19
OIL AND GAS SECTOR IN MYANMAR Warmly Welcome All Delegates from United State of America

Ministry of Energy Myanmar 2-27-13

Embed Size (px)

DESCRIPTION

Ministry of Energy Myanmar

Citation preview

  • OIL AND GAS SECTOR IN MYANMARWarmly Welcome All Delegates from United State of America

  • Myanmar is the second largest nation in South-East Asia

    Total area is 676,577 square kilometers

    Coastal strip is 2832 kilometers

    Population is about 60 million

  • *

  • Onshore Blocks 53 blocksOffshore Blocks 51 blocks

    Total 104 blocks for Onshore and offshore

    Type of ContractMainly Production Sharing Contract (PSC)

  • Onshore BlocksCurrently,17 Blocks are under operating by 12 companies in onshore area.

    1st bidding round was completed in 2011 and2nd bidding round was launched on 17.1.2013.Offshore BlocksCurrently, 20 Blocks are under operating by 9 companies in offshore area.

    Offshore bidding round will be launched in very near future.

    *

  • Existing ProjectsYadana Project ~~~ Exporting to Thailand(some amount is used for domestic supply)

    Yetagun Project ~~~ Exporting to Thailand

    Ongoing ProjectsShwe Project ~~~ Exporting to China (some amount will be used for domestic supply)

    Zawtika Project ~~~ Exporting gas to Thailand (some amount will be used for domestic supply)

    Future ProjectBlock M-3 Project ~~~ New Discovery,(All of M-3 gas will be used for Domestic supply)

    0

    *

  • LOCATION: MOATTAMA OFFSHOREBLOCKS: M-5 / M-6SELLERS: TOTAL31.24 % UNOCAL28.26 % PTTEP25.50 % MOGE15.00 %BUYER: PTT PlcRESERVES: 6.5 TCFEXPORT DCQ: 565 MMCFDDOMESTIC GAS: 200 MMCFDOFFSHORE FACILITIES: WELL HEAD PLATFORM 1 ( 8 WELLS ) WELL HEAD PLATFORM 2 ( 7 WELLS ) WELL HEAD PLATFORM 3 ( 2 WELLS ) PROCESSING PLATFORM LIVING QUARTER PLATFORM FLARE PLATFORM MEDIUM COMPRESSION PLATFORMONSHORE FACILITIES: PIPELINE CENTER METERING STATIONPIPELINES: 216 MILES 36 PIPELINE ( OFFSHORE ) 39 MILES 36 PIPELINE ( ONSHORE )START OF GAS EXPORT: 1998PROJECT COST: 1200 MM$

    *

  • LOCATION:TANINTHARYI OFFSHOREBLOCKS:M-12 / M-13 / M-14SELLERS:PETRONAS40.75 %NIPPON19.40 %PTTEP19.40 %MOGE20.45 %BUYER:PTT PlcRESERVES:4.16 TCFEXPORT DCQ:400 MMCFD( ABOUT 30 BL CONDENSATE / MMCF )OFFSHORE FACILITIES:WELLHEAD PLATFORM ( 10 WELLS ) PROCESSING PLATFORMFSOCOMPRESSION PLATFORMYTG BOOSTER COMPRESSION PLATFORMONSHORE FACILITIES:PIPELINE CENTERMETERING STATIONPIPELINES:126 MILES 24 PIPELINE ( OFFSHORE )42 MILES 24 PIPELINE ( ONSHORE )START OF GAS EXPORT:2000PROJECT COST:ABOUT 700 MM$

  • LOCATION: RAKHINE OFFSHOREBLOCKS: A-1 / A-3SELLERS: DAEWOO51 % ONGE17 % GAIL8.5 % KOGAS8.5 % MOGE15 %BUYER: CHINA OILRESERVES: 4.5 TCFEXPORT DCQ: 400 MMCFDDOMESTIC GAS: 100 MMCFDOFFSHORE FACILITIES: SHWE PROCESSING PLATFORM ( 11 WELLS ) MYA-NORTH SUB-SEA WELL HEAD (4 WELLS)ONSHORE FACILITIES: ONSHORE GAS TERMINALPIPELINES: 110 KM 32 PIPELINE ( OFFSHORE ) 5.7 KM 32 PIPELINE ( ONSHORE )START OF GAS EXPORT: 2013PROJECT COST: ~ 2000 MM$

  • LOCATION: MOATTAMA OFFSHOREBLOCKS: M-9SELLERS: PTTEPI80 % MOGE20 %BUYER: PTT PlcRESERVES: 1.44 TCFEXPORT DCQ: 245 MMCFDDOMESTIC GAS: 100 MMCFDOFFSHORE FACILITIES: ZAWTIKA PROCESSING QUARTER WELL HEAD PLATFORM 1 ( 7 WELLS ) WELL HEAD PLATFORM 2 ( 12 WELLS ) WELL HEAD PLATFORM 3 ( 16 WELLS )ONSHORE FACILITIES: ZAWTIKA PIPELINE OPERATING CENTER ZAWTIKA METERING STATIONPIPELINES: 230 KM 28 PIPELINE ( OFFSHORE ) 72 KM 28 PIPELINE ( ONSHORE )START OF GAS EXPORT: 2013PROJECT COST: ~ 2000 MM$

  • Length: 770 kmDiameter: 32 inchesDCQ: 400,000 blFirst Oil Transport: 2013Project Cost: 2.45 billion US$Length: 792 kmDiameter: 40 inchesDCQ: 500 mmcfFirst Gas Transport: 2013Project Cost: 2.15 billion US$

  • MOGE has been laying the pipes throughout Myanmar to expand its national pipeline network.Various size from 6 to 24 of pipeline were constructed.Total length is about 2100 miles

    *Domestic Pipeline Offshore OnlandYadana(36) 216 miles 39 milesYetagun (24) 126 miles 43 milesZawtika (28) 143 miles 42 milesShwe (32) 65 miles 3 milesChina-Myanmar(40) nil495 miles

    (Gas)China-Myanmar(32) nil481 miles

    (Oil)Export Pipeline

  • Initiated in Myanmar since 1985. 1985 August 2004 :

    - 5 CNG Filling Stations ;- 2 in Yangon City- 2 in Yenangyaung Field- 1 in Chauk Field - 587 NGVs (Converted from petrol buses) CNG / NGV Programme was reactivated

    in August 2004 and Widely used in 2005. As at 2012 :

    - 45 CNG Filling Stations were constructed- 40 in Yangon City- 2 in Mandalay City- 2 in Yenangyaung Oil Field- 1 in Chauk Oil FieldCurrently, more than 27600 passenger cars were converted to NGVsThe project is still continuing with high momentum

  • Refineries -No. 1 Refinery (Thanlyin) (20,000 B/D)No. 2 Refinery (Chauk) (6,000 B/D)Petrochemical Complex (Thanbayakan) (25,000 B/D)

    Urea Plants -No. 1 Fertilizer Factory (Sale) (465 MT/D)No. 2 Fertilizer Factory(KyunChaung) (207 MT/D)No. 3 Fertilizer Factory (Kyawzwa) (600 MT/D)No. 4 Fertilizer Factory(Myaungdaga) (500 MT/D)No. 5 Fertilizer Factory(Kangyidauk) (500 MT/D)

    Others -LPG Extraction Plant (Minbu) (24 mmcfd gas)Skid-Mounted LPG Plant(Nyaungdon) (10-16 mmcfd)Skid-Mounted LPG Plant(Kyunchaung) (8-10 mmcfd)Methanol Plant (Seiktha) (450 MT/D)Bitumen Plant (Thanlyin) (548 MT/D)Urea Plants -

  • HealthInfrastructureEducation*

  • *

    *

    *