5/12/2020 1 Cuba City Presidential Plaza Presented by: Mineral Engineering (Christopher Moore, Dustin Reynolds, Kyle Samann, and Ryan Schuppie) CE 4930: Civil and Environmental Engineering Senior Design May 12, 2020 1 Outline Objectives Project Constraints Existing Conditions Research Decision Matrix Proposed Site Plans & Renderings Cost Estimate Recommendation 2 1 2

Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

1

Cuba City Presidential Plaza

Presented by: Mineral Engineering (Christopher Moore, Dustin Reynolds, Kyle Samann, and Ryan Schuppie)

CE 4930: Civil and Environmental Engineering Senior DesignMay 12, 2020

1

Outline• Objectives

• Project Constraints

• Existing Conditions

• Research

• Decision Matrix

• Proposed Site Plans & Renderings

• Cost Estimate

• Recommendation

2

1

2

Page 2: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

2

Objectives• Develop various seasonal multi-age

engagement events and activities.

• Create a design based on decision matrix and public feedback

• Design the Presidential Plaza in phases to increase community support and accommodate further plaza development

• Develop a cost estimate for each phase.

3

Project Constraints

• No parking

• Buildings

• Restrooms

• No budget

Source: Google 2020

4

3

4

Page 3: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

3

Project Constraints

• No parking

• Buildings

• Restrooms

• No budget

Source: Google 2020

5

Existing Conditions• Land Use

• Current site pavement conditions

• Neighboring site concerns

• Utilities

• ADA complianceSource: City of Cuba City 1999

6

5

6

Page 4: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

4

• Land Use

• Current site pavement conditions

• Neighboring site concerns

• Utilities

• ADA compliance

Existing Conditions

7

• Land Use

• Current site pavement conditions

• Neighboring site concerns

• Utilities

• ADA compliance

Existing Conditions

8

7

8

Page 5: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

5

9

• Land Use

• Current site pavement conditions

• Neighboring site concerns

• Utilities

• ADA compliance

Existing Conditions

10

9

10

Page 6: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

6

Research• Destination Development

Association

• Cuba City High School Survey

• Resident Interviews

• Comprehensive Plan Survey

11

Source: Google 2020

12

11

12

Page 7: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

7

Decision Matrix• Criteria

Enjoyment by age group Other uses

• Events and Activities: Definitions Season Phase

• Enjoyment by Age (Scored: 0-5) Children (0-11) Teenagers (12-19) Young Adults (20-25) Adults (26-60) Senior Citizens (61+)

• Other Uses (Scored: 0-3) Ease of Participation Flexibility/Mobility Water Needs Electricity Needs Sanitary Needs Space Occupied Cost Community Involvement

13

Top Events

Proposed Event

Season Phase Matrix Score

Comedian Non-Specific Three-Year 40

Movie Non-Specific Three-Year 39

Pumpkin Carving

Fall One-Year 38

Barbeque Non-Specific Five-Year 38

National Night Out

Non-Specific One-Year 37

14

13

14

Page 8: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

8

Top Activities

Proposed Activity

Season Phase Matrix Score

Ice Cream Stand Summer Three-Year 43

Canvas Painting Non-Specific One-Year 43

Music/Speakers Non-Specific One-Year 41

Lawn Games Non-Specific One-Year 41

Cards Non-Specific One-Year 41

15

1 Year Site Plan

16

15

16

Page 9: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

9

17

3 Year Site Plan

18

17

18

Page 10: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

10

19

20

19

20

Page 11: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

11

5 Year Demo Plan

21

22

21

22

Page 12: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

12

5 Year Site Plan

23

24

23

24

Page 13: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

13

25

10 Year Demo Plan

26

25

26

Page 14: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

14

27

10 Year Site Plan

28

27

28

Page 15: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

15

29

30

29

30

Page 16: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

16

Renderings

31

View from Main St 32

31

32

Page 17: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

17

View from Webster Street 33

Rendering Video

34

33

34

Page 18: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

18

Cost Estimate• Contingency

15% Covers tax, and

unforeseen additional costs

• Inflation 3% per year

• Does not include cost of: Museum Bike Trail

Phase Cost

One-Year $36,000

Three-Year $63,000

Five-Year $121,000

Ten-Year $178,000

Engineering & Surveying

$15,000

Total Cost $413,000 35

Recommendation • Use the three-dimensional rendering and four phase

site plans to increase public support for the Presidential Plaza.

• Complete following surveys: Property Topographic and planimetric Utility

• Further investigate the storm sewer locations near the Presidential Plaza.

• Produce final engineered site plans for each phase.

36

35

36

Page 19: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

19

Summary• Identified constraints and existing conditions.

• Research resources, surveys, comprehensive plan, and interviews for background research.

• Decision Matrix used to determine events and activities.

• Site plans and renderings of the plaza were designed based off the events and activities identified in decision matrix.

• Total Project Cost of $413,000

• Design met the project objectives.

37

Acknowledgements• We would like to thank the following people for their help on this project Mr. Bob Jones, Economic Development Director of

Cuba City Mr. Jerry Mahun Dr. Kristina Fields Mr. George Morrissey Ms. Marisa Mutty Mayor Tom Gile Ms. Jenna Droessler and Ms. Teagan Graber

38

37

38

Page 20: Mineral Engineering Final PresentationMicrosoft PowerPoint - Mineral Engineering Final Presentation Author: Chris Moore Created Date: 5/12/2020 12:11:11 PM

5/12/2020

20

References• Brooks, R. (2018). Resurgence of Downtowns [Webinar]. Destination

Development Association, <https://www.destinationdevelopment.org/cpages/the-resurgence-of-downtown-series>. (Accessed 13 February 2020).

• City of Cuba City. (1999). City of Cuba City Zoning Map [Paper copy].

39

Questions?

40

Thank You from Mineral Engineering!