor and
evaluate the
performance of
railways
Monitoring and
evaluation
surveys of
operational
railway lines
conducted
0.01 0.8 0.6 0.6 0.6
Monitoring
reports
compiled
Monitoring
reports
compiled
Monitoring
reports
compiled
Monitoring
reports
compiled
Monitoring
reports
compiled
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
49
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
URAHC Bill
and Concession
Agreement
amended
- 0.2 - - -
- URAHC Bill
2007 approved
by Parliament
- - -
- 0.5 - - -
- Concession
agreement to
allow passenger
railway
transport
services
prepared
- - -
Increase the
volume of
passenger and
cargo traffic by air
transport
Routine aerodrome
inspections at
upcountry
aerodromes to
increase
accessibility by air
Four quarterly
supervision and
inspections
visits done
0.2 0.2 0.2 0.1 0.1
Quarterly
supervision/
inspections
reports prepared
Quarterly
supervision/
inspections
reports prepared
Quarterly
supervision/
inspections
reports prepared
Quarterly
supervision/
inspections
reports
prepared
Quarterly
supervision/
inspections
reports
prepared
Monitoring of
development
projects to upgrade
upcountry
aerodromes at Arua
and Kasese
Quarterly
supervision and
inspections
visits done
0.6 0.6 0.6 0.8 0.9
Quarterly
supervision/
inspections
reports prepared
Quarterly
supervision/
inspections
reports prepared
Quarterly
supervision/
inspections
reports prepared
Quarterly
supervision/
inspections
reports
prepared
Quarterly
supervision/
inspections
reports
prepared
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
50
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Carry out feasibility
study for
establishment of
other upcountry
airports (Yumbe,
Rukungiri, Pader,
Apac, Ntungamo/
Rwentobo, Rakai
Nakasongola,
Kiboga, Sembabule)
Feasibility study
report prepared
- - 2.2 1.1 -
- - Draft feasibility
report
Final draft
feasibility
report
-
Carry out feasibility
study for
establishment of an
airport near oil
fields in Albertine
Graben region
Feasibility study
report prepared
- 1 1 0.5 -
- Aerodrome
constructed
(40%
equivalent) in
the Albertine
region
Aerodrome
constructed
(40%
equivalent) in
the Albertine
region
Aerodrome
constructed
(20%
equivalent) in
the Albertine
region
-
Carryout studies to
assess the socio-
economic impact of
rehabilitated/establi
shed airports
Socio-economic
impact
assessment
study reports
prepared
0.2 0.2 0.2 0.2 0.2
Four socio-
economic
survey reports
prepared
Four socio-
economic
survey reports
prepared
Four socio-
economic
survey reports
prepared
Four socio-
economic
survey reports
prepared
Four socio-
economic
survey reports
prepared
Promote Regional and - - - 0.17 0.2
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
51
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
collaboration
linkages with
Regional and
International
organizations in
provision of air
transport services
and infrastructure
International
collaboration
linkages
established
- - - Recommendat
ions of EAC
resolutions to
promote trade
along the trade
corridor
prepared
Reports on
implementatio
n of
recommendatio
ns of EAC
resolutions
prepared
Monitor and
evaluate the
operations of CAA
M&E study for
CAA activities
carried out
0.04 0.04 0.04 0.02 0.02
M&E study
report prepared
M&E study
report prepared
M&E study
report prepared
M&E study
report
prepared
M&E study
report prepared
Master Plan for
Kasese Air Port
report prepared
- 0.5 - - -
- Master Plan for
Kasese Air port
finalized
- - -
Entebbe
International
Airport
Investment Plan
report prepared
- 0.5 - - -
- Review of
Entebbe
International
Airport
Investment Plan
finalized
- - -
Increase the Conduct Feasibility Feasibility 0.2 0.3
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
52
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
volume of
passenger and
cargo traffic by
marine transport
Study to assess
traffic volume on
Uganda inland
water ways
Study report
prepared
Draft feasibility
study report
Final draft
feasibility Study
report
Procure 2
marine vessels
for potential
landing sites
10.8 9.0
- - - Marine vessel
procured
Marine vessel
procured
Re-open the central
corridor through
Lake Victoria
Feasibility study
report to
develop Tanga-
Arusha-
Musoma-
Bukasa Port
report prepared
- 1 - - -
- Feasibility
Study report
prepared
- - -
MV Kaawa
rehabilitated
2.5 4.0 - - -
MV Kaawa
rehabilitated
MV Kaawa
rehabilitated
- - -
MV Pamba
rehabilitated
- 1 2.5 - -
- MV Pamba
rehabilitated
MV Pamba
rehabilitated
- -
New vessel to
replace MV
Kabalega and
Port bell and
- - - 3.0 5.0
- - - Designs
commenced
Designs
completed
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
53
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Jinja piers
designed
Feasibility study for
introduction of
modern cargo boats
for roll-on roll-off
and container cargo
on Lakes Victoria,
Albert and Kyoga
Feasibility study
report prepared
- - 2.8 - -
- - Feasibility study
report prepared
- -
- - - 0.5 0.75
- - - Modern cargo
boats procured
Modern cargo
boats procured
Carry out feasibility
study for
introduction of first
furious passenger
boats on Lakes
Victoria, Albert and
Victoria Nile
Feasibility study
report prepared
- - 1.5 - -
- - Feasibility study
report prepared
- -
- - - 0.5 0.75
- - - Furious
passenger
boats procured
Furious
passenger
boats procured
Undertake socio-
economic impact
studies on
rehabilitated/establi
shed water transport
and infrastructure
Socio-economic
impact surveys
reports prepared
0.05 0.80 0.80 0.80 0.80
Socio-economic
impact surveys
reports prepared
Socio-economic
impact surveys
reports prepared
Socio-economic
impact surveys
reports prepared
Socio-
economic
impact surveys
reports
prepared
Socio-
economic
impact surveys
reports
prepared
Carry out Feasibility study - - 1.2 - -
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
54
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Feasibility study to
operate a second
ship between
Nakiwogo and
Lutoboka landing
sites
report prepared - - Feasibility study
report produced
- -
Concept paper on
Inland Water
Transport
Development Plan
for Lake Victoria
prepared
Concept paper
on Inland Water
Transport
Development
Plan for Lake
Victoria
prepared
- 0.50 - - -
- Concept paper
prepared
- - -
Strategy and
Investment plan for
ferry services
prepared
Strategy and
Investment plan
for ferry
services
prepared
- 0.7 - - -
- Strategy and
Investment plan
for ferry
services
prepared
- - -
Carry out feasibility
study for provision
of transport to
connect the 84
Ssesse islands to
Feasibility study
report to link
Ssesse islands to
main land
prepared
- 0.7 - - -
- Feasibility study
report prepared
- - -
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
55
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
main land
Update the inland
water study (1998)
In land water
study updated
- 0.5 - - -
- Updated IWT
study report
- - -
Increase
efficiency and
improve
effectiveness in
the service
delivery of
transport
infrastructure and
provision of
transport services.
Participate in
strengthening the
coordination
mechanisms within
the sector and
establishment of the
National Transport
Databank
Reports on
traffic flow for
the various
modes of
transport
prepared
0.05 0.60 0.50 0.50 0.50
Reports on
traffic flow for
the various
modes of
transport
prepared and
disseminated
Reports on
traffic flow for
the various
modes of
transport
prepared and
disseminated
Reports on
traffic flow for
the various
modes of
transport
prepared and
disseminated
Reports on
traffic flow for
the various
modes of
transport
prepared and
disseminated
Reports on
traffic flow for
the various
modes of
transport
prepared and
disseminated
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
56
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Quality Assurance and Construction Standards
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Improve the
stock and
quality of road
infrastructure
Provide Construction
Standards.
Monitor Quality
Assurance Systems
and Compliance to
standards and
Specifications
A set of
Construction
standards
provided.
0.1 0.11 0.12 0.13 0.15
10
Construction
standards
reviewed and
re-produced
10
Construction
standards
reviewed and
re-produced
10
Construction
standards
reviewed and
re-produced
10
Construction
standards
reviewed and
re-produced
10
Construction
standards
reviewed and
re-produced
Compliance
reports prepared
0.313 0.313 0.313 0.313 0.313
Reports (two)
fieldwork
visits prepared
Reports (two)
fieldwork
visits prepared
Reports (two)
fieldwork
visits prepared
Reports (two)
fieldwork
visits prepared
Reports (two)
fieldwork
visits prepared
Undertake Innovative
Research in
Construction
Materials
Research reports
on construction
materials
prepared.
0.072 0.105 0.11 0.115 0.12
2 reports
prepared
2 reports
prepared
2 reports
prepared
2 reports
prepared
2 reports
prepared
Monitor compliance
to environmental and
social standards
Environmental
and social
compliance
reports prepared
0.1 0.021 0.079 0.023 0.024
Report
prepared
Fieldwork
conducted and
four reports
prepared
Fieldwork
conducted and
reports
prepared
Fieldwork
conducted and
reports
prepared
Fieldwork
conducted and
reports
prepared
Undertake capacity
building on
innovative
technologies.
Training
workshop
conducted and
report prepared
0.02 0.21 0.22 0.23 0.6
Two work-
shops held and
report prepared
Two work-
shops held and
report prepared
Two work-
shops held and
report prepared
Two work-
shops held and
report prepared
Two work-
shops held and
report prepared
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
57
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Review standards for
conditions of Roads
(National roads and
DUCAR)
Standards for
condition of
Roads (National
roads and
DUCAR)
established
0.2 - - - 0.3
Report on two
training
workshops
prepared
- - - Standards
disseminated;
workshop
reports
prepared
Create a Data base for
the Conditions of
Roads
Data base for the
Conditions of
Roads created
0.5 0.3 - 0.25 -
Five sets
finalized
Five sets of
standards for
road
conditions
printed and
disseminated
- Functioning
data base for
road condition
in place
-
Carry out capacity
Building on the
application of Low
Cost Sealing
Engineering
Standards
Low Cost
Sealing
Engineering
Standards
developed and
disseminated
0.5 0.45 0.6 0.6 0.6
Database
established
Low Cost
Sealing
Engineering
Standards for
Tourism roads
developed
Report on two
training work-
shops for
stakeholders
conducted
2 training
workshops for
Stakeholders
conducted
2 training
workshops for
Stakeholders
conducted
Carry out pavement
evaluation
Report on
pavement
evaluated
0.105 0.11 0.1 0.12
Report
Pavement
Report
Pavement
Report
Pavement
Report
Pavement
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
58
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
evaluation for
100km
conducted
evaluation for
100km
conducted
evaluation for
100km
conducted
evaluation for
100km
conducted
Carry out Technical
Audits
Districts local
government
audited
0.115 0.105 0.11 0.115 0.120
100 Km per
financial year.
40 Local
Government
Audit reports
prepared
40 Local
Government
Audit reports
prepared
40 Local
Government
Audit reports
prepared
40 Local
Government
Audit reports
prepared
Carry out
Environmental and
social Impact
Assessments in the
GKMA
Environmental
and social
Impact
Assessment
(ESIA) carried
out in GKMA
0.15 - - - -
Impact
Statements
prepared and
submitted to
NEMA
- - - -
Undertake
resettlement Action
Plans (GKMA)
Resettlement
Action Plan
prepared for
GKMA
0.1 - 0.1 - 0.1
Resettlement
Action Plan
produced for
selected areas.
- Resettlement
Action Plan
produced for
selected areas.
- Resettlement
Action Plan
produced for
selected areas.
Carry out
Geotechnical
Investigations
Geotechnical
Investigations
carried out.
0.05 - 0.05 - -
Report on
Geotechnical
Investigations
prepared
- Report on
Geotechnical
Investigations
prepared
- -
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
59
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Undertake Material
Testing
Material test
exercise
conducted.
0.1 - - - 0.12
Material test
reports
produced
- - - Material test
reports
produced
Undertake Capacity
building for use of
Low Cost Seals to
Stake holders
Report on
training
workshops held
0.06 0.06 0.065 0.065 0.07
Reports on
training
workshops
held
Reports on
training
workshops
held
Reports on
training
workshops
held
Reports on
training
workshops
held
Reports on
training
workshops
held
Improve the
traffic flow
within the
GKMA
Review railway
Engineering
Standards
Standards
developed and
printed
- 0.25 - - 0.25
- Standards
finalized and
printed
- - Standards
finalized and
printed
Carry out
Geotechnical
Investigations
Three
Geotechnical
Investigations
carried out.
- 0.105 0.11 0.115 -
- Report on
Geotechnical
Investigations
Report on
Geotechnical
Investigations
Report on
Geotechnical
Investigations
-
Undertake Material
Testing
Materials tested - 0.105 0.11 0.115 0.115
- Materials test
reports
produced
Materials test
reports
produced
Materials test
reports
produced
Materials test
reports
produced
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
60
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Increase the
volume of
passenger and
freight cargo
conveyed on the
rail network
Environmental and
Social Impact
assessment and
Resettlement Action
for landing sites
prepared
Environmental
and Social
Impact
Assessments,
Resettlement
Action reports
prepared
0.15 0.15 - -
Three
environmental
and Social
Impact
statement
reports
prepared
- Three
environmental
and Social
Impact
statement
reports
prepared
- -
Undertake
Geotechnical
Investigations on
ferry landing sites
Two
Geotechnical
Investigations
reports prepared
- 0.2 - 0.2 -
- Geotechnical
Investigations
reports
prepared
- Geotechnical
Investigations
reports
prepared
-
Formulate
Resettlement Action
Plans (RAP)
RAP formulated
for selected
affected people
0.2 - 0.2 - 0.2
RAP prepared - RAP prepared - RAP prepared
Increase the
volume of
passenger and
cargo traffic by
air transport
Carry out periodic
Reviews of
Engineering
Standards for runways
and Airport facilities
Engineering
Standards for
runways and
Airport facilities
reviewed
0.35 - - -
Two sets of
engineering
Standards
done
- - -
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
61
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Increase the
volume of
passenger and
cargo traffic by
marine transport
In collaboration with
other line Agencies,
carry out
Environmental and
Social Impact
assessment and
Resettlement Action
Planning
Environmental
and Social
Impact
Assessments
(EIA) conducted
0.2 0.15 0.15 0.15 0.15
Environmental
and Social
Impact
statement
prepared and
submitted to
NEMA
Compliance
monitoring
reports
prepared
Compliance
monitoring
reports
prepared
Compliance
monitoring
reports
prepared
Compliance
monitoring
reports
prepared
Develop guidelines
for oil spill control on
Water bodies
Guidelines for
oil spill control
on Water bodies
developed
- 0.2 0.1 0.1 0.1
- Guidelines for
oil spill
control on
Water bodies
produced
Compliance
monitoring
reports
prepared
Compliance
monitoring
reports
prepared
Compliance
monitoring
reports
prepared
Develop Engineering
Standards for ferry
Landing Sites
Engineering
standards
developed.
0.2 0.25 0.25 0.25 0.25
Sets of
Engineering
standards
printed
Report on
dissemination
workshops
prepared
Report on
dissemination
workshops
prepared
Report on
dissemination
workshops
prepared
Report on
dissemination
workshops
prepared
Carry out
Geotechnical
Investigations on
ferry landing sites
Geotechnical
Investigations
carried out.
0.2 0.1 0.11 0.115 0.12
Geotechnical
Investigations
Geotechnical
Investigations
Geotechnical
Investigations
Geotechnical
Investigations
Geotechnical
Investigations
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
62
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
reports done reports done reports reports done reports done
Mainstream Cross
cutting Issues in the
Transport Sector
policies and
regulatory framework
Guidelines for
mainstreaming
crosscutting
issues developed
and disseminated
0.3 0.315 0.33 0.345 0.36
M&E
indicators for
crosscutting
issues
developed
Reports on
dissemination
workshops
prepared
Reports on
training of
Stakeholders in
mainstreaming
crosscutting
prepared
Reports on
training of
Stakeholders in
mainstreaming
crosscutting
prepared
Reports on
training of
Stakeholders in
mainstreaming
crosscutting
prepared
Strengthen the
National
Construction
Industry
Operationalise and
Establish Drafting bill
for UCICO
Drafting Bill
established.
0.5 - - - -
UCICO bill
produced and
printed
- - - -
Review and
Disseminate the NCI
Policy
NCI policy
reviewed and
established.
0.3 0.315 0.33 0.36 -
NCI Policy
printed and
disseminated
and reports
compiled
NCI Policy
disseminated
and reports
compiled
NCI Policy
disseminated
and reports
compiled
NCI Policy
disseminated
and reports
compiled
-
Study, review and
approve all road
design and Parking
areas/Pavements
Standards and
designs
approved.
0.1 0.105 - - -
Standards and
designs
produced
Standards and
designs
produced
- - -
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
63
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Carry out
Environmental and
social Impact
Assessments
An
Environmental
and social
Impact
Assessment
(ESIA) carried
out proposed
project
0.25 0.25 0.25 0.25 0.25
Impact
Statements
prepared and
submitted to
NEMA
Impact
Statements
prepared and
submitted to
NEMA
Impact
Statements
prepared and
submitted to
NEMA
Impact
Statements
prepared and
submitted to
NEMA
Impact
Statements
prepared and
submitted to
NEMA
Undertake training for
professionals in the
sector and equip them
with up to date
practices in planning,
design, construction
Training
workshops
organized.
0.6 0.6 0.6 0.6 0.6
Reports on the
training
workshops
held
Reports on the
training
workshops
held
Reports on the
training
workshops
held
Reports on the
training
workshops
held
Reports on the
training
workshops
held
Facilitate Research
and material testing
centers
Research and
material testing
centers
supported
0.2 0.21 0.23 0.25 0.25
Renovations
carried out
and equipment
procured
Renovations
carried out
and eqpmt
procured
Research and
material
testing reports
Research and
material
testing reports
Research and
material
testing reports
Establish
Construction
guarantee fund
Construction
guarantee fund
established
3.21 3.735 3.735 1.425 1.425
Functional
guarantee
fund in place
Functional
guarantee
fund in place
Functional
guarantee
fund in place
Functional
guarantee
fund in place
Functional
guarantee
fund in place
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
64
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Roads and Bridges
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Improve the
stock and
quality of road
infrastructure
Collect data on National
roads, District, Urban and
Community Access roads
Data base for
National roads,
District, Urban and
Community Access
roads established
2.6 5.2 5.2 2.6 2.6
-Data base
designed -
Staff trained
and roads
mapped.
Data
collected and
roads
mapped.
Data base for
National
roads and
DUCAR
Established
Data base for
National
roads and
DUCAR
updated
Data base for
National roads
and DUCAR
updated
Determine the national
roads to be upgraded from
gravel to class I & II
bitumen standards and
DUCAR to be worked on
Plan for national
roads and DUCAR
reviewed and
updated
0.1 0.1 0.1 0.1 0.1
Annual plan
for national
roads and
DUCAR
Annual plan
for national
roads and
DUCAR
Annual plan
for national
roads and
DUCAR
Annual plan
for national
roads and
DUCAR
Annual plan for
national roads
and DUCAR
Determine the length of
roads that require
improvement from fair to
good condition
Plans for roads that
require improvement
from fair to good
condition reviewed
0.2 0.1 0.1 0.1 0.1
Annual plan
for roads’
improvement
Annual plan
for roads’
improvement
Annual plan
for roads’
improvement
Annual plan
for roads’
improvement
Annual plan for
roads’
improvement
Determine, plan and
construct strategic roads
leading to major tourism
sites, mining areas, oil and
gas exploration and
production areas, urban
and rural industrial areas
230km roads leading
to major tourism
sites rehabilitated
1.1 1.0 2.5 2.5 2.5
60km roads
leading to
major
tourism sites
rehabilitated
20km roads
leading to
major
tourism sites
rehabilitated
50km roads
leading to
major
tourism sites
rehabilitated
50km roads
leading to
major
tourism sites
rehabilitated
50km roads
leading to
major tourism
sites
rehabilitated
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
65
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
192km roads leading
to mining and oil
exploration areas
rehabilitated
1.0 1.0 2.5 2.5 2.5
22km roads
leading to oil
exploration
and mining
areas
rehabilitated
20km roads
leading to
mining and
oil
exploration
areas
rehabilitated
50km roads
leading to
mining and
oil
exploration
areas
rehabilitated
50km roads
leading to
mining and
oil
exploration
areas
rehabilitated
50km roads
leading to
mining and oil
exploration
areas
rehabilitated
Rehabilitate selected
District, Urban,
Community Access Roads
and Bridges
456km of District
roads rehabilitated
2.8 5.0 5.0 5.5 5.5
56km
District
roads
rehabilitated
100km
District
roads
rehabilitated
100km
District roads
rehabilitated
100km
District
roads
rehabilitated
100km District
roads
rehabilitated
27km Urban roads
rehabilitated under
urban resealing unit
by force account and
Urban councils
monitored
1.04 3.96 3.96 3.96 3.96
3km Urban
roads
rehabilitated
under urban
resealing
unit by force
account and
monitoring
reports
6km Urban
roads
rehabilitated
under urban
resealing
unit by force
account and
monitoring
reports
6km Urban
roads
rehabilitated
under urban
resealing unit
by force
account and
monitoring
reports
6km Urban
roads
rehabilitated
under urban
resealing
unit by force
account and
monitoring
reports
6km Urban
roads
rehabilitated
under urban
resealing unit
by force
account and
monitoring
reports
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
66
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
prepared prepared prepared prepared prepared
25km of urban roads
rehabilitated under
directives and
pledges by
contracting
0.4 4.8 4.8 4.8 4.8
1km of
urban roads
rehabilitated
6km of
urban roads
rehabilitated
6km of urban
roads
rehabilitated
6km of
urban roads
rehabilitated
6km of urban
roads
1200km of
community access
roads rehabilitated
- 4.5 6.0 6.0 6.0
- 150km of
community
access roads
rehabilitated
200km of
community
access roads
rehabilitated
200km of
community
access roads
rehabilitated
200km of
community
access roads
rehabilitated
18 Bridges
Rehabilitated
2.25 4.0 6.0 6.0 6.0
3 Bridges
Rehabilitated
3 Bridges
Rehabilitated
4 Bridges
Rehabilitated
4 Bridges
Rehabilitated
4 Bridges
Rehabilitated
Rehabilitate selected roads
under Interconnectivity
Programme
1100km of roads
rehabilitated
8.2 8.8 8.8 9.0 9.0
300 km of
roads
rehabilitated
320km of
roads
rehabilitated
320km of
roads
rehabilitated
320km of
roads
rehabilitated
320km of roads
rehabilitated
Monitor selected roads 1000km of CAIIP 2.5 2.5 2.5 2.5 2.5
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
67
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
under Community
Agriculture infrastructure
Improvement Programme
(CAIIP)
roads monitored per
FY
Reports on
1000km of
CAIIP roads
supervised
and
monitored
Reports on
1000km of
CAIIP roads
supervised
and
monitored
Reports on
1000km of
CAIIP roads
supervised
and
monitored
Reports on
1000km of
CAIIP roads
supervised
and
monitored
Reports on
1000km of
CAIIP roads
supervised and
monitored
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
68
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Rehabilitate selected roads
under Karamoja Special
Security Programme
450km of roads
rehabilitated under
IDA
2.635 17.0 17.0 17.0 16.0
450km of
roads
designed
90km of
roads
rehabilitated
125km of
roads
rehabilitated
125km of
roads
rehabilitated
110km of roads
rehabilitated
Purchase road equipment
for the Urban resealing
Unit and emergencies
Road equipment
purchased for urban
resealing unit and
emergencies
1.0 3.0 3.0 1.5 1.5
1Motor
grader and 1
wheel loader
1bull dozer
1 vibro roller
1 bitumen
distributor
and
1 excavator
1 crane (40t)
2 tippers
1 vibro roller
1pneumatic
roller
1chip
spreader
1 cargo truck
1 self
loading truck
1water
bowzer
2 tippers
1crane self
loading truck
3 forklifts
(5t,10t,20t)
1wheel
loader
1 water bowzer
1 pneumatic
roller
1chip spreader
1 bitumen
distributer
Repair of all heavy
equipment
Equipment serviced,
repaired and
maintained
0.1 2.0 2.0 0.7 0.7
All
equipment
serviced,
repaired and
maintained
All
equipment
serviced,
repaired and
maintained
All
equipment
serviced,
repaired and
maintained
All
equipment
serviced,
repaired and
maintained
All equipment
serviced,
repaired and
maintained
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
69
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Support MELTC activities
Train students in labor
based activities
125 No. of
contractors trained.
60 Engineers
trained.
120 district non
engineering staff
trained.
3.48 4.0 4.0 4.0 4.0
-25
Contractors
and 12
Engineers
trained
-24 District
Non
Engineering
Staff trained
-25
Contractors
and 12
Engineers
trained
-24 District
Non
Engineering
Staff trained
-25
Contractors
and 12
Engineers
trained
-24 District
Non
Engineering
Staff trained
-25
Contractors
and 12
Engineers
trained
-24 District
Non
Engineering
Staff trained
-25 Contractors
and 12
Engineers
trained
-24 District
Non
Engineering
Staff trained
Increase
efficiency and
improve
effectiveness in
service delivery
of transport
infrastructure
and provision of
transport
services.
Creation of a DUCAR
Agency
DUCAR agency
created
0.5 0.1 0.2 - -
ToR for the
creation of
the DUCAR
agency
Drafting
principles
for the
creation of
the DUCAR
agency
DUCAR
agency
approved by
Parliament
- -
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
70
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Mechanical Engineering Services
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Improve the
stock and
quality of road
infrastructure
Support management of
road maintenance and
construction equipment
(Zonal and Regional
Mechanical Workshops).
District road
equipment
maintained.
1.4 7.0 10.5 12.0 12.5
Equipment
kept at 10%
availability
Equipment
kept at 70%
availability
Equipment
kept at 70%
availability
Equipment
kept at 70%
availability
Equipment
kept at 70%
availability
Develop guidelines on
specifications for road
equipment and vehicles.
A set of guidelines
on specifications for
a basic road unit
developed
- 0.016 0.11 0.4 0.4
- Draft
guidelines
developed
External
consultations
carried out
and final draft
produced
Guidelines
launched
and
disseminated
Quarterly
monitoring
reports on the
usage of
guidelines
Develop guidelines and
standards for garages that
provide
repair/maintenance
services.
A set of guidelines
and classification of
garages developed
- 0.016 0.21 0.4 0.4
- Draft
guidelines
developed
External
consultations
and final draft
produced
Guidelines
launched
and
disseminated
Quarterly
monitoring
reports on the
usage of
guidelines
Provide technical advice
on vehicular waste
management.
Improved
management
practices of waste
products in
mechanical w/shops.
- 0.1 - - -
- Report on two
stakeholder
workshops
held
- - -
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
71
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Provide technical advice
on appropriate disposal
methods.
Improved
management
practices of waste
products in
mechanical w/shops.
- - 0.1 0.3 0.3
- - Report on
waste oil
management
carried out.
Report on
two
campaigns
for MDAs &
general
public done
Report on two
campaigns for
MDAs &
general public
done
Support management of
road maintenance and
construction equipment.
Assessment of
resource
requirements done.
- 0.3 0.2 0.3 0.3
- Resource
assessment
report
complied
Resource
assessment
report
complied
Resource
assessment
report
complied
Resource
assessment
report
complied
Monitor performance of
road equipment.
Usage, utilization
and operation of
road equipment
monitored.
- 0.2 0.22 0.3 0.3
- Report on the
two LGs
monitored
prepared
Report on the
two LGs
monitored
prepared
Report on
the two LGs
monitored
prepared
Report on the
two LGs
monitored
prepared
Increase the
volume of
passenger and
cargo traffic by
marine transport
Carryout delegated
procurement of marine
vessels.
Ferry for Lake
Bisina procured.
0.188 0.04 0.3 0.2 0.2
Assembling
of Lake
Bisina ferry
commenced
Ferry for L.
Bisina
commissioned.
Ferry for L.
Bisina
maintained
and kept at
80%
Quarterly
progress
reports on
initial ferry
operations
Quarterly
progress
reports on
initial ferry
operations
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
72
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
availability prepared prepared
Ferries and ship
procured
- - - - 6.0
- - - - 2 vessels
procured
Study and design for
lake Kyoga ferry
completed.
1.287 - - - -
Study report
produced
- - - -
Operate and maintain MV
Kalangala ship.
MV Kalangala
effectively operated
and maintained.
2.0 3.5 4.0 4.2 4.5
345 days
availability/
operational
345 days
availability/
operational
345 days
availability/
operational
345 days
availability/
operational
345 days
availability/
operational
Provide technical support
on marine infrastructure
matters.
Support supervision
marine rehabilitation
and/or construction
works done.
- 0.06 - - 0.09
- Four
supervision
reports
prepared
- - Four
supervision
reports
prepared
Increase
efficiency and
improve
effectiveness in
the service
delivery of
transport
Strengthen management
of government vehicle
fleet
Policy on
government vehicle
fleet management
0.01 0.02 0.2 0.3 0.3
Policy
submitted to
Cabinet
Policy
approved by
Cabinet
Policy
disseminated
Monitoring
report on
Gov't
vehicle fleet
management
policy
Monitoring
report on Gov't
vehicle fleet
management
policy
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
73
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
infrastructure
and provision of
transport
services.
Spearhead the deployment
and supervision of
Transport Officers.
Technically
competent Transport
Officers (TOs)
deployed to MDAs.
- 0.006 0.1 0.03 0.04
- Concept note
to Ministry of
Public
Service.
formulated
Transport
Officers
recruited and
deployed to
50% MDAs
Minutes of
two
management
meetings
Minutes of
two
management
meetings
Provide technical support
in fleet management and
operation.
Management of
transport during
National &
International
Functions carried
out.
0.04 0.05 0.05 0.05 0.06
80% of
transport
provided and
managed for
national and
international
functions
80% of
transport
provided and
managed for
national and
international
functions
80% of
transport
provided and
managed for
national and
international
functions
80% of
transport
provided &
managed for
national and
international
functions
80% of
transport
provided and
managed for
national and
international
functions
Drivers tested and
certified.
0.015 0.02 0.025 0.035 0.045
100% of
applicants
tested
100% of
applicants
tested
100% of
applicants
tested
100% of
applicants
tested
100% of
applicants
tested
Fleet management
workshop with
Transport Officers
held.
- 0.05 0.05 0.06 0.07
- Workshop
report
Workshop
report
Workshop
report
Workshop
report
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
74
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Inspection / valuation of
vehicles, plant and
machinery carried out.
Valuations/
Assessments carried
out for MDAs
0.05 0.06 0.065 0.08 0.1
100% of
required
inspections
and valuation
reports
prepared
100% of
required
inspections
and valuation
reports
prepared
100% of
required
inspections
and valuation
reports
prepared
100% of
required
inspections
& valuation
reports
prepared
100% of
required
inspections
and valuation
reports
prepared
Assess the status and
performance of
government fleet.
Government vehicle
condition register
annually updated.
0.06 0.3 0.3 0.3 0.45
Annual status
report
Update Gov't
vehicle
condition
rating and
register.
Update Gov't
vehicle
condition
rating and
register.
Update
Gov't
vehicle
condition
rating and
register.
Update Gov't
vehicle
condition
rating and
register.
Conduct a census of
government vehicle fleet.
Census of
government vehicles
coordinated.
0.565 - - 0.6 -
Vehicle
census report
- - Vehicle
census
report
-
Support capacity building
activities in fleet
management and general
engineering issues
Equipment operators
and technicians
trained.
0.2 0.02 0.2 0.2 0.3
Report on 30
Equipment
operators and
technicians
Training needs
assessment
report
Report on
two training
workshops
for MDAs
Report on
two training
workshops
for MDAs
Report on two
training
workshops for
MDAs
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
75
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
trained prepared prepared prepared
Apprentices and
interns trained.
0.03 0.03 0.03 0.03 0.04
Report on
30-50
trainees
trained
Report on 30-
50 trainees
trained
Report on 30-
50 trainees
trained
Report on
70-100
trainees
trained
Report on 100
-150 trainees
trained
Mechanical
engineering
computer research
laboratory set up.
- - 0.1 - 0.85
- - Assessment
requirement
report
produced
- Mechanical
engineering
research
laboratory
established.
Operation and
maintenance of Ministry
vehicles and government
Protocol fleet.
Ministry vehicles
and government
Protocol fleet
effectively
maintained.
0.421 1.0 1.2 1.4 1.4
50%
availability
of Ministry
vehicle fleet
70%
availability of
Ministry
vehicle fleet
70%
availability of
Ministry
vehicle fleet
70%
availability
of Ministry
vehicle fleet
70%
availability of
Ministry
vehicle fleet
0.149 0.5 0.5 0.8 0.9
55%
availability
of protocol
vehicle fleet
80%
availability of
protocol
vehicle fleet
80%
availability of
protocol
vehicle fleet
80%
availability
of protocol
vehicle fleet
95%
availability of
protocol
vehicle fleet
Upgrade existing New workshop 0.293 0.5 0.35 0.5 1.0
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
76
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
workshop technology. equipment procured. Contract to
upgrade the
vehicle
servicing/tyre
centre signed
10% of
workshop
equipment
upgraded
15% of
workshop
equipment
upgraded
25% of
workshop
equipment
upgraded
45% of
workshop
equipment
upgraded
Improve occupation,
safety and health practices
in mechanical workshops.
Protective wear for
staff procured.
0.097 0.12 - 0.15
Protective
wear
materials
procured
Protective
wear
materials
procured
- Protective
wear materials
procured
Procurement of Ministry
vehicles and equipment.
Supervision and/or
pool vehicles
procured.
- 0.2 0.5 0.2 0.22
- Two vehicles
procured
Five vehicles
procured
Two
vehicles
procured
Two vehicles
procured
Procurement of
vehicles for MoWT
Departments done.
- - - - -
- 100%
Contracts
signed and
MVs supplied.
100%
Contracts
signed and
MVs
supplied.
100%
Contracts
signed &
MVs
supplied.
100%
Contracts
signed and
MVs supplied.
Emergency /
specialized
equipment procured.
- 1.0 1.0 1.5 1.1
- 2 equipment
procured
2 equipment
procured
3 equipment
procured
2 equipment
procured
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
77
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Finance and Administration
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Administration
Increase
efficiency and
improve
effectiveness
in the service
delivery of
transport
infrastructure
and provision
of transport
services.
Strengthen
institutional
and
administrative
services
Administrative
expenses and
operational
costs cleared.
2.66 2.92 3.22 3.55 3.9
Security,
cleaning,
stationery,
furniture, office
equipment and
consumables,
utilities, Fuel,
oil & Lubricants
provided
Security,
cleaning,
stationery,
furniture, office
equipment and
consumables,
utilities, Fuel, oil
& Lubricants
provided
Security,
cleaning,
stationery,
furniture, office
equipment and
consumables,
utilities, Fuel, oil
& Lubricants
provided
Security,
cleaning,
stationery,
furniture, office
equipment and
consumables,
utilities, Fuel, oil
& Lubricants
provided
Security,
cleaning,
stationery,
furniture, office
equipment and
consumables,
utilities, Fuel, oil
& Lubricants
provided
1.8 1.93 2.13 2.34 2.57
Non procurable
administrative
inputs provided
Non procurable
administrative
inputs provided
Non procurable
administrative
inputs provided
Non procurable
administrative
inputs provided
Non procurable
administrative
inputs provided
Formulate a
client charter
Client charter
developed and
disseminated
0.20
- Disseminate
Client Charter
- - -
Finance
Strengthen
Financial
management
practices
Payments
effected on
time
0.3 0.3 0.3 0.3 0.3
All approved
claims and tax
invoices paid
All approved
claims and tax
invoices paid
All approved
claims and tax
invoices paid
All approved
claims and tax
invoices paid
All approved
claims and tax
invoices paid
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
78
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Reports
prepared and
submitted to
MoFPED
(monthly,
quarterly and
annually)
0.15 0.15 0.15 0.15 0.15
Weekly,
monthly, bi-
annual and
annual reports
prepared.
Weekly,
monthly, bi-
annual and
annual reports
prepared.
Weekly,
monthly, bi-
annual and
annual reports
prepared.
Weekly,
monthly, bi-
annual and
annual reports
prepared.
Weekly,
monthly, bi-
annual and
annual reports
prepared.
All Funds
Accounted for
within the
quarter of issue
0.2 0.2 0.2 0.2 0.2
Accountabilities
done within the
quarter.
Accountabilities
done within the
quarter.
Accountabilities
done within the
quarter.
Accountabilities
done within the
quarter.
Accountabilities
done within the
quarter.
Budget ceilings
effected and
funds utilized
as budgeted
0.1 0.1 0.1 0.1 0.1
Quarterly cash
limits prepared
Quarterly cash
limits prepared
Quarterly cash
limits prepared
Quarterly cash
limits prepared
Quarterly cash
limits prepared
Human Resource Management
Ministry
Performance
reviewed
Monthly
meetings held
0.05 0.05 0.05 0.05 0.05
Minutes
produced
Minutes
produced
Minutes
produced
Minutes
produced
Minutes
produced
Quarterly
monitoring
carried out.
0.15 0.15 0.15 0.15 0.15
Quarterly
reports prepared
Quarterly reports
prepared
Quarterly reports
prepared
Quarterly reports
prepared
Quarterly reports
prepared
Strengthen
Human
Staff recruited 0.035 0.035 0.02 0.02 0.025
No. of staff No. of staff No. of staff No. of staff No. of staff
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
79
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Resources
Management
recruited recruited recruited recruited recruited
Staff salaries
paid by 28th
of
every month
4.26 4.9 5.56 5.82 6.11
All staff on
payroll paid by
28th of the month
All staff on payroll
paid by 28th of the
month
All staff on payroll
paid by 28th of the
month
All staff on payroll
paid by 28th of the
month
All staff on payroll
paid by 28th of the
month
Ministry
Performance
reviewed
0.2 0.25 0.25 0.25 0.25
Minutes of the
Quarterly
performance
review
meetings held
Minutes of the
Quarterly
performance
review meetings
held
Minutes of the
Quarterly
performance
review meetings
held
Minutes of the
Quarterly
performance
review meetings
held
Minutes of the
Quarterly
performance
review meetings
held
Staff
performance
appraisal
conducted
0.1 0.1 0.1 0.1 0.1
95 % of staff
appraised
95 % of staff
appraised
95 % of staff
appraised
95 % of staff
appraised
95 % of staff
appraised
Staff trained
75% of planned
staff trained
75% of planned
staff trained
75% of planned
staff trained
75% of planned
staff trained
75% of planned
staff trained
Staff
professionalism
facilitated
35% of staff professionalized
35% of staff
professionalized
35% of staff
professionalized
35% of staff
professionalized
35% of staff
professionalized Staff welfare 0.1 0.1 0.2 0.15 0.15
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
80
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16 managed 100% of
HIV/AIDS
infected staff
(who open up)
offered medical
assistance
100% of
HIV/AIDS
infected staff
(who open up)
offered medical
assistance
100% of
HIV/AIDS
infected staff
(who open up)
offered medical
assistance
100% of
HIV/AIDS
infected staff
(who open up)
offered medical
assistance
100% of
HIV/AIDS
infected staff
(who open up)
offered medical
assistance
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
81
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Staff records and
other records
managed
0.04 0.04 0.025 0.025 0.025
90% of all
records
managed
according to the
Basic Registry
Procedure
Manual
90% of all
records managed
according to the
Basic Registry
Procedure
Manual
90% of all
records managed
according to the
Basic Registry
Procedure
Manual
90% of all
records managed
according to the
Basic Registry
Procedure
Manual
90% of all
records managed
according to the
Basic Registry
Procedure
Manual
Staff deployed to
meet manpower
demands
0.02 0.02 0.03 0.035 0.05
Offices
appropriately
staffed
Offices
appropriately
staffed
Offices
appropriately
staffed
Offices
appropriately
staffed
Offices
appropriately
staffed
Staff disciplinary
matters handled
0.025 0.025 0.025 0.025 0.025
All errant
officers
disciplined;
Disciplinary
Committee
reports
All errant
officers
disciplined;
Disciplinary
Committee
reports
All errant
officers
disciplined;
Disciplinary
Committee
reports
All errant
officers
disciplined;
Disciplinary
Committee
reports
All errant
officers
disciplined;
Disciplinary
Committee
reports
Staff reward
system
implemented
0.2 0.2 0.2 0.2 0.2
All deserving
officers
All deserving
officers rewarded
All deserving
officers rewarded
All deserving
officers rewarded
All deserving
officers rewarded
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
82
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
rewarded
Information and Public Relations
Development
of a
Communication
Strategy to
boost the
Ministry’s
image
Ministry of
Works and
Transport
Communication
Strategy (CS)
developed to
improve the
image of the
Ministry
0.06 0.1 0.1 0.1 0.1
Communication
strategy in place
by May 2012
Strategy
disseminated
Annual
implementation
report for the CS
produced
Annual
implementation
report for the CS
produced
Annual
implementation
report for the CS
produced
Increased public
awareness about
the Ministry’s
work and mandate
0.3 0.4 0.5 0.5 0.5
Communication
products put in
local media
Communication
products put in
local media
Communication
products put in
local media
Communication
products put in
local media
Communication
products put in
local media
Designing a
monitoring and
evaluation
framework for
media and
public relation
management
Monitoring and
evaluation
framework for
public relations
and media
management
- 0.1 - - -
- Monitoring and
evaluation
framework
developed
- - -
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
83
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Design a social
corporate
responsibility
plan for the
Ministry
Ministry Social
Corporate
Responsibility
Plan developed
- 0.04 0.3 0.2 0.2
- Draft Plan
produced
Approved Plan in
place
Reports on Plan
implementation
Reports on Plan
implementation
Design, install,
maintaining an
Interactive
Voice
Response
System for
Customer care
Operational
Interactive Voice
Response System
installed
- - 0.3 0.1 0.1
- - Interactive Voice
Response System
in place designed
and operational
Interactive Voice
Response System
maintained
Interactive Voice
Response System
maintained
Information and Communication Technology
Strengthen
information
management
ICT
implementation
strategy prepared
0.2 0.25 - - -
ICT
implementation Strategy prepared
Strategic Plan for
ICT prepared and
approved
- - -
Voice/Data
network built and
LAN assessment
and optimization
for different
- 2.32 1.282 0.888 0.587
- ICT soft ware
and hard ware
procured
Disaster recovery
solutions
developed
Service level
agreements
prepared and
servers
MoWT network
implemented
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
84
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
branches virtualized
Procurement and Disposal Unit
Strengthen
procurement
management
Consolidated
Procurement Plan
prepared and
submitted to
PPDA and
MoFPED
0.02 0.02 0.025 0.025 0.025
2011/12
Procurement
plan prepared
2012/13
Procurement plan
prepared
2013/12
Procurement plan
prepared
2014/15
Procurement plan
prepared
2015/16
Procurement plan
prepared
Bidding
documents
prepared and
approved by
Contracts
Committee
0.02 0.02 0.025 0.025 0.025
Approved Bid
documents
Approved Bid
documents
Approved Bid
documents
Approved Bid
documents
Approved Bid
documents
Bid opportunities
advertised or
invitations issued
0.05 0.055 0.06 0.065 0.07
Number of
Contracts
awarded
Number of
Contracts
awarded
Number of
Contracts
awarded
Number of
Contracts
awarded
Number of
Contracts
awarded
User departments 0.04 0.04 0.04 0.045 0.045
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
85
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
and bidders
informed of
Contracts
Committee
decisions
Reports on
Contracts
Committee
decisions issued
Reports on
Contracts
Committee
decisions issued
Reports on
Contracts
Committee
decisions issued
Reports on
Contracts
Committee
decisions issued
Reports on
Contracts
Committee
decisions issued
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
86
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
All Notification
of Award Letters,
Draft Contract
Agreements
prepared and
endorsed
0.03 0.03 0.03 0.03 0.03
Award Letters,
Draft Contract
Agreements
endorsed
Award Letters,
Draft Contract
Agreements
endorsed
Award Letters,
Draft Contract
Agreements
endorsed
Award Letters,
Draft Contract
Agreements
endorsed
Award Letters,
Draft Contract
Agreements
endorsed
Monthly,
Quarterly and
Annual
procurement
reports prepared
and submitted to
users
0.03 0.03 0.03 0.03 0.03
Procurement
reports prepared
Procurement
reports prepared
Procurement
reports prepared
Procurement
reports prepared
Procurement
reports prepared
All procurements
recorded,
referenced,
archived.
0.04 0.04 0.04 0.04 0.04
A functional
records
management
system in place
A functional
records
management
system in place
A functional
records
management
system in place
A functional
records
management
system in place
A functional
records
management
system in place
All procurement
documents are
verified before
submission to
Contracts
0.03 0.03 0.03 0.03 0.03
Verified
procurement
documents
Verified
procurement
documents
Verified
procurement
documents
Verified
procurement
documents
Verified
procurement
documents
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
87
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Committee.
All Local
Purchase Orders
prepared in
accordance to the
availability of
funds.
0.04 0.04 0.045 0.045 0.045
Local Purchase
Orders cleared
Local Purchase
Orders cleared
Local Purchase
Orders cleared
Local Purchase
Orders cleared
Local Purchase
Orders cleared
PPDA consulted
on procurement
issues and
information
requested by
PPDA submitted.
0.01 0.01 0.01 0.01 0.01
Functional PDU Functional PDU Functional PDU Functional PDU Functional PDU
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
88
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Public Structures
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Increase efficiency
and improve
effectiveness in the
service delivery of
transport
infrastructure and
provision of
transport services.
Improve delivery and
coordination of
services in the Sector
MoWT central office
headquarters constructed
MoWT
central office
headquarters
constructed
MoWT central
office
headquarters
constructed
MoWT central
office
headquarters
constructed
MoWT central
office
headquarters
completed
Strengthen the
National Construction
Industry
Operationalize the
National Construction
Industry Policy
UCICO law formulated
and disseminated
0.3 0.2 0.2 0.2 0.2
UCICO law
formulated
UCICO law
approved by
Parliament
Reports
prepared on
dissemination
of UCICO law
Reports
prepared on
dissemination
of UCICO law
Reports
prepared on
dissemination
of UCICO law
Review the National
Construction standards
and disseminate them
effectively
Updated Standards
disseminated
0.1 0.1 0.1 0.1 0.1
Updated
Standards
Updated
Standards
Reports on
Standards
disseminated
Reports on
Standards
disseminated
Reports on
Standards
disseminated
Expedite the Building control laws 0.3 0.2 0.2 0.2 0.2
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
89
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
formulation and
enactment of building
laws
formulated and
disseminated
Building control
laws formulated
Building
control laws
disseminated
Building
control laws
disseminated
Building
control laws
disseminated
Building
control laws
disseminated
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
90
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Formulate and
disseminate building
regulation, codes and
guidelines
Building Regulation,
Codes and Guidelines
formulated and
disseminated
0.1 0.1 0.1 0.1 0.1
Building
Regulation,
Codes and
Guidelines
formulated
Reports on
Building
Regulation,
Codes and
Guidelines
disseminated
Reports on
Building
Regulation,
Codes and
Guidelines
disseminated
Reports on
Building
Regulation,
Codes and
Guidelines
disseminated
Reports on
Building
Regulation,
Codes and
Guidelines
disseminated
Strengthen the
enforcement
mechanism of
approvals of Plans,
quality assurance and
inspection in the
building industry
150 Annual assessment
and investigative reports
issued out
0.15 0.15 0.15 0.15 0.15
30 Annual
assessment and
investigative
reports issued
out
30 Annual
assessment
and
investigative
reports issued
30 Annual
assessment
and
investigative
reports issued
30 Annual
assessment
and
investigative
reports issued
30 Annual
assessment
and
investigative
reports issued
Promote certification
and adherence to
building regulation
and codes
70% of public buildings
with approved plans
0.2 0.25 0.28 0.3 0.3
70% of public
buildings with
approved plans
70% of public
buildings
with
approved
plans
70% of public
buildings with
approved
plans
70% of public
buildings with
approved
plans
70% of public
buildings with
approved
plans
Initiate and support
leasing mechanism for
contractors
Annual grant provided to
UCICO
- 0.5 0.5 0.5 0.5
- Annual grant
provided to
UCICO
Annual grant
provided to
UCICO
Annual grant
provided to
UCICO
Annual grant
provided to
UCICO
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
91
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Ensure availability of
Technical data for
planning, design,
construction and
maintenance purposes
Reviewed Technical
specifications
disseminated annually
0.3 0.3 0.3 0.3 0.3
Report on
stakeholder
dissemination
workshops
Report on
stakeholder
dissemination
workshops
Report on
stakeholder
dissemination
workshops
Report on
stakeholder
dissemination
workshops
Report on
stakeholder
dissemination
workshops
Undertake training for
all professionals in the
sector and equip them
with up to date
practices in planning,
design, construction
and maintenance
a) 30 persons annually
trained
b) In-service
workshops
conducted
0.15 0.15 0.15 0.15 0.15
Report on 30
persons
annually trained
Report on 30
persons
annually
trained
Report on 30
persons
annually
trained
Report on 30
persons
annually
trained
Report on 30
persons
annually
trained
0.5 0.5 0.5 0.5 0.5
Reports on In-
service
workshops
conducted
Reports on
In-service
workshops
conducted
Reports on In-
service
workshops
conducted
Reports on In-
service
workshops
conducted
Reports on In-
service
workshops
conducted
Provide regular
technical advise to the
public/private sector
players
50 building works
assessment reports
issued out annually
0.5 0.5 0.5 0.5 0.5
50 building
works
assessment
reports issued
50 building
works
assessment
reports issued
50 building
works
assessment
reports issued
50 building
works
assessment
reports issued
50 building
works
assessment
reports issued
Ensure efficient and
safe working
environment for public
and private sector
50% public buildings
supervised and reports
prepared
0.2 0.2 0.2 0.2 0.2
Supervision
reports prepared
Supervision
reports
prepared
Supervision
reports
prepared
Supervision
reports
prepared
Supervision
reports
prepared
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
92
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Provide technical
advice to Ministries,
Departments,
Agencies (MDAs),
and the private sector
in planning, design,
construction and
maintenance of public
structures
i) Client sensitization
on the Ministry’s
services carried out
ii) Venues for national
functions prepared
iii) Assessment /
technical advisory
reports prepared and
issued
0.5 0.5 0.5 0.5 0.5
-Client Charter
disseminated to
MDAs and the
public
-12 venues
-Quarterly
reports prepared
-Client
Charter
disseminated
to MDAs and
the public
-12 venues
-Quarterly
reports
prepared
-Client
Charter
disseminated
to MDAs and
the public
-12 venues
-Quarterly
reports
prepared
-Client
Charter
disseminated
to MDAs and
the public
-12 venues
-Quarterly
reports
prepared
-Client
Charter
disseminated
to MDAs and
the public
-12 venues
-Quarterly
reports
prepared
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
93
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Policy and Planning
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Increase efficiency and
improve effectiveness in the
service delivery of transport
infrastructure and provision
of transport services.
Strengthen the
coordination
mechanism within the
sector and establish a
national transport
databank
Transport sector
data management
system established
and implemented
4.0 4.5 3.5 3 2.8
Sector
statistical plan,
M&E policy
and framework
finalized
TSDMS
Hardware/soft
ware procured
TSDMS
operationalised.
National vehicle
census
undertaken
Joint M&E
surveys
undertaken
TSDMS
maintained
Joint M&E
surveys
undertaken
Year book
published
Joint M&E
surveys
undertaken
Year book
published
Improve coordination
of institution planning
through informing the
SWG to incorporate
key Sector affected and
those that contribute to
the transport sector.
Sector Working
Group (SWG) and
Technical
Working Group
(TWG) meetings
held
0.3 0.5 0.5 0.5 0.5
-Minutes of 10
SWG meetings
held
- Minutes of
12 TWGs
meetings held
-Minutes of 8
SWG meetings
held
- Minutes of 48
TWGs meetings
held
-Minutes of
10 SWG
meetings held
- Minutes of
48 TWGs
meetings held
-Minutes of
10 SWG
meetings
held
- Minutes of
48 TWGs
meetings
held
-Minutes of
10 SWG
meetings
held
- Minutes of
48 TWGs
meetings
held
Sector Coordination
Strengthened
JTSR and the
Midterm Review
organized
0.55 0.6 0.65 0.7 0.75
JTSR and the
Midterm
Review
organized
JTSR and the
Midterm
Review
organized
JTSR and the
Midterm
Review
organized
JTSR and the
Midterm
Review
organized
JTSR and
the Midterm
Review
organized
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
94
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Key Policy documents
produced
Policy papers
prepared including
BFP, MPS.
0.4 0.45 0.5 0.5 0.5
Policy papers
prepared
including BFP,
MPS.
Policy papers
prepared
including BFP,
MPS.
Policy papers
prepared
including
BFP, MPS.
Policy papers
prepared
including
BFP, MPS.
Policy papers
prepared
including
BFP, MPS.
Sector
contribution to the
H.E President’s
State of the Nation
Address and
Budget Speech
Sector
contribution to
the H.E
President’s
State of the
Nation Address
and Budget
Speech
Sector
contribution to
the H.E
President’s State
of the Nation
Address and
Budget Speech
Sector
contribution
to the H.E
President’s
State of the
Nation
Address and
Budget
Speech
Sector
contribution
to the H.E
President’s
State of the
Nation
Address and
Budget
Speech
Sector
contribution
to the H.E
President’s
State of the
Nation
Address and
Budget
Speech
National Transport
Policy and
Strategy
developed
0.6 0.7 0.5 0.5 0.5
National
Transport
Policy and
Strategy
developed
Policy launched
and
disseminated
Policy
recommendati
on
implemented
Policy
recommendat
ion
implemented
Policy
recommenda
tion
implemented
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
95
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
96
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output Budget (bn UGX) / Annual Milestones
2011/12 2012/13 2013/14 2014/15 2015/16
Preparation of
other Policy
documents
backstopped.
0.1 0.1 0.1 0.1 0.1
Preparation of
other Policy
documents
backstopped.
Preparation of
other Policy
documents
backstopped.
Preparation of
other Policy
documents
backstopped.
Preparation
of other
Policy
documents
backstopped.
Preparation of
other Policy
documents
backstopped.
- 0.1 0.1 - -
- Rural Transport
Policy prepared
Rural
Transport
Policy
formulated
- -
Coordination
office for NTMP
Setup.
NTMP M&E
framework
developed.
0.85 0.85 1.5 0.1 0.1
Implementation
of NTMP
activities
monitored
Implementation
of NTMP
activities
monitored
NTMP
midterm
review
undertaken
Implementati
on of NTMP
activities
monitored
Implementatio
n of NTMP
activities
monitored
MoWT Five year
Strategic Plan
formulated.
0.2 0.3 0.3 0.3 0.3
Annual review
of MoWT Five
year Strategic
Plan carried out
Annual review
of MoWT Five
year Strategic
Plan carried out
Midterm
review of
MoWT Five
year Strategic
Plan carried
out
Annual
review of
MoWT Five
year
Strategic
Plan done
Final
evaluation and
formulation of
a new S/Plan
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
97
____________________________________________________________________________________________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
Objective Intervention Output s
2011/12 2012/13 2013/14 2014/15 2015/16
Sector performance
reports produced
Performance
reports availed
(Quarterly,
Midyear and
Annual)
0.3 0.3 0.3 0.3 0.3
Performance
reports availed
(Quarterly,
Midyear and
Annual)
Performance
reports availed
(Quarterly,
Midyear and
Annual).
Performance
reports
availed
(Quarterly,
Midyear and
Annual).
Performance
reports
availed
(Quarterly,
Midyear and
Annual).
Performance
reports
availed
(Quarterly,
Midyear and
Annual).
98 | P a g e
Annex 2: CLIENT CHARTER
1.0 INTRODUCTION
This Client Charter presents the Commitments of the Ministry of Works and Transport in
delivery of services to its clients and the public. It provides the Ministry’s mandate,
vision, mission, principle services, key result areas and commitments. The Charter
outlines its clients, accountability framework, procedures to be followed in handling
complaints and feedback mechanisms.
The Ministry’s Mandate is to:
a) Plan, develop and maintain an economic, efficient and effective transport
infrastructure;
b) Plan, develop and maintain economic, efficient and effective transport services by
road, rail, water, air and pipeline;
c) Manage Public works including government structures and;
d) Promote good standards in the construction industry
Vision
To provide reliable and safe works, transport infrastructure and services.
Mission
To promote adequate, safe and well maintained Works and Transport Infrastructure and
Services for Social Economic Development of Uganda.
Our Mission is, “To provide effective leadership, policy guidance, quality assurance,
regulation and oversight by adhering to professionalism and integrity for socio-economic
development of the country”.
2.0 VALUES AND PRINCIPLES
The values and principles that guide and commit the staff of the Ministry of Works and
Transport to the above Mandate, Vision and Mission in providing services are as stated
below.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
99
______________________________________________________________________________
______________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
l) Professionalism: We shall adhere to the defined rules, standards and guidelines of
the respective disciplines, exhibiting professionalism, competence and honesty.
m) Integrity: We shall show the highest standards of integrity and shall not place
ourselves under any financial or other obligations to individuals or organizations
that might seek to compromise our professional behaviour in performance of our
duties.
n) Quality Assurance: We shall put in place measures and mechanisms that will ensure
our clients deliver/receive quality services and works within budget and time.
o) Selflessness: We shall put public interest above personal interest without
consideration of any financial or material benefit and gain.
p) Objectivity: We shall make decisions based on merit, researched information,
professional codes and other codes of good practice.
q) Customer/Client focus: We shall put the interests of our customers/clients as our
first priority. We shall always seek to meet our customers’ needs and expectations.
r) Partnership: We shall engage our partners in planning, designing, implementing,
monitoring and evaluating our programmes and Projects.
s) Optimal use of resources: We shall optimally use resources in the attainment of the
Ministry objectives and targets.
t) Transparency and Accountability: We shall be transparent and accountable for
our decisions, actions and inactions.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
100
______________________________________________________________________________
______________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
u) Responsiveness: We shall respond to our clients effectively and efficiently when
called upon.
v) Impartiality: We shall provide services to all clients without discrimination on the
basis of gender, race, colour and religion or creed or ideological orientation or
social status.
3.0 KEY RESULT AREAS AND COMMITMENTS
3.1 Key Results Areas
The Ministry’s Key Result Areas are:
a) National Policies, Plans, Standards, Laws and Regulations formulated;
b) National Policies, Standards, Laws and Regulations enforced;
c) National Transport Data disseminated ;
d) Safety of public transport service vehicles and inland water vessels improved
e) Performance of agencies monitored and evaluated;
f) Technical support to Ministries, Departments and Agencies provided; and
g) Research on local construction materials and technologies undertaken
3.2. Commitments
The Ministry of Works and Transport commits itself to the following:
a) Finance and Administration
We shall:
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
101
______________________________________________________________________________
______________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
i) Build Staff Capacity and professionalism;
ii) Prepare and implement the ministry’s communication strategy
iii) Ensure safe custody, proper utilization and accountability for all Public funds
and assets;
iv) Provide Management Support Services;
v) Ensure goods and services are procured, and ministry assets disposed of in
accordance with the law and good practices; and
vi) Ensure bills/Invoice/Certificates are paid/ settled within 30 days after
submission of full verification and certification.
b) Policy and Planning
We shall:
i) Coordinate and analyze strategic policy options to guide the Ministry programmes
and projects;
ii) Liaise with other Government Ministries in developing and analyzing cross-
sectoral policies and issues for guidance in the Ministry;
iii) Coordinate the preparation of the major policy statements namely: Medium
Term Expenditure Framework and Ministerial Budget Policy statement;
iv) Monitor and evaluate the implementation and carry out regulatory impact
assessment of major policies in the Ministry;
v) Coordinate and monitor Works and Transport sub-sector performance; and
vi) Collect, process, analyze, interpret store and disseminate data on all modes of
transport for strategic planning.
c) Public Structures
We shall:
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
102
______________________________________________________________________________
______________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
i) Plan, monitor and evaluate Building Construction Projects within budget and
time;
ii) Check and approve Tender and Contract documents for adoption within 30
calendar days;
iii) Formulate, review, enforce and monitor building construction Laws, Policies,
Standards and Regulations to ensure observance of quality, safety and
standards; and
iv) Supervise and manage Consultancy Services contracts and building works
contracts under MDAs to ensure quality, safety and standards.
d) Construction Standards and Quality Management
We shall:
i) Undertake research and materials testing
ii) Develop adequate engineering specifications and standards;
iii) Promote good standards in the construction industry; and
iv) Promote integration of crosscutting issues namely; Environment, Gender,
HIV/AIDS, Occupational Health and Safety and Disability in the sector.
e) Roads and Bridges
We shall:
i) Monitor and evaluate performance of agencies, authorities, local governments
involved in the development and maintenance of road infrastructure;
ii) Formulate policies and guidelines for the development and maintenance of
road infrastructure;
iii) Regulate agencies, authorities, local governments involved in the
development and maintenance of road infrastructure;
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
103
______________________________________________________________________________
______________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
iv) Collaborate with agencies, authorities, local governments involved in the
development and maintenance of road infrastructure; and
v) Monitor and evaluate surveys, demarcation, and acquisition of land titles,
marking and protection of road reserves for transport projects for existing and
future Road Infrastructure to avoid large amounts of compensations.
f) Mechanical Engineering Services
We shall:
i) Inspect Government vehicles and equipment for condition assessment and onward
advice as to future usage;
ii) Maintain and manage Government vehicle/equipment inventory database;
iii) Evaluate equipment and vehicles for procurement, arbitration or disposal
purposes;
iv) Guide in setting policies and standards for models/makes of vehicles for
government usage;
v) Set standards and requirements for private garages/workshops that repair
government vehicles and equipment; and
vi) Assist the Districts in procurement planning and managing the maintenance
of their road equipment.
g) Transport Regulation
We shall:
i) Initiate and develop transport policies, strategies and regulations to ensure
effective, efficient and safe transport services;
ii) Monitor and advise on effective enforcement of transport legislation;
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
104
______________________________________________________________________________
______________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
iii) Oversee investigations into causes of accidents and advise on mitigation
measures;
iv) Oversee sensitization programmes of the public about safety and discipline in
the transport industry;
v) Oversee performance of CAA ,TLB, NRSC so as to ensure compliance with
the legislation; and
vi) Co-ordinate formulation and implementation of bilateral, regional and
international agreements to enhance safety of transport in liaison with other
respective countries and organizations.
h) Transport Services and Infrastructure
We shall:
i) Undertake studies and engineering designs for rail, water and air transport modes;
ii) Implement plans for transport services and infrastructure for all modes of
transport (Road, Rail, Water and Air);
iii) Carry out research to identify requirements for development and
improvement of transport services and Infrastructure;
iv) Assess the impact of modes of transport in respect to socio-economic
development and poverty eradication in the country;
v) Formulate, Assess and evaluate the cost of transport services in terms of
tariffs and user charges in the Transport Sector;
vi) Monitor and evaluate the performance of Public Corporations in the Sub-
sector (Uganda Railways Corporation, Rift Valley Railways and Civil
Aviation Authority) to ensure efficiency and adherence to standards; and
vii) Promote collaboration linkages and liaising with Regional and International
Organizations concerned with provision of transport services and
Infrastructure.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
105
______________________________________________________________________________
______________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
4.0 CLIENT RIGHTS, EXPECTATIONS AND OBLIGATIONS
4.1 The Clients
Our Clients include but are not limited to the following:
a) The Parliament;
b) Development Partners;
c) Staff of the Ministry;
d) Ministries, Departments, Parastatals, Authorities Agencies and Local Governments;
e) Professional bodies;
f) Suppliers of Goods and Providers of Services/ Works;
g) Investors and Private Sector Operators;
h) Institutions of Learning;
i) Non Governmental Organizations/ Civil Society Organizations; and
j) Media; and
k) General Public;
4.2 Client Rights
Our Clients have a right to:
a) Services in accordance with the existing contractual obligations, regulations and
guidelines;
b) Timely response to issues raised;
c) Technical guidance and advise;
d) Access to information, regular reporting and accountability within the prescribed
law;
e) Confidentiality of information;
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
106
______________________________________________________________________________
______________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
f) Participation or representation in development of policies, systems and programs;
and
g) Know the user fees as per the fees structure.
4.3 Client Expectations
Our Clients shall expect the following from us:-
a) to be treated with respect and courtesy;
b) timely payment for goods supplied, services provided and works executed;
c) adequate and timely attention and response to issues and concerns raised;
d) confidentiality of information that relate to specific transactions in line with the
law;
e) timely, accurate and well presented policy advice; and
f) easy access by authorized persons to entitled information within the agreed
guidelines.
We shall serve our clients from Monday to Friday (Except on designated Public
Holidays) during the normal working hours as indicated below:-
Time: 8.00 am -12.45 pm.
2.00 pm – 5.00 pm.
4.4 Client Obligations
Our Clients shall have the following obligations:
a) Comply with the Laws, Regulations, Policies and Guidelines;
b) Provide correct and timely Information as may be required by the Ministry;
c) Be knowledgeable on regulations and laws relating to the Services they require;
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
107
______________________________________________________________________________
______________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
d) Participate in scheduled policy fora and workshops;
e) Mutual respect for staff and orderliness in offices;
f) Participate in the formulation, implementation, evaluation and sustainability of
programs; and
g) Provide goods and services that conform to set standards.
5.0 FEEDBACK AND COMPLAINTS PROCEDURES
5.1 Feedback Mechanisms
Clients shall provide feedback on our services through the following mechanisms:
a) Stakeholder meetings or conferences and technical review meetings;
b) Supervision and monitoring visits;
c) Periodic Performance Reports;
d) Telephone , e-mail and the Ministry Website;
e) The Ministry Public Relations Office; and
f) Writing to us through the following address;
Ministry of Works and Transport,
P.O. Box 10,
Telephone: 256-41-320101/9
Fax: 256-41-320135
E-Mail: [email protected]
5.2 Complaints Procedures
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
108
______________________________________________________________________________
______________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
The Ministry of Works and Transport is accountable to the Public for the Services it
offers, and has put in place the following procedure for handling complaints and
obtaining feedback from the clients:
a) Raise the complaint with the officer concerned;
b) Consult the Public Relations Office;
c) If no satisfactory response is obtained through (a) and (b) above, consult the Client
Charter Officer (Principal Personnel Officer) who will guide you on the next course
of action;
d) Write to us using the address given at the end of this document;
e) Call or fax on the numbers given at the end of this document; and
f) Use our website.
5.3 Appeal Mechanism
If you are not satisfied with the response from the action officer attending to you, or with
the way your complaint is handled, you may refer to:
a) The Head of Department;
b) The Director; and
c) The Permanent Secretary.
In case you are not satisfied with the appeal process at the Ministry of Works and
Transport, you may seek redress from the Head of Public Service and Secretary to
Cabinet, Office of the President.
MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________
109
______________________________________________________________________________
______________________________
Vision- To provide reliable and safe works, transport infrastructure and services.
6.0 ACCOUNTABILITY FRAMEWORK
6.1 Performance Reporting
We shall report our performance to our clients through various mechanisms listed here
below:
a) Stakeholders meetings or conferences;
b) Annual Ministerial Policy Statements;
c) Periodic Performance Reports; and
d) Releases in the mass media (electronic and print).
6.2 Performance Improvement
In collaboration with our clients, we shall continuously improve on the quality of service
delivery, periodically reports on our performance and commit ourselves to the above
principals and service standards.