RIMAU GROUP – PT SENAMAS ENERGINDO MINERAL
NAMA FILE Mine Condition Maret 2015 (Week 12)
TANGGAL 21 Maret 2015
DIBUAT OLEH MINE PLAN ENGINEER
LOKASI FILE Documents\Rimau Data\SEM\Mar 2015
PT. SENAMAS ENERGINDO MINERAL
Resume Volume Remain OB, Coal & Fleet Alocation
RESUME OB & COAL Week 3 March '15
LokasiRemain OB Remain Coal
SRCoal by Area Batubara Alokasi Fleet
by desain (BCM)
by Desain (TON)
Expose (TON)
Terendam (TON) OB COAL
P1 B23 519,401.76 255,463.57 2.03 73,546 36,503 4 3
P2 B14 1,264,342.76 349,075.92 3.62 - - 4 -P3 B7 94,635.23 32,522.40 2.91 - - - -
P3 B9 769,690.37 146,299.35 5.26 12,768 - 2 (hillcon) -
P3 B10 1,449,158.95 217,952.71 6.65 - 78,196 1 (hillcon) -
REMAIN WATER PIT SEM
U
PIT 1 BLOCK 23
PIT 1 BLOCK 21
PIT 2 BLOCK 9-10
PIT 2 BLOCK 13
PIT 3 BLOCK 10
PIT 3 BLOCK 6
PIT 3 BLOCK 9
VOL. REMAIN
Act. Debit HM/WH RL (-/+) (m) m3
PIT 1 B21 HINO 260 FM 12-Mar-15 61.25 L/s - 21.844 -0.881 104,790 OUT -11801.94
PIT 1 B23 SYKES 160 (09) 12-Mar-15 140 L/s - 2.224 -0.306 108,501 OUT (86,882)
PIT 2 B9 - 12-Mar-15 26.816 0.379 862,826 IN 35,469
PIT 2 B 13 - 12-Mar-15 25.484 0.924 619,281 IN 81,454
PIT 3 B 6 MITSUBISHI 12-Mar-15
PIT 3 B9 MULTIFLO 12-Mar-15
PIT 3 B10 - 12-Mar-15
VOL. IN / OUT
(cal. by.Survey) m3
No operation
No operation
LOKASI PUMP DATEELEVATION
PIT 1 BLOCK 21
B
B
A
PIT 1 HINO (01) ELEVATION VOL. REMAIN VOL. IN / OUT
BLOK 21 Act. Debit HM/WH RL (-/+) (m) Air & lumpur (m3) (cal. by.Survey) m3
7-Feb-15 61.25 L/s running 23.155 -0.456 121,344.00 -6528
21-Feb-15 61.25 L/s running 21.653 -1.502 102,391.00 -18953
5-Mar-15 No operation 22.725 1.072 116,591.78 14,200.78 12-Mar-15 61.25 L/s running 21.844 -0.881 104,789.84 (11,801.94)
A
INPIT DUMP BLOCK 22
Disposal low wall B22 longsor
OB B23 di dumping di kaki longsoran, danakan di connect dg jalan di low wall B22
Jalan low wall B22 yang tidak longsor
Fleet Alocation P1 B23
U
22
36
OB REMOVAL
KOMATSU PC 800 23 & 23
VOLVO EC 700 30 & 36
23
32
42
27
41
30
PIT 1 sykes 160 (10) ELEVATION VOL. REMAIN VOL. IN / OUT
BLOK 23 Act. Debit HM/WH RL (-/+) (m) m3 (cal. by.Survey) m3
7-Feb-15 140 L/s - 3.139 1.239 228,333.00 167,822.00
21-Feb-15 140 L/s 1.732 -1.407 125,986.86 -102346.14
9-Mar-15 No Operation 2.53 0.798 195,382.95 69396.09
12-Mar-15 140 L/s running 2.224 -0.306 108,500.60 -86882.35
38
SEAM INTAVTHK WASTE COAL
S08 0.57 68,733.22 7,269.26
S08L 0.21 147.29 43.56
S09XU 0.42 1,821.99 193.66
S09X 1.26 372,462.76 31,666.20
S09XL 0.26 60.76 98.39
S09M1 1.05 18,434.65 9,744.42
S09M 4.65 50,030.39 173,654.52
S09M2 3.55 7,416.93 32,764.20
S09L1 0.02 293.64 28.80
S09L 0.01 0.12 0.56
519,401.76 255,463.57
SR 2.03
SEAM THICK WASTE COAL
S09XU 0.36 452.24 89.87
S09X 0.70 4,472.27 3,061.81
S09XL 0.23 33.88 41.58
S09M1 - 52.79 -
S09M 4.91 20,103.13 70,353.02
TOTAL 25,114.31 73,546.28
COALTERENDAM TONASE
S09M 36,503.58
PIT 1 BLOCK 23
41
32
Tanggul penahan lumpurdi low wall B23
Lumpur Low wall B23
Remain coal di bawah B21 hingga ke jalan23ribu TON (berdasarkan data survey)
Exc 32 480, lansir coal
Exc 41 480, lansir coal
DISPOSAL EX-TOP SOIL PIT 1
Area dumping Soil
A
A
ABank Soil yang sudahdirelokasi dan jadi disposal
Kantor tambang
B
B
Pit 2 Block 9 - 10
Dumpingan hampir menyentuh TOPO ori
C
A
B
C
A
PIT 2 - ELEVATION VOL. REMAIN VOL. IN / OUT
BLOCK 8-9 Act. Debit HM/WH RL (-/+) (m) m3 (cal. by.Survey) m3
7-Feb-15 No operation 24.200 1.006 632,015.00 100,015.00
21-Feb-15 No operation 25.303 1.103 727,856.00 95,841.00
5-Mar-15 No operation 26.437 1.134 827,357.06 99,501.06 12-Mar-15 No operation 26.816 0.379 862,826.07 35,469.01
BOB dari B14 di dumping ke B9 digunakan sbg butress
Pit 2 Block 14
26
43
45
29
Bentuk buttress menggunakan material B14 untuk memaksimalkan disposal B9
Exc 45 VOL 700 soil salvage, stocking to B13
Exc 26 PC 800 OB Removal
Expose Seam 8 (1.2 m – 1.3 m)
Expose Seam 7 (1.3 m – 2.6 m)
SEAM INTAVTHK WASTE COAL
S07M 1.22 32,578.90 6,393.19
S07 1.50 50,897.32 12,575.46
S07L1 0.41 1,132.63 2,526.29
S07L2 0.12 512.26 735.15
S08 1.17 140,357.01 36,792.71
S09XU 0.40 17,938.51 1,406.90
S09X 0.66 823,658.71 27,897.75
S09XL 0.11 87.87 371.08
S09M 5.49 76,702.83 253,315.57
S09L1 0.25 62,829.15 3,551.18
S09L - 1,454.15 -
S09L2 0.28 56,193.41 3,510.62
1,264,342.76 349,075.92
SR 3.62
Blok 14 dilihat dari B9
PIT 3 BLOCK 3, 6 & 7
High wall Block 3 connect dengan Inpit Dump
Remain coal P3 B6 18ribu TON
Sekatan
PIT 3 BLOCK 7
SEAM WASTE COAL SR ASH CV TM TS VM
S09X 1,683.38 38.45 43.78 14.64 3,746.22 39.76 0.27 30.64
S09 233.20 12.84 18.16 5.02 3,577.04 42.77 0.15 34.23
S09M 92,062.13 31,598.24 2.91 5.36 3,729.74 42.92 0.18 33.53
S09L 507.27 872.87 0.58 7.03 3,675.33 41.20 0.17 33.71
S10 149.26 - - - - - - -
TOTAL 94,635.23 32,522.40 2.91
Block 9
Inpit dump P3 B7
Inpit Dump PIT 3 BLOCK 8
Rencana Stok ROM, batubara dari Blok 9
Stok soil dariperluasan Block 9
Disposal material pasiran
PIT 3 BLOCK 9
EXCA OB
VOLVO C 700 003
VOLVO EC 460 011
003
011
SP - 06
SEAM INTAVTHK WASTE COAL
S09M1 - 352.81 -
S09M 3.89 610,062.92 80,983.69
S09 6.68 123,281.02 43,931.22
S09M2 0.36 9.50 50.18
S09L1 0.96 1,085.21 4,074.32
S09L 1.65 21,156.65 12,918.52
S09L2 0.98 13,742.25 4,341.42
769,690.37 146,299.35
SR 5.26
INTERVAL INTAVTHK WASTE COAL
S09M1 3.15 37,777.12 12,768.47
S09M 2.64 4,946.68 13,102.13
S09M2 0.69 937.47 2,667.75
S09L1 1.28 6,474.93 11,042.55
S09L 1.76 1,133.92 2,375.12
S09L2 1.73 4,667.20 14,182.41
55,937.31 56,138.44
SR 1.00
Pit 3 Block 10
EXCA OB
VOLVO EC 460 002
VOLVO EC 700 -
P3B10V6
Boundary remain OB & coal
002
Top : Situasi W3 MAR’15Bottom: P3B10V6Schema: Semodel30
021
INTERVAL INTAVTHK WASTE COAL
S09M1 1.40 331,495.76 16,143.84
S09M 3.80 1,103,283.98 159,391.30
S09M2 2.52 5,443.70 28,366.35
S09L1 0.55 8,935.51 14,051.22
1,449,158.95 217,952.71
SR 6.65