Upload
dessa
View
39
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Mineral Exploration in Nevada and the Yukon. Mineral Exploration in Nevada and the Yukon. The Dime Property. The Dime Property. 2500M Drill Program completed. The Dime Property. 2500M Drill Program completed. Radiometric flyover completed. The Dime Property. - PowerPoint PPT Presentation
Citation preview
Mineral Explorationin Nevada and the Yukon
Mineral Explorationin Nevada and the Yukon
The Dime Property
The Dime Property
• 2500M Drill Program completed
The Dime Property
• 2500M Drill Program completed
• Radiometric flyover completed
The Dime Property
• 2500M Drill Program completed
• Radiometric flyover completed
• 854 additional deep auger Soil Samples completed
The Dime Property
• 2500M Drill Program completed
• Radiometric flyover completed
• 854 additional deep auger Soil Samples completed
• 1500M trenching on western anomaly completed
The Kodiak Property
The Kodiak Property
• Airborne Magnetometer and Radiometric flyover completed
The Kodiak Property
• Airborne Magnetometer and Radiometric flyover completed
• Additional soil sampling completed
The Kodiak Property
• Airborne Magnetometer and Radiometric flyover completed
• Additional soil sampling completed
• Reproductive rock sampling completed
The Bisoni McKay Property
The Bisoni McKay Property
• The Bisoni McKay asset is fully vested without encumbrance
The Bisoni McKay Property
• The Bisoni McKay asset is fully vested without encumbrance
• Bulk sampling program to be completed for metallurgy and analytics to complete scoping study
The Bisoni McKay Property
• The Bisoni McKay asset is fully vested without encumbrance
• Bulk sampling program to be completed for metallurgy and analytics to complete scoping study• Lynteck recommends qualified laboratories for additional Metallurgy and bulk sample tests
The Bisoni McKay Property
• The Bisoni McKay asset is fully vested without encumbrance
• Bulk sampling program to be completed for metallurgy and analytics to complete scoping study• Lynteck recommends qualified laboratories for additional Metallurgy and bulk sample tests
• Strategic market approach
Searchlight Nevada
Searchlight Nevada• Searchlight is located 60
miles South of Las Vegas Nevada
Searchlight Nevada• Searchlight is located 60
miles South of Las Vegas Nevada
• Mining began in Searchlight in 1898, by 1904 there were 7 operating mills in and around Searchlight NV
Searchlight Nevada• Searchlight is located 60
miles South of Las Vegas Nevada
• Mining began in Searchlight in 1898, by 1904 there were 7 operating mills in and around Searchlight NV• The Searchlight Quartet mine was the largest producing mine in Southern Nevada, and the largest gold producer in the U.S on multiple occasions
Smith Lease Claims/Piute Claims
Smith Lease Claims/Piute Claims• The Smith lease is to the direct South of the historic Quartet mine
Smith Lease Claims/Piute Claims• The Smith lease is to the direct South of the historic Quartet mine
• The Piute claims surround the Smith Lease Claim.
Smith Lease Claims/Piute Claims• The Smith lease is to the direct South of the historic Quartet mine
• The Piute claims surround the Smith Lease Claim.
• There is a multi vein system identified in this area that could extend to the Quartet Mine.
Smith Lease Claims/Piute Claims• The Smith lease is to the direct South of the historic Quartet mine
• The Piute claims surround the Smith Lease Claim.
• There is a multi vein system identified in this area that could extend to the Quartet Mine.
• Stina is planning an exploration program on the Smith Lease Claim initially, that could include up to 5 drill holes (1,500 feet)
Searchlight Option Agreement
Searchlight Option Agreement• Stina will earn a 70%
interest under Royal Mines in the Smith Lease Claim .
Searchlight Option Agreement• Stina will earn a 70%
interest under Royal Mines in the Smith Lease Claim. • Stina would also earn a 40% interest under Royal Mines in the 20 Piute Claims.
Searchlight Option Agreement• Stina will earn a 70%
interest under Royal Mines in the Smith Lease Claim. • Stina would also earn a 40% interest under Royal Mines in the 20 Piute Claims.
• Under the option agreement with Royal mines, expenditures of $100,000 within one year of agreement execution, and an additional $900,000 within 3 years.
Searchlight Option Agreement• Stina will earn a 70%
interest under Royal Mines in the Smith Lease Claim. • Stina would also earn a 40% interest under Royal Mines in the 20 Piute Claims.
• Under the option agreement with Royal mines, expenditures of $100,000 within one year of agreement execution, and an additional $900,000 within 3 years.
• Stina has executed a Memorandum of Understanding with Royal Mines in anticipation of a final agreement shortly.
Stina’s 2012 Property Status chart
Property Status
Stina’s 2012 Property Status chart
Property Status
• Dime Property
Stina’s 2012 Property Status chart
Property Status
• Dime Property -Planning 2012 exploration program
Stina’s 2012 Property Status chart
Property Status
• Dime Property
• Kodiak Property
-Planning 2012 exploration program
Stina’s 2012 Property Status chart
Property Status
• Dime Property
• Kodiak Property
-Planning 2012 exploration program
-Planning 2012 exploration program
Stina’s 2012 Property Status chart
Property Status
• Dime Property
• Kodiak Property
• Bisoni McKay Property
-Planning 2012 exploration program
-Planning 2012 exploration program
Stina’s 2012 Property Status chart
Property Status
• Dime Property
• Kodiak Property
• Bisoni McKay Property
-Planning 2012 exploration program
-Planning 2012 exploration program
-2012 bulk sample program and metallurgy work
Stina’s 2012 Property Status chart
Property Status
• Dime Property
• Kodiak Property
• Bisoni McKay Property
• Searchlight Property
-Planning 2012 exploration program
-Planning 2012 exploration program
-2012 bulk sample program and metallurgy work
Stina’s 2012 Property Status chart
Property Status
• Dime Property
• Kodiak Property
• Bisoni McKay Property
• Searchlight Property
-Planning 2012 exploration program
-Planning 2012 exploration program
-2012 bulk sample program and metallurgy work
-Finalizing agreements & planning 2012 exploration program
Safe HarborThis presentation contains forward-looking statements that are based on Stina Resources current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words or statements that certain events or conditions "may" or "will" occur, and include, without limitation, statements regarding potential mineralization and resources and future plans and objectives of Stina Resources. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Factors that could cause such differences include changes in world gold markets and equity markets, political developments in areas where Stina has exploration or future mining activities, changes to regulations affecting Stina Resources activities, uncertainties relating to the availability and costs of financing needed in the future, the uncertainties involved in interpreting drilling results and other ecological data and the other risks involved in the mineral exploration and development industry. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, Stina Resources disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.